Loading...
HomeMy WebLinkAboutA302.pdfTOP OF TPO MEMBRANE/ EDGE OF SCUPPER @ t$ DRAIN OPENING 07 24 00.A 04 21 OO.A FA407 05 12 00.A 08 80 OO.B 08 41 OOA- FA407, 8 07 62 OO.D ■I BBBBI' 11111_ BOTTOM OF SOFFIT Mmeem eemennninnnnninnnnnninnnnnninnninnnnml nnninnnl== inninnninnnnnninnninnnnnninnninnnnnnnnnl °!mum 1 ^n1�ni�R�mmmmmmmmmml�m��6D TOP OF WALL ELEV, 29' -10'1' TOP OF WALL ELEV. 26' -0 _ E!RE �_ Immm�mminnnmummnnnnmmmmminnnmmmmmmnnnmmmnmo� muumuu mmmnmmmnmmmn muumuu! Ill -I rilfil Innnnnnmmmnn nmmmnnnmmlmmmnnnmmlmmmnnnmmimmmnnl nnn.mmmmmmuennnnnn nnnnnnm nunnllllq mum FINISH FLOOR ELEV. 0 -0 EMIIMEMEMflEMEMEMEMEMEMEMEM MEMEMMEMEMEMEMEMEMEMEMEMEMEMEMEMMEM awr- awama•11a- 11—a=1aa•1aaNIaa IENNI MIa— MIa— aavuo- 1 1a MnM1M1M■1MEMIMEM1M •MaM•MaMn�t 111111 minnonsomosomon nrmm m 1!gam IEflEN IIMEM EN MEM IEMEMEN 80 11 OO.A/ 80 11 003 (3' X7)f 4 SEE CONCRETE STOOP FA407 2 FA407 2' TOP OF WALL TOP OF WALL 29' -1011 4, TOP OF WALL BOTTOM OF SOFFIT 1 FA30 SOUTH ELEVATION SCALE: 1/8" = 1' -0" • Mel METAL 1-07 62 00.D OVER COUNTER FLASHING TPO MEMBRANE SYSTEM 1 1" INSULATED SPANDREL PANEL (TYPICAL) 04 20 O0.H EU� TYPICAL • O" MMINNIMMIEM'—• -' -• -I _� EMEMIIMaMEINEE �Efl= TOP OF TPO MEMBRANE/ EDGE OF SCUPPER @ DRAIN OPENING BOTTOM OF CMU HEAD OPENIN ELEV. +13' -4 LOADING DOCK SEAL SYSTEM @ JAMB AND HEAD 08 33 00 (9' -0 11W X 9' -4 "H) TOP OF CONCRETE PLATFORM ELEV. +4' -0" VA302 NORTH ELEVATION SCALE: 1/8" = 1' -0" LOADING DOCK BUMPER @ SILL FINISH FLOOR ELEV. 0 -0 CSO Arc] ARCHITECTURE • IN1 8831 Keystone Crossing • In Main 317.848.7800 • Fax 317. © 2011 CSO Architects, Inc. All Rights Reserved tOJEC RE hl IRg eI, I Scope Drawkpe: These drawings idl cote the general scope of the p in terms of architectural design concept me dimerit. lonsl of the by !ding them architectural elements and the type of structural m owl and electrcol systems The drawings donnor ne ea my mmmte or describe al work performance and completion of me tie red of thellContmtl. me "a m of the yeneml scope - - the m nlmctors Mau fumih allltemms required °for° me' proper esecution and CornplNion of the work. Revision's Issue Date - Drawn By SCP Checked By NOC ELE EXTERIO lo Drawng iu l l Title: I TI 1 _. Certified Br R. TUct No. I AR009100361 STATE OF t 4e. RIO ,...S �I it' . Drawing Number: EFA302 Project Number: 11140