Loading...
HomeMy WebLinkAbout1402.97.41 POURED GONG, WALL 82XI6' C.M.J. FOOTER FOR BLOCK WALL 8' CONC. LINTEL D O n v I FOOTER FOR FOR S' CONCRETE WALL � • \ 1 4 V4 H r� 25'-4' 24'8' 11 ---------- — - - - - -i ! I Lu I I I I I I I ,► I 1 I I i I ►► I Q Z 3' dIL STEEL ! I 1 — JACK POST ON 1 ! I O 36'x36 1 X18" I (� ! ! CONCRETE PAD ! ' ► � I ►► I STEEL BEAM AS REQUIRED_ _L _ _______ _ _ _ _ __ _ _ =— r= = = = =_► I I ! BASEMENT LAYOUT I ! I— — — — J I I ►' ! I I ! 8'X9' POURED CONC. WALLS i 4' CONC. SLAB ON i ! 4' MIN, PEA FILL ! ! I r I '► I ,! n'-6 y2' I I► 5' -9'�i" ► I I STEEL BEAM AS REQUIRED— I I I I I I J i ►► I I I I I I I I I LOWER LEVEL UTILITY HER I jn IW CHASE THRouGH CLOSET i ' ! ABOVE AS SHOWN i 6' BEARING WALL W1 — ! THICKENED SLAB BY 1 CONCRETE CONTRACTOR. My f ! ! I !� ► ! - - - ! r� - - — — — — �—- - - - -5 - - -- — --- - - - - -I I oo lo ! I SUMP PIT I I I I oo I ( =r I I ! 1 I eo, I i � 'OPTIONAL" i I 00 I I I- I ! 0,0 ! -, - 7, EJECTION ! i ► - - - - - - - - - - 1 I I Z.Z - - - - - - - - - - - - - - - - - - - - - - ' ! I I i I 1 3' -5 ' '/2' - - - - - - - 19' -10 ' /i" 1 I I I i I I I I I I I ! ! I z I 000 ! GARAGE SLAB I IL ! 42 GONG. SLAB ON 000 41 MIN. PEA FILL ! Q I w i `^ I I n ! I 0 I ! SLOPE SLAB TO DOORS 1 U 1 i IL 000 I I O I 000 ! eoI ! I i I ! I p I I i I I I 1 I I I I 1 I i I f ! ! ! i I I I eo ! i I I I (0' -0' 51-8" -0■ i 7 7 7 7 7 7 7 7 7 7 7-7-7-7- 7 z z z r- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -1 I �-- LINTEL AT OVER DIG I AS REQUIRED, ALL POCKETS BY WALL CRAWL SPACE CONTRACTOR 41 MIN. PEA FILL OVER 6 MIL POLY VAPOR BARRIER VENTILATION AS REQUIRED I I I I T -10" 8' -0" 81 -0 " 8' -0 I I r--� r— r— I 81XI6' CM U. PIER ! ON 24"X24'XI1' CONCRETE PAD f � I I 8' -0" I I 8' PRE -CAST ! CONC. LINTEL ! I a; I `— LINTEL AT OVER DIG ! AS REQUIRED, ALL I POCKETS BY WALL 6'4" CONTRACTOR ! r —I —� r —� -' ---- - - - - -! rtl Q t -- PORCH SLAB 4' CONC, SLAB ON 4' MIN. PEA FILL 8' -0" oo ol I I I ! loo i I I I I ! I 1 cQ I I f I ! ! ool I 00 ! I I lo I f I I ! I I - - - - - - - - - - - - - - - - - - - ! ! I ! - - - - - - - - - - - - - - - - - -� I I - - - - - - - - - - - - - - - - - - - - - 12'-4" F • .►e' •► LLYOW • • \ \ V \ 13'-4" &'$' �4 CIA 4 4 — I N07ES: �n D ALL SOIL 16 BASED ON 2800 PAJ, AND CONCRETE E BASED ON 2800 Pb., i 28 DAYS, FOOTERB ARE *0 WE AND 8'k DEEP UNLESS NOTED OTFERWI6E ON PLANS. 2) BASEMENT WALL HEIGHT AS NOTED ON PLANS, W/ SHORT WALLS fi CRAWL SPACE OR SLAB BELOW FROST L06 AS REQUIRED, 3) THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND JUDGE FOR THEMSELVES, THE BWTABILITY OF THE PLANS IN RELATIONSHIP TO THE BUILDING SITE, AND EXISTING GRADES. 4) THESE DRAWING" SERVE SA A GWE TO THE CONSTRUCTION OF THE BUILDING, DUE TO VARIATIONS M DIFFERENT AREAS, THEY CAN ONLY BE A GWDE, AND M NO WAY DICTATE ANY OF THE LOCAL AND / OR STATE BUILDING CODES. R I6 THE CONTRACTORS FLLL RESPONSIBILITY TO REVIEW ALL PLANS FOR ACCARACY AND CLARITY, AND TO IN6WE ALL SUBS ARE CLEAR AS TO THE SCOPE OF THEIR WORK. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY 5) ALL STRWTIRAL MEMBERS AARRE BASED ON 4N A6AS6UMED NEED, AND MAY CHANGE AT ANY T'ME, IT B THE CONTRACTORS RESPONSIBILITY TO VERIFY ACTUAL. NEED AND 6=6 IF NOT SHOWN. 6) ALL WINDOW 61ZE6 LISTED ARE AS MANUFACTURED BY SEMCO WOOD PRODUCTS,UNLE66 NOTED OTW WW, AND MAY VARY "' BASED ON SUPPLIER, ALL FINS AND ROUGH OPENINGS MUST BE VERIFIED BY OtlNEW CONTRACTOR. b ALL WALLS W/ BRICK ARE 1-W, ALL OTI4M TO BE 3-W UNLESS NOTED OTHERWISE ON PLANS. 8) ALL CEILINGS ARE V MAIN LEVEL AND 8' UPPER LEVEL OR AS NOTED ON PLAN FOR GIVEN AREA, 9) ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR WRIIEDIATELY BEFORE CONSTRUCTION IS TO RESUME, TO INSURE PROPER STEPS ARE TAKEN. 4 J W Z Q W ni-L, L------ i 0 0 PeFa W O .e l.l_.l — m Lu vl T Q Z r :z cfJ O V (� vJ O DATE= 10 -13 -91 -DRAWN BY: J,HOLLEY SCALE= AS SHOW REVISIONS= SHEET