Loading...
HomeMy WebLinkAbout12070084.814 III C N n 6 5 4 3 2 1 0' -2" AO SEE SCHEDULE - 2„ DOW *RAME ELEVATIOW A 1/2" = 1' -0" 5A GENERAL NOTES ABBREVIATIONS REMARKS Height Floor Wall See Door Schedule A. This Door Schedule(s) is furnished for whatever assistance it may afford the AL Aluminum Finish Contractor. Do not consider it as entirely inclusive. Carefully examine the Drawings HM Hollow Metal 1. Existing door and frame to remain. New hardware only. Field verify all existing (especially the Floor Plans) and the Specifications to determine the extent of door ST Steel door and frame information as required for installation of new hardware. and frame quantities required (including interior borrowed lite or sidelite openings). WD Wood Should any particular door, frame, or interior borrowed lite or sidelite shown on the TG Tempered Glazing 2. New door /frame in existing masonry wall. Tooth in new masonry into existing as Drawings be inadvertently omitted from this Schedule, supply same as required for IG Insulated Glazing required. similar openings. LG Laminated Glazing A -105 Restroom FG Frosted Glazing 3. Set door in frame to allow for 180° door swing. B. The "Door Type" column designates both the door elevation and the number of SP Spandrel Panel Paint leaves in the opening (e.g. A = 1 leaf, AA = 2 leaves). The "Door Width" column Locker Room New 4. <NOTE TO EDITOR> Edit this list as required. < /NOTE TO EDITOR> designates the total width of all leaves. In multiple leaf conditions, the leaves shall 7' - 0" Ceiling Tile 104 equally divide the "Door Width" unless noted otherwise. A " -d" modifier designates a 79 SF Vinyl Tile Paint double egress frame (e.g. AA -d = AA door type in a double egress frame). 3' - 0" T- 0" 0'- 1 3/4" C. Door Type "X" denotes a frame with no door such as a borrowed lite, reference A -105 Ceiling Tile 105 Frame Elevations. 79 SF Vinyl Tile Paint D. An asterisk (") in a dimension denotes a width that varies, reference plans, elevations, details and schedules. E. Verify locksets with the Owner during submittals. DOOR 101 ELEVATION 1/2" = 1' -0" Finish Schedule Room Room Height Floor Wall Ceiling Number Name Area Finish Finish Finish 101 Vestibule 61 SF Vinyl Tile Paint Acoustical 5'- 11 11/32" 6-10" Ceiling Tile 102 Reception 441 SF Carpet Paint Acoustical HM A -105 A -105 Restroom New Ceiling Tile 103 Restroom 56 SF Ceramic Tile Paint Acoustical Locker Room New 105 3' - 0" 7' - 0" Ceiling Tile 104 Locker Room 79 SF Vinyl Tile Paint Acoustical 3' - 0" T- 0" 0'- 1 3/4" HM A -105 Ceiling Tile 105 Locker Room 79 SF Vinyl Tile Paint Acoustical HM A -105 A -105 Corridor New Ceiling Tile 106 Restroom 55 SF Ceramic Tile Paint Acoustical Studio Office New 109 3' - 0" 7' - 0" Ceiling Tile 107 Corridor 103 SF Carpet i Acoustical i T- 0" 0'- 1 3/4" HM A -105 Ceiling Tile 108 Office 64 SF Vinyl Tile Paint Acoustical j A -105 A -105 Janitor's Closet New Ceiling Tile .109 Studio 694 SF Wood I i Storage New 113 3' - 0" 7' - 0" Ceiling Tile 1 110 Kitchen 159 SF Vinyl Tile Paint Acoustical T- 0" 18'- 0" 0'- 1 3/4" ST A -105 Ceiling Tile 112 Storage 52 SF Vinyl Tile Paint Acoustical Ceiling Tile 1 113 Office 76 SF Carpet Paint Acoustical Ceiling Tile 114 Ballroom 3485 SF Wood Paint Acoustical Ceiling Tile i i I i j DOOR 101 ELEVATION 1/2" = 1' -0" Finish Schedule Room Room Height Floor Wall Ceiling Number Name Area Finish Finish Finish 101 Vestibule 61 SF Vinyl Tile Paint Acoustical 5'- 11 11/32" 6-10" Ceiling Tile 102 Reception 441 SF Carpet Paint Acoustical HM A -105 A -105 Restroom New Ceiling Tile 103 Restroom 56 SF Ceramic Tile Paint Acoustical Locker Room New 105 3' - 0" 7' - 0" Ceiling Tile 104 Locker Room 79 SF Vinyl Tile Paint Acoustical 3' - 0" T- 0" 0'- 1 3/4" HM A -105 Ceiling Tile 105 Locker Room 79 SF Vinyl Tile Paint Acoustical HM A -105 A -105 Corridor New Ceiling Tile 106 Restroom 55 SF Ceramic Tile Paint Acoustical Studio Office New 109 3' - 0" 7' - 0" Ceiling Tile 107 Corridor 103 SF Carpet Paint Acoustical i T- 0" 0'- 1 3/4" HM A -105 Ceiling Tile 108 Office 64 SF Vinyl Tile Paint Acoustical j A -105 A -105 Janitor's Closet New Ceiling Tile .109 Studio 694 SF Wood Paint Acoustical Storage New 113 3' - 0" 7' - 0" Ceiling Tile 1 110 Kitchen 159 SF Vinyl Tile Paint Acoustical T- 0" 18'- 0" 0'- 1 3/4" ST A -105 Ceiling Tile 112 Storage 52 SF Vinyl Tile Paint Acoustical Ceiling Tile 1 113 Office 76 SF Carpet Paint Acoustical Ceiling Tile 114 Ballroom 3485 SF Wood Paint Acoustical Ceiling Tile Door Schedule j Phase Mark Width Height I Thickness Frame I Material Head Jamb Detail Detail Remarks New 101 5'- 11 11/32" 6' - 10" New 102 5'- 11 11/32" 6-10" New 103 3'- 0" T- 0" 0'- 1 3/4" HM A -105 A -105 Restroom New 104 3' - 0" T-0-- 0' - 1 3/4" HM A -105 A -105 Locker Room New 105 3' - 0" 7' - 0" 0'- 1 3/4" HM A -105 A -105 Locker Room New 106 3' - 0" T- 0" 0'- 1 3/4" HM A -105 A -105 Restroom New 107 3' - 0" 7' - 0" 0'- 1 3/4" HM A -105 A -105 Corridor New 108 3'- 0" T- 0" 0'- 1 3/4" HM A -105 A -105 Studio Office New 109 3' - 0" 7' - 0" 0'- 1 3/4" HM A -105 A -105 Studio New 110 3' - 0" T- 0" 0'- 1 3/4" HM A -105 A -105 Kitchen New 111 2'- 3" 7' - 0" 0'- 1 3/4" HM A -105 A -105 Janitor's Closet New 112 3' - 0" T - O" 0'- 1 3/4" HM A -105 A -105 Storage New 113 3' - 0" 7' - 0" 0'- 1 3/4" HM A -105 A -105 Office New 114 T- 0" 18'- 0" 0'- 1 3/4" ST A -105 A -105 Ballroom New 115 3' - 0" T- 0" 0' - 1 3/4" DOOR 115 ELEVATION 1/2" = 1' -0" im l 08 4113.A2 - DOOR & FRAME, REF ^70R SCHEDULE SEE PLANS JAMB DETAIL 1 1/2" = V -0" SEE T' PLANS '92 00.63 - JOINT SEALANT (BOTH DES) 10 53.61 - WOOD BLOCKING 22 16.C11 - DOUBLE STUDS 29 00.139 - INT GWB, 5/8" TYPE X kCH SIDE 09 29 OO.B9 - INT GWB, 5/8" TYPE X EACH SIDE X09 22 16.C10 - METAL STUD BOX BEAM 10 OO.A1 - WOOD BLOCKING 07 92 OO.B3 - JOINT SEALANT (BOTH SIDES) I 08 41 13.A2 - DOOR & FRAME, REF — DOOR SCHEDULE HEAD DETAIL 1 1/2" = V -0" 6 5 4 3 2 1 E 111,] C W 0 SCHMIDT ASSOCIATES Architecture Engineering Technolog_y Interior Design Landscape Architecture Project No. 2012 - 007.000 Project Date 05.15.2012 Produced Designer Author sr NO 32631 QTATF OF H 11: � 6^-0*0240 Ab These ^ra.., ^gs and Specifications, and a!! copies thereof are and shall remain the property and copyright of the Architect. Thev shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. # Revision I Date 111 Medical Drive Carmel, IN 46032 KEG' PLAN z Daniel and Judy Corsaro Aurelia Dance Studio DOOR AND ROOM SCHEDULES A -104