HomeMy WebLinkAboutReith Riley/CO 5/inc 1,539.87/Towne 131 - 146th CITY OF CARMEL
TO: THE CITY OF CARMEL, INDIANA CONTRACT CHANGE REQUEST NO.: 5
DATE: 12/9/11
PROJECT NAME: Towne Road: 1315t Street to 146th Street
FROM: CLARK DIETZ ENGINEERS
IT IS REQUESTED THAT A CONTRACT CHANGE BE MADE TO THE ABOVE REFERENCED CONTRACT.
1. SCOPE OF WORK
Install 24 Ift of 12 in CMP under driveway to the Steven H. Ermel property.
2. REASON FOR CHANGE: � <'
New drive construction impedes natural overland flow and creates significant ponding along
and in the right of way.
3. APPROXIMATE COST CHANGE TO CONTRACT PRICE: $1539.87
4. WILL THE CONTRACT NEED ADDITIONAL CONTRACT TIME TO COMPLETE THE CHANGE IN
WORK SCOPE? -YES X -NO
5. WILL THE CONTRACTOR NEED ADDITIONAL PERSONNEL TO COMPLETE THE CHANGE IN WORK
SCOPE? -YES X -NO
IF NO, TRADE(S):
NO. OF PERSONNEL:
DURATION:
6. IDENTIFICATION OF ATTACHMENTS: Time and Material pricing quote from contractor
DATE: 12/9/11 DATE: /A S ,,ZO/2.
PREPARED %/k 44,//R-7
REVIEWED BY: Thomas Gentry Clark-Dietz Engineers REVIEWED BY: ,z, /g.„
ENGINEER
Comments and Recommendation:
TO: Rieth Riley CONTRACT CHANGE ORDER NO.:5
DATE: 12-9-11
PROJECT NAME: Towne Road: 1315t Street to 146th Street
CITY REQ.NO.:
CiTY PO NO.:
CiTY PO DATE:
L You are directed to make the following changes in this Contract:
Install 24 Ift of 12 in CMP under driveway to the Steven H. Ermel property.
SCHEDULED ADJUSTMENT
ITEM (New) AMOUNT (+) OR (-) DAYS
110 12 in CMP Drive Culvert LS =$1,539.87 Zero Days
iI. The following referenced Documents further describe the changes outlined in Paragraph 1;
and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.:
Other: Time and Material pricing quote from contractor
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $3,757,489.11
Contract Price will be increased/decreased by this Change Order $1,539.87
New Contract Price including this Change Order $3,759,028.98
Contract Time Prior to this Change Order: Completion Date December 3rd, 2011
Net increased/decreased resulting from this Change Order Zero Days
Current Contract Time including this Change Order Completion Date December 3rd, 2011
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are The Above Changes Are Approved
Recommended: Accepted:
A/07 ne coif
Clark Dietz Engineers Reith Riley Construction Co. James Brainard, Mayor
ENGINEER CONTRACTOR
8900 Keystone Suite 900 P.0 Box 276 •
Address Address ary • nn Burke, Membe
Indianapolis. Indiana 46240 Indianapolis. Indiana 46206 Lcki W. �>> b:
City/State/Zip City/State/Zip
�•. �r •.- ion �_ is ��l�j-.4
By:''j j/'.t/Q5 471 B, ,:11".•"" �/ / ATTEST:
Phone:317-503-5250 Phn -:31 634 : . Diana Cordray, Clerk-Date:
Date: 1/12/12 Date:9/13 W Treas rer
Date: JO / i/j2—
?4cb —
I4'tr1A�t I IVIG6E1 : , Ciro Ci-G!r l Ek
! I
gY
' 9�
► r U_ CoNsifiucriow 8
POST OFFICE BOX 276 • INDIANAPOLIS,INDIANA 46206 • WWW.RIETHRILEY.COM
"700%Employee Owned"
1-12-12
John Yadon
Project Manager
Rieth-Riley
1751 West Minnesota Street
Indianapolis,IN 46206
Thomas A. Gentry
Clark Dietz,Inc. -Engineers
8900 Keystone Crossing, Suite 900
Indianapolis,IN 46240
317.844.8900-office
317.844.9158-fax
317.503.5250-cell
thomas.gentry cr.clarkdietz.com
www.clarkdietz.com
Project: Towne Road 1315`- 146th Street
RE: Corrugated Metal Pipe Under Drives
Dear Tom,
Attached is the change order request for placing metal pipe under drives to prevent ponding in the yards. The
total request for this change is $1,539.87 and 2 additional days added to the contract. Please see the attached
request from Poindexter for additional information.
Since ely, -
ohn Yadon
1751 W.MINNESOTA • INDIANAPOLIS,INDIANA 46221 • TELEPHONE: (317)634-5561 • FAX:(317) 631-6423
•a ;.. t T✓� `+r�' tic n @ ''' '�. '
tei �i
,0 V B P Y* �$ " acr •
yA 5 V r 21_
`, tx t"°k • x '
t�� _��>rxa f 5a , r�m r •_
Change Order Request
C.O.R.# 11-005-006
G.C. #
Date: 12/9/2011
POINDEXTER
Excavating Inc.
Project Name: Towne Road-131st-146th Project#: 11-005
To: Rieth-Riley Construction Co. From: Poindexter Excavating,Inc.
Attn: John Yadon Zach Finney
1751 W. Minnesota Street PO Box 36399
Indianapolis, IN 46236
Indianapolis, IN 46221
Phone: (317)634-5561 Fax: (317)631-6423 • Phone: (317)823-6837 Fax: (317)823-4662
We hereby propose to make the following changes:
T&M Work-Installing CMP
Added corrugated metal pipe under driveway to drain ponding water in a residents front yard.
Labor-$340.80
Equipment-$710.08
Materials-$327.94
Total-$1,392.61
Change Order Price $1,392.61
Original Contract Amount $1,500,948.98
This price is good for 60 days. If conditions change,this price is void.
We are requesting a time extension of 0 days in conjunction with this change.
Zach Finney 12/9/2011
Author Date Sent
Accepted The above prices and specifications of this Change Order request are satisfactory and are hereby
accepted. All work to be performed under same terms and conditions as specified in original
contract unless otherwise specified.
Authorized Signature Date of Acceptance
•
Page 1 of 2
•
,
Change Order Request
p4
C.O.R.# 1 1-005-00 6
G.C. #
Date: 12/9/2011
POINDEXTER
Excavating Inc.
Project Name: Towne Road-131st-146th Project#: 11-005
Labor
Labor Type,.:.:,'.!. ,.• .",1 ,::::•,1,:.',:':',-rMar:Hrs[i:::•:.'•',,,:.:,..•':::•::::.i::: '.Eijit-,.!.:::::::,,,::Burden :,., :::'::. :::',Frirgl.6.:—. :':TatalTaxi:,:•::::':::::,•::;:f •Total Labor
Foreman 4.00 $71.00 $0.00 $0.00 $0.00 $340.80
Sub Total $340.80
Grand Total $340.80
Materials
:'.Material :ii.:•;:::.,-:.;.,:••:.:::::: ., ..:.:::',..:.:::'!:::-_:::.:E4::.:-::::::',...•:::::,:•::.:. y:.i,::.::...:,1,::::::,....::: •:,:•.•,::::,.:!•:;H:1::::::;:•.:;:!'.-.:::.:!Quantitv_::-:::::::• :, Cost :1Totaliaxl::•.::.',... :T.Otal:•Materials!
CMP 20.00 $14.64 $0.00 $327.94
Sub Total $327.94
Grand Total $327.94
Equipment
Eciiiiprriefitliii,:::iiii.iiiii.ii.:.;.i.i:;ii:•....:iiHiii.i::::i-i,i'ir:::.iii.iiii.iiiii..ii..:',.:iii_iiii iii:' , ::....ii.i.t.'i,.::::ii:iii:-iiQuantityl.,.: ,, -.•::: ;••,:,,,Caat ,7:--•:::::,H.:, :'TotalTax :•,,,:•,: -.:TotaliEquipment
580L Case backhoe 4.00 $101.00 $0.00 $452.48
Delivery Truck w/Trailer 2.00 $115.00 $0.00 $257.60
Sub Total $710.08
Grand Total $710.08
Total Cost $1,378.82
Bond $13.79
Total $1,392.61
Page 2 of 2
MAIN OFFICE POINDEXTER P.O.BOX 36399
(317)823-6837 INDIANAPOLIS,INDIANA 46236-0399
EX C AVAT I N G ;
'J
DATE 11 N 4:Azdf:,
INSURED AND BONDED
sf,
MACHINE
WORKED TRAVEL TOTAL TOTAL EMPLOYEE
JOB PERFORMED
H TIME HOURS NAME
•
ID( al04t 11-61.7,4:
214
Dc trA) u z_ ji 5- 2:se, _ sett. . E
;40' •• =iV -
1-1,u-A 2412.So
1.0)
iosk.So 4 PAL
Remarks: A-c,/ e,/,,-6-./ c.,4,5>
-7;41 6 CA 47-y 4), -/=-3.:4 4:- V,J-cb. isk,o (1 oti
-- 3 A -k-c= %.NA,7 C.VD=(
Poindexter Job Name —1-;L,3*.e Y-sok
Customer P.O. Poindexter Job# -00
Bill To Operator =2:1\-/-6 g 1--);422
Address Customer
We Are An Equal Opportunity Employer and participate in E-Verfy