Loading...
HomeMy WebLinkAbout1151.97.7OCCURS UNDER ALL BEARING STUD WALLS 245 RCBARS CONT. V2" GYP BD ON 2wX6" STUD WALL AT 16'OC 4" CONC SLAB ON 6 MIL VISQ,VAPOR BARRIER OVER 4" MIN GRANULAR FILL I r ( 16"W X 8"D THK SLAB TYP. THICKENED CONC. SLAB v2%f -Op R -13 BATT INSULATION W/ 2 NIL VAPOR bARRIr.R 314" FLOOR DECKING; — SEE FLOOR FRAMING FOR JOIST SIZE 2' PERIMETER INSULATION DOWN TO GRANULAR FILL i✓ o n r , FINISH INSULATION Yr OFMAT TO PACE OF STUD 5/4' RIM INSULATION 2' X 44 TREATED WOW SILL PLATE U'M SILL ANCHOR BOLTS • 61-O" GK 8" CONC BLOCK 4a MIN ©RANL LAR FILL ib w X m CONC FOOTING TYPICAL - -G - FOUNDATION SCALE: 1/2 " =1' -01' 2 "X4' STUD WALL V2" SHEATHING EXTERIOR FINISH 1NSVLATION SYSTEM 1/213 TO FACE TREATED 2°X49 – WOOD PLATE OF STUD FROM FACE OF CONC. /— V21' RD X 80 ANCHOR BOLTS AT 8'-0' OC 244 BARS AT TOP 129 OF WALL BATT INSUL 1 I R:13 0 ( 1 i t, i 2"X4' STUD WALL i. f AT FINISHED ` AREAS 04 BARS AT 24' OC HORTZ 2° GLR t TUFF -N-DRI WATERPROOF FUR WALL OUT G ' SYSTEM 4" FROM FACE OF CONC _ a ! � ' 8" CONC WALLS e UP TO V MGT l . " 10" COMIC WALLS OVER 10' HAT � 1 i 1 i 04 BARB AT 189 OC VERT 49 CONC SLAB W/ ; 6X6- W1.4XW1.4 WWF - N DOWELS 249 X OVER VISO VAPOR F 89 AT 18' OC VERT BARRIER OVER 49 MIN ORAN FILL 49 PW DRAIN TILE BOTH SIDES OF FOOTING Gv,$yL a *Vxl 'o — r• - P act °o CONC. FTG. a , Q a MIN 12� COVER OVER TILE 6 189 \ 245 BARS CONT BASEMENT WALL SECT. yr • .-Q• 'rlri G? U fr i� U cn IV 0 A 'V Q V v 0o W 0 Z I � mim C AS NC 0 1 — --c= U) G 0 S L0 V Z Z Q U J SHEET Am7 OF 7 SHE SECTION THRU STAIR DATE 9/ "7 SCALE 1/2 " =1' -O" REV. SVIIhT 1► • r 4 4