HomeMy WebLinkAbout1402.97.41
POURED GONG, WALL
82XI6' C.M.J.
FOOTER FOR BLOCK WALL
8' CONC. LINTEL
D O n v I
FOOTER FOR FOR S' CONCRETE WALL
� • \
1
4
V4
H
r�
25'-4'
24'8'
11
----------
—
- - - - -i
!
I
Lu
I
I
I
I
I
I
I
,►
I
1
I
I
i
I
►►
I
Q
Z
3' dIL STEEL !
I
1
—
JACK POST ON 1
!
I
O
36'x36 1 X18" I
(�
!
!
CONCRETE PAD !
' ►
�
I
►►
I
STEEL BEAM AS REQUIRED_
_L
_
_______ _ _ _ _ __
_
_ =— r= = = = =_►
I
I
!
BASEMENT LAYOUT
I !
I— — — — J I
I
►'
!
I
I
! 8'X9' POURED CONC. WALLS
i
4' CONC. SLAB ON
i
!
4' MIN, PEA FILL
!
!
I
r
I
'►
I
,!
n'-6 y2'
I
I►
5' -9'�i"
►
I
I
STEEL BEAM AS REQUIRED—
I
I
I
I
I I
J i
►►
I
I
I
I
I I
I
I
I
LOWER LEVEL UTILITY HER
I jn
IW CHASE THRouGH CLOSET
i
' !
ABOVE AS SHOWN
i 6' BEARING WALL W1
—
! THICKENED SLAB BY
1 CONCRETE CONTRACTOR.
My f !
!
I
!�
►
!
-
- - ! r�
- - — — — —
�—-
- - - -5
-
- --
—
--- - - - - -I
I
oo
lo !
I
SUMP PIT I
I
I
I
oo
I
(
=r
I
I
!
1 I
eo,
I
i
�
'OPTIONAL" i
I
00
I I
I-
I !
0,0
!
-,
- 7,
EJECTION !
i ►
- - - - - - - - -
-
1
I
I
Z.Z
- - - - - - - - - -
-
- - - - - - - - - - -
'
!
I
I
i
I
1 3' -5 ' '/2'
- - - - - - -
19' -10 ' /i"
1 I
I I
i I
I
I
I
I
I I
! !
I z I
000 ! GARAGE SLAB
I IL !
42 GONG. SLAB ON
000 41 MIN. PEA FILL
!
Q
I w i
`^
I I
n
!
I 0 I
!
SLOPE SLAB TO DOORS
1 U 1
i IL
000 I
I O I
000 !
eoI
!
I
i
I
!
I p I
I i
I I
I 1
I I
I I
1 I
i I
f
!
!
!
i
I
I
I
eo
!
i
I
I
I
(0' -0' 51-8" -0■
i 7 7 7 7 7 7 7 7 7 7 7-7-7-7- 7 z z z
r- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -1
I
�-- LINTEL AT OVER DIG
I
AS REQUIRED, ALL
POCKETS BY WALL CRAWL SPACE
CONTRACTOR
41 MIN. PEA FILL OVER
6 MIL POLY VAPOR BARRIER
VENTILATION AS REQUIRED I
I
I
I
T -10" 8' -0" 81 -0 " 8' -0
I I
r--� r— r—
I
81XI6' CM U. PIER !
ON 24"X24'XI1'
CONCRETE PAD
f
� I
I
8' -0"
I
I
8' PRE -CAST !
CONC. LINTEL !
I
a; I
`— LINTEL AT OVER DIG !
AS REQUIRED, ALL I
POCKETS BY WALL 6'4"
CONTRACTOR !
r —I —� r —� -' ---- - - - - -!
rtl
Q
t
--
PORCH SLAB
4' CONC, SLAB ON
4' MIN. PEA FILL
8' -0"
oo
ol
I I I !
loo
i I I I
I ! I
1 cQ I I
f I ! !
ool
I 00 ! I I
lo
I f
I I
! I I
- - - - - - - - - - - - - - - - - - - ! ! I
! - - - - - - - - - - - - - - - - - -� I
I
- - - - - - - - - - - - - - - - - - - - -
12'-4"
F • .►e' •► LLYOW • • \ \ V \
13'-4"
&'$'
�4
CIA
4
4
— I N07ES:
�n D ALL SOIL 16 BASED ON 2800 PAJ, AND CONCRETE E BASED ON
2800 Pb., i 28 DAYS, FOOTERB ARE *0 WE AND 8'k DEEP
UNLESS NOTED OTFERWI6E ON PLANS.
2) BASEMENT WALL HEIGHT AS NOTED ON PLANS, W/ SHORT WALLS
fi CRAWL SPACE OR SLAB BELOW FROST L06 AS REQUIRED,
3) THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND JUDGE
FOR THEMSELVES, THE BWTABILITY OF THE PLANS IN RELATIONSHIP
TO THE BUILDING SITE, AND EXISTING GRADES.
4) THESE DRAWING" SERVE SA A GWE TO THE CONSTRUCTION OF
THE BUILDING, DUE TO VARIATIONS M DIFFERENT AREAS, THEY CAN
ONLY BE A GWDE, AND M NO WAY DICTATE ANY OF THE LOCAL
AND / OR STATE BUILDING CODES. R I6 THE CONTRACTORS FLLL
RESPONSIBILITY TO REVIEW ALL PLANS FOR ACCARACY AND
CLARITY, AND TO IN6WE ALL SUBS ARE CLEAR AS TO THE SCOPE
OF THEIR WORK. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY
5) ALL STRWTIRAL MEMBERS AARRE BASED ON 4N A6AS6UMED NEED,
AND MAY CHANGE AT ANY T'ME, IT B THE CONTRACTORS
RESPONSIBILITY TO VERIFY ACTUAL. NEED AND 6=6 IF NOT SHOWN.
6) ALL WINDOW 61ZE6 LISTED ARE AS MANUFACTURED BY SEMCO
WOOD PRODUCTS,UNLE66 NOTED OTW WW, AND MAY VARY
"' BASED ON SUPPLIER, ALL FINS AND ROUGH OPENINGS
MUST BE VERIFIED BY OtlNEW CONTRACTOR.
b ALL WALLS W/ BRICK ARE 1-W, ALL OTI4M TO BE 3-W UNLESS
NOTED OTHERWISE ON PLANS.
8) ALL CEILINGS ARE V MAIN LEVEL AND 8' UPPER LEVEL OR AS
NOTED ON PLAN FOR GIVEN AREA,
9) ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION
OF THE CONTRACTOR WRIIEDIATELY BEFORE CONSTRUCTION
IS TO RESUME, TO INSURE PROPER STEPS ARE TAKEN.
4
J
W
Z
Q
W
ni-L,
L------ i
0
0
PeFa
W
O
.e
l.l_.l
—
m
Lu
vl
T
Q
Z
r
:z
cfJ
O
V
(�
vJ
O
DATE= 10 -13 -91
-DRAWN BY: J,HOLLEY
SCALE= AS SHOW
REVISIONS=
SHEET