Loading...
HomeMy WebLinkAboutReith Riley/CO 8/inc 4,090/Towne 131-146th TO:Rieth Riley CONTRACT CHANGE ORDER NO.:8 DATE: 12-9-11 PROJECT NAME:Towne Road: 131St Street to 146th Street CITY REQ.NO.: CITY PO NO.: CITY PO DATE: 1. You are directed to make the following changes in this Contract: Install 24 wide farm field entrance on the Gloria De Guy property. SCHEDULED ADJUSTMENT ITEM (New) AMOUNT (+) OR (-) DAYS 114 Farm Field Entrance LS = $4,090.00 Zero Days II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: Time and Material pricing quote from contractor The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $3,775,177.28 Contract Price will be increased/decreased by this Change Order $4,090.00 New Contract Price including this Change Order $3,779,267.28 Contract Time Prior to this Change Order: Completion Date December 3rd, 2011 Net increased/decreased resulting from this Change Order Zero Days Current Contract Time including this Change Order Completion Date December 3rd,2011 This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved Recommended: Accepted: L Clark Dietz Engineers Reith Riley Construction Co. James Brainard, Mayor ENGINEER CONTRACTOR 8900 Keystone Suite 900 P.O Box 276 /� �� // Address Address ar : nn Burke, Member t Indianapolis. Indiana 46240 Indianapolis. Indiana 46206 Lori W. 'on, Me •ber City/State/Zip City/State/Zip , 1.i Pa � it7� � •p e• ,.n s• By: � By, oT/ , ATTEST: Phone:317-503-5250 Ph• =.3 7-6 ..: . Diana Cordray, Clerk-Date: Date: 1/12/12 Date: VW Treasurer — Date: /0/i 7//2_ Mit41116"1.- I. 604j. ,Crry foGikvrck CITY OF CARMEL TO: THE CITY OF CARMEL, INDIANA CONTRACT CHANGE REQUEST NO.: 8 DATE: 12/9/11 PROJECT NAME: Towne Road: 131St Street to 146th Street FROM: CLARK DIETZ ENGINEERS $ 4o� ►� ►� � de*. IT IS REQUESTED THAT A CONTRACT CHANGE BE MADE TO THE ABOVE REFERENCED CONTRACT. 1. SCOPE OF WORK Install 24 wide farm field entrance on the Gloria De Guy property. 2. REASON FOR CHANGE: No entrance was included on the original construction documents. 3. APPROXIMATE COST CHANGE TO CONTRACT PRICE: $4,090.00 4. WILL THE CONTRACT NEED ADDITIONAL CONTRACT TIME TO COMPLETE THE CHANGE IN WORK SCOPE? -YES X -NO 5. WILL THE CONTRACTOR NEED ADDITIONAL PERSONNEL TO COMPLETE THE CHANGE IN WORK SCOPE? -YES X -NO IF NO, TRADE(S): NO. OF PERSONNEL: DURATION: 6. IDENTIFICATION OF ATTACHMENTS: Time and Material pricing quote from contractor DATE: 12/9/11 DATE: //8,20/,Z PREPARED -14/41/Gr✓ l REVIEWED BY: Thomas Gentry Clark-Dietz Engineers REVIEWED BY: _AllIA(.3Z ENGINEER Comments and Recommendation: 4,1 Alb \P 219-w y s aor.ira g n Ap; pf ' Employe,o°"ed' John Yadon Project Manager Wozb-Riley 1751 \Vcst Minnesota Sired Indianapolis, IN 46200 Thomas A. Gentry Clark Diet,. Inc. Engineers 8900 Keystone Crossing. Suite 900 Indianapolis, lN4624O 3L7.&44.8900'office 3l7.844.9)j8-fax 317.503.5I50'coU .s.,g*��`'^���,y^�*�x Project: Towne Road 130- 146m�r,r� RE: Request for Change Order for Farm Field Entrance Dear Torn, Per your request we performed work related to installing a farm field entrance that was no! included on the original drawings. The entrance allowed the property owner to in access bo � o u|dmithou� onyoha� odony. '[hopnupu�yo�vncrhad rnuunao[eaoeom prior to this contract and �vaauoahletocoLer under the original contract conditions. The request for this change is $4,090.00 and no additional days. ,$t>/: ,:iog(4(4:(416.4m4)(Kg(4.4414(1)(606.0n4kon1M111,(10151(16%11145141MMEgnigt:P-1 Project Change Order Budget Client Project 4 R-R Project 4: 3200425 Date: 4/4/2011 Work Performed: Yes Project Name: Towne Road Change Order H: Pay Item # T&M R-R Cost Code: 42515 Description: T&ill Farm i F field Entrance Sub Addendum; Nol Needed Quantity: I _.�.�.� Unit: ..�. LS Revenue: $ 4,090.56 Copt_ 3:268.23 Unit Price: $ 4,03Q.56 Unit Cost: $ 3,26823 Cost Breakdown Labor Equipment Material Trucking Expense I sub 1,207.73 1.016.50 $ 1,444.00 $ �S S Created By: Checked By: Page 1 of 2 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: Work Performed: 'Farm F(ed Entrance - CONTRACT: PROJECT: FORCE ACCOUNT/EXTRA WORK FOR atfeiNlitbilikigitigOgaittgd:UikiNili:5119111NIENCidilbatit:glinal FIMIEEMET1111,31r .: :::3ENNARRETHEN:tiiralllVara1001?Matillintrallal Minglig-:: -.3N1111111111111r:::--. HAREggill-MMilarnirillrilittenVii.1-IiiirM7P111111111111101141 LABOR 109.05(b)(11 HOURS E MR.OYE E Regular- Overtime Do u bleti me TOTAL RATE EXTENSION CARPENTER MIDINgen Ifirtfrpq rmon 0.00 $26:Qo $0.00 CARPENTER FOREMAN 0.00 $28.:00 $0,00 COMBINATION AMR 0.00 828.76 $0.00 FINISHER g;:giznagel aseconveg AggpaG.,':, 0.00 $0.00 FOREMAN 6 M2 Z,V5:11 2.50 $82.70 LABORER tika, 144:.: 12.50 $23.62 $295.25 ImEcHANic .; 0 00 $0.00 It-.)PERA roB(103) a! O97..n'a a(a),( . 'n-',((ara 6.00 $30,70 5184 20 OPERATOR(841) ,!:!.;,!1151::ViE--AIR 0,00 -$28-.9 $0.00 .OPERATOR OILER(103) 10114141 PC:4:5199M1 T11!%*41 0.00 827 63 $0.00 GA TECH gINORRAti 000 '-$23,62- $0.00 SUPERINTENDENT 4:0-Qtims 4.00 ,''$380 $154.80, TEAMSTER 1,00 :$2608 $26.06 rAL LABOR $74301 (2) IrIOA 401443151M Ta x LAB(2) FRINGES EMPL OYEE HOURS RATE 1 EXTENSION CARPENTER • 0.00 , $0,00 CARPENTER FOREMAN - 0.00 - $12.96 = $0.00 COMB:NA 0.00 x = 7 $0..00 FINISHER 0.00 x = $0.00 FOREMAN 2.50 x , •-• $10.00 = 1 $25.00 LABORER 1250 x $11.21: = $140.13 MECHANIC 0 00 x - = $0.00 OPERATOR 6 00 $1291 1 $7746 OPERATOR(841) 000 X -$1526: = I $0.00 Imam OPERATOR OILER(103) 000 dm= $12.91 = $0.00 OA TECH 000 x $0.00 SUPERINTENDENT 4.00 x = $40.00 TEAMSTER 1.00 " $9.98 TOTAL FRINGES $292.57 ('F) WC,'RKERS COMPENSATION % X UNE(2) $42.50 (5) BODILY INJURY./PROPERTY DAMAGE INSURANCE ig5k$Pi % X LINE(2) $43.09 (0) STATE UNEMPLOYMENT ri3451 % X LINE(2) $28.61 (7) FEDERAL UNEMPLOYMENT ia-UO2 % x LINE(2) $2.23 (a) TRAVEL ALLOWANCE OR SUBSISTENCE(NOTE#.3) $0.00 (9) TOTAL LINES 2,3,4,5,0,7,409 $1,207.73 (10) x LINE(10) $241.55 ;11) GRAND TOTAL LABOR LINES(10)+01) $1,449.28(12) Page 1 of 2 MATERIAL 109.05(4)(3) Manteacturecl ,P intAA'''Airnt.AleaConicrtet U312,022';E-Aad, 003 5, t55.00 544 26 Pare$CO3%0, Teen,-4111440"PM641 8111?t1 1,(4 OX1115:4S8819.151( 5t4tt'11.11500,9(: s 52000 '4's4tPT s . = s 5 MATEP1A2 SP,IRC.11,ASED 91,044,X:15) MA1E1,0.4.1:3 MANLI(4:-TUREO SC.30 t NO IA: LINE 09) 19) 51:044,00 22' 12%Y.LINE i2121 8125 20(21 101A1.FOR MATERIAIS.111(9 czo) $1 15028 021 --- EQUIPMENT 109.05(b)(4) CON11A,ACT OR OWNEL1 EC421PMEI4 1 HO2RS EXTENSION 0 Eaclthoe 15,5X.• .. '-'4,ft176 S145 00 Ttuck Salth' • IMMS: $15850 31211Se93s 9921112 0.00 5,40 00 559011. $0.00 Ten • 933.03 $83.09, S0.00 51400:• 1 2:W14(1 50410 $0 00 moo- 8000 $022 80.004 90. 3 ' " . $0.00, soot). F:oimetio47 s1,0-'4.0o 231 $0.00 t)2(1, FUEL.LUBRICANTS-AND TRANSPOR I 31100 COS Ts 8254.13 051 TOTAL LINES(711«9741 125) 51,270.53 12E1 1214 ONE(19) $152 48(211 GRAND TOTAL IQA EQUIPMENT LINE:2E2E) P20 81 423 IC(291 SUBCONTRACTORS 109.05 01)(91 DE:22017,110N 5000 $0 00 TOTAL SUB.:',ONIRAC 1931-119 1-1401110 11000 10'tb"X Lit■E POJ$3,C110,1X1 OR(.995 80.00 CO; x t.iNE(ir...)OVER 93,0110.09 $0,00 t 52) GRAND TOTAL.PON OUR,01419302091.LINES(0,(-1 I'll'•(112} $0.00 1,33, ° - — TOTAL OF WORK COMPLETED FOR THE WEEK TOTE)t INES(LA.),IITI,1721.(2A)9 123( 84,041 66 134) 1,1;1.1A:%OP 13C11IO 9319 RASEU UPON LIEN 34, 844 46(35) to%, INF Ettn $4.45{3C) 1<.IA,.1111 1143 WORK ONES'!341 4351 Obi 84.000 56,;245 Page 2 of 41 At.„:!!,1 C fems u1/4 -of * T Co 'uoem�v^p�o°=� 5'29-}2 JoboVudoo Manager Rjcd+RilcT {75\ West Minnesota Street Indianapolis. IN 46200 Thomas A.Gentry Clark Dieiz. inc. Engineers 8900 Keystone Crossing, Suite 900 Indianapolis,[M40240 3]7V44890O-office 3l7.&41,9l58' fax 3\7,5O3,52j0-cell Project; Towne Road 13r' i4.6mStreet. RE: Request for Change Order fovBikePatb Dear Tom, Due to the additional inlets that were required for yard drains the bike path had to be removed and reinstalled } am requesting $4,550.98 for the additional work and no additional days. Sincere ___ Project Change Order Budget Client Project 4 R-R : r-oiec'i 4: 320 425 Date: 4/4'2011 Work Performed: Yes._- _..- Project Name: Towne Road Change Order 0: Pay Item# TF t!i R R Co s; Code: 0 '�1 Description: Bike Path Sub Addendum: Not Needed Quantity: 1 Unit LS Revenue: $ 4,550.98 Cost: r,1 t4 Unit Price: $ 4,5`0.998 Unit Cost: $ 615.44 1 Cost Breakdown I i .. Labor quit b r i fain : Trucking txtu rise i Sub S 1,100.49 I S 1,283-00 $ 1,231.95 $ - $ $ Created By: Checked By: Pane 1 of 2 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: Work Performed: 1111.3'003R111:1110-:::::::-:..,-• CONTRACT TOOMISRt PROJ EC I: ••.-:!-::::-:::,:;:::::::13,11182,$::,::7.: aggreigatiatir....N::qA:glagi; FORCE ACCOUNT/EXTRA WORK FOR: PT17411110.1FAMINKE.-..--:::::•.....ki13111,41;:;;K:igainglitialf100:0011•11 Algagegallt,Agal,tirAfilIllntiagiRMEIMPtV 121115016.4515111figE::::',.... -:::::::11111111E241112:.::::4:2MIONSIONE111.0111011111E111 LABOR 109.05(b)(1) 111111111111111111111111111111111. Rc'gular (3verbrn p°ubletime TOTAL IIIIPP1,11: Enagell111111111111111111111111111111111.11akkallaiLI,-',..E'l4111,051 0-00 $26.00 $0.00 CARPEN1 ER FOREMAN _ IMIIIIPSSakirillig.MHAR! 0,00 $28.00 $0.00 COMBINATION 111011111 Minn 0.00 '11.$7.74,10. $000 FINISt tER 11Fite::'::TA 0.00 $25.62 $800 FOREMAN .kgIa2I020:iga IggligtOpiggl 3.00 435.95- 5115 78 I LABORER Nitotil 6.00 $165.34 MECHANIC 0.00 . 520.70 $0.00 OPERATOR(103) zugl4.Ritigra megtoojok lestim 6.00 70 $214.90 OPERATOR(841) rfflogoam 4)'4 0,00 0.00 - 528-:95 $0.00 OPERATOR OILER(103) 4 0.00 $27.63 $0.00 ,DA TECH 14oke..:0ii,:m„i,,gami 0.00 ',.•::; $262 $380 SUPERINTENDENT OK 406RM:I 4.00 - '538.70 $154.80 TEAMSTER 2.00 :$26.00 MEM TOTA1 ABOR $702.94 c.2) FICA 17,5.pam x LINE(2) $52.72 (3) FRINGES EMPLOYEE HOURS RATE EXTENSION CARPENTER U.00 X i T;. $12:96 = $0.00 CARPENTER FOREMAN 0.00 x „.$12.96 = $0.00 COMBINATION aoo x $0.00 EINISHER 0.00 X $11.21 = $000 ,FOREMAN 300 x = $30.00 LABORER 15.00 x = $67.26 MECHANIC 308 X = I $0.00 OPERATOR(103) 6.00 x = OPERATOR(841) 0.00 $15.20 = I $0„00, OPERATOR OILER(103) 0.00 x = $0.00 OA TECH 0.0) x = $0.00 SUPERINTENDENT 4.00 x = $40.00 TEAMSTER 2,00 x I = $19.96 TOTAL FRINGES 5234_68 WORKERS COMPENSATION 5,72 % x LINE(2) $40.21 (5) BODILY INJURY PROPERTY DAMAGE INSiIRANCE % x LINE(2) $40.77 (6) STATE UNEMPLOYMENT 3.85 % X LINE(2) $27.00 (7) FEDERAL UNEMPLOYMENT % X LINE(2) $2.11 (8) RAVEt At OWANCE OR SUBSISTENCE(NOTE 43) $0.00 (9) ToTAL LINES 2,3,4, 1.659 51,100.49 (10) 20%x LINE(10) $220.10 01) GRAND TOTAI. LABOR LINES(10)+(11) 51,320_59 (12) Page 1 of 2 •„ MATERIAL 109.05(bi(3) Purchauen ot Munplatiared DeAcripiion , Quantity UALit Lnal Raw ii.E.3-22:1313122S-a)qak3aLe LILESY:-.2211INGI S 21-11I 434M 04 ophopirmi!,1,K4fxs5BE MATERIALS PURODAEED 02,231 95 cle, MAI ERIAL.S MA OF 30 50 c.191 TOTAL INS(la) 59; .F.,1231,95(20) 12401-8./5120 3142 83 GR.AND.1OtP.L FOR MATERIALS I INFS.(25> 21-) 31,375.78(22) EQUIPMENT 109.0$(0101 (CONTRACTOR OWNED EQUIPMENT HOURS EXTELLSK>H 0 5001500 252.00: EF:TiTigltnta $114.110 Ruler B46.(lti --_3:Ds011I5,300 3)44.00 L(AuBoy .11.12.011 $472.02 38380 1/3004I09 $337 00 Tnok S23.00 100 0101,00 S'1" 61r4QI,S44103188 ••••••• 30.00 io.R0 SD OD 30 03 50.00 . $0,00 50-00 • alMillantik:MIN 30.00 30.00 • $9.00 $0.00, >0>5 FOUIPMENT 01,283.00/22; TOTAL 7RuiLiONG SO.00;341 FUEL.WE-IRK:AN rs AI40 I RANSPORIA ON COS IS 332)575 12:1 TOTAL 11000 12.2•(24)A ILLS) 01,403 75 42%> IN)-(201 51112.45 127; GRAND TOTAL FOR EQUIPMENT:LINES(26; ;27; 31,796.20 SUBCONTRACTORS 109.0$(N(2) - -- DESCRIPTION $000 $301> TOTAL SUBCONTRACT WOO'ELIDING 30.00;23) 10% LINE(30)S2000(A)OR LESS 00 CO(311 7%-;curiE(3o)OVER$3.000 co SO CO 012) GRAND TOTAL FOR SUBCONTRACTORS:LINES(20)•(21 4;32; $000;33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL 0'4E1 tl2L A F1.3; S44657(3=1) Cr BOND RAIL RASED UPON L;NE(34L 04.9.40(35) 10 4 x 5(145)94 $495 Qs: 11).Fist&AI RA WORK LINES:I:31i (35) (2,3i S4,550.98(27;, Page 2 of