HomeMy WebLinkAboutReith Riley/CO 7/inc 8,970/Towne 131-146th CITY OF CARMEL TO: THE CITY OF CARMEL, INDIANA CONTRACT CHANGE REQUEST NO.: 7 DATE: 5/29/12 PROJECT NAME: Towne Road: 131st Street to 146th Street�� FROM: CLARK DIETZ ENGINEERS i.` 1 IT IS REQUESTED THAT A CONTRACT CHANGE BE MADE TO THE ABOVE REFERENCED CONTRACT. 1. SCOPE OF WORK Install 24" pipe catch basins on the Doug Dye property and Hugh Calvin property. 2. REASON FOR CHANGE: New drive construction impedes natural overland flow and creates significant ponding along and in the right of way. 3. APPROXIMATE COST CHANGE TO CONTRACT PRICE: $8,970.00 4. WILL THE CONTRACT NEED ADDITIONAL CONTRACT TIME TO COMPLETE THE CHANGE IN WORK SCOPE? -YES X -NO 5. WILL THE CONTRACTOR NEED ADDITIONAL PERSONNEL TO COMPLETE THE CHANGE IN WORK SCOPE? -YES X -NO IF NO, TRADE(S): NO. OF PERSONNEL: DURATION: 6. IDENTIFICATION OF ATTACHMENTS: Time and Material pricing quote from contractor DATE: 5/29/12 DATE: #S/2O/2 PREPARED l REVIEWED BY: Thomas Gentry Clark-Dietz Engineers REVIEWED BY: _4&_,Z.V4Z ENGINEER Comments and Recommendation: TO: Rieth Riley CONTRACT CHANGE ORDER NO.:7 DATE: 5/29/12 PROJECT NAME:Towne Road: 131St Street to 146th Street CITY REQ.NO.:7 CITY PO NO.: CITY PO DATE: I. You are directed to make the following changes in this Contract: Install 24" pipe catch basins on the Doug Dye property and Hugh Calvin property. SCHEDULED ADJUSTMENT ITEM (New) AMOUNT (+) OR(-)DAYS 113 24 in Pipe Catch Basins LS=$5,750.00 Zero Days II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C.No.: Other: Time and Material pricing quote from contractor The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $3,766,207.28 Contract Price will be increased/decreased by this Change Order $8,970.00 New Contract Price including this Change Order $3,775,177.28 Contract Time Prior to this Change Order: Completion Date December 3rd,2011 Net increased/decreased resulting from this Change Order Zero Days Current Contract Time including this Change Order Completion Date December 3rd,2011 This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved Recommended: Accepted: /(.-0 n f Clark Dietz Engineers Reith Riley Construction Co. James Brainard, Mayor ENGINEER CONTRACTOR 8900 Keystone Suite 900 P.O Box 276 .AA/ Address Address ary . nn Burke Member I 1; Indianapolis, Indiana 46240 Indianapolis, Indiana 46206 Lo' i W. o em City/State/Zip City/State/Zip By: f41 d ���� ATTEST: Phone:317-503-5250 Phon . 1 634 Diana Cordray, Clerk-Date: Date: 5/12/29 Date: 9/17 F' Tre ure Date: /017 /2- 2VA7/64.-4g P1�uan�L 1, aic641hE , &Tr 64,ti 4e A : 1 4 j.-,-.,, . , ,,,, VO v-.;, 4 ..4,• 1 2-, l',-.,' to - . .7'..." m r .,-1-40—$ •, a -* 1 k 17,--in. .1` ''' '0 riff9 1 flitiL i 'ON Ctiti POST Ol I n L?:j-3O\ 276 D1 i,N.'tPOLIS. NDIAN: 462.0.1 • WWW.b0L;I'Ilfill E .C-E`M 5-29-12 John\'adon Project Manager Rieth-Riley 1751 West Minnesota Street Indianapolis. IN -162(.6 Thomas A. Gentry Clark Dietz. Inc. -Engineers r(9(8)Keystone Cross.Ulk. Suite 900 Indianapolis. IN 46241) 317 844.8900-office 317.844.9158 -fax 31 7.503.5250-cell Project: Towne Road 131 '- 144`"Street RIE: Request for ('bane e Order for Additional Yard Inlets Dear Tom, Due to excessive water being collected between the new grade and existing drives additional drainage was needed to allow positive drainage. This agreement was made on a 'I .M basis and was performed by Poindexter excavating. I am requesting $5,750.00 for the additional work related to this change and no additional days. Sincertiy,, nf{ .1 in Yadon r .-. . M N; .3-._.-.'1 INDIANAPOLIS. ,Tt.lt;xikA 4t...... i L.t_$L."iil2N,'_:(3 1 T)034-5561 1 fat:(.317)(431-612.; ',° it ,ik:`#'atg 1**,,0,m ep Pine-.° �' t 1� S� ,`'` 3 '� :- 4 .Ia .O&a�T�` '��..� A✓ "�'€�S,a ?.z.� � �a`t`I3 �tl',��' ^tx ^3 .,a �, s x Project Change Order Budget _' `^ " Client Project 4 R-R Project 4: u- Date: C-2L-Z' /2___ Work Performed: ?roiectNarne: [han#e {>/�de/4� ___ _ ~----- Cost Breakdown _ Labor Equipment Material 1 Trucking I Expense 1 Sub Pay Item 4 R RC��tCode� Description: ------ -- Sub Addendum: Quantity: -------------- --' --- Unit: --- ----- Revenue: ---� Cost: Unit Price: Unit Cost: ------ --- ----- -- Cost Breakdown --- -- -----[���---- Equipment |--���te/is[— --- Expense — ---- ---- � ---�--'-------']-��------'--- � T��-------' ' -------- ~ Pay Item# R-K[ost[odc ` Description: ---- Sub Addendum: Quantity: ------' Unit: ------ -- —' Revenue: --- ._ Cost: Unit Price: ---- Unit Cost: —'---� -- -- Cost 8reandown ---- � Labor 1 Equipment----� Trucking ------- Ex Expense Material $ �__-__ $ __ ________-________. Pay Item A K-RCo�t[ode� Description: ----- — Sub Quantity: ' ----- Unit: ---' Revenue: --- --- Cost: Unit Price: Unit Cost: -----------' --- ----- [ust8reak6ov/: -- ---' — ---- La E- -- ent_ Material Trucking --- Sub --Expense __' � � . . - __ ' ' __. 3�__- -'_-_�'-_��___-__- . � . Pay}/em # ' — R-R Cost Code: Description: ---'----'--- ____ ������������—_ _ ___ Quantity: Unit: -----------Revenue: ---------- Cost: - — --- Unit Cost: --- —'—' ---- --- Cost Breakdown —'---- ----- Labor EquipmentT Material—1 Trucking --1 Expense I Sub . ' ---- --- ---- ---- — --- -----' — ---' — ------- ------------ Change Order Request �/].R.� 11'o05-0g9 G.C. # Date: 4/9,2012 Project Name; Towne Road 131st-146th Project,#: 11-005 — To: K/etb'Ri|eyCona\rucdon Co. From: Poindexter Excavating, Inc. Attn!John Yadon Kim Andrews 1751 W. Minnesota Street P0 Box 363AQ Indianapolis, iN46236 Indianapolis, IN 46221 Phone: (317)O84' 551 Fax: (317) 631-6423 Phone:(317) 823-6837 Fax: (317)823-4662 We hereby propose to make the fol lowing changes T& M Work: install yard drains Per Torn Gentry 3/16/12 T& NA ticket#111688 install yard drains 20.54 tons of IN state#88 stone Core drilling; re-spread topsoil 3/19;12 T & M tick.et#111887 Continue installing yard drains used 2 yds of Class A concrete; hauling 3120/12 T & KS ticket#1116OG backfill yard drains and re graded area; dumped concrete pipe Change Order Price $5,227.31 Original Contract Amount 81.500.94898 This price is good for 60 days. If conditions change, this price is void We are requesting a time extension of 0 days in conjunction with this change. Kim Andrews 4/9/2012 Author Date Sent _ / Accepted The above prices and specifications of this Change Order request are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless cthewise specified Authorized Signature Date of Acceptnc pmoa1n/z Change Order Request C.O.R.# 11-005-009 *, :.,,,... G.C. #*,,,,O.f Dale: 4/912012 Project Name: Towne Road- 131s1-146th Project#: 11-005 Laber . -- t..,aj,,s,rIvile i Map Hrs-1 Snirl B..g.r. 1 Frinnel . Total Taxi Total Labor 1 '.... - Laborer 19.00 550.00 $0.00 $0.00 SO 00 $1.140.00 Laborer Premium rime 3.00 525.08 5/100 $0.00 $0.00 590.00 Sub Totai $1,230.00 Grand Ir.vtai 5'1,230.00 Materials [ Materials i Qttanklyi .1 IA Total Mated& Corn-seta 2.00 $178,00 $0.00 $398.72 #8 slone-IN 20.54 $13.90 $0.00 $319.77 Sub Total - $718.40 Grand Total $718.49 Equipment I Equipment 1 Quantitil cp._517- TirgatTa-,-1 Total Equipment' 416 Liaclo>e 2.000 S101.00 $000 32.202.40 Skid Steer 2.00 $109.60 $0.00 $244.16 Sub Iota: 52,606.66 Grand Iota: $2.506.58 Expenses gxoenses 1 Quantity Cost! Total Tax! Totat Expense _ Tri-axle 5.00 $80.00 $0.00 $473.00 Core drilling 1.00 5225.00 S0.00 $247.50 Sub Total $720.50 Grand Total $720.50 Totat Cost $5,175.55 Bond $51.76 Total $5,227.31 Pace 2 of 2 , . MA 1 OFFICE PO'Nt i P---vf t--14 : _ t[ ,," CZ", .; ..._, ' Ra BOX.:J(.:3•:-.1'9 (317-)823-6B37 .,Ir'ir, '.1.'0L.1 ,I4:?,141 SA 64Epi,,; EV C 4:\I 61-11k G ii„,„, ,,,,,t ti, ,, , : ,:, ,,,,, .,, , ,,,, „.,,,,,,, ,10;,.•:vi,,,ile,. , DATE i IN L,-, IN.si_IRF F.)AND BONID4FD _ —.----, — --„,..—— — 7-- WORKED ' TRAVEL i TOTAL MACI-CNE TOTAL 1 76 1 JOB PERFORMED HOURS ilia: 1 HOURS @ ,,Aistir 777 -777—.7--- . . -..„....— . .,,,. 1 , - t . i • . ' * ; I. „ „ ..,,.. Z ..! .-.2:3- t, -I ..., .,. , . - . . . . . .,.-- 1 . i t• --I - - I - -.1 a......1 I - F - - 1... . 1- - 11 I 1, H ! ---- I t- 11 - . -- Reniarlt:"..,: • • :4-- " - :'-,-,. ! f...,::...-' & -1 '......;,-L-.. '''', ; '...'..1; ' " ... '",`'.;$1 "..".,,:,, - :--,:,-:*- , Poicemxter Job;.1.ilnp:: Cuslornet P O. ,ii (2 t is;bic. tl ___________ i „_ Silt Ta r ,.. . Opeator Acidres5 Cizturocr_ .."-,,,,,. .•,,,,,...,_.^*: " , ,,,,„,;......,--C--* ---• Ict! 4re AA ET;(if Opportunity Employer and participate fit E-VeriLi‘ MAIN OFFICE :.' 't :''S, I'"'",:s.,-' -r t-r., Pkj tN Li EAT 1-:k CO,,c,,,, fc.,17)6236537 INLIIANAPCI.11:"i, NDIANI=.7,..-62I36-0 [,.....,:v 0' AV . , PI\tr ......., ,,..,......,,r--,:.xo -,, . v t. ,,,N.:7 . . DATE N.I'( — tfilf%44kill , _ INSURED AND BONDIEE.1 r -, _____ ..,.._......... MACHINE woRKED r 4.434VEI.. 1 TOM. 1 ( if tk,i 0 T ,L. Hams , TIME HOURS 1 .- k P.m,„.: I JOE-i PERFoRkf,ED _ ...... . „ I , 1 , .,. _ ! I ----1- 1F- ________ 1 ------1 L , , i i i „,.. 1 i —1----- 1 i • i , i _ ... , ; 4 _ i ......._ ...._.I ,..,„ . . ,'„,,• f ,..:.,..-'1.,-,:, ..1,: t'., ;-,..:.: ' .');,...,.,:?.. , — , ., _.. . - ..- Poiodemf Job fIarn72 1 :,_.-_, „ „4_,...' ;:, .., ' 7:'01 j..-,(.2,7•T-4,,, t."7usbrner P.O.g _ i L' ” -=,',,-.," 7 .1 Poindelzter Job i _ ________ Sili To _ _ Oi.wiistul ',,,' t',2'7 7 =_L-LL = rz' '. Address _ Custorne: __.;:c, l 4' ,,,` .... _A...',',_ , ,.;- m file Are Ati Equal.OpporNuity Emptoyer and participate iii E-I-;Trifj, 'riP,11-4 OFFICE ""...' `'Nr)E rr::: i-z, Vz',,,,) ' L. ,.)-\. 0 LI, ,,,, 17)f-i23-€B37 NISAANAV-OL!'<;,iNDI*JA V:v-r A.-VAT r 6.....ek,, .--r-k. ,,. :_ '1 ' —I Ai 4.1 7 . DATh [NL , ...74:71'1 . t__ INSURED AWE):30NDL'i,)_ I To,TrA,L, ,mpto,EE takcHNE 1 vg-,1,7", 1 T it,5‘'E'- HOURS -±. , NAME -.'-----'------1--- - '---- --7--------7-7-7---- 1 1 , . ---r- . . I I --L__ I. ___,,r.y-• - . ... L LITt4 (10 I i -i 1 1 ? .1 —,,:.ri,:-,,,,,, 4",",', '''r..,•rri b,.4 _.I ff•-•:.,f't..-ii•-...2-1'._-•if.F,T.,_ir ,•• 1 71: • •e"r",i'. L,1441-1,./r•rrt: / 1 I 11- - - I - — -4-• 1 I i -1- 1 _____ ____..... 1 I I I _ 4 — i t---- 1 -- - -.._I - - I ___ I-----1 .... .... I 1 -1 J i . 1 1 _ _ ..... Remarks: /.,-, <"/ „■5,,-.4-'' <-i ,,,,7.z.1±_sit,.-- , „ eil, ,<= C- ' ft`,'9''.,...--k --I-fir,/ -14 ''' ' ..,...-__47..4f,--.... --' '---,,,,,,, --•,-- . ///- t -;•rt, • A .,,-•, ,f''''r•e -4- -,', is.,,,j/ •-'1 i'r r..--,.. ...4.i ,.,,,' 11 '.1• ?” 6.4_1_4-, :',,,.-:,7 i it4, %,„,,,,:.."_, ..., ,,z Nip:feu:to,.ix..)Nams-._ •,,• ,,,, _ •.,. ,--'-i p ft•r t:,4:: ,rr \'' Customs/P.O.e t tj_r" , I e'') ' - ' f=oludertuf../N1 A: ,, :,.. kliit To , Adoress _ Cuome: si _,-, -• 'f' ...-f.,..,..A._ We Are.4 Equal Oppor6ority Empleyer and participate la r-l'erip' r - EY CONSTRUCTION CO INCH POST OFFICE BOX 276 INDIANAPOLIS,INDIANA 46206 • WWW.RIETHRILEY.COM "100%Employee Owned" LETTER OF TRANSMITTAL TO: Clark Dietz, Inc. DATE: 8/28/12 8900 Keystone Crossing, Suite 900 PROJECT: 146th and Town Indianapolis, IN 46240 JOB#: 3200425 ATTN: Thomas A. Gentry RE: EWA Repair Bike Path Revised We Are Sending: { Submitted For Action Taken: Shop Drawings X I Approval j j Approved as.Submitted Letter I Your Use j j_Approved as Noted J Prints/Plans As Requested I Returned After Loan X Change Order Review and Comment i Resubmit Copies Samples { ; Submit Copies Specifications Sent Via: Email { j Returned Other: { X Attached j Returned for Corrections j I Separate Cover Via: Due Date: Notes/Remarks: Tom, Please find the revised pricing below for the bike path repair. If you have any questions or need any further documentation, please give me a call at your earliest convenience. ITEM DESCRIPTION QTY UNIT UNIT PRICE EXTENSION EWA Repair Bike Path 1 LS $ 3,220.00 $ 3,220.00 _ 3,220.00__- . CC: 3200425-Job File Signed: 4• Lisa Lukemeyer, RR Cont Admin. Brian .arrett-,;senior "roject Manager 1751 W.MINNESOTA • INDIANAPOLIS,INDIANA 46221 • TELEPHONE:(317)634-5561 • FAX: (317)631-6423 AN EQUAL OPPdRTUNlTY ErVIPLQYER i -- 4lr� f23tLl JQ --° 44ssu�rAnrcF of icIrt inn-EQm P spoNSrgmnr o I�t'C rsra� old` RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 8/28/12 Work Performed: 3/20/12 and 3/22/12 CONTRACT: PROJECT: 3200425 FORCE ACCOUNT/EXTRA WORK FOR: Repair Bike Path(revised) LABOR 109.05(b)(1) HOURS EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION P CARPENTER 0.00 $25.87 $0.00 CARPENTER FOREMAN 0.00 $27.37 $0.00 COMBINATION 0.00 $28.06 $0.00 FINISHER 0.00 $25.62 $0.00 FOREMAN 3.00 3.00 $31.25 $93.75 LABORER 9.00 9.00 $23.62 $212.58 MECHANIC 0.00 $30.25 $0.00 OPERATOR(103) 9.00 9.00 $30.25 $272.25 OPERATOR(841) 3.00 3.00 $29.25 $87.75 OPERATOR OILER(103) 0.00 $28.53 $0.00 QA TECH 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 $41.08 $0.00 TEAMSTER 0.00 $26.81 $0.00 TOTAL LABOR $666.33 (2) FICA 7.50 I % x LINE(2) $49.97 (3) FRINGES EMPLOYEE HOURS RATE EXTENSION CARPENTER 0.00 X $15.47 = $0.00 CARPENTER FOREMAN 0.00 X $15.47 = 1 $0.00 COMBINATION 0.00 X $11.86 = $0.00 FINISHER 0.00 x $11.86 = $0.00 FOREMAN 3.00 x $11.86 = $35.58 LABORER 9.00 x $11.86 = $106.74 MECHANIC 0.00 X $14.56 = $0.00 OPERATOR(103) 9.00 X $14.56 = $131.04 OPERATOR(841) 3.00 X $16.16 = $48.48 OPERATOR OILER(103) 0.00 X $14.56 = $0.00 QA TECH 0.00 X $11.86 = $0.00 SUPERINTENDENT/PROJECT MAN 0.00 X $10.00 = $0.00 (TEAMSTER --- I 0.00---1 -X---I $11.901- = I - $0.00 TOTAL FRINGES $321.84 (4) WORKERS COMPENSATION 5.72 I % x LINE(2) $38.11 (5) BODILY INJURY/PROPERTY DAMAGE INSURANCE 5.80 % x LINE(2) $38.65 (6) STATE UNEMPLOYMENT 3.85 % x LINE(2) $25.65 (7) FEDERAL UNEMPLOYMENT : 0.40 i % X LINE(2) • $2.67 (8) TRAVEL ALLOWANCE OR SUBSISTENCE(NOTE#3) $0.00 (9) TOTAL LINES 2,3,4,5,6,7,8&9 $1,143.22(10) 10%x LINE(10) $114.32(11) GRAND TOTAL LABOR LINES(10)+(11) $1,257.55 (12) Page 1 of 2 MATERIAL 109.05(b)(3) Purchased or Manufactured Description Quantity Unit Unit Price Extenstion M HMA Surface 7.10 Tons S 44.00 $ 312.40 M HMA Intermediate 20.75 Tons S 42.00 S 871.50 - S - S - MATERIALS PURCHASED $0.00(18) MATERIALS MANUFACTURED $1,183.90(19) TOTAL LINE(18)+(19) $1,183.90(20) 10%x LINE(20) $118.39(21) GRAND TOTAL FOR MATERIALS:LINE(20)+(21) $1,302.29(22) EQUIPMENT 109.05(b)(4) wdew CONTRACTOR OWNED EQUIPMENT frown HOURLY RATE HOURS EXTENSION 7248 PAVER 8FT TRACK AP655C CAT $229.78 $0.00 xMiscl Roller $28.46 3.00 $85.38 xMisc2 Skid Steer $37.69 3.00 $113.07 7516 TRUCK PICKUP 3/4 T CHEV $28.28 $0.00 xMisc3 Tack Truck $61.69 $0.00 xMisc4 Low Boy $79.69 $0.00 7739 TRUCK FLATBED DUMP KENWORTH $35.67 $0.00 6335 TRAILER TILTTOP TALBERT $7.04 $0.00 xMisc5 Cat 420EBackhoe $44.43 3.00 $133.29 0- $0.00 $0.00 0• $0.00 $0.00 0- $0.00 $0.00 TOTAL EQUIPMENT $331.74(23) TOTAL TRUCKING $0.00(24) FUEL,LUBRICANTS AND TRANSPORTATION COSTS $0.00(25) TOTAL UNES(23)*(24)•(25) $331.74(26) 10%xUNE(26) $33.17(27) GRAND TOTAL FOR EQUIPMENT:LINES(26)+(27) $364.91 (28) SUBCONTRACTORS 109.05(b)(6) • DESCRIPTION Trucking-3 hours( $78 Hr $234.00 TOTAL SUBCONTRACT WEEK ENDING $234.00(29) 10%x UNE(30) $23.40(31) (32) GRAND TOTAL FOR SUBCONTRACTORS:UNES(30)+(31)+(32) $257.40(33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL UNES(12),(17),(22),(28)&(33) $3,182.15(34) 1.1 :%OF BOND RATE BASED UPON UNE(34) $35.00(35) 10%x LINE(35) $3.50(36) TOTAL EXTRA WORK UNES:(34)*(35)*(36) $3,220.66(37) Page 2 of 2