Loading...
HomeMy WebLinkAbout12070084.41114 IF= U =I on ►I r IN i 6 5 4 3 2 12'- 1 1/4" I I = II 0 II T II I II I I I IR 11 II �♦ �. 79 rq 87 r— L J 11_ J I I L7 - �I II II 8' - 4„ I a0 Lr) I / I II I I REMOVE EXISTING CLG. UP TO LOCATION OF NEW BALLROOM WALL I II I II i I II II � II II II II I 'I II ii II I II I II I 27' -0° I II I i ,doo� �04 3' -4" 6A DEMOLITION PLAN 1/4" = 1'-0" I I Z) 1� General Demolition Notes 1. Contractor shall field -verify all existing conditions, dimensions, and arrangements. 2. Contractor is responsible for protection of all existing surfaces, materials, and components to remain or be relocated. Damage to these resulting from performance of Work shall be repaired by Contractor to satisfaction of Owner and Architect at no additional expense to Owner. 3. Contractor shall provide temporary dust protection as required to prevent construction debris and dust from migrating out of Project Area. Owner /Architect shall confirm all dust prevention measures/locations and shall determine changes to these measures. 4. All existing equipment and fixtures shall remain property of Owner. All reusable items salvaged during demolition operations shall be retained for Owner's inspection. Only items so inspected and rejected by Owner shall be disposed. All other such items shall be turned over to Owner for disposition. 5. All existing surfaces located adjacent to, or exposed by demolition work and scheduled to receive new construction shall be patched and repaired as required to cleanly receive new work. 6. All existing surfaces located adjacent to, or exposed by demolition work and scheduled to remain exposed after completion of new const. shall be repaired and patched as required to receive new finishes. 7. Owner will be responsible for removal /rearrangement of all existing loose furnishings during construction, unless noted otherwise. 8. Refer to Mech. /Elec. Drawings for additional patching and preparation work related to M.E.P. demolition items. 9. Existing sleeves, holes, and other penetrations or new damage of existing building structure above grade exposed by demolition and removal of piping, appurtenances, equipment shall be patched and repaired as part of the Work. Maintain fire ratings of all and adjacent construction affected. 10. Cap all piping to remain or abandoned in accordance with requirements of authority having jurisdiction and in accordance with all local and state plumbing and health codes. Utilize only pre- manufactured and approved fittings to cap existing piping. 11. Each Contractor is responsible for all demolition work required or noted for installation of new Work. Demolition may include associated distribution systems, appurtenances, equipment supporting controls, and miscellaneous supports, unless noted otherwise. 12. Coordinate all demolition with Project sequencing as directed by General Contractor or Construction Manager. �r it �r I 14 C SCHMIDT A SSOCIATES Architecture Engineering Technology Interior Design Landscape Architecture Project No. 2012-007.000 Project Date 05.15.2012 Produced Designer Author Se, G1 ST f F� i N0 32631 STATE OF j Q`'' :ND ANP• cH ITti;So These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. # Revision Date 111 Medical Drive Carmel, IN 46032 KEY PLAN Z Daniel and Judy Corsaro Aurelia Dance Studio DEMOLITION PLAN A -100