HomeMy WebLinkAbout05040069-Heating/Cooling Specs 8465 Keystone Cross ng
Suite 445
Indianapolis, Indiana 46240
(317) 254.0336
HALLMARK, HALLMARK REGENCY & SHOWCASE S r~IES
.STANDARD HEATING AND COOLING SPECIFICAT. ION/
The Heating Subcontractor understands that the HVAC System and base price is
based upon our All Electric standard house specificatione, (including the ~e-
~ignated standard foundation type), which will include R-35 ceiling insulation,
RLl3 halls~ with insulated sheathing, and R-11 four foot drape on the basement
ir infiltration package and thermally broken windows.
warranty' peridd.
ice includes an electric furnace
necessary ductwork £equired for ceil-
to all walk-in closets on outside
.dual-'return air ducts in the
els only), dryer venting, temporary
covering of all duct openings to eli-
~, bath fan venting directly
~r roof ~ouver, furnaces set during
~ted duct %ork in all non-conditioned
all supply russ, low voltage wiring,'
price protection through all selection
year round, 24 hour, emergency service
Heating Subcontractor's layout, in a workman
cmpliance with any and all applicable codes, rules,
~nces so ae to provide and ~ a 75' temperature
an a 20' temperature difference o~ cooling for each
clu lng the balancing of the'system, the insulation of
ter at th end of the construction ~eriod and a minimum warranty
and labor, five (5) years on the compressor and
All backfill,
by others.
FIXTURE~
M/!
ng
Suite 145
Indianapolis, Indiana 4§240
(31 ?) 254.0336
KAL_LMARK, HALLMARK REGENCY & SHOWCASE SERIES
SPECIFIC SPECIFICATION
1. All soil lines, stacks and vents'shall be PVC Plastic with 3" risers
~ to the 2nd floor C.I.
2. Furnish and install ~lastic laundry box (dryer venting by others).
3, Furnish and install 2" floor drain to sump pump (delete and issue
cre f not applicable).
4. 2"
% anti-freeze sillcocks..
5. Furnish and install i Zoeller ~53 Sump Pum
p (pit by others) with
with sump line stubbed 3' beyond foundation [delete and issue credit
if not apolicable.
6. Provide any and all plumbing work for electric furnace, heat pump
and electric water heater.
7. Provide rough-in and prepare for hook-up of 1 icemaker.
8. Furnish and install ~;1 radon vent from basement, stub to attic & cap.
9. Furnish and install water heater venting to furnace flue installed
by others.
L0. Install dishwasher hook up only.
lay tops, dishwasher and dryer vents to be installed
Tub-American Standard 5' steel (colored) or equal with Hoen Cha
fixtures and trim.
~r Closets-Gerber ~71-212 Elongated Closet Combination Color or equal.
Lay Trim-La~ tops by others with Hoen Chateau fixtures and trim.
Kitchen Sink-Elkay CHR-3322 D.C. Stainless Steel Sink with Hoen Chateau
fixtures, trim and sprayer.
36 (or designated size) molded stone shower base
eau fixtures and trim.
~y Disposal or equal.
eater-A.O. $~:i:h 52 gallon electric hot water heater.
Indianapolis Indiana 46240
(317) 254-0336
~LUM~ING ~PECIFICATIONS
.GENERAL SPECIFICATIONS:
Plumb;
· 2. Ail
national codes,
· 3.
rmits, fees, licenses, etc. shall be obtained by the
ctor and~shall be included in his base bid price, '
All open ends of
prevent infiltration of con~
ina st%
to
local, state and
tnd ordinances.
temporarily sealed to
~bris.
beyond foundation or connected
water line stubbed
' :e line installed by
Ail base bid prices shall be based upon the designated standard All
Electric h0use.plan (excluding any options and/or extras) including
the standard foundation type for each specific plan.
7. The number of fixtures and/or appurtenance may vary according to each
standard house plans (eRcluding.~option). The Plumbing Subcontractor
WaEran[~,that his base bfd pricelincludes all fixtures and/or ~ppur-
tenances required for a complete job'of ~lumbing for each standard
house plan.
~nship,
~d area
site clear of all related
.o house as may be required.
s shall include a m~nimal i year warranty on all work-
labor.
845~ Key$1~ne Crossing
Sui[e 145
ndi~napol s indiana 45240
· (317) 254'033S
pD~LHAF~K,' H~SLLI~ARK REGENCY & SHO'~'CASE SERIES
~?A]~DARD fALL ELECTRIC) F_LECTRICA~* WIRING SPECIFICATIONS
200 ~.=.p Service
220! Furnace Ci'rcuit
220'! Air Conditioning Circuit *
'220V ~ange Circuit .
220';.Dryer
220V
iI0V Wi ump
hwasher
s-Per Pl~.n
Code
etlon-Per Plan
es-?er Plan
:a'~ires '~i=h jacks
.ga Door O
Per. Plan
i~ & Lam ar ~lan
xtures-Per Plan
Fan-Per
Lice
~rd Post
Light-Per House
at in some instances
molete, improperly
ance with lo oma are currently being
included in h~s
.tent of xl;in .; 7 n
our Homebuyer ~ith electrical ooeni g (i I.:
devices) ~hich function correctly end are orooarly
=a~e wiring fro~ the exterior ~all to the condensor(imcluding
ROUGH FRAMING SPECIFICATIONS
H/I Scb
2.
~pe
GENERAL SPECIFICATIONS
~subcontractor with
Inc. standard
not be
[e backfilled foundation ready
options,
.ng nails) through a
, %
M/I Homes s
a day to answer questions or
shortage list.
Costs for
~ at least once
and get material
lities:
established bid price, established option
~rice of extra work
bid.
provided by
specifications.'
for X materials during the
neglect, misuse or
completion
FRAMING SPECIFICATIONs
foundation for
,sts to with
base down and beam
er will be installed at all locations indicated on attached
9.
10.
secured.
kept
th T&G
crowns (3/8") thrown out
11 plates and beam plate with (3)
with (4)
bearing points (beams or
over.
! at the rate of (1] 32 oz. tube per
s clean and nailed per nailing
· to be glued. Butt joints to be
Maximum rise to be 8-1/4".
diagram).
2. Install treads with (3)
3. Install stairs with (3)
sidewa
6.
Minimum effective tread to be 9" (see
stringer.
into
~r into each stud with 7/16"
from top of stringer to any obstruction is 6'-8".
for level.
~ with (4) 2X4'S in winter(if no
lewalls, one
4' back mounting.
3.
4.
5.
6.
udded 16" 0.
plate (all
1/2"
bracing installed at
.re too close to corner.
~erimeter 12" 0.C.
tuds.
~s are to be filled
detail.
openings to be correct size, square a/id per detail,
2
13. A continuous bead of qlue to be applied at all bottom plates to
set per manufacturer's instructions, plumb and
square w~th exterior nailing, flange taped.
2. All wood windows to have 1/2 inside revealed for dr%wall.
3 All doors to have aluminum flashing ,~nderneath.
4. Ps to be set plumb, with a 1/2 reveal to inside for drywall,
galvanized
ed for top hinge.
5. for square by checking for even margin
[des.
6. [n glue with 1-1/2" projecting
~e of sill to be stuffed with sill sealer
installation.
sses per truss
es and raft~
manufacturer's
f roof system.
{1 per each bay).
for ridge vent.
ightened before lx6 subfascia is
installed
2x6 blockin~ is required between studs at roof lines to allow for
installatio~ of step flashing.
Blocking is rewired between studs at ceil/ha lines of cathedral and
vaulted ceiling for fireblocking.
Interior Walls
------~11 interior wall studs to be 16" O.C. and stacked over ~und under
floor '' .
~~i Sight studs where
~en trusses every 24" over interior
aring walls can 2x4..
~ 2x6.
e corner.
Bottom plate of interior
joists are to be nai]
~re to be nail~
parallel
subfloor every. 24".
Set stairs w/th treads level.
every sidewall stud from
Install 2x4 flat blocking on bottom side of all finished stairs at
every other tread bay.
All inside corners at walls and ceilings to be checked for drywall
nailers.
Install 2x4 blocking for handrails and shower doors.
Install 22-1/2"x30" attic access per pla~ and wrap with 12" plywood
rips.
blocks tc centered on top
12.
13.
14.
n
-g or
room.
Install garage step.
with torsion bar
length x14"
nyl~ 85-1/2, if tile or wood.
:kordered door or
at dropped ceilings,
covered with t-ply.
blocks in center of
supervis,
ba~.
nt shall be left broom clean, with'debris removed
~ile in front yard in trash b~sket
y in garage on floor next to
s material
is to be placed on a
3 com
~r~ punchout.
trip to house at
Subcontractor
r areas for squareness and flatness
H/I $chottenstein Homes, Inc.
Date:
competen
1.
All drywall to be 1/2" regular except as follows:
A. Water resistant (WR) board around all tubs and showers
B. All 2 0 O.C. Trusses or Rafters to have 5/8"
All ceilings t ' ,, ·
o receive a Light DauD texture (Except garage
allmark Series Hodels).
vaulted and/or cathedral ceilings and arches and as
Shown on standard model plans (Excluding optional and/or extra
items.
of floors and hauling away of all
from job site.
5,All final touch-up and punch-out work including 1 year warranty
inspection and punch-out (Including nail pops settlin, g cracks
and tape and/or texture defects).
6. Standard garage work shall be as follows:
and ceilin~
ta textured.
es-all walls are
nd all ceilings to be
Drywall Su