HomeMy WebLinkAbout0989.97.960'- 7 112"
*" - - - -- -- - -- .�--------------- - - - - --
00
ICA
9'-- 4 3; 4" 10' - 9" ! 13' -1 /4" 1 C�' ,,, 141 0 1112"
sToi� WORK fZ1 i I I IL I
i -Z l.i►I OF I
i I
; � I
,CU..TOi"i
C0t1NTE
CE
STORA
� 1
I
I 13' -10 6'- 3 3/4„ ✓\ 29 - - 4
I -
i x,
i -- *= -- ------------ - - - - -- -1
-- — —
i
I I ��'!l• LEG. � I �R�✓€ I � ; . '__'�
I PC- L-I- ATE
FLLK0+I WITH ADJAGV-N1 \VAL -tG � I
')l'- 4 1 %4"
I �
I
I
I
I
L-----------------------------=------------------------------------ - - - - --III --- - - - - -- ----------------- - - - -��
�INV dF N£NV p>UILVING
DEMOLITION PLAN
AtT, i-T, r
i.Do not scale drawings. Refer any discrepancies
to Architect for clarification.
2.The Contractor is responsible for visiting site to
become familiar with existing conditions.
Demolition drawings and notes are a reference
to aid the Contractor in the evaluation of the
extent of the demolition, but shall not be
considered to be all inclusive.
3. The contractor is responsible for obtaining all
necessary demolition and building permits.
4. The contractor shall coordinate with all other
trades, utility companies, and agencies having
jurisdiction over this project to complete the
site demolition as noted, shown or specified
throughout the plans and specifications.
5. If hazardous materials are uncovered at any time
during demolition or construction, the Architect
shall be notified immediately. All hazardous
materials shall be removed by the Owner, at
Owner's expense under a separate contract.
6. The Contractor shall remove and /or demolish
Items indicated to be demolished on the plans.
Demolished items shall be removed from the
site immediately by the contractor unless noted
otherwise.
1. The Contractor shall be responsible for demoli-
tion required for the installation of new work`
whether or not it is speclFically noted on the
drawings.
8. The Contractor shall coordinate ail existing
utility lines to be capped from the site installa-
tion of new work whether or not it is specificaliy
noted on the drawings.
9. The Contractor shall verlfy the location of all
existing utilities and underground conduits,
chases and soil conditions prior to commencing
demolition and /or construction.
GENERAL NO TES
1. The Contractor is responsible for verifying all
dimensions and conditions at job site and for
coordinating the structural, Mechanical, and
electrical requirements prior to commencement
of construction.
2. The Contractor shall protect area, and new or
existing materials and Finishes From damage
which may occur from construction, demolition,
dust, water, etc. Damage to the new and existing
materials, Finishes, structures, and equipment shall
be repaired or replaced to the satisfaction of
the Owner at the Contractor's expense.
3. The Contractor shall be responsible for protect-
ing from paint, all surfaces not to receive paint.
These surfaces shall include, but are not limited
to. Floors, ceilings, door hardware, frames and
glass. The Contractor shall clean or replace any
such surface defaced or damaged at
Contractor's expense.
4. The Contractor shall repair all damaged surfaces
to match adjacent surfaces and insure tight
joints all around.
5. The Contractor shall not scale drawings except
for referencet dimensions governs large scale
details govern.
6. The Contractor shall submit shop drawings
as requested for fabricated Itemst cuts of all
fixtures and equipment, and samples of all
finishes called for to the Architect For approval
prior to installation.
1. The Contractor shall provide all necessary
blocking, backing, framing, hangers, or other
support for all fixtures, cabinetry, equipment,
furnishings and all other items requiring the same.
8. The Construction Documents are provided to
illustrate the design and general type of
construction, material, and workmanship through-
out. The Contractor, in assuming responsibility
For the work Indicated, shall comply with the
spirit and the letter in which they were written.
9. The Contractor shell remove all rubbish and
waste materials on a regular basis, and shall
exercise strict control to prevent any dirt or
debris from affecting finished areas of the job
site. The site or building refuse facilities shall
not be used for this purpose.
D0fi
A R C H I
I N C 0 R P I
3737 NORTH ME
SUITE 301
INDIANAPOUS, Iii
PH (317) 923 -1
FX (317) 923 -!
A
OON9ULTANT I
DESIGN -
CONSUL
724 North I11inc
Suite 200
Indianapolis, Ind
(317) 464 -9090
Mechanical and
Electrical Engh
8COPE OF=
DEMOL
PLAN
HOTSF
EINMI�
CENTS
CARMEL, IN
REVISIONS
DATE DRAW
05- 01 -9'1 TW
CERTIFIED BY
IM01
SHUT NO.
OF 8
pannIcrr un
BTAT E t