HomeMy WebLinkAboutMinutes PC 06-29-04 Hearing Officer
C lemraC fo yti
City of Carmel
D E P A R T M E N T O F C O M M U N I T Y S E R V I C E S
CAPC
ARMEL DVISORY LAN OMMISSION
MIKEHOLLIBAUGH,HEARINGOFFICER
C-1/CC&C-2/OTDH
ITY ENTER LD OWN ISTRICT EARINGS
June 29, 2004
Minutes
Attending on behalf of the City:
Mike Hollibaugh
Adrienne Keeling
David Littlejohn
Agenda
A. Docket No. 04060034 ADLS Amend
Carmel City Center, Parcel 10, Shapiro’s, Phase II: Flagstar Bank (signage)
The applicant seeks sign package approval. The site is located at 902 South
Range Line Road.
Filed by Joyce Webb of The Sign Group, Inc.
Attending for Flagstar Bank:
Pete Joines, Regional Manager;
Robert Scherer, President, The Sign Group, Inc.
Department Report, Adrienne Keeling: The Department has been in contact with Les
Olds of the Carmel Redevelopment Commission and the CRC has approved all of the
except
signs Sign B, “bank parking only.”
Flagstar Bank would prefer to reverse the sign colors and have black letters on a white
background. However, if not, it is not vital.
Mike Hollibaugh stated that the white letters on black background has already been
approved by the Carmel Redevelopment Commission. The “CRC” was pretty specific
with signage and the original proposal presented by Flagstar. The color palette was
approved for black, white, and bronze.
Adrienne Keeling agreed that the sign package before the Hearing Officer today is what
S:\PlanCommission\HearingOfficer\2004june29
1
the Carmel Redevelopment Commission approved.
There was a question regarding the lighting. Flagstar was to reproduce the exact lighting
that was installed at Shapiro’s. Thus far, there is no information available as to the
general contractor that installed the existing lighting; the petitioner must go to Shapiro’s
for information. However, the lighting will mimic Shapiro’s.
The Department confirmed that the current submission is consistent with what the
Carmel Redevelopment Commission adopted. The only outstanding issues were
lighting/landscaping for the Flagstar sign.
Bob Scherer stated that the Flagstar sign would not be illuminated and there is no
landscaping.
Pete Joines reported that Flagstar would be open for business on Wednesday, July 7;
however, the “Grand Opening” will take place for 90 days after the “soft opening.”
Adrienne Keeling stated that 8 signs would need permits; the drive-thru, ATM,
open/closed, are not large enough to require a permit but sign “G” would need a permit.
There is a possibility of installing an interim sign/banner, and at the same time, the
petitioner could apply for a sign up to 32 square feet—suggest same color palette as City
Center. The petitioner would have 90 days before interim signage expires—time to
provide permanent signage. There are two frontages for Flagstar: one on City Center
Drive, and one on Monon Greenway.
APPROVED Docket No. 04060034 ALDS Amend, Carmel City
Mike Hollibaugh
Center, Parcel 10, Shapiro’s, Phase II, Flagstar Bank signage, conditioned upon
the
lighting to coincide with Shapiro’s.
B. Docket No. 04060038 ADLS Amend
Old Town, Parcel 8, AMLI at Old Town
The applicant seeks Exterior Lighting, Landscaping and Signage approval. The
site is located at the southeast corner of Main Street and the Monon Trail.
Filed by the Department of Community Services.
NO REPRESENTATION FROM AMLI
Adrienne Keeling commented on the sign package and the lighting. The landscape plan
was submitted as a part of the Development Plan in 2002. Scott Brewer is doing a final
site inspection today on the landscape plan for AMLI.
Mike Hollibaugh requested this package be made available in PDF format.
Approval of this Docket would be contingent upon any revisions that need to occur and
subject to Scott Brewer’s final inspection. We can fine tune if need be.
S:\PlanCommission\HearingOfficer\2004june29
2
Muldoon’s awnings have been changed to reflect the sign package for AMLI.
APPROVEDDocket No.
Mike Hollibaugh the sign package and landscape package for
04060038 ADLS Amend, Old Town, Parcel 8, AMLI at Old Towncontingent
upon
Scott Brewer’s final comments on the landscape plan.
The sign package for AMLI was detail, and very good.
The meeting was adjourned at 10:25 AM.
Note: Adrienne Keeling is to contact Pedcor Tenants to let them know they must come
through the Plan Commission for approval.
____________________________
Mike Hollibaugh, Hearing Officer
For the Carmel Plan Commission
______________________________
Ramona Hancock, Secretary
S:\PlanCommission\HearingOfficer\2004june29
3