HomeMy WebLinkAbout1179.97.6BASEMENT ROUGH FRAMING NOTES:
1. USE (2)-2x4 CRIPPLES UNDER EACH END OF HEADER
FOR OPENINGS 8' -0" OR GREATER IN WIDTH
2. REFER TO MECHANICAL PLAN FOR BULKHEAD AND
DROP CEILING LOCATIONS.
3. ALL BEAMS TO HAVE MINIMUM (2) -2x4 STUDS UNDER
EACH END FOR BEARING SUPPORT
4. ALL WALLS TO BE 2x4 STUDS AT 16" O.C. UNLESS
NOTED OTHERWISE
5. ALL WINDOWS TO HAVE DRIP CAP MATERIAL AT TOP
6. SEE SHEET S1 FOR BEAM CENTERLINE DIMENSIONS
7. STANDARD HEADER HEIGHT AT 6' -10 718" A.F.F. (U.N.0)
8. FINISH FLOOR REFERENCES ARE TO TOP OF CONCRETE FLOOR
notes.frm01
FOUNDATION FLOOR PLAN
scale: 1/4" = 1' -0"