HomeMy WebLinkAbout0424.97.4I
BASEMENT FLOOR ROUGP FRAMING NOTES:
1. USE (2) 2 X 4 CRIPPLE!, UNDER EACH END OF HEADER
FOR OPENINGS 8' -0' OR GREATER IN WIDTH.
2. REFER TO MECHANICAL PLAN FOR BULKHEAD AND
DROP CEIL ING LOCATIONS.
3. ALL BEAMS TO HAVE MINIMUM (2) 2 X 4 STUDS UNDER
EACH END FOR BEArms SUPPORT.
4. PROVIDE (2) 2 X 10 HEADER AT FIREPLACE OPENING.
5. ALL WALLS TO BE 2 X 4 STUDS AT 16' O.C. UNLESS
NOTEr' OTHERWISE.
6. SEE SHEET SI FOR BEAM CENTERLINE DIMENSIONS.
�. STANDARD HEADER HEIGHT TO BE AT 6' -10 1/8' AFF. (U.N.O.).
8. FINISH FLOOR REFERENCES ARE TO TOP OF CONCRETE FLOOR
kM
c
t/_ 1 1■
54&E1 IENT FLOOR f=L AN
SCALE: 1/4' = I' -0'
Partial Br
BASE
FLOOR
SHE
OF
DATE:
JOB ":
FII FNAMF.