HomeMy WebLinkAbout1124.97.3N
AP
1
551 -10°
L
5ECONO FLOOR PLAN
1/411 = 11-011
NOTES
I. ALL CA5E0 OPENIN65 GREATER THAN 4811 WIDE
HOLD HEADER TIGHT TO PLATE
2. ALL BI -FOLD DOOR5 R.O.i5 = 1 I /2° WIDER THAN DOOR5
HEADER HT.:: 82° AFF
3. ALL 51 -PA55 DOORS R.O.i5 = SAME AS DOOR
HEADER HT = 83" AFF
4. 2x 5LOCKIN6 UNDER ALL EXTERIOR 5WIN6 DOORS
5. Ix BLOCKING UNDER ALL EXTERIOR 5LIDIN6 DOOR5
6. TOWEL BARS (TB) OVER CABINETS AND TOILETS
BLOCKING TO BE 55° AFF TO CL
T. TOWEL BARS (TB) NOT OVER CABINETS AND TOILET5
BLOCKING TO BE 39° AFF TO CL
8. BLOCKING FOR T155UE HOLDERS (TH) TO BE 24" AFF
-- ALL EXTERIOR HEADERS ARE 2-2xI2
NOTE : ALL OIMEN510N5 ARE FROM FACE OF 5TUD TO
FACE OF 5TUD. ALL 5TU05 ARE 3 1/211 UNLF-55 NOTED.
ALL OIMEN510N5 PRESENTED HERE ARE FRAME
01MENSION5 ONLY - 5EE 5HT. 1.1 FOR FOUNDATION
FOOTPRINT.
REVIEW ALL WINDOW HPR HEI6HT5 PER PLATE HT. AND
VERIFY W/ ELEVATION5 AND CORNICE OETAIL5
NOTE:
ERRORS AND OM15510N5 WHICH MAY OCCUR IN THE CONTRACT
OOCUMENT5 SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT, IN WRITING, AND WRITTEN INSTRUCTION SHALL
BE OBTAINED PRIOR TO PROCEEDING WITH CON5TRUCTION.
THE CONTRACTOR 5HALL Be HELD RE5PON51BLE FOR ANY
ERRORS, 015CREPANCIE5 OR OM15510N5 FOR WHICH THE
CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR
TO CONSTRUCTION AND /OR FABRICATION OF THE WORK.
NOTE:
FIELD CHECK ALL
APPROPRIATE ANO
CURRENT PETAIL5
FOR TH15 PROJECT
PRIOR TO START
OF CON5TRUCT ION
G. M ICI
WANG
Architects / t
1365 5henani
Rochester H
Michigan 48:
(313) 656-118
Pul
MasterB
Project
INDI
DIVI
12220 North
Suite 1185
Carmel, India
Subdivision / Ph
WIND
Job No.
WIND
Pate
155UE
Sheet Title
5EGONC
FLOOR
PLAN
AND
OPT ION;
DR 16K "
BELT
OPTION
Sheet No.
L
r,
N
5HT
N
Field verify all dimensions
DO NOT SCALE DRA WINGS!