Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1243.97.4
y' i i F L —ROOF SHEA7HIN6 PER 5PEC ROOF 5HIN69LE5 W/ MTL DRIP ED6E 5EE ELEVATION5 PER 5PEC FOR ROOF PITCH EN611W ISRED ROOF TRU55E5 INSULATION BAFFLE - 2' MOJ. CLEAR SEE LORNIGE DETAIL R -30 INSUL' 2-2x4 TOP PLATE 1/2" GYP. BD-_ 2X11 RIGID IN5UL. 5HEATHING PER 5PEC HOR 5117IN6 PER 5PE6. tx4 5TU17 16" O.G. THERMOPLY 5HEATHIN6 4" T&G 5UBFLO0R (GLUE & 5CREW) . 12xI0 FLOOR J5T. AT 16" OL. ;4 P.T. BOTTOM PLATE 2xi0 RIM J015 BRICK LE06E 4" POURED CONC. ON 4" MIN. 5AND F -13 INSUL IBERGLA5 BATT INSULATION 3/4" T&6 5UBFLOOR (GLUE & 5GREW ON 2x10 FLOOR J5T. AT 16" OL. -2x4 BOTTOM PLATE - R-13 IN5UL FIBERGLA5 BATT INSULATION 2x4 P.T. 51LL PLATE W/ AB'5 PER SPEC. LOCATE PLATE SQUARELY ON TOP OF WALL A5 5HOWN I" MIN. 51PINO OVERLAP 8° CONCRETE WALL FIELD VERIFY POUR HT. 5ITOUMINOU5 WATERPROOFING PER 5PEC. ON CEMENTITIOU5 PARGING. 5EE 5HT 1.1 FOR FURTHER INFO ON FOUNDATION t I i II II II II II it MEATH .1/2" AB 12" OG. THRU 2X10 BOND J015T AND BOTTOM CHORD OF GIRDER TRU55 6ARA6E 5/0" TYPE "X" GYP. AT WALLS AND CLQ GOMMOM TO HOUSE FIELD VERIFY TRU55 CONFIGURATION FOR VAULT GL6. MASTER 5U ITE 5E6 T ION 13R ICK TO BELT OPTION o° 3.1 1/4" , 11 -0" --4" PERFORATED DRAIN TILE 56HEO.3034 x 20" CONT. POURED CONCRETE FOOTING 51D ING ONLY WALL 5EGT ION 3/4" = I[ -0'l 3 5TA I 5E 6T ION 3.I 1/4" = I' -0" CONT RIDGE KITCHEN 5A5EMENT CONVENTIONAL FRAMING IN LINE W/ TRU55E5— 12 �T 12 �T Roof ehhgles per spec on 150 felt per spec /2" Roof sheathing ngincered roof trusses 0 24" O.c. ttic insulation per spec N(R-30) X6 Fascia " cont soFfit vent x6 Soffit xIO Frieze board -2x4 Top plate or. eking per spec on tyvek x4 studs, 16" o.c. :-I I batt Insulation ' --1 /2" Insulated sheathing -2x4 Bottom plate --4x10 Floor joist a 16" o.c. x10 Rim joist T &G, glue & screw -2x4 Top plate rack per elevation 2x4 studs, 16" o.c. R- I I batt insulation 1/211 Insulated sheathing w/ tyvek per spec 1 -2x4 Bottom plate II 12" HDR 5R 106E I 1 =1 II 36" KNEEWALL I I 5EE DETAIL PER SPEG� II II I -- - - - - - -- — — — — — — — — — - -� - - - -- - - - - -I� — - -- - - - - - -- --- — — — — — — __ T4 - 13 - -12 II y — — T NOTE 11 II REVERSE FRAMIN6 5TRIN6ER / 4 — — — AT BRIDGE R CA5E1P OPN6 - 8 LOW FOYER w �� FAM ILY Zn I 03 ' cc II " II II — — 13 -- 12 11 10 -- 9 -- 8 - - 5A5EMENT 6 - - -5 � - - -4 - - -3 -- 2 5E6T ION 5R ICK TO BELT OPTION 1/4" % 1'-0" x10 Rim joist /4" T &6, glue & screw .T. 2X4 mud sin x 10 Floor joist 0 16" o.c. 'oundation waterproofing " Concrete foundation Concrete slab w/ 4" min sand under /2" Expansion joint 'noting keyway ." Footing drain 0 "w x 8 "d GONG. FTC. NOTE= F IELO CHECK ALL APPROPRIATE AND CURRENT PETAIL5 FOR TH15 PROJECT PRIOR TO START OF CON5TRUCTION ROOF 5HIN6LE5 PER 5PEC I /2" PLYWD ROOF %EATHIN6 ENGINEERED ROOF TRU55E5 FIBEROLA55 BATT INSULATION €XTEW 50FFIT 9" AT REAR OF FAMILY ROOM 2x6 5TUO5 a 16" O.G. OUTLINE OF CANT A NOOK BEYOND FLU5H HDR AT NOOK BEYOND FIELD VERIFY BEARING INTERSECTION 314" T&6 SUBFLOOR (GLUE & 5CREW) ON 2x10 FLOOR J015T PER FRAMING PLAN FIBER6LA55 GATT IN5ULATION 8" GONG. FOUNDATION WALL W /5"x[2" BRICK LE126E m N © Copyright 1994 Puke Home Corporation G. M, IC_HAEL WAN60UR d Architects / ConsA mts 1365 Shenandoah Rochester HIIs z Michigan 48306 (313) 656-1187 7 f