HomeMy WebLinkAbout1347.97.6notes.tre01
I
XX'.xx,
SCALE - 1/4" = 1' -0"
FRAMING NOTES:
BASEMENT ROUGH
1.
USE (2) -2x4
CRIPPLES UNDER EACH END OF HEADER
FOR OPENINGS
8'-0" OR GREATER IN WIDTH
2.
REFER TO MECHANICAL PLAN FOR BULKHEAD AND
DROP CEILING
LOCATIONS.
3.
ALL BEAMS TO
HAVE MINIMUM (2)-2x4 STUDS UNDER
EACH END FOR
BEARING SUPPORT
4.
ALL HALLS TO
BE 2x4 STUDS AT 16" O.C. UNLESS
NOTED OTHERWISE
5.
ALL WINDOWS
TO HAVE DRIP CAP MATERIAL AT TOP
6.
SEE SHEET 51
FOR BEAM CENTERLINE DIMENSIONS
7.
STANDARD HEADER HEIGHT AT 6'-10 718" A.F.F. (U.N.0)
8.
FINISH FLOOR
REFERENCES ARE TO TOP OF CONCRETE FLOOR
notes.tre01
I
XX'.xx,
SCALE - 1/4" = 1' -0"