HomeMy WebLinkAbout0411.97.2i
i
i
i
i
i
/
i
i
i
n
a
i
\ \ O \�
I
_ 2.5" CALIPER
*l "- 1 X
1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND PLANT LIST, THE PLAN SHALL DICTATE. IF
PLANT IDENTIFICATION BOX QUANTITY SHOWN ON PLAN DIFFERS FROM GRAPHIC PLANT CIRCLE COUNT,
THE GRAPHIC CIRCLE COUNT SHALL DICTATE. IF IN QUESTION, CONTACT THE LANDSCAPE ARCHITECT.
2. ALL SHRUB PLANTING AREAS TO BE COVERED WITH 3' THICK LAYER OF SHREDDED HARDWOOD
BARK MULCH. ALL GROUND COVER BEDS SWILL BE COVERED WITH 1" SHREDDED HARDWOOD
BARK MULCH. BARK MULCH SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND SHALL BE
UNIFORM IN TEXTURE AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR LUMBERING
OPERATIONS. NO UTILITY MULCH OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED.
3. AN APPROVED PRE- EMERGENT HERBICIDE SWILL BE APPLIED IN ALL PLANTING AND GROUND COVER
BEDS AT RATES SPECIFIED BY MANUFACTURER FOR EACH VARIETY OF PLANT.
4.
FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL BE APPROVED BY LANDSCAPE ARCHITECT
O
BEFORE PLANTING OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH
vi
2
A WOODEN STAKE INDICATING VARIETY AND SIZE OF TREE. ALL GROUND COVER AND MULCH BED
0
LINES SHALL BE MARKED BY A HIGHLY VISIBLE PAINT LINE WITH OCCASIONAL WOOD STAKES FOR
REFERENCE. ALL STAKES SHALL BE REMOVED FOLLOWING PLANTINGS OPERATIONS. LANDSCAPE
J
ARCHITECT RESERVES THE RIGHT TO ADJUST PLANT LOCATIONS ON SITE.
\ 5.
NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ALLOWED. IF PLANTS ARE SHOWN TO BE
N
UNAVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID DATE IN
WRITING. ALL PLANTS SHALL BE INSPECTED AND TAGGED WITH PROJECT IDENTIFICATION AT
NURSERY OR CONTRACTOR'S OPERATION PRIOR TO MOVING TO JOB SITE. PLANTS MAY ALSO BE
J
O
INSPECTED AND APPROVED OR REJECTED ON THE JOB SITE.
6.
ALL PLAITS ARE TO MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK, 1986 EDITION,
a
AS SET FORTH BY AMERICAN ASSOCIATION OF NURSERYMEN.
7.
PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE PLACED WHERE THEY WILL
r)
NOT CONFLICT WITH CONSTRUCTION OPERATIONS AND AS DIRECTED BY OWNER.
8.
ALL LANDSCAPE PLANTINGS, INCLUDING TRANSPLANTS, SHALL BE GUARANTEED FOR A PERIOD OF
Z
J
ONE (1) YEAR FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. AT THE END OF THIS
PERIOD, PLANT MATERIAL TERMED DEAD OR UNSATISFACTORY BY LANDSCAPE ARCHITECT SHALL
BE REPLACED AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR.
9.
THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE
REQUIRED FOR HIS PORTION OF WORK.
10.
PEAT MOSS TO BE USED ON PROJECT SHALL BE A DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE
N
BROWN IN COLOR AND COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS
J
TO ALSO BE MILDLY ACIDIC IN CHARACTER AND SHALL MEET APPROVAL OF ARCHITECT.
11.
LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT IN WRITING PRIOR TO BID DATE
P,
M
OF ANY PLANTS THAT HE FEELS MAY NOT SURVIVE TRANSPLANTING OPERATIONS OR IN LOCATIONS
F\-
NOTED.
12.
ALL DISTURBED LAWN AREAS SHALL BE SEEDED OR SODDED AS NOTED. SEEDED AND SODDED
LAWNS SHALL BE SEED MIX "U" FROM INDIANA STATE HIGHWAY SPECIFICATION OR AS APPROVED
0
BY LANDSCAPE ARCHITECT.
13.
ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT
END OF ONE (1) YEAR GUARANTEE PERIOD WITH NO BARE SPOTS COMPRISING MORE THAN 2% OF
ANY LAWN AREA. ANY AREA SO NOTED WILL BE SEEDED UNTIL AN ACCEPTABLE STAND OF GRASS
IS ESTABLISHED.
14.
ALL LANDSCAPE PLANTINGS TO BE MAINTAINED FOR 90 DAYS FOLLOWING FINAL INSPECTION OF
LANDSCAPE ARCHITECT. ALL SODDED LAWN TO BE MAINTAINED FOR A PERIOD OF 90 DAYS
FOLLOWING FINAL INSPECTION BY A/E AFTER WRITTEN REQUEST FROM LANDSCAPE CONTRACTOR.
MAINTENANCE TO INCLUDE WATERING, WEEDING, CULTIVATING, MULCHING, MOWING AND ALL OTHER
NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF LAWNS AND PLANTINGS.
'ACTA'
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WATERING, EVEN IF THE IRRIGATION SYSTEM IS
H
NOT OPERATIONAL AT THE TIME OF PLANTING OR IS NOTED INCLUDED IN CONSTRUCTION.
15.
CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF WORK AS REQUESTED BY LANDSCAPE
ARCHITECT.
16.
ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO RECEIVE 4" MINIMUM APPROVED TOPSOIL PRIOR TO
SEEDING OR SODDING OPERATIONS.
17.
BACKFILL FOR TREE PLANTING SHALL BE 75% APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS.
TOP LAYER OF BACKFILL SHALL BE 1007. EXISTING TOPSOIL A 5 -10 -5 ANALYSIS SLOW RELEASE
FERTILIZER SHALL BE INCORPORATED INTO BACKFILL AT APPROVED RATES.
i
CROSSING
BUILD NG
'ACTA'
H
N
�lmm NICE
n
rn
O
i o
O I N
000 o a a 2
N
V
5
W
O
Z
Q
vi
2
d
0
c
co
�?
J
N
CT)
O
U-)
N
Lj
d
o-
�
re)
J
O
O
Z
tli
;
a
J
pM
r-
It
r)
LL-
�_
Z
J
N
J
C
P,
M
0 d
0
F\-
NJ
T
0
0
0
�lmm NICE
n
rn
O
i o
O I N
000 o a a 2
N
V
f��
0
C'3
Za �
Oya a
Z�Z W
V
00W � o
mQ� g
s
O
O
CD
N
T
SHEET NO.
C7
>
i-
0
C
C)
Ln
O
d
0
c
co
�?
J
N
CT)
O
U-)
N
Lj
d
o-
�
re)
J
O
O
() 3
N
N
I\
X
Q
3
r-
It
r)
LL-
f��
0
C'3
Za �
Oya a
Z�Z W
V
00W � o
mQ� g
s
O
O
CD
N
T
SHEET NO.
C7