HomeMy WebLinkAbout12070084.814
III
C
N
n
6 5 4 3 2 1
0' -2"
AO
SEE SCHEDULE
- 2„
DOW *RAME ELEVATIOW A
1/2" = 1' -0"
5A
GENERAL NOTES
ABBREVIATIONS
REMARKS
Height
Floor
Wall
See Door Schedule
A. This Door Schedule(s) is furnished for whatever assistance it may afford the
AL
Aluminum
Finish
Contractor. Do not consider it as entirely inclusive. Carefully examine the Drawings
HM
Hollow Metal
1. Existing door and frame to remain. New hardware only. Field verify all existing
(especially the Floor Plans) and the Specifications to determine the extent of door
ST
Steel
door and frame information as required for installation of new hardware.
and frame quantities required (including interior borrowed lite or sidelite openings).
WD
Wood
Should any particular door, frame, or interior borrowed lite or sidelite shown on the
TG
Tempered Glazing
2. New door /frame in existing masonry wall. Tooth in new masonry into existing as
Drawings be inadvertently omitted from this Schedule, supply same as required for
IG
Insulated Glazing
required.
similar openings.
LG
Laminated Glazing
A -105
Restroom
FG
Frosted Glazing
3. Set door in frame to allow for 180° door swing.
B. The "Door Type" column designates both the door elevation and the number of
SP
Spandrel Panel
Paint
leaves in the opening (e.g. A = 1 leaf, AA = 2 leaves). The "Door Width" column
Locker Room
New
4. <NOTE TO EDITOR> Edit this list as required. < /NOTE TO EDITOR>
designates the total width of all leaves. In multiple leaf conditions, the leaves shall
7' - 0"
Ceiling Tile
104
equally divide the "Door Width" unless noted otherwise. A " -d" modifier designates a
79 SF
Vinyl Tile
Paint
double egress frame (e.g. AA -d = AA door type in a double egress frame).
3' - 0"
T- 0"
0'- 1 3/4"
C. Door Type "X" denotes a frame with no door such as a borrowed lite, reference
A -105
Ceiling Tile
105
Frame Elevations.
79 SF
Vinyl Tile
Paint
D. An asterisk (") in a dimension denotes a width that varies, reference plans,
elevations, details and schedules.
E. Verify locksets with the Owner during submittals.
DOOR 101 ELEVATION
1/2" = 1' -0"
Finish Schedule
Room
Room
Height
Floor
Wall
Ceiling
Number
Name
Area
Finish
Finish
Finish
101
Vestibule
61 SF
Vinyl Tile
Paint
Acoustical
5'- 11 11/32"
6-10"
Ceiling Tile
102
Reception
441 SF
Carpet
Paint
Acoustical
HM
A -105
A -105
Restroom
New
Ceiling Tile
103
Restroom
56 SF
Ceramic Tile
Paint
Acoustical
Locker Room
New
105
3' - 0"
7' - 0"
Ceiling Tile
104
Locker Room
79 SF
Vinyl Tile
Paint
Acoustical
3' - 0"
T- 0"
0'- 1 3/4"
HM
A -105
Ceiling Tile
105
Locker Room
79 SF
Vinyl Tile
Paint
Acoustical
HM
A -105
A -105
Corridor
New
Ceiling Tile
106
Restroom
55 SF
Ceramic Tile
Paint
Acoustical
Studio Office
New
109
3' - 0"
7' - 0"
Ceiling Tile
107
Corridor
103 SF
Carpet
i
Acoustical
i
T- 0"
0'- 1 3/4"
HM
A -105
Ceiling Tile
108
Office
64 SF
Vinyl Tile
Paint
Acoustical
j
A -105
A -105
Janitor's Closet
New
Ceiling Tile
.109
Studio
694 SF
Wood
I
i
Storage
New
113
3' - 0"
7' - 0"
Ceiling Tile
1 110
Kitchen
159 SF
Vinyl Tile
Paint
Acoustical
T- 0"
18'- 0"
0'- 1 3/4"
ST
A -105
Ceiling Tile
112
Storage
52 SF
Vinyl Tile
Paint
Acoustical
Ceiling Tile
1 113
Office
76 SF
Carpet
Paint
Acoustical
Ceiling Tile
114
Ballroom
3485 SF
Wood
Paint
Acoustical
Ceiling Tile
i
i
I
i
j
DOOR 101 ELEVATION
1/2" = 1' -0"
Finish Schedule
Room
Room
Height
Floor
Wall
Ceiling
Number
Name
Area
Finish
Finish
Finish
101
Vestibule
61 SF
Vinyl Tile
Paint
Acoustical
5'- 11 11/32"
6-10"
Ceiling Tile
102
Reception
441 SF
Carpet
Paint
Acoustical
HM
A -105
A -105
Restroom
New
Ceiling Tile
103
Restroom
56 SF
Ceramic Tile
Paint
Acoustical
Locker Room
New
105
3' - 0"
7' - 0"
Ceiling Tile
104
Locker Room
79 SF
Vinyl Tile
Paint
Acoustical
3' - 0"
T- 0"
0'- 1 3/4"
HM
A -105
Ceiling Tile
105
Locker Room
79 SF
Vinyl Tile
Paint
Acoustical
HM
A -105
A -105
Corridor
New
Ceiling Tile
106
Restroom
55 SF
Ceramic Tile
Paint
Acoustical
Studio Office
New
109
3' - 0"
7' - 0"
Ceiling Tile
107
Corridor
103 SF
Carpet
Paint
Acoustical
i
T- 0"
0'- 1 3/4"
HM
A -105
Ceiling Tile
108
Office
64 SF
Vinyl Tile
Paint
Acoustical
j
A -105
A -105
Janitor's Closet
New
Ceiling Tile
.109
Studio
694 SF
Wood
Paint
Acoustical
Storage
New
113
3' - 0"
7' - 0"
Ceiling Tile
1 110
Kitchen
159 SF
Vinyl Tile
Paint
Acoustical
T- 0"
18'- 0"
0'- 1 3/4"
ST
A -105
Ceiling Tile
112
Storage
52 SF
Vinyl Tile
Paint
Acoustical
Ceiling Tile
1 113
Office
76 SF
Carpet
Paint
Acoustical
Ceiling Tile
114
Ballroom
3485 SF
Wood
Paint
Acoustical
Ceiling Tile
Door Schedule
j
Phase Mark
Width
Height
I Thickness
Frame
I Material
Head Jamb
Detail Detail Remarks
New
101
5'- 11 11/32"
6' - 10"
New
102
5'- 11 11/32"
6-10"
New
103
3'- 0"
T- 0"
0'- 1 3/4"
HM
A -105
A -105
Restroom
New
104
3' - 0"
T-0--
0' - 1 3/4"
HM
A -105
A -105
Locker Room
New
105
3' - 0"
7' - 0"
0'- 1 3/4"
HM
A -105
A -105
Locker Room
New
106
3' - 0"
T- 0"
0'- 1 3/4"
HM
A -105
A -105
Restroom
New
107
3' - 0"
7' - 0"
0'- 1 3/4"
HM
A -105
A -105
Corridor
New
108
3'- 0"
T- 0"
0'- 1 3/4"
HM
A -105
A -105
Studio Office
New
109
3' - 0"
7' - 0"
0'- 1 3/4"
HM
A -105
A -105
Studio
New
110
3' - 0"
T- 0"
0'- 1 3/4"
HM
A -105
A -105
Kitchen
New
111
2'- 3"
7' - 0"
0'- 1 3/4"
HM
A -105
A -105
Janitor's Closet
New
112
3' - 0"
T - O"
0'- 1 3/4"
HM
A -105
A -105
Storage
New
113
3' - 0"
7' - 0"
0'- 1 3/4"
HM
A -105
A -105
Office
New
114
T- 0"
18'- 0"
0'- 1 3/4"
ST
A -105
A -105
Ballroom
New
115
3' - 0"
T- 0"
0' - 1 3/4"
DOOR 115 ELEVATION
1/2" = 1' -0"
im
l
08 4113.A2 - DOOR & FRAME, REF
^70R SCHEDULE
SEE
PLANS
JAMB DETAIL
1 1/2" = V -0"
SEE
T'
PLANS
'92 00.63 - JOINT SEALANT (BOTH
DES)
10 53.61 - WOOD BLOCKING
22 16.C11 - DOUBLE STUDS
29 00.139 - INT GWB, 5/8" TYPE X
kCH SIDE
09 29 OO.B9 - INT GWB, 5/8" TYPE X
EACH SIDE
X09 22 16.C10 - METAL STUD BOX BEAM
10 OO.A1 - WOOD BLOCKING
07 92 OO.B3 - JOINT SEALANT (BOTH
SIDES)
I 08 41 13.A2 - DOOR & FRAME, REF
— DOOR SCHEDULE
HEAD DETAIL
1 1/2" = V -0"
6 5 4 3 2 1
E
111,]
C
W
0
SCHMIDT
ASSOCIATES
Architecture
Engineering
Technolog_y
Interior Design
Landscape Architecture
Project No. 2012 - 007.000
Project Date 05.15.2012
Produced Designer Author
sr
NO
32631
QTATF OF
H 11: �
6^-0*0240 Ab
These ^ra.., ^gs and Specifications, and a!! copies
thereof are and shall remain the property and copyright of
the Architect. Thev shall be used only with respect to this
Project and are not to be used on any other Project or
Work without prior written permission from the Architect.
# Revision I Date
111 Medical Drive
Carmel, IN 46032
KEG' PLAN z
Daniel and Judy
Corsaro
Aurelia Dance Studio
DOOR AND ROOM
SCHEDULES
A -104