HomeMy WebLinkAbout1286.97.8INSTALL NEW WATER CLOSETS
AND LAVATORIES AND HOOK -UP
SUPPLY AND DRAINAGE PIPING.
INSTALL NEW SHOWER
AND HOOK -UP SUPPLY AND
DRAINAGE PIPING.
SH-
AV-
1 -1/4' CW
WC -3
--1/2' HWS
3/4'
- 1 -1/4' CW
-3/4' HWS
1 -1/4' HWS
1 SEE DETAIL 'A'
F ❑R PIPING DETA
INSTALL NEW WATER CLOSETS
AND LAVATORIES AND HOOK -UP
SUPPLY AND DRAINAGE PIPING.
GENERAL NOTES:
1 /^]I It, fm
1- 1/4'irl -1/4' HW`.
CW
NOT TO SCALE
L CV-1
TEMPERING
VALVE SE
L 120 °F
I. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTING THE SITE FOR DETERMINING EXACT LOCATION AND SIZE OF EXISTING
PIPING BE RECONNECTED INTO DOMESTIC WATER SYSTEM BEFORE BIDDING.
2 ALL PIPING TO RUN THROUGH JOIST SPACE EXCEPT FOR DROPS TO FIXTURE AND AS NOTED ON DRAWING.
3, ALL DOMESTIC WATER PIPING SHALL BE MADE OF 'L' COPPER EXCEPT 1/4' PIPE FOR REFRIGERATOR WHICH SHALL BE MADE OF TYPE 'K'
SOFT COPPER.
4. ALL DRAIN PIPES SHALL BE MADE OF PVC.
5, ALL ISOLATION VALVES SHALL BE BALL VALVES,
6. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WORK WITH MECHANICAL AND ELECTRICAL CONTRACTORS,
7. ALL DOMESTIC WATER PIPING SHALL BE INSULATED WITH 112 INCH THICK CLOSED CELL, PREFORMED NEOPRENE INSULATION.
8, PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR FLUSHING DOMESTIC WATER SYSTEM AND CHLORINATION TREATMENT,
1/2' HWR
1 -1/2• CW
INSTALL NEW SINK
AND HOOK-UP WATER
AND DRAINAGE PIPING.
S -1
�`- -CONNECT PIPE TO EXISTING
PIPE -,TUBBED OUT
-1/4'
RUN 1/4' TUBING FOR
,,r��� REFRIGERATOR ICE
MACHINE.
2' C W
— INSTALL WATER CLOSET AND LAVATORY
AND HOOK -UP SUPPLY PIPING AND
DRAINAGE PIPING.
W
'�- CONNECT PIPE TO EXISTING
1/2' LAV -3 PIPE STUBBED OUT
1-1i;>• ru -I' -1'
2' CW
PLUMBING PLAN�x
----- CONNECT PIPE TO EXISTING
1 -1/4' CW PIPE STUBBED OUT,
—PIPING TO RUN UNDER
MEZZANINE.
1/2' HWS
1/2' Cw
CONNECT PIPE TO EXISTING
PIPE STUBBED OUT.
INSTALL NEW LAVATORY
SHOWER, AND WATER CLOSET
AND HOOK -UP WATER AND
DRAINAGE PIPING.
SHOCK
ABSORBER #A
INSTALL NEW LAVATORY'
SHOWER, AND WATER CLOSET
AND HOOK -UP WATER AND
DRAINAGE PIPING.
n
m
r
m
W
1•-
a
N
(r
7
K
r
N
V
N
F
a
r
N
3
in
Goi
N
n
M
r
n
M
M
w
t
W
4
a c Uri 0+' d 0 to at
In-
aa— C C
� - �y
as
L__ +%A 8
0 L 0 V'
171"6 $ 4
-
y $ m b
E O =
- lA`laf1MC
40 w
CAN: QOdOiG
CD-0 0
kn cis' vi�a`� d
tA 8-w
> W
�12 t, cs u
u
J
r Iz
J
a
U,
a_
J
• W
a
0
J
a
a
c
cu
W
Z
�r
0
J
Q
n
o.
W
r
A
r
a
a
Z
C3
W
c
i
W
r
a
o
+
L
x
>
� S
IA 0
w
J
�s 078 40
�
~•
uL -C
a;
_
J
O
.2 -0 Go
0 6 L
Q
71
06
0
u
J
r Iz
J
a
U,
a_
J
• W
a
0
J
a
a
c
cu
W
Z
�r
0
J
Q
n
o.
W
r
A
r
a
a
Z
C3
0-
x
>
a
w
J
�
Q
�
O
Q
71
06
<c
p
v
o
►--
_U
Z`
CU
C
W
Q
Cl
z
a
Z
J
a
Q
co
U
w
Z
PLUMBING
PLAN
1/4' =1'-0' 1 /121
V.S. V,S.
r 970453 140435
DVG NNE
G_203
u