Loading...
HomeMy WebLinkAboutD1B.pdfFLOOR FINISH SCHEDULE SYM MANUFACTURER SSPECI CAD NONR N SSTEM / COLOR NUMBER SIZE REMARKS PC 1 HTC FLOOR SYSTEMS SUPERFLOOR PLATINUM N/A N/A N/A SUBMIT SAMPLES FOR APPROVAL TF 1 DAL TILE QUARRY TEXTURES RED FLASH OT02 8"x8" USE GT 1 & 5 "x8" COVED BASE. LATICRETE 254 PLATINUM THIN SET OR EQUAL FOR MORTAR BED EP 1 DUR -A -FLEX INC HYBRI -FLEX EQ W/ ARMOR -TOP FINISH COAT QUARTZ BLEND Q11 -36 AS SPECIFIED BY MANUF. FOR SYSTEM LISTED SUBMIT SAMPLES FOR APPROVAL. FLOOR PREP & APPLICATION AS RECOMMENDED BY MANUF. VB1 JOHNSONITE VINYL WALL BASE GANACHE 284 4 "XROLL SUBMIT SAMPLES FOR APPROVAL GT 1 LATICRETE SANDED 1500 SAND BEIGE 30 -1500 N/A USE TRI -POLY MODIFIED SANDED GROUT /TF1. USE MATCHING COLOR FOR EXPANSION JOINTS. NOTES 1. QUESTIONS ON FINISHES SHOULD BE DIRECTED TO BOB GORSKI (Be 952- 949 -0382. 2. USE TCA (TILE COUNCIL OF AMERICA) STANDARDS FOR CERAMICS. 3. GENERAL CONTRACTOR WILL PREP ALL FLOORS TO RECEIVE FINISHES. 4. ALLIED TILE MFG. CONTACT PAT DAHL ® 1- 800 - 366 -0558 RESINOUS FLOORING I Jc MIN. I/8" SILICON BEAD SEALED OR POLISHED CONCRETE CONCRETE SLAB 4 SAW CUT CONCRETE FOR RESINOUS FLOORING TRANSITION RESINOUS /CONC. DETAIL 6 " =1' -0" *PERMABASE BRAND CEMENT BOARD BY NATIONAL GYPSUM COMPANY UP TO 6" ABOVE CEILING OR STRUCTURE AS DETAILED. CLEAR SILICON SEALANT *CONCRETE BACKER FROM FLOOR TO 6" ABOVE CEILING OR STRUCTURE AS DETAILED NOTE: INSTALL BASE INTEGRAL W/ FLOOR TILE. DO NOT TOP SET BASE! PARTITION AS SCHEDULED WALL FINISH AS SCHEDULED FLOOR /WALL BASE TF -1 OR MATCH ADJACENT. CONTINUOUS URETHANE SEALANT COLOR TO MATCH FLOOR GROUT CERAMIC FLOOR TILE THIN SET BED *PERMABASE BRAND CEMENT BOARD BY NATIONAL GYP. COMPANY UP TO 6" ABOVE CEILING OR STRUCTURE AS DETAILED *CONCRETE BACKER BOARD IS INSTALLED AT ALL WALL LOCATIONS SCHEDULED TO RECEIVE FRP OR CERAMIC WALL TILE TO 6" ABOVE CEILING OR STRUCTURE (AS DETAILED) SALES FLOOR SIDE PARTITION AS SCHEDULED WALL FINISH AS SCHEDULED TO BE INSTALLED BEFORE RESINOUS BASE(CERAMIC TILE OR FRP) RESINOUS BASE (EP1) RESINOUS FLOORING (EPI) CORNER FILLER AS APPROVED BY EPDXY FLOORING MANUF RESINOUS BASE DETAIL VERIFY W/ REFRIGERATED CASE BASE N.T.S. PREP ROOM SIDE 'EASED EDGE (TYPICAL) 4 4 - EXISTING SLAB - RESINOUS FLOORING -EP1 TOP FLOOR CONCRETE PAD DETAIL 1 -1 /2 " =1' -0" CLEAR SILICON SEALANT -3/4" PAINT GRADE PLYWOOD TO 4' -0" AFF W/ 45' CANT K TOP. PAINT "B ", IPS #10 4 4 4 4 2x6 BASE /WAINSCOT CLEAR SILICON SEALANT 2X6 TREATED BASE w/45' CANT ® TOP. PAINT "A ", IPS #10 ° COOLER /FREEZER PANEL OR WALL PARTITION -SEE D3 CLEAR SILICON SEALANT CONCRETE SLAB 4 4 4 NOTE: SEE SHEET D1A & D3 FOR USE DOOR 2" x 3/8" MARBLE THRESHOLD, SINGLE BEVEL SEE PLAN THRESHOLD DETAIL CONTINUOUS URETHANE SEALANT. COLOR TO MATCH GROUT 1/2" TILE FLOOR - SEE PLAN BOND COAT (3/32" MIN.) (THIN SET) • CONCRETE SLAB AT ALL RESTROOMS II .• • l6 - -SILICON SEALANT *CONCRETE BACKER FROM FLOOR TO 6" ABOVE CEILING OR STRUCTURE AS DETAILED PARTITION AS SCHEDULED FRP PANEL WHITE VINYL FRP CHANNEL VINYL /FRP BASE N.T.S. SILICON SEALANT 'RABBITED TRIM W/ WILSONART #4846 -60 MORROW ZEPHYR LAMINATE ON 3/4" MDO BOARD SILICON SEALANT TW -1 WALL TILE TF -1 WALL BASE SECTION @ RESTROOMS N.T.S. REVISIONS: • U �W4 O rk m �.0 v 6 s s e O Cn r*e ael U DRAWING NAME: FLOOR FINISH PLAN & DETAILS PROJECT AME: EartN h Fare PROJECT LOCATION: 1390 RANGELINE RD. CARMEL, IN 46032 PROJECT NUMBER 2012 - 158 -10 STORE #675 EARTH FARE #675 DESIGNER RMG DRAFTER JPH/RMG CHECKED BY: RIVIG ISSUE DATE: 09 -21 -2012 SHEET: D1B