FOUNDATION CHECKLIST
FRAME PUNCH OUT CHECK LIST
SLAB
BASEMENT 1. GARAGE l
GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: ' HT., 8' OR 16' WIDE.
PROJECT INFORMATION PROJECT INFORMATION GARAGE ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION.
NAILERS AT ALL CORNERS OF GARAGE AND CEILING.
GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR
HOUSE NAME /ELEV. HOUSE NAME / ELEV. BOW STUDS
STRAP ANCHOR NAILED CORRECTLY
SET NUMBER SET NUMBER
2. HOUSE
PLAN / JOB NUMBER PLAN / JOB NUMBER CHECK FOR BOW STUDS
CHECK FOR NAILERS
MARK DOOR SWING DIRECTION AND SIZE
STANDARD OR REVERSED STANDARD OR REVERSED CHECK FOR CASING ROOM (MIN. 2" ON EACH SIDE)
CHECK CENTERLINE OF KITCHEN WINDOW
ANY NON -STD. CHANGES? ANY NON -STD. CHANGES? CHECK BULKHEAD DIMENSIONS (2" LONGER AND 2" WIDER THAN CABINETS)
CHECK WALL SIZES IN RELATION TO CABINET SPACE
FRONT OR SIDE LOAD CHECK VANITY SIZES IN RELATION TO WALL SPACE
FRONT OR SIDE LOAD CHECK VANITY DEPTH TO DOOR OPENING (MIN. 24 1/2 ")
CHECK DOOR OPERATION AND INSTALLATION
STD., ENLARGED, OR FULL BSMT. ALL SIDING OR BRICK FRONT CHECK WINDOW OPERATION AND INSTALLATION
(IN SET ") COPT. 293) COPT: 295) (IN SET ") (OPT 490) CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION
PITCH RAIL WALL INSTALLED 1/2" BELOW STRINGER AND 1 1/2" SHORT
ALL SIDING OR BRICK FRONT HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS (BOTH STAIRWAYS)
(IN sET. «) (OFT. 490) MASONRY HALF -WALL AT STAIRS PAST STRINGER 1 1/2"
FIREPLACE OPT. PRE-FAB — TUB PLATFORM BUILT CORRECTLY 16 1/2" HT., 39" X 51" INSIDE
MT. WINDOW OPT. QTY. NO STUDS 0 24" O.G. AT CERAMIC ACAS. (IC," OZ. MAX_)
NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES
(MARK LOCATION(S) ON PRINT TUB BLOCKS INSTALLED AT CERAMIC AREAS.
BUILDING PERMIT NUMBER NAILEI�s FOR FIBERGLASS TUBS INSTALLED
FRONT PORCH WALL HT. TO BE MEASURE VINYL AREAS FOR SQUARE }
ABOVE TOP OF FTN. WALL CB PANELS HAVE BLOCKS ON ENDS
FLUSH WI 9 1/4" iet FLR. T.J.I.'s 2" ABOVE W/ 11 '1/8" 1st FLR. T.J.I: e 6" ABOVE W/ 14" iet FLR T.J.1.'s
LOT ADDRESS CHECK FOR LOAD - BEARING POINTS IN HOUSE AND PROPER LOAD TRANSFER
STRAP ANCHORS SECURED IN HOUSE
MASONRY CRAWL. SPACE AND BASEMENT CLEANED OUT
FIREPLACE OPT. PRE -FAB TOWNSHIP STAIRWAY SHIMMED (MAX 1/2" GAP EACH SIDE)
NOTE: INSTALL BRICK LEDGE ON MAC RY FIREPLACES
let AND 2nd FLOORS LINE UP IN STAIR WELL
NO GAPS ABOVE STAIRWAY DRAFT-STOP
BUILDING PERMIT NUMBER STAIRWAY DROP CEILING DONE CORRECTLY (C44ECK PRINTS)
HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING
LOT ADDRESS SAFETY BOOTS AND RAILS INSTALLED 3 1/2" FROM STRINGER
CHECKLIST SQUASH BLOCKS INSTALLED PER PLAN AND TJ.1. DETAIL SHEET
FLOOR SHEATHING NAILED PER SPEC.'s
TOWNSHIP
MARK OUT ALL HAUNCHES NOT USED FALL PROTECTION INSTALLED AT STAIR WALL OPENINGS
CHECKLIST MARK IN FRONT PORCH WALLS IF NOT ON PRINTS EYEBOLT AND ANCHOR POINT IN PLACE
WATER SLEEVE LOCATION MARKED ALL DRAFT STOP INSTALLED ON CHASE AND BAND JOISTS
SUMP PUMP LOCATION MARKED SEWER AND WATER SLEEVE
HIGHLIGHT ALL THICKENED SLAB FOOTINGS ALL TYVECK STAPLED IN -PLACE EXTERIOR
SUMP PUMP SLEEVE LOCATION MARKED LOCATIONS MARKED (3' W/ 4" SEWER HIGHLIGHT ALL PAD FOOTING LOCATIONS
ALL HOLES PATCHED IN INSULATION BOARD
COUPLER, 5'W/ 1 1/2" SLEEVE) ALL TRIM INSTALLED PER PRINT
MARK OUT ALL HAUNCHES NOT USED HIGHLIGHT ALL BEAM POCKETS BEAM TAKEOFF SHEET COMPETE AND TURNED IN
TO FOUNDATION SUPERVISOR 3 1/2" RIPS I/2 SHEATHING INSTALLED ON CORNERS
MARK IN FRONT PORCH WALL HIGHLIGHT ALL PAD FTG. LOCATIONS (TO BE GOMPLTED EVEN IF NO BEAMS REQUIRED)
IF NOT ON PRINTS ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES
BEAM TAKE -OFF SHEET COMPETE AND TURNED IN
ALL DOORS TAPED ABOVE
TO FOUNDATION SUPERVISOR PRINT HUNG ON NAIL IN GARAGE.
.,.
(TO BE COMPETED EVEN IF NO BEAMS REQUIRED) PERIMETER AND PANELS GLUED
INTERIOR WALLS GLUED DOWN
DONOT REMOVE BLUEPRINTS FROM JOBSITE INTERIOR AND EXTERIOR WALLS NAILED INTO TRUSSES BELOW SET �; _
E BS INTO ROOM AND WIPE -OUT
I. EXCAVATOR PLACE PRINT TUBE INSIDE OF EXCAVATION. ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, !2" SIDES
J
ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK
d) 2. WALL CONTRACTOR LEAVE ON TOP OF WALL. JOIST HAN;3ERS NAILED FRONT AND SIDES
SITE PICKED UP AND PUT IN PILE EACH DA?
3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL. 2X4 AROUND TOP OF G!- IiMNEY „1;:1 /2' PAST CHIMNEY FLAT
4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL. ALL GIRDER TRUSSES NAILED PER ENGINEERING