Loading...
HomeMy WebLinkAbout1286.97.8INSTALL NEW WATER CLOSETS AND LAVATORIES AND HOOK -UP SUPPLY AND DRAINAGE PIPING. INSTALL NEW SHOWER AND HOOK -UP SUPPLY AND DRAINAGE PIPING. SH- AV- 1 -1/4' CW WC -3 --1/2' HWS 3/4' - 1 -1/4' CW -3/4' HWS 1 -1/4' HWS 1 SEE DETAIL 'A' F ❑R PIPING DETA INSTALL NEW WATER CLOSETS AND LAVATORIES AND HOOK -UP SUPPLY AND DRAINAGE PIPING. GENERAL NOTES: 1 /^]I It, fm 1- 1/4'irl -1/4' HW`. CW NOT TO SCALE L CV-1 TEMPERING VALVE SE L 120 °F I. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTING THE SITE FOR DETERMINING EXACT LOCATION AND SIZE OF EXISTING PIPING BE RECONNECTED INTO DOMESTIC WATER SYSTEM BEFORE BIDDING. 2 ALL PIPING TO RUN THROUGH JOIST SPACE EXCEPT FOR DROPS TO FIXTURE AND AS NOTED ON DRAWING. 3, ALL DOMESTIC WATER PIPING SHALL BE MADE OF 'L' COPPER EXCEPT 1/4' PIPE FOR REFRIGERATOR WHICH SHALL BE MADE OF TYPE 'K' SOFT COPPER. 4. ALL DRAIN PIPES SHALL BE MADE OF PVC. 5, ALL ISOLATION VALVES SHALL BE BALL VALVES, 6. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WORK WITH MECHANICAL AND ELECTRICAL CONTRACTORS, 7. ALL DOMESTIC WATER PIPING SHALL BE INSULATED WITH 112 INCH THICK CLOSED CELL, PREFORMED NEOPRENE INSULATION. 8, PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR FLUSHING DOMESTIC WATER SYSTEM AND CHLORINATION TREATMENT, 1/2' HWR 1 -1/2• CW INSTALL NEW SINK AND HOOK-UP WATER AND DRAINAGE PIPING. S -1 �`- -CONNECT PIPE TO EXISTING PIPE -,TUBBED OUT -1/4' RUN 1/4' TUBING FOR ,,r��� REFRIGERATOR ICE MACHINE. 2' C W — INSTALL WATER CLOSET AND LAVATORY AND HOOK -UP SUPPLY PIPING AND DRAINAGE PIPING. W '�- CONNECT PIPE TO EXISTING 1/2' LAV -3 PIPE STUBBED OUT 1-1i;>• ru -I' -1' 2' CW PLUMBING PLAN�x ----- CONNECT PIPE TO EXISTING 1 -1/4' CW PIPE STUBBED OUT, —PIPING TO RUN UNDER MEZZANINE. 1/2' HWS 1/2' Cw CONNECT PIPE TO EXISTING PIPE STUBBED OUT. INSTALL NEW LAVATORY SHOWER, AND WATER CLOSET AND HOOK -UP WATER AND DRAINAGE PIPING. SHOCK ABSORBER #A INSTALL NEW LAVATORY' SHOWER, AND WATER CLOSET AND HOOK -UP WATER AND DRAINAGE PIPING. n m r m W 1•- a N (r 7 K r N V N F a r N 3 in Goi N n M r n M M w t W 4 a c Uri 0+' d 0 to at In- aa— C C � - �y as L__ +%A 8 0 L 0 V' 171"6 $ 4 - y $ m b E O = - lA`laf1MC 40 w CAN: QOdOiG CD-0 0 kn cis' vi�a`� d tA 8-w > W �12 t, cs u u J r Iz J a U, a_ J • W a 0 J a a c cu W Z �r 0 J Q n o. W r A r a a Z C3 W c i W r a o + L x > � S IA 0 w J �s 078 40 � ~• uL -C a; _ J O .2 -0 Go 0 6 L Q 71 06 0 u J r Iz J a U, a_ J • W a 0 J a a c cu W Z �r 0 J Q n o. W r A r a a Z C3 0- x > a w J � Q � O Q 71 06 <c p v o ►-- _U Z` CU C W Q Cl z a Z J a Q co U w Z PLUMBING PLAN 1/4' =1'-0' 1 /121 V.S. V,S. r 970453 140435 DVG NNE G_203 u