Loading...
HomeMy WebLinkAbout0986.97.22�j U P E R '� tS Q R W CORK S H E E T Y LAND FOUNDATION CHECKLIST FRAME PUNCH OUT CHECK LIST SLAB BASEMENT 1. GARAGE l GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: ' HT., 8' OR 16' WIDE. PROJECT INFORMATION PROJECT INFORMATION GARAGE ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION. NAILERS AT ALL CORNERS OF GARAGE AND CEILING. GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR HOUSE NAME /ELEV. HOUSE NAME / ELEV. BOW STUDS STRAP ANCHOR NAILED CORRECTLY SET NUMBER SET NUMBER 2. HOUSE PLAN / JOB NUMBER PLAN / JOB NUMBER CHECK FOR BOW STUDS CHECK FOR NAILERS MARK DOOR SWING DIRECTION AND SIZE STANDARD OR REVERSED STANDARD OR REVERSED CHECK FOR CASING ROOM (MIN. 2" ON EACH SIDE) CHECK CENTERLINE OF KITCHEN WINDOW ANY NON -STD. CHANGES? ANY NON -STD. CHANGES? CHECK BULKHEAD DIMENSIONS (2" LONGER AND 2" WIDER THAN CABINETS) CHECK WALL SIZES IN RELATION TO CABINET SPACE FRONT OR SIDE LOAD CHECK VANITY SIZES IN RELATION TO WALL SPACE FRONT OR SIDE LOAD CHECK VANITY DEPTH TO DOOR OPENING (MIN. 24 1/2 ") CHECK DOOR OPERATION AND INSTALLATION STD., ENLARGED, OR FULL BSMT. ALL SIDING OR BRICK FRONT CHECK WINDOW OPERATION AND INSTALLATION (IN SET ") COPT. 293) COPT: 295) (IN SET ") (OPT 490) CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION PITCH RAIL WALL INSTALLED 1/2" BELOW STRINGER AND 1 1/2" SHORT ALL SIDING OR BRICK FRONT HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS (BOTH STAIRWAYS) (IN sET. «) (OFT. 490) MASONRY HALF -WALL AT STAIRS PAST STRINGER 1 1/2" FIREPLACE OPT. PRE-FAB — TUB PLATFORM BUILT CORRECTLY 16 1/2" HT., 39" X 51" INSIDE MT. WINDOW OPT. QTY. NO STUDS 0 24" O.G. AT CERAMIC ACAS. (IC," OZ. MAX_) NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES (MARK LOCATION(S) ON PRINT TUB BLOCKS INSTALLED AT CERAMIC AREAS. BUILDING PERMIT NUMBER NAILEI�s FOR FIBERGLASS TUBS INSTALLED FRONT PORCH WALL HT. TO BE MEASURE VINYL AREAS FOR SQUARE } ABOVE TOP OF FTN. WALL CB PANELS HAVE BLOCKS ON ENDS FLUSH WI 9 1/4" iet FLR. T.J.I.'s 2" ABOVE W/ 11 '1/8" 1st FLR. T.J.I: e 6" ABOVE W/ 14" iet FLR T.J.1.'s LOT ADDRESS CHECK FOR LOAD - BEARING POINTS IN HOUSE AND PROPER LOAD TRANSFER STRAP ANCHORS SECURED IN HOUSE MASONRY CRAWL. SPACE AND BASEMENT CLEANED OUT FIREPLACE OPT. PRE -FAB TOWNSHIP STAIRWAY SHIMMED (MAX 1/2" GAP EACH SIDE) NOTE: INSTALL BRICK LEDGE ON MAC RY FIREPLACES let AND 2nd FLOORS LINE UP IN STAIR WELL NO GAPS ABOVE STAIRWAY DRAFT-STOP BUILDING PERMIT NUMBER STAIRWAY DROP CEILING DONE CORRECTLY (C44ECK PRINTS) HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING LOT ADDRESS SAFETY BOOTS AND RAILS INSTALLED 3 1/2" FROM STRINGER CHECKLIST SQUASH BLOCKS INSTALLED PER PLAN AND TJ.1. DETAIL SHEET FLOOR SHEATHING NAILED PER SPEC.'s TOWNSHIP MARK OUT ALL HAUNCHES NOT USED FALL PROTECTION INSTALLED AT STAIR WALL OPENINGS CHECKLIST MARK IN FRONT PORCH WALLS IF NOT ON PRINTS EYEBOLT AND ANCHOR POINT IN PLACE WATER SLEEVE LOCATION MARKED ALL DRAFT STOP INSTALLED ON CHASE AND BAND JOISTS SUMP PUMP LOCATION MARKED SEWER AND WATER SLEEVE HIGHLIGHT ALL THICKENED SLAB FOOTINGS ALL TYVECK STAPLED IN -PLACE EXTERIOR SUMP PUMP SLEEVE LOCATION MARKED LOCATIONS MARKED (3' W/ 4" SEWER HIGHLIGHT ALL PAD FOOTING LOCATIONS ALL HOLES PATCHED IN INSULATION BOARD COUPLER, 5'W/ 1 1/2" SLEEVE) ALL TRIM INSTALLED PER PRINT MARK OUT ALL HAUNCHES NOT USED HIGHLIGHT ALL BEAM POCKETS BEAM TAKEOFF SHEET COMPETE AND TURNED IN TO FOUNDATION SUPERVISOR 3 1/2" RIPS I/2 SHEATHING INSTALLED ON CORNERS MARK IN FRONT PORCH WALL HIGHLIGHT ALL PAD FTG. LOCATIONS (TO BE GOMPLTED EVEN IF NO BEAMS REQUIRED) IF NOT ON PRINTS ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES BEAM TAKE -OFF SHEET COMPETE AND TURNED IN ALL DOORS TAPED ABOVE TO FOUNDATION SUPERVISOR PRINT HUNG ON NAIL IN GARAGE. .,. (TO BE COMPETED EVEN IF NO BEAMS REQUIRED) PERIMETER AND PANELS GLUED INTERIOR WALLS GLUED DOWN DONOT REMOVE BLUEPRINTS FROM JOBSITE INTERIOR AND EXTERIOR WALLS NAILED INTO TRUSSES BELOW SET �; _ E BS INTO ROOM AND WIPE -OUT I. EXCAVATOR PLACE PRINT TUBE INSIDE OF EXCAVATION. ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, !2" SIDES J ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK d) 2. WALL CONTRACTOR LEAVE ON TOP OF WALL. JOIST HAN;3ERS NAILED FRONT AND SIDES SITE PICKED UP AND PUT IN PILE EACH DA? 3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL. 2X4 AROUND TOP OF G!- IiMNEY „1;:1 /2' PAST CHIMNEY FLAT 4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL. ALL GIRDER TRUSSES NAILED PER ENGINEERING