Loading...
HomeMy WebLinkAboutVectren 10-12-12From: Clark, Joanne L. To: Eric Gleissner Cc: Conn, Angelina V (Aconn(@carmel.in.gov) Subject: RE: Oct. 17 Technical Advisory Committee meeting agenda (Dunkin Donuts / C- Store) Date: Friday, October 12, 2012 10:33:27 AM Eric, We will need a utility easement along the south edge of property line, as we will need to run a main back to catch the buildings and we can't install main on property without being in easement. Other than that Vectren does not have any issues with your development. Thank you, Joanie Clark Vectren Energy 317 - 776 -5532 From: Eric Gleissner [mailto:egleissner @civilsite.net] Sent: Friday, October 05, 2012 3:35 PM To: 'Conn, Angelina V; 'Blanchard, Jim E'; 'Brooke Gajownik'; 'David Lucas'; 'Duffy, John M'; 'Duncan, Gary R'; 'Ellison, Christopher M'; 'Greg Ilko'; 'Hohlt, William G'; 'Huffman, David'; 'Jason Kirkman'; 'Jason LeMaster'; 'Joel Thurman'; 'Krueskamp, Theresa A'; 'Redden, Nick'; 'Ron Farrand'; 'Ryan Hartman'; 'Shirley Hunter'; 'Westermeier, Mark'; Gary.McNamee @duke - energy.com; 'Yackle, Troy'; Clark, Joanne L.; 'Thomas, John G'; Greg.Hoyes @hamiltoncounty.in.gov; dan.davenport @aes.com; doland.w.wise @usps.gov; 'Mindham, Daren'; 'Littlejohn, David W'; 'KREBS, STEVEN 3 (ATTINB)'; 'Larry Beard'; 'Green, Timothy 3'; 'Duane Whiting'; 'Lux, Pamela K' Cc: Dobosiewicz, Jon C; Brad Walker; Brad Smith; Jim Shinaver Subject: RE: Oct. 17 Technical Advisory Committee meeting agenda (Dunkin Donuts / C- Store) Good afternoon TAC members, Please find attached revised Detailed Development Plans for the Dunkin Donuts / C -Store to be located at 9800 North Michigan Road. This project was originally filed back in March of this year; however, the development was undergoing some significant changes so it was not discussed at the April TAC meeting for which it was scheduled. The PetSuites building previously proposed for the rear half of the property has been removed and a smaller commercial building has replaced it. The new building is much closer to Michigan Road and the rear half of the site will be used for tree preservation and detention as needed. There is significantly more greenspace on this revised plan (over 55 %) due to the difficult soils located on the rear half of the subject parcel. Hard copies of the revised plans will be going out in the mail on Monday. Please let me know if you have any questions or comments in the meantime. Thanks and have a great weekend, Eric A. Gleissner, P.E. Civil Site Group, Inc. 643 Massachusetts Avenue, Suite 200 Indianapolis, IN 46204 Phone: 317 - 423 -3305 Fax: 317 - 423 -3306 DISCLAIMER: ++ +The information transmitted is intended only for designated recipient(s) and may contain confidential and /or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this in error, please contact the sender and do not retain but destroy any copies of this document. + + +.