HomeMy WebLinkAbout0411.97.3" � Z-1
r
i
i
ZXX ' c5jQ'
/'
1
i
a
a
i
1
i
1
O \1
�� ) �)
O �
- - - - -- 2.5" CALIPER - --
2.
ALL SHRUB PLANTING AREAS TO BE COVERED WITH 3" THICK LAYER OF SHREDDED HARDWOOD
N
BARK MULCH. ALL GROUND COVER BEDS SHALL BE COVERED WITH 1" SHREDDED HARDWOOD
Ln
O
BARK MULCH. BARK MULCH SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND SHALL BE
13.
UNIFORM IN TEXTURE AND COLOR AND SWILL BE OBTAINED FROM SAWMILL OR LUMBERING
Z
OPERATIONS. NO UTILITY MULCH OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED.
3.
AN APPROVED PRE- EMERGENT HERBICIDE SWILL BE APPLIED IN ALL PLANTING AND GROUND COVER
N
BEDS AT RATES SPECIFIED BY MANUFACTURER FOR EACH VARIETY OF PLANT.
0
FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL BE APPROVED BY LANDSCAPE ARCHITECT
'
BEFORE PLANTING OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH
C7)
A WOODEN STAKE INDICATING VARIETY AND SIZE OF TREE. ALL GROUND COVER AND MULCH BED
-N
O
LINES SHALL BE MARKED BY A HIGHLY VISIBLE PAINT UNE WITH OCCASIONAL WOOD STAKES FOR
c CEO
N
REFERENCE. ALL STAKES SHALL BE REMOVED FOLLOWING PLANTINGS OPERATIONS. LANDSCAPE
`
ARCHITECT RESERVES THE RIGHT TO ADJUST PLANT LOCATIONS ON SITE.
5.
NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ALLOWED. IF PUNTS ARE SHOWN TO BE
15,
UNAVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID DATE IN
WRITING. ALL PLANTS SHALL BE INSPECTED AND TAGGED WITH PROJECT IDENTIFICATION AT
W
O
0
N
INSPECTED AND APPROVED OR REJECTED ON THE JOB SITE.
6.
ALL PLANTS ARE TO MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK, 1986 EDITION,
�
N
7.
PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE PLACED WHERE THEY WILL
ao
8.
dj
ONE (1) YEAR FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. AT THE END OF THIS
PERIOD, PLANT MATERIAL TERMED DEAD OR UNSATISFACTORY BY LANDSCAPE ARCHITECT SHALL
BE REPLACED AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR.
W
THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE
REQUIRED FOR HIS PORTION OF WORK.
}
Z
.>!j
J
t1i
4
pW
LANDSCAPE NOTES
N
AN
1. IN CASE OF DISCREPANCIES BETWEEN THE PL AND PUNT LIST, THE PLAN SHALL DICTATE. IF
PLANT
r
0
^
N
U IDENTIFICATION BOX QUANTITY SHOWN ON PLAN DIFFERS FROM GRAPHIC PLANT CIRCLE COUNT,
It
*
T
THE GRAPHIC CIRCLE COUNT SHALL DICTATE. IF IN QUESTION, CONTACT THE LANDSCAPE ARCHITECT.
,
0
0
0
2.
ALL SHRUB PLANTING AREAS TO BE COVERED WITH 3" THICK LAYER OF SHREDDED HARDWOOD
C
v
BARK MULCH. ALL GROUND COVER BEDS SHALL BE COVERED WITH 1" SHREDDED HARDWOOD
Ln
O
BARK MULCH. BARK MULCH SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND SHALL BE
13.
UNIFORM IN TEXTURE AND COLOR AND SWILL BE OBTAINED FROM SAWMILL OR LUMBERING
O
OPERATIONS. NO UTILITY MULCH OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED.
3.
AN APPROVED PRE- EMERGENT HERBICIDE SWILL BE APPLIED IN ALL PLANTING AND GROUND COVER
N
BEDS AT RATES SPECIFIED BY MANUFACTURER FOR EACH VARIETY OF PLANT.
4.
FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL BE APPROVED BY LANDSCAPE ARCHITECT
'
BEFORE PLANTING OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH
C7)
A WOODEN STAKE INDICATING VARIETY AND SIZE OF TREE. ALL GROUND COVER AND MULCH BED
-N
O
LINES SHALL BE MARKED BY A HIGHLY VISIBLE PAINT UNE WITH OCCASIONAL WOOD STAKES FOR
c CEO
N
REFERENCE. ALL STAKES SHALL BE REMOVED FOLLOWING PLANTINGS OPERATIONS. LANDSCAPE
`
ARCHITECT RESERVES THE RIGHT TO ADJUST PLANT LOCATIONS ON SITE.
5.
NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ALLOWED. IF PUNTS ARE SHOWN TO BE
15,
UNAVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID DATE IN
WRITING. ALL PLANTS SHALL BE INSPECTED AND TAGGED WITH PROJECT IDENTIFICATION AT
16.
NURSERY OR CONTRACTOR'S OPERATION PRIOR TO MOVING TO JOB SITE. PLANTS MAY ALSO BE
INSPECTED AND APPROVED OR REJECTED ON THE JOB SITE.
6.
ALL PLANTS ARE TO MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK, 1986 EDITION,
AS SET FORTH BY AMERICAN ASSOCIATION OF NURSERYMEN.
7.
PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE PLACED WHERE THEY WILL
NOT CONFUCT WITH CONSTRUCTION OPERATIONS AND AS DIRECTED BY OWNER.
8.
ALL LANDSCAPE PLANTINGS, INCLUDING TRANSPLANTS, SHALL BE GUARANTEED FOR A PERIOD OF
ONE (1) YEAR FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. AT THE END OF THIS
PERIOD, PLANT MATERIAL TERMED DEAD OR UNSATISFACTORY BY LANDSCAPE ARCHITECT SHALL
BE REPLACED AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR.
9.
THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE
REQUIRED FOR HIS PORTION OF WORK.
10. PEAT MOSS TO BE USED ON PROJECT SHALL BE A DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE
BROWN IN COLOR AND COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS
TO ALSO BE MILDLY ACIDIC IN CHARACTER AND SHALL MEET APPROVAL OF ARCHITECT.
11. LANDSCAPE CONTRACTOR SWILL NOTIFY LANDSCAPE ARCHITECT IN WRITING PRIOR TO BID DATE
OF ANY PLANTS THAT HE FEELS MAY NOT SURVIVE TRANSPLANTING OPERATIONS OR IN LOCATIONS
NOTED.
12.
ALL DISTURBED LAWN AREAS SHALL BE SEEDED OR SODDED AS NOTED. SEEDED AND SODDED
C
v
LAWNS SHAD_ BE SEED MIX 'U" FROM INDIANA STATE HIGHWAY SPECIFICATION OR AS APPROVED
Ln
O
BY LANDSCAPE ARCHITECT.
13.
ALL LAWNS SWILL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT
O
END OF ONE (1) YEAR GUARANTEE PERIOD WITH NO BARE SPOTS COMPRISING MORE THAN 2X OF
J
H
ANY LAWN AREA. ANY AREA SO NOTED WILL BE SEEDED UNTIL AN ACCEPTABLE STAND OF GRASS
N
IS ESTABLISHED.
14.
ALL LANDSCAPE PLANTINGS TO BE MAINTAINED FOR 90 DAYS FOLLOWING FINAL INSPECTION OF
3
LANDSCAPE ARCHITECT. ALL SODDED LAWN TO BE MAINTAINED FOR A PERIOD OF 90 DAYS
C7)
FOLLOWING FINAL INSPECTION BY A/E AFTER WRITTEN REQUEST FROM LANDSCAPE CONTRACTOR.
-N
O
MAINTENANCE TO INCLUDE WATERING, WEEDING, CULTIVATING, MULCHING, MOWING AND ALL OTHER
c CEO
N
NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABUSHMENT OF LAWNS AND PLANTINGS.
A'
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WATERING, EVEN IF THE IRRIGATION SYSTEM IS
NOT OPERATIONAL AT THE TIME OF PLANTING OR IS NOTED INCLUDED IN CONSTRUCTION.
15,
CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF WORK AS REQUESTED BY LANDSCAPE
ARCHITECT.
16.
ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO RECEIVE 4" MINIMUM APPROVED TOPSOIL PRIOR TO
SEEDING OR SODDING OPERATIONS.
17.
BACKFILL FOR TREE PLANTING SHALL BE 75X APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS.
TOP LAYER OF BACKFILL SHALL BE 100% EXISTING TOPSOIL A 5 -10 -5 ANALYSIS SLOW RELEASE
FERTILIZER SHALL BE INCORPORATED INTO BACKFILL AT APPROVED RATES.
ZOSSING
IILDIN G
A'
I Nk
quam C
t`
rn
O
0
O I M
0 a d
U) "
:S
•
•
J
m
C'3
za g
Oya a
Z�� W
z a
ZW U
z
mQ� g
0
co
N
T
SHEET NO.
C7
N
o
C
v
Ln
O
a
v
E
c
—
O
00
Ln
J
H
N
O
in
N
LEI
m
3
a-
v
C7)
►�
-N
O
O
�
c CEO
N
(V
X
Q
:S
•
•
J
m
C'3
za g
Oya a
Z�� W
z a
ZW U
z
mQ� g
0
co
N
T
SHEET NO.
C7
N