HomeMy WebLinkAbout12070084.10
S
1,3 o 7oc/4
Danie
p1!1!'
Aurel'in Dance
111 Medical
' �
5i;
M�P?—
■''�_ C-1
�zID. o
-�z
CA,
ig
�
C �
Q .n
_ 46032"
Carmel, IN z
2012 - 007.000
General Notes
Nothing set forth in these Drawings shall release any Contractor
from responsibility to provide appropriate quantities, field
measurements, dimensional stability, installation, anchorage and
coordination with other trades, or waive the Contractor's
responsibility to identify and resolve deviations from the
requirements of the Contract Documents; or waive the
Contractor's responsibility to alert the Architect to errors or
omissions contained therein.
Each Contractor shall verify in the field all existing applicable
conditions and dimensions shown (if, tine UlaWillytS di1U as
pertinent to the intent of these Drawings. Any discrepancy
discovered shall be brought to the attention of the Architect prior
to the commencement of any Work affected by, or related to,
such discrepancy.
Each Contractor shall be responsible for all costs associated
with, or caused by failure to comply with requirement.
Each Contractor shall review in advance all portions of the Work
to verify that the Work will not prohibit completion of the Project
as intended in these Contract Documents. Any questions shall
be promptly referred to the Architect for resolution.
Each Contractor shall refer to the Project Manual for cleaning
and disposal requirements.
Each Contractor shall be responsible for the protection of all
surfaces and finishes at interior and exterior of building.
Damaged surfaces and finishes resulting from the performance
of the Work shall be repaired at no cost to the Owner by the
responsible Contractor to match existing to the satisfaction of
the Owner.
Each Contractor shall coordinate respective cutting and patching
Work with the other Prime Contracts.
Each Contractor shall become completely familiar with all
aspects of the Work, even those areas designated to be
provided by others. This familiarization includes full and
complete understanding of the Work described on all Sheets of
the Drawings and in all Sections of the Project Manual. Failure
by the Contractor to become completely familiar and cognizant
of all aspects of the Work shall not relieve the Contractor of the
responsibility to provide materials, assemblies, or services
indicated in the Contract Documents.
Vicinity Map
il
Thoroughfare Map
Corsaro
tud io
S
ASSOCIATE �
Architecture
Engineeri
ng
TeC*h-n(-,)1.(,),-jrNy
Interior Design
L�cndscupe Architecture
.. L
.. , NO t2
s ..
v i 8644101 r�
4�i STATE OF
"aipy%11111iI,I
= ° No.
21458
' -
STATE CF 4t
NAL
�r�f�1111V11, ®1
Drawing Index
1 - General
G -000
G -100
COVER SHEET
SITE PLAN
4 - Architectural
A -001 FIRE AND LIFE SAFETY & WALL TYPES
A -100 DEMOLITION PLAN
A -101 FLOOR PLAN
A -102 STRUCTURAL PLANS & DETAILS
A -103 ELEVATIONS
A -104 DOOR AND FINISH SCHEDULES
7 - Mechanical
M-1 01 MECH NICA L FLOOR P! ANS) AND DETAII
9 - Electrical
E -101 ELECTRICAL PLAN
N o
� o
O °
CN P*Ikft
0
� o
�
CN
LO O
r:
O
o
L
C/)
O �1
U �
� U
c
c� CO
(D
ca �
11ral
03 -40
�10�,�� ,ins
Set Number
'
e M
=�
_ 5, L _�.
ilk-
-
-
7
5
s �.rt.� d
N o
� o
O °
CN P*Ikft
0
� o
�
CN
LO O
r:
O
o
L
C/)
O �1
U �
� U
c
c� CO
(D
ca �
11ral
03 -40
�10�,�� ,ins
Set Number