Loading...
HomeMy WebLinkAbout1334.97.16SPECROATUNG WON MOM ppp ®8lf����l�l � �� � P/fl'�f�l @f11� N C g ®I�����ttl �� ���F����U ��� REV. 4/17/97 V N qg MECHANICAL p� ®�ll����9�1 fad ° tlltl�V�9���P9L� REV. 4/17/97 PART 3 - GENERAL PLUMBING SPECS PART 4 - GENERAL PLUMBING SPECS DIVOON 16 e ELECTRICAL REV. 4/17/97 PART 3 - MATERIALS CONTINUED .(CONTINUED) 08111 - STEEL DOORS REV. 4/17/97 10522 - FIRE EXTINGUISHERS PART 1 -GEN. HVAC HEATING/COOLING SPECS 2. General provisions for plumbing work. PART 1 - GENERAL E. Surface metal raceway shall be as manufactured by W'rk Part I- GENERAL REFER TO DOOR SCHEDULE Port I- GENERAL A. It is the intent of these drawings and specifications that the hvoc contractor A. This contractor shall visit site to verify conditions which may affect his bid A. Architects general conditions ore o pat of this division. All equipment shall be UL listed. or Notional. Rocawoys, elbows, fittings and outlets shall designed for use together. They shill be of o size as r FOR STEEL DOOR SPECIFICATIONS 1. Obtain fire extinguishers from one source from o 9 single manufacturer. be responsible (a the hooting, ventilation, anal or conditioning system installation. The HVAC Contractor shall coordinate all work with the other contractors. and he shall be responsible for the Electrical Contractor shill boa the cost of alt fees, permits, licenses and taxes. All material and work provided shall be in accordance with the latest issue of the following codes and standards: wires indicated and shall be installed in on approved on( SUBMIT SHOP DRAWINGS do PRODUCT DATA 08410 - STOREFRONT SYSTEM AND Fire extinguishers shall be UL- listed do boor UL "Listing Mork" for t e, ratio and classification. YP 9 B. The HVAC Contractor shill secure dl permits as required and nstroll all equipment and systems in strict accordance with all state and local codes. inclusion of oil required demolition in areas undergoing modification whether or 1.Americon Notional Standards Institute (ANSI). 2.Americon Society for Testing and Materials (ASTM). F. Minimum S•izim Conduit 1/2" unless noted otherwise. G. No Romex cable shoo be permitted DECORATIVE PANELS 2. Provide fire extinguishers and mounting brackets at locations C. The contractor shill field verify and coordinate oil dimensions before fabrication of an ductwork. not such work is indicated on the plans. 3.Buiding Officials and Code Administrators (BOCA) do U.B.C. H. Use steel or malleable iron conduit, damps, strops and indicated and elsewhere oar required by loco) authorities. Y 4.Notional Electrical Code.(NEC) WIRING PART t - GENERAL Fire extinguishers shall comply with requirements D. The required temperature control configuration for different s systems �' Per YS B. This contractor shall verify the exact location A. Wire 110 and smaller shall be slid conducts with Type MITT SUBMITTAL of governing authorities. is as follows: t. Supply and install o hootingg/coding thermostat, 'HONEYWELL' model and elevation of existing utilities before 5.Notional Electrical Manufacturer's Association (NEMA). ( ) larger shall be stranded conducts with type THHN insuh Gonad: Submit the fallowing in accordance with Conditions of 1787D -1165 (include 0- 674AI019 sub -loose) commencing work. Any discrepancies between 6.Notiond Fire Protection Association NFPA . ( ) un9 AN wiring insulation to be rated 600V and and cola coi Contract. for the rooftop units. existing conditions and contract documents 7.Occupotionol Safely and Health Act (OSHA). Minknu m size wire for 1' t and r9h power circuits shill be t Product data for each type of product and process specified in this section, including fabrication, finishing, and installation. 2. Supply and install o *HONEYWELL" model /T87F thermostat preset at 60' for the stockman gas unit heater.(Where indicated) shall be reported to the architect. B.Stote Building Code. annealed copper. Whore practical, circuits on each of tl the neutral and run bock to panel. Contracts shall inc Shop drawings showing location of each item, dimensioned plans E. Entire HVAC system shall be tested and balanced by a certified C. The plumbing contractor shall coordinate his 9.Underwrilers' Laboratories (UL). branch and feeder circuits. The Electrical Contractor sh and elevations, large -scale details, attachment devices, and other components. air balance controcta. A written report must be submitted to construction special � P work with that of all other contractors IO.Fire Department Regulations, Product certificates signed by manufacturer project manager upon completion of air balancing. before installation of his work in chases, 11.Locol codes, lows and advances. SWITCHES, RECEPTACLES AND ACCESSORIES certifying that products comply with specified requirements. F. Roo( top units include the fallowing: ceiling spaces, and other areas where 12.Americans with Disabilities Act (ADA). QUALITY ASSURANCE 1. HVAC Contractor to hove Lennox nc., a equal, perform an E.P.C. (equipment conflicts may occur. B. The above listed codes and standards shill be followed oar minimum requirements and shall roil A. Ali wall switches and duplex receptacles shall be specifu or oar shown on Pis• Manufacturer Qualifications: Firm experienced in successful) P Y performance check) for all hvoc equipment. The check is to be D. The contract drawings ore generally diagrammatic relieve the Electrical Contractor from any additional requirements as indicated on the Project 1. Wall switches shall be mounted 48" above floor oppc producing aluminum storefront systems similar to that indicated completed and forwarded to the construction special project mgr. and convey the scope of work do general Drawings or as herein specified. Where provisions of pertinent codes and standards conflict with indicated. Switches shall be 20 ampere, Pdc.S /20AC For this project, with sufficient production capacity to produce required units without causing delay in the Work. All rooftop units shall be checked, after contractor installation and startup, by arrangement of items. Exact locations necessary these specifications, the more stringent provisions shall be conformed to. 2. Duplex receptacles shall be mounted 18" above fnisl Installs Ouolifvcations: Installs shall demonstrate successful the manufacturer's factory employed quality field service representatives. The nstdl -firm shall have qualified HVAC technician present to re -test and to secure the best conditions must be determined of the project. If directed by the engineer a C. Submit six copies of manufacturer's drawings of electrical devices and panels to the architect 3. Switches shall be Bonged under one cover whore the experience in installing architectural items similar in type and quality to those required for this project. service or correct any problem discovered during equipment performance checkout. architect, this contractor shofl make reasonable for approval within 15 days after award of contract. Submit information on any other equipment to be used when requested by Architect or Engineer. The following list of electrical 4. All wall switches and receptacles shall be flush mots c a as requested by tenant. DELIVERY STORAGE AND HANDLING Rooftop manufacturer shall furnish to owner. VIA contractor, a check -out list support with actual performance data for both heating and coding. The HVAC modifications to the layout without extra charge items must be submitted b this Controcts for review and comments: Y et boxes B. Outlet boxes 9hap be zinc cooled sled 4" x 4". Use I Protect Materials during transit, delivery stooge, and handling installer is responsible for coordinating the equipment check -out with the to proper execution of the work. 1. Ponelboords and circuit breakers. Use box extensions where applicable. to prevent damage, soilage, and deterioration. manufacturer at least 2 (two) weeks n advance and power/gos and EMS shall be 3. Above ground soil, waste and vent piping shall be 2. Transformers. SAFETY SWITCHES AND FUSES PART 2 - PRODUCTS on 24 hours minimum before check out. cost iron no -hub pipe and fittings, uncoated, and 3. Safety switches. MATERIAL 2. Units shall receive o factory pre-fabricated root curb. joined using S.S. couplings with neoprene gasket. 4. Light switches, receptacles and plotes. A. Switches shop be heavy duty as manufactured by Squa NEMA 3 outdoor, unless otherwise noted. 1. Acceptable aluminum storefront systems: KAwNEER Trifob II 3. Hooter sections will have educed draft and electronic a hot surface ignition. PVC schedule 40 n may be used in lieu of cost piping Y DELETE PART 5 - GENERAL FIRE PROTECTION SPECS (DELETE) 5. Surface raceway. . B fuses for so(et Y switches shall be non - renewable cam #451 -T series with Vd spor Ind. coating /391A226, Flu on finish, cola - Colonial White. op 4. Heater sections shall be 2 stage wherever () age possible. iron where allowed by code and regulations. 4. 1. Furnish and instill o complete automatic wet pipe sprinkler 6. Fire alarm components Showmut. Jefferson a approved equal to Bussmon Type size is readily viable. Y 2. Acceptable decorative panels: 1" thick high - impact ABS Panel, Above ground water piping shall be type L copper system, where required by local stole building codes o 7. Nameplates, for dl electrical enclosures. insulated with polyurethane rigid foom with applied metal sheet G. Rooftop units shall have gas burners and electric refrigeration. rooftop units tubing, conforming to federal specification WW -T -799 ordinances shall be hydraulically designed on computer utilizing LIGHTING FIXTURES on interior face by "Vocuform Industries, Inc. "x72', "x36" shall be self- contoined, packaged, factory assembled and prewred, consisting of hard temper, wrought copper and bronze solder a density of .15 over 1500 square feet. maximum sprinkler A. AN fixtures shill be as indicated on plans. Substitutior Panel sizes: 24 -3/4 and 22 -3/4 cabinet and frome, supply fan, controls, 30/30 disposable air filters, refrigerant joints using only "LEAD -FREE' solder. P 9 y head spacing shall be 120 square feet per head. D. Electrical Contractor shalt provide o guarantee covering all material and workmanship price aril and ant of accepted b the tenant. Y r � eP Y See drawings for locution 9 coding coil and compressor, condenser coil and condenser fan. Factory mount 5. Below ground soil, waste, and vent piping shall be 2. Retail area: sprinkler heads shall be recessed, chrome plated, for one year following date of acceptance by owner. B. AN fluorescent fixtures shall be complete with energy su disconnect switch & duplex 115 v GCFI service outlets. Supply fan shall be forward curved, centrifugal with coda cot and compressor. condenser coil and 9d �' 9 o service weight, cost iron pipe, asphalt or cool- 9 P P � endont mounted, 165 degree f rated ,with C.P. adjustable escuth � N Reliable F E. Electrical Contractor shill examine architectural pions and the pions and specifications G.E., Sylvania or Philips, or as specified. Install lumps i Part III- INSTALLATION condenser fan. Fats fan shall be resilient) mounted with v -bet drive, and rubber Y y for itch tooted. Caulk with lead and oakum or P uol to model -1, gloss bulb. of other trades to determine extent of their work. He shall visit the site and familiarized himself C. AN fluorescent lamps shall be cod white, unless specific Install storefrontsystem in accordance with 1 � � applicable code and manufacturer's requirements. isolated him mounted motor. 9� neoprene gaskets, 6. Below 3. Ph mocy. provide reliable model F -1 below the ceiling; and upri t, with the project and local conditions before submitting his bid. He shall be held responsible for ony assumptions mode thereof. If directed by Engineer, Electrical Contractor shall, without extro D. Fluorescent fixtures shall be provided with Class P. r i Pr oP ballasts equal to Advance Mork N. The shod be high 2. Apply flexible sealants of o color to match window frames Furnish and install complete with recirculated air outside air dampers, air PI P ground water piping shall be type k copper bras rough finish, conventional design sprinklers above the ceii 9 char mace reasonable modifications n the layout t gel, you o achieve proper installation of work. Y reset thermal protector and shalt meet ETL -CBwt sped} at perimeter of system. filers, domper and actuator controls. Low leakage dampers shall ride in nylon tubing, soft temper with bituminous coating. Wrought "LEAD equal o reliable modal G. QUALITY ASSURANCE PROTECTION Provide final protection and maintain conditions ' o manner bearings. The economizer section shill provide for the introduction of 100% outdoor oir for mnimurn ventilation and free cooling. Integrated economizer cycle copper and bronze with - FREE" solder; no joints where possible. 4. Securit observation area requirements: provide reliable m F -1 A. All materials and apparatus used n the work, which is included n Underwriters Label Service, °per " be bear the Underwriters CIRCUIT A. All branch circuit breakers shall be bolt -on t ick• type. acceptable to manufacturer and owns, that insure that materials shall allow compressor to cycle for dehumidificotfon and additional coolie oar 9 needed with 1(IOX outdoor air intake. Damper actuator shall be 24 volt, fully 7. All piping shall run concealed above ceiling and sprinklers elow the ceiling and Reliable model g above the eiling. Provide c plete sprinkler coverage below the security ob votion shall new and shall Laboratories, Inc. UL" label. Materials which ore not included n Underwriters Lobel Service shall be new and shall conform to NEMA or other trips an multi -pale circuit bredcers Breakers shall be 11 ore without damage a deterioration of ' e o Subs tial Completion. modulation spring return. Controls shall include fixed 55 degree F 13 wee C ( ) n wolf chases unless otherwise indicated. Exposed piping shall be chrome plated and installed o area plotfor . applicable industry standards. All manufactured materials and equipment shop be installed n accordance with the manufacturer's recommendations. APPARATUS ()f OTHER TRADES 8460 - AUTOMAT C DO S ( LE Po I- GENERAL / mixed air controller, damper r air nt dpy cone minimum position switch and slid -state adjustable outdoor o'r enthalpy control. Outdoor air hood shall be galvanized steel with o powdered enamel point finish electrostatically bonded to minimum 3/4 -inch from any wall surface. 8. All piping shall be supported from bldg. structure 5. Office, restr s, jonit closet: sprinkler heads shall be semi- recessed, rough brass pendant mounted, 165 degree oted, reliable model SPECIFIC REQUIREMENTS A. the Specifications and Project Drawings ore complementary, one to the other. M items l� ings PI Y Y A. Electric Motors oral Heating Apporotus: Shill be mounts B. Power Provide ON win to all ��. Power � equipment. and ovie, disconnects for cup Dr equipment 1. Coo 'note with Elect ' of W k. the meld. Control shall ndude differential enll►dpy control (velum air Y pproved standard wet ht ul fm b means of o g / mentioned a called for by one shall be considered as being indicated v both the Specifications unless explici include correct connections far Pose proper motor rots 2. Furnish rid install all eriols, hardware and lobo required sensor) economizer Air duct smoke detector factor installed. y hangers. The spacing of hangers shall be 6. Flow tests shall erformed thi controcta o the requirements and the Project Drawings. � to rovide lete en nce s tem. P P 1. BURGLAR less ore to be LENNOX supplied for nsidlotion n accordance with the state plumbing code. In no horizontal of N.F.P.A. tests sh I b oken of hydrants in ose proximity of the Yd P Y B. Equipment furnished and/or installed by other trades shall hove wing extended to the C. Control Oevicex Mechanical equipment control devices s �'pn� similar devices for equipment controlled by magnetic silk 3. APPLIC E : GI zing comply wit Article 22 of 9 P Y '91, the supply and return openings n the roof curb, curb openings case shall piping be supported at ". building. wi in 500' 9 ( ) equipment, and props connections shall be mode to the equipment. and natauped by mechanical contractor. For equipment r THE CA NATI CODE, 990, do U.B. are to be coordinated with the structural drawings. intervals greater than 10' -0 7. Submit kin plans o d hydraulic catculat s signed and sealed b a 9 P Yd i9 Y C. The Elec. Contractor shall provide dl labor, materials, tools and equipment required for complete and starter or contoctor, ft war wire Po g provided shall inc Part 11- 0 CTS A Bars to be installed by HVAC contractor. HVAC controcta to cut 9. Install plumbing fixtures as shown on dwg /P -1.(By others) professional otecti gneer regist n the state n which the satisfactory installation. control devices, which wit be furnished and mounted b y I -F A OMATIC 00 BY "S LEY AUTO BIFOLD DOORS" out hale for duct penetrations 1" forger than duct. Plumbing submittals to be roved b architect 9 approved Y project is located, ou ities that ho jurisdiction. D. The electrical drawings are diagrammatic, with approximate equipment, conduit and device D. Motor and Electric Heater Sizes and Locations: AN mot( (Vol In oat 391A , ur on finish, color- Coloniol White 1 op ) (REFER D SCHEDUL DOOR SIZES.) ORDINA ION OF HARD RE: Th manufacturer shall H. Split-system air conditioning unit shat be let Spl" ys q split evoporoter /condenser matched set factory assembled and pre -wired . Condenser units suitable for outdoor use consisting of cabinet, compressors, condensing cal and tons, integral sub - cooing coil, controls, prig to fixtures berg ordered. If other than specified in the Construction Documents. 8. akin Ions and c puteri hydrou c calculations shalt be prepared level N.I.GE.. locations. All electrical work el►dl be coordinated with other trades nvdved. E. As itont f practical to detail n these Specifications all fittings and accessory equipment required for the proper installation and operation of the various systems descrbed, it ions indicated on the Project Oro+: ore let Drawings approxir as actually installed Before connecting to any piece of ro ' e product a and shop owin s to ARCHITECT for P P 9 liquid receiver, and screens. Units shill have an anew efficient rota EER not less 'qu 9Y Y 9 ( ) 10. Furnish and install valves where required b code, ell Y o minimu cstif sprinkler layout designer. drowns y 9 shill be understood that these items will be provided. data against the information as indicated on the Projec hordw than by ASHRAE 90. Provide shod D signed on the N.I.C.E. cer dicote number indicated on plan. All t purpose coordinating and security prescribed unit with a complete refrigerant circuit indicated an plan, a specified so locate valves so that ' E. Power Wiring: Provided power wiring for plumbing, heo r uvrern with electrical interface doors systems Ys prior to stollotion. that includes factory installed filer drys, sight gloss w /moisture indicator, thermal they may be operated, repaired or replaced with gs, nclu g as- builts, sho a submitted on disc using AutoCAD Rel. 13 PART 2 -SCOPE OF WORK systems as indicated oar the Project Drawings and in oc Fart II INSTALLATION expansion valve, insulated suction tine, suction and liquid line service valve, liquid Ire solenoid valve, char valve, compressor discharge service valve, and 9n9 condenser pressure relief valve. Provide and install type ACR refrigerant, suction minimum effort and repacked under pressure. Provide access ponds where valves are concealed 9. sprin ark shall adhere to o y and all applicable codes and ordi ces and N.F.P.A. 13 late a ition. A. Furnish do vertu)) o complete electrical system including, but not limited to:secondory service equipment from point of service with local utility, meter center, service entrance equipment, panels, Provided by the respective trades. F. Apparatus to be Installed: The electrical contractor shop APPor transformers, branch feeders, lighting fixtures, switches, conduit, wiring, outlets, equipment disconnects, A or news tom to resist wind loads, in occordonc with system code requirements. do liquid n insulated w 1 2' ormorfkx between iqu' piping / / evoprotor and condenser. non - removable ceilings a walls. 1 . Submi drawings to lord fire t and toin necessary approvals, ' fuses, Ianps, telephone bodkboord and conduits, special systems and dl other equipment as shown lighting oar sfawn on the Pro' � Project Drawings and not spec � ^�� n dance with the Project Drawing uilding 11. Boll valves 2" and smelter are to be two piece, all bronze sand certificates pri to submis to the engineer for on plans do heron specified. Systems shall be complete v dl respects rood to of Y � e• c Apply flexible sealants fully around perimeter of new system with full port chrome plated boll, teflon seats, final review. WORK BY OTHERS CONDUIT WIM ��gg 2 ��pp pp��22 ®Q�Q�� ®tl�l ��U�10�WL�� PART 2 - GENERAL DUCTWORK SPECIFICATIONS solder a threaded ends, extended stems and 600 11. Occupancy. ordinary haz d (GROUP -1). A. Pointing Contractor will proviall preparation and pointing of finished work, as required for installation A- All wiring shill be run in rigid steel conduit or electrical REV. 4117197 psi cold working pressure equal to APOLLO 70 -200. P 9 P ell 12. Above ground wet spri ter pipe 2" and smut shall be welded and of electrical systems. TEMPORARY LIGHT AND POWER metallic sheathed cable may be used where allowed by 09250 - GYPSUM DRYWALL SYSTEM 1. All ductwork shoN be designed in accordance with 'SMACNA' publication titled "HVAC Systems Duct ��.' 12. Wall hydrants shall be equal to J.R. Smith r55090T, seamless steel pipe, HEDULE 40, ASTM A -5 Fittings shall be cost iron, 'pints. A. Electrical Contractor ail provide the fumishng and montonng of the necessary may be used for drops from junction boxes to loy-n lit switddaes to mechanical ent. equipment, Port I - GENERAL YS 2. All ductwork construction Shop be of fabricated sheet meld (no non- freeze, with 3/4" NPT standard hose outlet. class 125, A.N.S.I. B .4 with threaded electrical service for supplying the hooting system anal temporary light and power required by the other erodes during construction and oar negotiated with the construction manager. B. Exposed conduit shall run either parallel a ular PaP� Furnish and install all drywoll materials, accessories and products required to provide a complete installation, ductboord oporwed) and be butt n accordance with 'SIIA(�lA' 'HVAC ". 13. All piping shall be insulated with 1" gloss fiber, 13. Above ground wet rinkler pipe 2 -1/2" and torg shall be welded steel DRAWINGS C. Secure conduit in protect whore necessary to P and including interior partitions, soffits, fascias and standards and notion titled Duct Construction Standards � 3 -1/2 pound density, snap -on fiberglass with pipe, SCHEDULE 1 , rolled grooved without metal r oval, ASTM A -135. Fittings A. Drawings ore diagrammatic and indicate the general arrangement of systems and work during construction. Pkag ends of conduit with cork, odu gypsum wallboard used as substrates for other materials. 3. All sheet metal ductwork shalt be externally nsubted, with o vapor par barrier jacket and self- sealing lop. All shall be ductile ran ASTM A -536, with grooved or Ider ends, couplings 9r P 9 included n the contract do not scale the draw Consult the architectural draw r+9s)• drawings and with mortar or debris. 0. Z. Type "CA" cops shall be us Coordinate this Work with the RELATED WORK of others minimum of 1 -1/2" of appropriate insulation. It shill be U/L labeled 'Ductwork Insulation with Vapor Barrier'. valves and fittings shall hove fiberglass insulation shall be ducti iron ASTM A -536, with flexible joints, toulic style 77. details far exact location of fixtures and equipment. Where some ore not definitely located, obtain this information from the Architect. D. Group conduit in parallel runs where practical and use c Application procedures do workmanship shall be in accordance 4. The first 10 feet of supply and return ductwork from the rooftop and be covered with MANVILLE'S ZESTON, PVC fitting 14. The sprinkl head layout shown is on approximation and is intended only to B. Provide and keep up -to -dote one (1) complete "As -Suit" set of drawing prints, corrected chouund with conduit straps or clamps; provide space fo with GA -216 and ASTM C840. units shall be sound -lined with 1" acoustical lining. lung covers with A 25/50 flame and smoke rating. provide o understanding of the scope of the work. This c tractor is required doily and showing every change from original drawings and specifications and exact "as -bull" conduit. Support cup conduit at o maximum of six feet c Part 11- PRODUCTS AND MATERIALS shall be 2 Ile. d"ty and u tested. All remain' ductwork she be ^/ 14. All underbodies of roof drains shall be insulated to field i(y the exact locations of all existing hoods to in re this work will location, kind of fixture, runs of wire and conduit, location of pull and junction boxes and SL41RS GYPSUM DRYWALL PANELS / ' insulated with 1 1 2" thick, 3 4 Ile. density (leer ass duct nsulotion with y A 1 2" to of insulating Cement, troweled smooth / 9 other equipment as actually installed In addition, dl items chonged a deleted by addendum A. Provide o system completes en of conductors for all (ceders A. Fire Resistant where required b code)- 5 8" thick ( q Y ) / FSK jacket secured with 4" wide adhesive strips spaced with canvas jacket pointed an. not c flict with the ceiling grid or lighting layout. Refer to t architectural or chop orders shall be indicated. This drown set shall be kept on site and used as o � 9 � the Project Dr The wire !su an^^9s• g system shat be comple with a type X core; equal to Gold Bond Fire - Shield V -0' O.C. on all four sides. draw' s for reflected ceiling Ions and coordinate all work with I other 9 9 P record set. box, safety switch, or motor stater shown a specified with Sto- Smooth edges. 9 B. Moisture Resistant - for application in wet areas and for adapter ' 5. Flexduct can be used from the dffuser ter bode to the rigid 15. CVS to supply and install the following: mirrors, paper towel holders, gloss shelves and all c doctors prig to installation of the sprinkle system. SURVEYS AND MEASUREMENTS A. Before submitting his bid, the Elec. Contractor shall visit the site and shall become thoroughly B. No vies snap be pulled until the conduit system is corn use as a substrate for areas desvgnonted to receive non - absorbent finish materials on similar sheet metal. 1 - toilet room accessories. 15. se required by code a directed by local authorities, this contr a shill fomiior with dl conditions under which his ask will be installed as he will be held responsible for other than powdered soapstone a pulling compound, UL insulation, shall be used to facilitate the puling of wires products, use 5 8 thick sum wallboard equal to Gold P / " 9YP q 6. All flexduct used shop be of the insulated type, and not exceed six feet (6'-O*) n I length. 16. All vent lines shall be run concealed in walls as rovide seismic hanging do constraints on all piping n can I 9 9 p•P� g � pole occ ce any assumptions he makes or any omissions or errors he maces OS a result of his future to became familiar with the site and contract documents, find termination shah oauforrrn to the Notional Electrical Bond MR Fire - Shield G with green paper faces and tapered edges. 7. Provide volume dampers at each trunk and branch run -out. not to interfere with deck above employee area. with the latest issue of the state mechanical building code, local code B. The Elec. Contractor shall base all measurements, both horizontal and vertical, from established C. Splice wiring only of accessible junction boxes. Use sdde C. Regular - 5/8" thick gypsum wallboard equal to Gold Bond regular Pin 8. All ductwork scans and ' ' is shall be to sod VTR to be min. 24' from aside (ace of exterior wall. and n(po. bench marks. All work shill wee with these established lies anal levels. Verify dl measurements a9 y on site and check the correctness of sane oar re a to the work, irnsuloting covers far c wire dapper splices and tops No. 8 cup spring wire connectors with plastic cops for No. 10 AWG gypsum wallboard. D. Dens Gold Gypsum Sheoting- 1 /2'thick water resistant silicon treated core Inspection of this shall be than before insulation is installed. In completed by cvs before insulation is nstaped. 17. Natural gas piping 2" and smalls shall be schedule 40 block steel pipe (ASTM B16.3) with screwed 16. fire Protection Contractor shill provide o guarantee covering dl material connectors for wire copper splices and tops No. 6 AWG n enotrated b fiberglass mots front do bock. P y 9 9. All square elbows shall have double thickness turning vanes. fittings. Natural gas piping 2 -1/2" anal lags shill and workmanship for one year following dote of acceptance by CVS. C. Site Ion electrical indicated on draw E -3 is for tot onl requirements may P �� � prototype y' � � Y onductors and concourse with electrical tape to one him install per manufacturer specifications. vary from site to site. Electrical Contractor to coordinate and verify exact locations, quantities and value of the conductor. Contact Georgia Pacific Gypsum Technical department: 1- 800 -225 -6119 1 be SCHEDULE 40 black steel pipe with welded fittings. model numbers with site utility plans, point -to -point plans and Architect/Enginea. If pole light FIRE ALARM JOINT TREATMENT 3 -COATS MINIMUM. NOTE: where required by code or directed by local authority quantities and /or model numbers ore different than specified on drawings, the Electrical Contractor A. Provide o class "A" fire dorm system, with mosterbox it A. Joint Toe - paper P P P Prior spec Should nsulation be installed to inspection. owner This contractor shall provide seismic hanging and is to coordinate off changes and conflicts with Architect/Engineer so as not to exceed moxmmum state bu codes or ordinances. System shall be su Ys PP B. Joint Compound - fast hardening type equal to Gold Bond reserves the right to open a minimum of 50 l'neor feet, without constraints on all gas piping in complete accordance breaker size per the National Electrical Code. . manufacturers equipment warranty. Afl aspects of the fi Star- Smooth. charge for its replacement, for the purpose of inspecting the the requirements of oll notional and local codes as well ACCESSORIES "x ductwork and sealing. with the latest issue of the State Plumbing Code PART 3 - MATERIALS B. For 24 V.D.C. circuits use 14 AWG solid copper conducto A. Corner Beads - 1 -1/8 1 -1/8" galvanized metal, crimped 10. Diffusers and other duct terminal devices will be manufactured by and all local codes. to all wall board corners. B. Corner Beads - 1-1/4"x 1-1/4* galvanized metal for 'CARNES'. or on approved equal. 18. Engineer and architect to verify number of plumbing A SLEEVES. INSERTS AND AN(31C1R BOLTS double layered walls. Ye 11. All supply diffusers shill hove manual adjustable dampers, fixtures with local codes and officials. Adjust design A. The Elec. Contractor shall provide, set in place and be held responsible for the location of dl sleeves, inserts and anchor belts required for his work. In the event that future to do so requires C. Casing Beads - galvanized metal. 12. Submittal sheets ore required for dl registers, grilles and diffusers and as required. Contractor shall be responsible for alt cutting and patching of finish work, it shall be done at the Elec. Contractor's expense. Port 111-FABRICATION AND INSTALLATION other duct tamed devices for approval prior to nstdbtion. additional fixtures, including all roughing and trim CONDUITS AND RACEWAY Install system free of waves, buckles and uneveness. 13. Delete to insure o complete and fully operable plumbing system. A. Rigid metal conduit (GRC) shall be hot - dipped galvanized steel, conforming to ASC 80 -1, EXPOSED TO VIEW - all joints, holes and depressions visible 19. Plumbing Contractor shall provide o covering as as manufactured by Republic Steel do Tube, Allied Tube and Conduit Company a Rob Roy. GRC . below the ceiling line shall be filled, floated, sanded smooth installed underground a n concrete slobs shall be half kavalop wrapped w/ scotch /SO tape. and made ready to receive point primer. all material and workmanship far one year fallowing year B. metallic tubing (EMT) shall be zinc coated steel conforming to industry CONCEALED LOCATIONS - all joints, holes and depressions 14. All ductwork shall be run concealed n walls or as required not to interfere e dote of acceptance by CVS. ac standards, manufactured by Pittsburgh Standard Conduit Company, Republic Steel and Tube concealed above ceiling lines and behind permanent fixtures with deck above employee oreo or Allied Tube and Conduit Company. EMT may be used where conceded n rill and ceiin Pant Y 9s, shall be filled and toped. and where not subject to public view and/or physical dornoge above 48" AFF. Use steel setscrew 09900 - PAINTING PART 3 - GENERAL LUMBING SPECS type fittings. REFER TO EXTERIOR ELEVATIONS do FINISH SCHEDULE 1. AN work stall be done n accordance with the C. Schedule 40 PVC conduit may e used underground. Use t ed GRC for Y cup penetrations ysm through concrete from PVC conduit blow. For dl pulls over 25' long, elbows n PVC system shall be (;itC. FOR ADDITIONAL INFORMATION requirements of the following: A. the The latest issue of Applicable Bldg. Code, D. Flexible metallic conduit condo t shalt galvanized, spiral wrapped gal cupped metallic conduit (Greenfield) a mechanical and codes and op P�n9 liquid tight flexible meld conduit. Conduit shalt be as manufactured by Allied Tube and Conduit relevant N.F.P.A. codes. Company, republic Steel & Tube or Pittsburgh Standard Conduit Company. Lay-in lighting DEA, INC, B. All codes and regulations of local authorities having jurisdiction fixture whips may be up to 6' long. 6214 M0 INDIANAP mold Company, Lobway, Wal kermoid be of the some manufacturer and oted, approved for the rumba and size of workmanlike manner. supports. THHN insulation. Sze j8 and ition, unless otherwise indicated led per NEC. 12. All conductors shall be soft ree phase legs may be combined with ude o green ground conductor for dl Al bdonce all branch circuits between phases otion grade, provided as noted site hinged side of door, unless otherwise -1 Series or approved equal. ved floor, unless otherwise indicated. re is more than one switch ted where applicable with smooth phenolic Roster rings on plastered wogs. e D with NEMA 1 enclosure, indoor, and ige tyQe, UL listed, Bussmon. Z77/480V usage. InstoH fuse so that s shill be on an odd or deduct wing lumps as manufactured by n all fixtures. dly scheduled otherwise. i start, energy efficient type bower factor, complete with outonnotic cations. Ballasts shall be A sound rated. •make, quick -break and hove common switching duty for control of the fights. d by the trade furnishing the equipment. Ore through starters and eontoetors, ly stated otherwise. Power wiring shill ition. uch as thermostats, frestots, and rters and contactors will be furnished hich is not contrdkd by o magnetic ude all wiring through line voltage others. r and electric heater sizes and note. Mdse connections to equipment such equipment check name plate I Drowiir% ;4 ventilation, and air conditioning cardance with the wiring cliogroms provide elf electrical (apparatus and rcopy excluded above, and shop install nd Specification& metallic tubing, expect that non - I.E.C. and local codes. Flexible conduit Piling fixtures and from safety (at right angles) to the bw'Iding walls. prevent domoge to the work rrm, or push- pennies to ovoid filing !d with type B conduit bushings. aruduit rock constructed of steel twenty free patent odditional n center. and branch circuits as indicated on x to each and every outlet, junction which requires electrical connections Mete. No grease, oil, or lubricant listed and compatible with conductor The minimum bending radius for ;ode requirements. less pressure connectors with AWG and smaller; use nsuloted and smaller. Use split boll nd large; tape uninsuloted dred fifty percent of the insulation We required by local and lied complete with a 3 year e alarm system stall meet bs the Authority having jurisdiction. 's, with type THHN insulation. ,; ( 1. * ,; { A, j. P `y 94 "' ;;' s ZENCI TRAIL - 110 DLIS, IN 46268