HomeMy WebLinkAbout1254.97.8GENERAL NOTES 1. Design and /or fabrication shall be in accordance with Whirlwind's standard practices and interpretation of the following codes: Ninth Edition AISC Steel Construction Manual ASD, 1986 AiSI Cold— Formed Steel Design Manual, 1996 AWS D1.1 Structural Welding Code —Steel and any other code listed within the Design Information. 2. Materials ASTM Designation DATE Minimum Yield Hot Rolled Mill Shapes A36 COVER FY =36 KSi Steel Plote /Flot Bar A572 or A529 FY =50 KSI Structural Steel Sheets A570 or A607 FY =50 KSI Cold— Formed Light Gouge Shapes A570 or A607 FY =55 KSI Coble Bracing A475 FRAME X— SECTION Extra High Strength Rod Bracing A36 SHEETING /TRIM FY =36 KSi Roof and Wall Sheeting A792 D —ONE FY =50, 80 KSI Machine Bolts A307 A 10.20.97 FRAME SECTION —X High Strength Bolts A325 Anchor Bolts (by others) A36 FY =36 KSI 3. Finish A. All cold— formed structural framing members shall be shot blasted, given one coot (0.5 mils) of premium polyester —bosed red primer, then oven baked prior to any fabrication. The primer contains a "wax" type lubricant to focilitote roil forming and deter marring during these operations. Hair line crazing which may occur during forming operations is considered normal. B. All other structural framing members shot[ be cleaned in accordance with the RISC Code of Stondord Practice and given one shop coot (1.0 mils) of Whirlwind's standard red oxide primer designed for short term field protection during the erection process. Whirlwind's standard red oxide primer meets the performance specifications of Federal Specification TT— P -636D and TT —P -664. 4. All Bolts ore i ?. x 0' -1 4- A307 Except A). Endwoll rafter splice — -8~ x 0' -1 2" A325 —N B). Endwoll column to— rafter connection — 18' x 0'— 1 2" A325 C). Main frome connections — SEE CROSS SECTION 5. A325 Bolt Tightening Requirements All high strength bolts are A325 unless specifically noted otherwise. All structural A325 bolts with heavy hex nuts for the Rigid Frame are to be installed using the turn —of —nut method specified in the „Specification for Structural Joints Using ASTM A325 or A490 Bolts" in the RISC Manual. All bolted connections unless noted are designed as bearing type connections with bolt threads not excluded from the shear plane. 6. Closure Strips Furnished For Roof Application INSIDE — under roof panels at eove OUTSIDE — between endwaii panels and roke trim and at the high side eove trim 7. Erection Note: All bracing shown and provided by Whirlwind for this building is required and shall be installed by the erector as o permanent part of the structure. ("Code of Stondord Practice for Steel Buildings and Bridges" in the AISC Manual; Section 7.9) 8. Shortages Any claims or shortages by buyer must �e mode to Whirlwind within seven (7) working days after delivery, or such claims will be considered ;, hove been waived by the customer and disallowed. �W7W1� _ff S11). oDON S CUSTOMER: 9. Misfits Claims for correcti alleged misfits will be disallowed unless Whirlwind shall hove received prior notice J 0 B NUMBER: thereof and ollow -„ reasonable inspection of such misfits. Ordinary inaccuracies of shop work shall not be construer' os misfits. No part of the building may be returned or charges assessed for alleged misfits witho:.' prior approval from Whirlwind. OWNER: JOBSITEO 0 DRAWING PACKAGE FOR B.J. WIRTH CORPORATION 970950 STEVE WEAVER PROJECT CARMEL, INDIANA DRAWING SCHEDULE DRAWING NUMBER ISSUE DATE DESCRIPTION C —ONE A 10.20.97 COVER E —ONE A 10.20.97 ROOF FRAMING PLAN E -2 A 10.20.97 ELEVATION FRAMING E -3 A 10.20.97 ENDWALL ELEVATION F-1 A 10.20.97 ANCHOR BOLTS P —ONE A 10.20.97 FRAME X— SECTION S &T —ONE — 10.20.97 SHEETING /TRIM S &T -2 — 10.20.97 ENDWALL SHEETING D —ONE A 10.20.97 LAP— DETAIL P -2 A 10.20.97 FRAME SECTION —X RESPONSIBILITIES I. The Contractor obtains and pays for oil building permits, licenses, public assessments, paving or utility pro rota, utility connections, occupancy fees and other fees required by any governmental authority or utility in connection with the work provided for in the Contract Documents. The Contractor provides at his expense all plans and specifications required to obtain a building permit. It is the Contractor's responsibility to ensure that ail pions and specifications comply with the applicable requirements of any governing building authorities. 2. The End Customer is responsible for identifying oil applicable building codes, zoning codes, or other regulations applicable to the Construction Project, including the metal building system. it is the responsibility of the Contractor to interpret oil aspects of the End Customer's specifications and incorporate the appropriate specifications, design criteria, and design loads into the Order Documents submitted to Whirlwind. It is the responsibility of Whirlwind, through Whirlwind's Engineer, to design the metal building system to meet the specifications including the design criteria and design loads incorporated by the Contractor into the Order Documents. Whirlwind is not responsible for making an independent determination of any local codes or any other requirements not port of the Order Documents. Whirlwind is responsible only for the structural design of the metal building system it provides. Whirlwind or Whirlwind's Engineer is not the Design Professional or Engineer of Record for the Construction Project. Whirlwind is not responsible for the design of any components or materials not provided by it or their interface and connection with the metal building system unless such design responsibility is specificoily required by the Order Documents. 3, Whirlwind Steel Buildings' standard specifications apply unless stipulated otherwise in the Contract Documents. Whirlwind design, fabrication, quality criteria, standards, practice, methods and tolerances shall govern the work any other interpretations to the contrary not withstanding. It is understood by both parties that the Contractor is responsible for clarifications of inclusions or exclusions from the Architectural plans and /or specifications. 4. in case of discrepancies between Whirlwind's structural steel plans and plans for other trades, Whirlwind's shall govern ('Code of Standard Practice for Steel Buildings and Bridges" in the AISC Manual; Section 3.3) 5. Approval of Whirlwind drawings and /or calculations indicate that Whirlwind has correctly interpreted the contract requirements. This approval constitutes the Contractor acceptance of the Whirlwind design, concepts, assumptions and loadings ("Code of Standard Practice for Steel Buildings and Bridges" in the AiSC Manual; Section 4.2) 6. Once the Contractor has signed Whirlwind's Approval Package and the project is released for fabrication, changes shall be billed to the Contractor i'ncludi'ng material, engineering and other cost. An additional fee may be charged if the project must be moved from fabrication and the shipping schedule. 7. The Contractor is responsible for overall project coordination. All interface, compatibility and design considerations concerning any materiols not furnished by Whirlwind and Whirlwind's steel system ore to be considered and coordinated by the Contractor. Specific design criteria concerning this interface between materials must be furnished before release for fabrication or Whirlwind's assumptions will govern. 8. The Contractor is responsible for the setting of anchor bolts and erection of steel in accordance with Whirlwind's "For Construction" drawings only. 9. Temporary supports, such as guys, braces, folsework, cribbing or other elements required for the erection operation shall be determined and furnished by the erector ("Code of Standard Practice for Steel Buildings and Bridges" in the AISC Manual; Section 7.9). 10. Normal erection operations include the correction of minor misfits by moderate amounts of reaming, chipping, welding or cutting and the drawing of elements into line through use of drift pins. Errors which require major changes in the member configuration ore to be reported immediately to Whirlwind by the Contractor to enable whoever is responsible either to correct the error or to opprove the most efficient and economic method of correction to be used by others ("Code of Standard Practice for Steel Buildings and Bridges" in the AISC Manual; Section 7.12). 11. Neither the ►abricator nor the Contractor will cut, drill or otherwise otter their work, or the work of other trades to accommodate other trades unless such work is clearly specified in the contract documents. Whenever such work is specified the Contractor is responsible for furnishing complete information as to materials, size, location and number of alterations prior to preparation of shop drawings ("Code of Standard Practice for Steel Building and Bridges" in the AISC Manual; Section 7.13). 12. Whirlwind does not investigate the influence of the metal building system on existing buildings or structures. The End Customer assures that such buildings and structures are adequate to resist snow drifts, wind loads, or other conditions as a result of the presence of the metal building system. CUSTOMER- B.J WIRTH CORPORATION JOB NO.: 970950 1DWG. NO.: C —ONE n