Loading...
HomeMy WebLinkAbout1120.97.20 HAR 51PE ENTRY GARAGE 1/411 = I' -011 �o 0 N 41 -811 2-2x8 HDR 3060 F_ LA�NPRY 1 19'0" GLG L_ — VINYL F 071 2/8 1 2 3.1 3.1 55-0" 24' 01 161-811 i oil i 11 i u i u 4 10 I 9-10_ 6-I 4-6 I ' 64 1/21' X3'-1 1/2111 41-9" L 51-111 21 -911 L, 31-411 W 3'-4° , 131-811 11- NOTE: BOND JOISTS CONTINUOUS TO MIN. 811 PAST WINDOW ROUGH OPN6.5 2-2xI2 HOR ;- 2-2x12 HDR N 4272 ; 2_2x10 HOR ; 4272 2x6 WAL L -- ` - - -- - -- - - - - -- i 341/2" 51LL HT 6" PREFAB FIREPLACE o 2-2x10 HOR W/ HEARTH AND SURROUND PER LOCAL GORE 6068 5GD ; K, A, 48 4 -5L o N Zk4 31k4 3672 3612 3672 9 ?�¢ -- 2.2x12 HOR -- — — —3--13 T4 x P 2thCBY 4 — - - f � ' �4 NOOK ? +A ARING POINT FOR BEAM ABOVE 2-2x12 FAR x X I 9'°" GI-G FAM ! L Y VINYL 2-5TORY - -- I 32" H KNEE WAL I CARPET I cp 81-111/2" 8'-101/2" _ 1611° I 131-41/2" ju FURNACE FLUE I �SOLiD BLGK'G TO J� o L IV ING K ITGFt' N *= STRAIGHT RUN - BEARING BELOW 9b" GLG i `? or TO ROOF ABOVE X• ( 9'0° GLG o ow VINYL 2i lii 31 8 1/211 31.21' IOi_3u N -IV C-41111 2/0 I ° 5 5H I --- - - - - -- ---- - - - - -- --- Z-------------------------- - - - - -- - - - -- -- -- ---- 101-411 ROOF TRU55E5 24" OG. ' i 16' x 7' OH GAR DOOR 0 N 101-411 CARPET ° o �I 2x10 FLOOR J015T5 I N 12" O.G. OVER 01 I CLIP STAIR STRINGER 0`r' // \\� �"I BEARING SEE DETAIL WALL 41 -011 1, I 41011 81 -6 1/� 3 ��/ 31 -311 \� 41 -4ii 31-211 51-10 1/2" STACK • —� • 2" H KNEEWALL FRAMING 8'0" H CO 2- 1 3/4 x LVL 91/4 15 \\ F UP R I d 12 R 2-2x10 HDR 2/8 pWpR ;X0 - `�' � 2/8 "' 9b" GLG 3066 co 2 3 4 5 6 8 N 4'-1 i n i_ n TILE 4-I I/2 3-1 5 I 2-2x'2 HDR 2/6 \ ART NIGF� � SHELF 32 Aff 18'0" A N 6 o! D IN ING 4 ° 9'0" GLG - 3 N CARPET I oc CL I li_lu- 3i -1" II _= FOYER o= IImN it �xili REF. ELEVATIONS BALLOON FRAME WALL VOL 2x6 12" OG 2- 13/4' x 16" ML H12R W/ 8" x 4" x 1/2" LLV BOLTED W/ 3/4" THRU BOLTS 1 12" OG TO CARRY BRICK GABLE PER ELEVATION 111-4112° �_ 11-911 A IR15 w a: I � ° FL. J5T.5 HANGERED - ' 0 o TO BOND JST. - BOLT Q 511 I 1314' N o BOND J5T TO 6RI12ER DBL 2/0 L IBRARY x - TRU55 USING 5/8" AB'S 9'0" GLG I I I CARPET 6" O.G. STAGGERS o i 201-111 GIRDER TRU55 BY MFR �ti+ 'o ; N ATTIC GARAGE I I ACCESS I - - - _Ji I 101-411 ROOF TRU55E5 24" OG. ' i 16' x 7' OH GAR DOOR 0 N 101-411 CARPET ° o �I 2x10 FLOOR J015T5 I N 12" O.G. OVER 01 I CLIP STAIR STRINGER 0`r' // \\� �"I BEARING SEE DETAIL WALL 41 -011 1, I 41011 81 -6 1/� 3 ��/ 31 -311 \� 41 -4ii 31-211 51-10 1/2" STACK • —� • 2" H KNEEWALL FRAMING 8'0" H CO 2- 1 3/4 x LVL 91/4 15 \\ F UP R I d 12 R 2-2x10 HDR 2/8 pWpR ;X0 - `�' � 2/8 "' 9b" GLG 3066 co 2 3 4 5 6 8 N 4'-1 i n i_ n TILE 4-I I/2 3-1 5 I 2-2x'2 HDR 2/6 \ ART NIGF� � SHELF 32 Aff 18'0" A N 6 o! D IN ING 4 ° 9'0" GLG - 3 N CARPET I oc CL I li_lu- 3i -1" II _= FOYER o= IImN it �xili REF. ELEVATIONS BALLOON FRAME WALL VOL 2x6 12" OG 2- 13/4' x 16" ML H12R W/ 8" x 4" x 1/2" LLV BOLTED W/ 3/4" THRU BOLTS 1 12" OG TO CARRY BRICK GABLE PER ELEVATION 111-4112° �_ 11-911 A 2 3.1 3.1 FIRST FLOOR PLAN 1/4" = 114" REF ELEV.S NOTE : ALL DIMENSIONS ARE FROM FACE OF STUD TO FACE OF STUD. ALL STUDS ARE 3 1/2" UNLE55 NOTED. ALL DIMEN510N5 PRESENTED HERE ARE FRAME DIMEN510N5 ONLY - 515E SHT. 1.1 FOR FOUNDATION FOOTPRINT. REVIEW ALL WINDOW HDR HEIGHTS PER PLATE HT, AND VERIFY W/ ELEVATIONS AND CORNICE DETAILS I a, i 11-10 1/211 L 15RAR 1 /4f1 = 11-0 11I 61.911 1,-101/211 NOTES : I. ALL CA5E0 OPENIN65 GREATER THAN 48" WIDE HOLD HEADER T16HT TO PLATE 2. 'ALL BI-FOLD DOORS R.O.'S = 1 1/2" WIDER THAN DOORS HEADER HT. = 82" AFF 3. ALL 13I-PA55 DOORS R.O.'S = SAME A5 DOOR HEADER HT = 83" AFF 4. 2x BLOCKING UNDER ALL EXTERIOR 5WIN6 DOORS 5. Ix BLOCKING UNDER ALL EXTERIOR 5L IDIN6 DOORS 6. TOWEL BARS (TB) OVER CABINETS AND TOILETS BLOCKING TO BE 55" AFF TO CL 1. TOWEL BARS (TB) NOT OVER CABINETS AND TOILETS BLOCKING TO BE 39" AFF TO GL 8. 13LOCKIN6 FOR T155UE HOLDERS (TI H) TO BE 24" AFF —ALL EXTERIOR HEADERS ARE 2-2x12 NOTE: FIELD CHECK ALL APPROPRIATE AND CURRENT DETAILS FOR TH15 PROJECT PRIOR TO START OF CONSTRUCT ION NOTE, ERRORS AND OM15510N5 WHICH MAY OCCUR IN THE CONTRACT DOCUMENTS SHALL Be BROUGHT TO THE ATTENTION OF THE ARCHITECT, IN WRITING, AND WRITTEN 1145TRUCTION SHALL BE OBTAINED PRIOR TO PROCEEDING WITH CONSTRUCTION. THE CONTRACTOR SHALL Be IfLD RESPONSIBLE FOR ANY ERRORS, DISCREPANCIES OR 01115510N5 FOR WHICH THE CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR TO CONSTRUCTION AND /OR FABRICATION OF THE WORK. N O m 5ubdvis1on / Ph WINp Job No. WIND' Date ISSUE Sheet Title FIRST FLOOR PLAN �I N N Sheet No. n m L N 5HT _ N Field verify all dimensions DO NOT SCALE DRA WING IR15 r a: I 0 511 I 1314' N o DBL 2/0 L IBRARY o� 9'0" GLG I I CARPET 2 3.1 3.1 FIRST FLOOR PLAN 1/4" = 114" REF ELEV.S NOTE : ALL DIMENSIONS ARE FROM FACE OF STUD TO FACE OF STUD. ALL STUDS ARE 3 1/2" UNLE55 NOTED. ALL DIMEN510N5 PRESENTED HERE ARE FRAME DIMEN510N5 ONLY - 515E SHT. 1.1 FOR FOUNDATION FOOTPRINT. REVIEW ALL WINDOW HDR HEIGHTS PER PLATE HT, AND VERIFY W/ ELEVATIONS AND CORNICE DETAILS I a, i 11-10 1/211 L 15RAR 1 /4f1 = 11-0 11I 61.911 1,-101/211 NOTES : I. ALL CA5E0 OPENIN65 GREATER THAN 48" WIDE HOLD HEADER T16HT TO PLATE 2. 'ALL BI-FOLD DOORS R.O.'S = 1 1/2" WIDER THAN DOORS HEADER HT. = 82" AFF 3. ALL 13I-PA55 DOORS R.O.'S = SAME A5 DOOR HEADER HT = 83" AFF 4. 2x BLOCKING UNDER ALL EXTERIOR 5WIN6 DOORS 5. Ix BLOCKING UNDER ALL EXTERIOR 5L IDIN6 DOORS 6. TOWEL BARS (TB) OVER CABINETS AND TOILETS BLOCKING TO BE 55" AFF TO CL 1. TOWEL BARS (TB) NOT OVER CABINETS AND TOILETS BLOCKING TO BE 39" AFF TO GL 8. 13LOCKIN6 FOR T155UE HOLDERS (TI H) TO BE 24" AFF —ALL EXTERIOR HEADERS ARE 2-2x12 NOTE: FIELD CHECK ALL APPROPRIATE AND CURRENT DETAILS FOR TH15 PROJECT PRIOR TO START OF CONSTRUCT ION NOTE, ERRORS AND OM15510N5 WHICH MAY OCCUR IN THE CONTRACT DOCUMENTS SHALL Be BROUGHT TO THE ATTENTION OF THE ARCHITECT, IN WRITING, AND WRITTEN 1145TRUCTION SHALL BE OBTAINED PRIOR TO PROCEEDING WITH CONSTRUCTION. THE CONTRACTOR SHALL Be IfLD RESPONSIBLE FOR ANY ERRORS, DISCREPANCIES OR 01115510N5 FOR WHICH THE CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR TO CONSTRUCTION AND /OR FABRICATION OF THE WORK. N O m 5ubdvis1on / Ph WINp Job No. WIND' Date ISSUE Sheet Title FIRST FLOOR PLAN �I N N Sheet No. n m L N 5HT _ N Field verify all dimensions DO NOT SCALE DRA WING