Loading...
HomeMy WebLinkAboutTraffic Impact Study Update7-04 ~ I i I I, ~- I i I I I II~ " I- I: I: 1-: J II j I,! j I' ! I- I"! I~: Eclwarcb; 2!EKelcey 'Transportation Communications Building Technologies Site and Facility Design July 29, 2004 Mr. Jon Dobosiewicz Planning Administrator City of Carmel One Civic Square, Third Floor Carmel, Indiana 46032 RE: West Clay Traffic Impact Study Update EK 0400.48.034 Dear Mr. Dobosiewicz: As you know, Brenwick Development completed an extensive Traffic Impact Study in 1999 for the Village of West Clay Mixed-Use Development. At that time, Brenwick committed $1.28 Million for improvements to the local street system based on identified needs for signals, intersection improvements, and resurfacing. It is my understanding that roughly half of that amount has been spent to date. It is our intent that the following information may be used as a tool to aid the City of Carmel and Brenwick Development in determining the appropriateness of redistributing the previously-committed and remaining dollars. In addition to the amount that Brenwick has already provided, the City and County have made some roadway and intersection improvements in the area as needs have arisen. Other projects are currently planned which will further improve traffic conditions in the area. These completed and planned projects have resulted in a shifting of priorities for all future improvements. To this end, we have prepared analyses of traffic conditions under various development scenarios for the Village of West Clay. In previous submittals, we have provided you and the City of Carmel with the Levels of Service (LOS) estimates for existing conditions and traffic volumes at twenty-three intersections in West Clay Township. These intersections were identified by the City of Carmel for 2004 traffic counts and analysis and are within a study area bounded by 1 16th Street, Spring Mill Road, 141 st Street, and Shelbourne Road. - In addition to looking at existing conditions, analyses were conducted and are summarized in this letter to determine the impact that the Village of West Clay site would have on the traffic within that study area. In order to accomplish this, trip generation estimates were prepared for the modified Village of West Clay site as is currently being proposed. The land use composition for the project has changed since our original Traffic Impact Study (TIS) submittal in 1997. The trip generation estimates' from the original study and the proposed modified project configuration are summarized in Table 1. 222 E. Ohio Str.eet Suite 400 Indianapolis, Indiana 46204-2156 Voice 317.636.1552 Fax 317.636.1345 www.ekcorp.com Edward!!i ~Kelceg July 30, 2004 Mr. Jon Dobosiewicz Carmel City Hall Dear Mr. Dobosiewicz: An incomplete copy of this report was mailed to you yesterday in which ~~< ,,/' , 30 pages were inadvertently omitted. Please accept the attached report a~9/;":'~:>/\-';~'-~" discard the one you are to receive in Monday's mail. /~:'_,';v/ ::~ Administrative Asst. to Jennifer Pyrz , ., " ,I i :1 ! .~ .1 .~ "~ II ,I ~I, I 11 I: I: Ii :1 I~ '.1 ; J Eclwarcb; ~Kelceg Mr. Dobosiewicz July 29, 2004 Page 2 Table 1. Trips Generation Comparison Village of West Clay AM Peak Hour PM Peak Hour Combined Peal;( Hours In Out Total In Out Total In Out Total Total External Trips'll Original Study 648 716 1 ,364 1,111 974 2,085 1,759 1 ,690 3,449 Updated Study 694 853 1,547 1 ,233 1 ,233 2,466 1 ,927 2,086 4,013 0/0 Difference 70/0 190/0 130k 110/0 270/0 180/0 100/0 230k 160/0 Total External, Non-Pass-By Trips** Original Study 648 716 1 ,364 1,111 974 2,085 1 ,759 1 ,690 3,449 Updated Study 694 853 1 ,547 1,111 1,111 2,222 1 ,805 1 ,964 3,769 0/0 Difference 70/0 190/0 130/0 00/0 140/0 70/0 30/0 160/0 90/0 * Extemaltrips are those trips that enter/exit the subject site from the adjacent roadway system. Internaltrips which are conducted solely within the site itself (i.e. between the retail and residential portions of the project) have been deducted since they do not add traffic to the adjacent roadway system. ** Pass-by trips are trips that are attracted to the site from the existing traffic stream. These trips are not new to the adjacent roadway system. They are already passing by the site and will be added only onto the site driveway volumes as they exit the adjacent roadway, enter the site, conduct their business, and then return to that same adjacent roadway., Using these updated traffic estimates, site trips were distributed among the study roadways and intersections based on roadway configuration, distribution of trip destinations, and existing traffic patterns. Trips from within the Village were distributed differently from trips to and from the retail space at l3l5t and Towne Road, the latter assumed to be an attractor of trips mostly from within the study area. Table 2 provides a comparison of 2004 Existing LOS and 2008 Future LOS, for both the modified ("updated") and original WestClay configurations. The Future scenario LOS were estimated using background information from the original study for the Village of West Clay. In the original WestClay study, trip generation estimates were individually prepared and distributed for more than 4,000 acres of then-undeveloped land. In additon to those volumes, a 1 % per year background growth rate was added to the entire system to simulate regional growth outside of the immediate study area. For the work prepared for this update, the same background growth and adjacent land growth was assumed and included, adjusted to account for the six years that have taken place since that study was prepared. The future scenario LOS therefore includes traffic from the following sources: ~ I I I I I ~ ~ I I ~ I I: 11 II II: I Ii I: .J Edwards ~Kelcey Mr. Dobosiewicz July 29, 2004 Page 3 1. Existing 2004 traffic volumes, plus 2. Background growth of 1 % per year between 2004 and 2008, plus 3. Traffic volumes from the development of adjacent (and currently undeveloped) parcels to occur between 2004 and 2008, plus 4. Traffic volumes from the development of the Village of WestClay (originally proposed and updated) The intersection configurations for both the original future and updated future scenarios is identical. Where improvements are currently planned by the City of Carmel, those configurations were utilized. In most cases, that meant a single-lane roundabout. Where improvements are not currently planned, the existing (2004) intersection configuration was used. Based on the results provided in Table 2, the intersection of 131 st Street and Towne Road is currently operating below expected Levels of Service and will continue to do so in the future under both the original and updated WestClay development plans. This intersection was estimated at unacceptable levels of service in the future year of the original. study as well. No improvements are currently plailned by the City for this intersection. LOS B or better in the peak hours could be attained with the installation of a two-phase signal and left-turn lanes on each approach once warranted. Alternatively, a roundabout may be constructed at this location. Capacity analysis indicates that a single-lane roundabout may be reaching the upperbounds of capacity with the estimated volumes. A two-lane roundabout should be considered at this location. The following intersections are expected to degrade from acceptable to unacceptable levels of service as result of the addition of background, vacant and WestClay site traffic volumes: 131 st and Shelbome 131 st and Ditch 1 16th and Hoover Each of these intersections is currently stop-controlled, with an all-way stop condition operating at 131 st and Shelborne and two-way stops at 131 st I Ditch and 1 16th I Hoover. When warranted, the installation of a two-phase signal and left-turn lanes would bring each of these locations up to acceptable LOS in the peak hours. Alternatively, single-lane roundabouts would also provide good LOS at any of these locations. The original study also estimated that all three intersections would fall to unacceptable levels in future scenarios. Roundabouts are currently planned for construction at four of the study intersections. The roundabout planned at 136th and Ditch is expected to operate efficiently as single-lane roundabout under the estimated traffic volumes. The following locations should be considered for two-lane roundabouts: .1 I 'I I , , I I I ~ 1 I: I; I: I II II II 1 I: IJ ...J Edwarcb; ~Kelcey Mr. Dobosiewicz July 29, 2004 Page 4 131 st and Spring Mill 116th and Ditch 1 16th and Spring Mill These same conclusions would be drawn from the traffic volume estimates prepared in the original study. Overall, Table 2 shows that the original traffic study predicted generally the same levels and locations of needed improvements, despite the differences in land use assumptions used for the Village of West Clay - original vs. updated. There are four locations that should continue to be considered for traffic signal or roundabout installation as buildout of the township progresses; one of those is currently operating below acceptable levels of service. Four other intersections will be improved to acceptable LOS with planned roundabout ,construction at those locations. Please contact us if you have any questions or require additional information. At your request, we will be happy to provide the Highway Capacity Software output for any or all of the intersection analyses. We are also prepared to assist in discussions with the City or Plan Commission at your request. Very truly yours, EDW ARDS AND KELCEY G-/1J~ Jennifer Pyrz, P.E. Transportation Engineer Cc: Keith Lash Mike McBride 1:\040048034 West Clay II\Correspondence\07-27-04 Lash Letter (rev).doc ~ I I I ~ I ! I I I .~ I: I II I. I: i , ! II II I II I 11 Edwards ~Kelceg Mr. Dobosiewicz July 29, 2004 Page 5 Table 2. Existing vs. Future LOS 2004 Existing 2008 Future LOS 2008 Future LOS Intersection Period Approach LOS (Updated Study) (Original Study) NB A A A 5B A A A Q) ~ EB C C B c <( ~ WB D C B 0 .... INT "C - - - c NB A A A ro ....... 5B A tJ) A A 'T"'" ~ ~ EB C C C 'T"'" (l. WB C C B INT - - - NB - - - 5B A A A Q) ,~ EB c <( - - - ~ WB C C B 0 I- INT -c - - - c: NB co - - - .r::. 5B A A A .... c.o C') ~ EB 'T"'" (l. - - - WB C C C INT - - - NB A S8 A .c. ~ EB A u <( ..- WB B (5 "'C INT A Single lane Single lane c:: roundabout under roundabout co NB A .c. capacity under capacity ..- CD 5B A ("I) ~ or- EB A 0... WB A INT' A , I I I I i ~ ~ ~ Ii I II It J I. I~ I: I" I I: IJ j Edward!!; ~Kelcey Mr. Dobosiewicz July 29, 2004 Page 6 Table 2. Existing vs. Future LOS 2004 Existing 2008 Future LOS 2008 Future LOS Intersection Period Approach LOS (Updated Study) (Original Study) NB C B B Q) S'B A D F c: :E L- EB .8 C B ::J <( 0 .c WB B C C Q) J:: INT 8 C E en -c NB A F F c: co 58 C B F ~ ~ U) EB B C C ~ a.. M ~ WB B D C INT B F F NB E F C SB F F E Q) ~ EB D F C c: <( ~ WB F F 0 0 t- INT F F D -c c: NB F F F co .... (f) 5B E F E ~ ('i') ~ EB C F D 0r- a.. WB E F F INT F F F NB - - - SB D F E .r::. ~ EB A A A u <( ...... WB C5 - - - -c INT - - - c: ro NB - - - ...... UJ 5B C -,:- F F M ~ ~ EB A B B a.. WB - - - INT - - - I I I I , , I I I I ~ I I I: I: Iii II IJ I ; J EdwarcIB ~Kelceg Mr. Dobosiewicz July 29, 2004 Page 7 Table 2. Existing vs. Future LOS 2004 Existing 2008 Future LOS 2008 Future LOS Intersection Period Approach LOS (Updated Study) (Original Study) NB C C C L- S8 - - - Q) +-' ~ c EB - - - Q) <( () WB A A A ~ co 'NT - - - (3 '"0 NB C E D c: co 5B - - - ...... ~ tn EB .,.... a.. - - - ct:) WB A A A .,.... INT - - - NB C 5B F ~ ~ EB F C) <( c WB 0 .t: Single lane Single lane 0- INT F en roundabout over roundabout over '"C NB F capacity c capacity co 5B ~ F en ~ .,.... EB F ("i') (L .,.... WB F INT F NB B C C 58 B C D Q) :E EB C C C c: <( 3: WB C C C 0 .... INT C C C -c c: NB C C 0 ro ..r:. 58 B C C ..- C.D .,.... ~ EB C 0 C .,.... (L WB C E B INT C 0 C I I I I I I I I I I I I II II 1'1 I: II! I II I . , J Edwards ~Kelcey Mr. Dobosiewicz July 29, 2004 Page 8 Table 2. Existing vs'. Future LOS 2004 Existing 2008 Future LOS 2008 Future LOS Intersection Period Approach LOS (Updated Study) (Original Study) NB - - - 58 C F F L- :2 EB Q) A A A > <! 0 WB 0 - - - :r: INT "C - - - c NB OJ - - - .c 5B C F F -+-' CD :2 ~ EB A B C ~ a. WB - - - INT - - - NB 5B .c ~ EB (..) <! :t::: WB Single lane 0 Single lane Single lane -0 INT roundabout c: roundabout at roundabout over co NB under .c:: capacity capacity -+-' 5B capacity CD ~ ~ ~ EB a. WB INT NB D 58 F ~ ~ EB F C') <( c WB F "L: 0- INT F Single lane Single lane en roundabout over roundabout over "'0 NB F c capacity capacity OJ '5B F .c:: -+-' ~ EB F (C ~ a. ~ WB F INT F I I I I I I I I I I I: I! 11 11 11 I Ii Ii , I IJ Village of WestClay Traffic Impact Study Update 2004 Existing Traffic Volumes Existing Intersection Configurations Edwards and Kelcey A-I ~ I I I I , ~ I I I I' II I: II 11 I I: I] J Two-Way Stop Control Page 1 ot"2 nNO-WAYSTOPCONTROLSUMMARY General Information Site Information Intersection 141st Street and Towne Analyst Derek Butler Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 6/4/2004 Analysis Year 2004 Analysis Time Period Existing AM Peak Project 10 040048034 Village of West Clay Update EastlWest Street: 141 st street North/South Street: Towne Road Intersection Orientation: North-South Study Period (hrs )-: 0.25 l\Iehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L' T R Volume 9 132 17 2 339 11 Peak-Hour Factor, PHF 0.45 0.69 0.47 0.50 0.72 0.69 Hourly Flow Rate, HFR 20 192 36 4 467 16 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0, 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal 0 0 Minor ,Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 42 48 4 1 17 2 Peak-Hour Factor, PHF 0.81 0.48 0.50 0.25 0.47 0.50 Hourly Flow Rate, HFR 52 100 8 4 36 4 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (010) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length, and Level of Service Approach Ns S8 Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR v (vph) 20 4 160 44 C (m) (vph) 1090 1352 332 333 vlc 0.02 0.00 0.48 0.13 950/0 queue length 0.06 0.01 2.50 0.45 Control Delay 8.4 7.7 25.5 17.4 LOS A A D C Approach Delay -- -- 25.5 17.4 V\pproach LOS -- -- D C ~1 _ . J/~.\ n_n"____QntC'O~ ') ()~T\r10k ')()~ptt1nQs\dhlltler\Local%20Settings\ Temp\u2k5C. tmp 6/4/2004 A-2 ~ I I I , I I I I I II Ii I: I Ii II I'i I I] IJ Two-Way Stop Control Page 1 ot:l TWO-WAY STOP CONTROL SUMMARY General Information Site Information Intersection 141st Street and Towne Analyst Derek Butler Road ~gency/Co. Edwards and Kelcey J u risd iction City of Carmel Date Performed 6/4/2004 ~nalysis Year 2004 Analysis Time Period Existing PM Peak Project 10 040048034 Village of West Clay EastlWest Street: 141 st Street North/South Street: Towne Road 'ntersection Orientation: North-South Study Period (hrs): 0.25 tvehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R f\Jolume 5 378 32 9 202 2 Peak-Hour Factor, PHF 0.25 0.91 0.73 0.45 0.77 0.50 Hourly Flow Rate, HFR 20 415 43 20 264 4 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Config,uration LTR LTR Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R ~olume 14 11 4 5 67 3 Peak-Hour Factor, PHF 0.50 0.69 0.50 0.63 0.76 0.38 Hourly Flow Rate, HFR 28 16 8 8 88 8 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (0/0) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length, and Level of Service ~pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR v (vph) 20 20 52 104 C (m) (vph) 1307 1114 270 319 rv/c 0.02 0.02 0.19 0.33 95% queue length 0.05 0.05 0.70 1.38 Control Delay 7.8 8.3 21.5 21.6 LOS A A C C !Approach Delay -- -- 21.5 21.6 lApproach LOS -- -- C C _.. 11r1.\ T"t. _ ______ _~_~~O'_ "()n.....r10~ ")()~ptt1n(J~\nhlltler\Local%20Settings\ Temp\u2k60.tmp 6/4/2004 k , I I I I I ~ I .~ I, I, I: II I'~ I I; I: t II II II , I I , j Two-Way Stop Control rage, 1 01 ~ ~O-WAYSTOPCONTROLSUMMARY General Information Site Information Analyst Derek Butler Intersection 136th Street and Towne Road ~gency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 6/4/2004 Analysis Time Period Existing AM Peak ~nalysis Year 2004 Project Description 040048034 Village of West Clay EastlWest Street: 1 ~~~1\Street North/South Street: Towne Road Intersection Orientation: North-South Study Period (hrs): 0.25 ~ehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R lVolume 0 131 38 16 402 0 Peak-Hour Factor, PHF 1.00 0.96 0.73 0.50 0.83 1.00 Hourly Flow Rate, HFR 0 135 52 .32 484 0 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT' Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 69 0 3 0 0 0 Peak-Hour Factor, PHF 0.69 1.00 0.38 1.00 1.00 1.QO Hourly Flow Rate. HFR '100 0 8 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (Ok) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 0 0 Config u ration LTR Delay, Queue Length, and Level of Service ~pproach NB 58 Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR v (vph) 32 108 C (m) (vph) 1399 412 v/c 0.02 0.26 950/0 queue length 0.07 1.04 Control Delay 7.6 16.8 LOS A C Approach Delay -- -- 16.8 A.pproach LOS -- -- C Rights Reserved .t:l_. J Jr"1.\ n^""n'\pntt!O~ ')()~nr10/n20~ettlnQs\dbutler\Local%20Settings\ Temp\u2kB 7 .tmp 6/7 /2004 A-~ II II I I I I I I I I I I I I I II Ii II IJ TWO-WA Y STOP CONTROL SUMMARY General Information Site Information ' lAnalyst Derek Butler Intersection 136th street and Towne Road ~gency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 6/4/2004 ~nalysis Year 2004 Analysis Time Period Existing PM Peak Project Description 040048034 Village of West Clay Update EastIWest Street: 136th Street North/South Street: Towne ,Road I ntersection Orientation: North-South Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R rvolume 0 369 100 7 213 0 Peak-Hour Factor, PHF 1.00 0.92 0.86 0.58 ' 0.71 1.00 Hourly Flow Rate, HFR 0 399 116 12 300 0 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R ~olume . 56 0 8 0 0 0 Peak-Hour Factor, PHF 0.64 1.00 0.67 1.00 1.00 1.00 Hourly Flow Rate, HFR 88 0 11 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (0/0) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 0 0 Configuration LTR Delay, Queue Length, and Level of Service ~pproach NB 58 Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR r.J (vph) 12 99 C (m) (vph) 1061 379 ~/c 0.01 0.26 950/0 queue length 0.03 1.03 Control Delay 8.4 17.8 LOS A C Approach Delay, -- -- 17.8 Approach LOS -- - C Rights Reserved file:IIC: \Documents%20and %20Settings\dbutler\Local %20Settings\ Temp \u2kBB. tmp 6/7/2004 A-Pj II I I I I I I I I I I I I I I I II II I ALL-WA Y STOP CONTROL ANA,L YSIS General Information Site Information Analyst Derek Butler Intersection 136th Street and Ditch Road Agency/Co. Edwards and Kelcey ",urisdidion City of Carmel Date Performed 6/4/2004 nnalysis Year 2004 040048034 Village of West Clay - Analvsis Time Period Existing AM Peak ProjectlD Update EastIWest Street: 136th Street North/South Street: Ditch Road Volume Adjustments and Site ,Characteristics [Approach Eastbound Westbound Movement L T R L T R Volume 8 68 18 26 47 15 0,'0 Thrus Left Lane 50 50 Approach Northbound Southbound Movement L T R L T R Volume 4 26 8 53 206 15 Ok Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Configuration LTR LTR LTR LT R PHF 0.94 0.81 0.96 0.95 0.75 Flow Rate 99 108 39 271 20 % Heavy Vehicles 0 0 0 0 0 No. Lanes 1 1 1 2 Geometry Group 2 2 4a 5 Duration, T 0.25 Saturation Headway Adjustment Worksheet Prop. Left-Turns 0.1 0.3 0.1 0.2 0.0 Prop. Right-Turns 0.2 0.2 0.2 0.0 1.0 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 0.0 hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT-adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 4.79 4.79 4.79 4.79 4.79 Departure Headway and Service Time hd, initial value 3.20 3.20 3.20 3.20 3.20 lx, initial 0.09 0.10 0.03 0.24 0.02 hd, final value 4.79 4.79 4.79 4.79 4.79 x, final value 0.13 0.14 0.05 0.38 0.02 Move-up time, m 2.0 2.0 2.0 2.3 Service Time 2.8 2.8 2.B 2.8 Capacity and Level of Service Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 349 358 289 521 270 Delay B.51 8.65 B.07 10.95 7.27 LOS A A A B A ~pproach: Delay 8.51 8.65 8.07 10. 70 LOS A A A B Intersection Delay 9.69 Intersection LOS A file:/ /C: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \u2k83. tmp 6/4/2004 A-lt I I I I I I I I I I II II 11 11 II I Ii II IJ A~L-WA Y STOP CONTROL ANAL YSIS General Information Site Information ~nalyst Derek Butler Intersection 136th street and Ditch Road lAgency/Co. Edwards and Kelcey urisdiction City of Carmel nalysis Year 2004 Date Performed 6/4/2004 !Analysis Time Period Existing PM Peak Project I D 040048034 Village of West Clay Update EastlWest Street: 136th Street North/South Street: Ditch Road tvolume Adjustments and Site Characteristics IApproach Eastbound Westbound Movement L T R L T R Volume 5 98 8 19 110 34 Ok Thrus Left Lane 50 50 [Approach Northbound Southbound Movement L T R L T R !Volume 25 142 20 23 73 4 OkThrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Configuration LTR LTR LTR LT R PHF 0.68 0.93 0.95 0.70 0.63 Flow Rate 162 174 196 136 6 Ok Heavy Vehicles 0 0 0 0 0 No. Lanes 1 1 1 2 Geometry Group 2 2 4a 5 Durati~n, T 0.25 Saturation Headway Adjustment Worksheet Prop. Left-Turns 0.0 0.1 0.1 0.2 0.0 Prop. Right-Turns 0.1 0.2 0.1 0.0 1.0 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 0.0 hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT-adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1'.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 5.03 5.03 5.03 5.03 5.03 Departure Headway and Service Time hd, initial value 3.,20 3.20 3.20 3.2'0 3.20 lx, initial 0.14 0.15 0.17 0.12 0.01 hd. final value 5.03 5.03 5.03 5.03 5.03 lX. final value 0.23 0.24 0.28 0.21 0.01 Move-up time, m 2.0 2.0 2.0 2.3 Service Time 3.0 3.0 3.0 3.0 Capacity and Level of Service Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 412 424 446 386 256 Delay 9.50 9.50 10.00- 9.90 7.75 LOS A A A A A ~pproach: Delay 9.50 9.50 10.00- 9.81 LOS A A A A Intersection Delay 9.71 Intersection LOS A I file:IIC: \D 0 cuments%2 0 and%2 0 S etting s\dbutl er\L 0 cal %2 OSettings\ Temp \u2k87 · tmp 6/4/2004 A'; " I I 'I I I I I I I I I 11 II II Ii I II 1,1 ALL-WA Y STOP CONTROL ANAL YSIS General Information Site Information lAnalyst Derek Butler Intersection 131st Street and She/bourne !Agency/Co. Edwards and Ke/cey ~urisdiction City of Carmel ~nalysis Year 2004 Date Performed 6/3/2004 !Analysis Time. Period Existing PM Peak Project ID 040048034 Village of West Clay Update EastlWest Street: 131 st Street North/South Street: She/bourne Road lVolume Adjustments and Site Characteristics IApproach Eastbound Westbound Movement L T R L T R Volume 17 75 14 36 129 - 16 OJ'o Thrus Left Lane 50 50 lApproach Northbound Southbound Movement L T R L T R lVolume 19 350 90 6 43 10 OJ'o Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 ~onfiguration LTR LTR LTR LTR PHF 0.95 0.84 0.89 0.82 Flow Rate 109 214 515 71 % Heavy Vehicles 0 0 0' 0 No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Saturati()n Headway Adjustment Worksheet Prop. Left-Turns 0.2 0.2 0.0 0.1 Prop. Right-Turns 0.1 0.1 0.2 0.2 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 hL T-adj 0.2 0.2 0.2 ' 0.2 0.2 0.2 0.2 0.2 hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 5.78 5.78 5.78 5.78 Departure Headway and Service Time hd, initial value 3.20 3.20 3.20 3.20 tx, initial 0.10 0.19 0.46 0.06 hd, final value 5.78 5.78 5.78 5.78 x, final value 0.18 0.33 0.69 0.11 Move-up time, m 2.0 2.Q 2.0 2.0 Service Time 3.8 3.8 . 3.8 3.8 Capacity and Level of Service Eastbound Westbound Northbound Southbound L1 L2 L1 'L2 L1 L2 L1 L2 Capacity 359 464 724 321 Delay 10.01 11.40 1 B. 15 9.21 LOS -8 8 C A Approach: Delay 10.01 11.40 1 B. 15 9.21 LOS 8 B C A Intersection Delay 14.89 Intersection LOS B file ://C: \Documents%20and%20Settings\dbutler\Local %2 OSettings\ Temp \u2k63. tmp 6/3/2004 A-~ I I I I I I I I I II I II I 1 1 I I Ii 11 ALL-WA Y STOP CONTROL ANALYSIS General Information Site Information Analyst Derek Butler Intersection 131 st Street and Shelbourne Agency/Co. Edwards and Kelcey urisdiction City of Carmel nnalysis Year 2004 pate Performed 6/3/2004 IAnalysis Time Period Existing AM Peak Project I D 040048034 Village of West Clay Update EastIWest Street: 131,st Street North/South Street: She/bourne Road Volume Adjustments and Site Characteristics Approach Eastbound Westbound Movement L T R L T R Volume 17 108 11 70 70 5 Ok Thrus Left Lane 50 50 Approach Northbound Southbound Movement L T R L T R Volume 6 35' 40 37 288 12 OJ'o Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Configuration LTR LTR LTR LTR PHF 0.76 0.81 0.81 0.81 Flow Rate 178 178 99 414 OJ'o Heavy Vehicles 0 0 0 0 No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Saturation Headway Adjustment Worksheet Prop. Left-Turns 0.1 0.5 0.1 0.1 Prop. Right-Turns 0.1 0.0 0.5 (J.O Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 hL T -adj .0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 '-0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 5.59 5.59 5.59 5.59 Departure H'eadway and Service Time hd, initial value 3.20 3.20 3.20 3.20 x, initial 0.16 0.16 0.09 0.37 hd, final value 5.59 5.59 5.59 5.59 x, finai value 0.28 0.28 0.15 0.59 Move-up time, m 2.0 2.0 2.0 2.0 Service Time 3.6 3.6 3.6 3.6 Capacity and Level of Service Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 428 428 349 664 Delay 10.71 10.89 9.22 15.06 LOS B B A C Approach: Delay 10. 71 10.89 9.22 15.06 LOS B B' A C Intersection Delay 12.65 Intersection LOS B file ://C: \Documents%20and%20Settings\dbutler\Local %20Settings\ T erop \u2k5F · tmp 6/3/2004 A-C I I I I I I I I I I I II II 11 I I I I IJ ALL-WA Y STOP CONTROL ANAL YSIS General Information Site Information ~na'yst Derek Butler Intersection 131st Street and Towne Road lJurisdiction City of Carmel ~Qency/Co. Edwards and Kelcey If"\nalysis Year 2004 Date Performed 6/3/2004 ~na'vsis Time Period Existing AM Peak Project 10 040048034 Village of West Clay Update EastIWest Street: 131 sf Street North/South Street: Towne Road Volume Adjustments and Site Characteristics APProach Eastbound Westbound Movement L T R L T R N'olume 13 189 26 200 117 12 Ok Thrus Left Lane 50 50 APproach Northbound Southbound Movement L T R L T R ~olume 18 185 82 42 420 28 0/0 Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Configuration LTR LTR LTR, LTR PHF 0.85 0.73 0.82 0.86 Flow Rate 267 449 346 568 % Heavy Vehicles 0 0 0 0 No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Saturation Headway Adjustment Worksheet Prop. Left-Turns 0.1 0.6 0.1 0.1 Prop. Right-Turns 0.1 0.0 0.3 0.1 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 9.34 9.34 9.34 9.34 Departure Headway and Service Time hd, initial value 3.20 3.20 3.20 3.20 lx, initial 0.24 0.40 0.31 0.50 hd, final value 9.34 9.34 9.34 9.34 x, final value 0.6,9 1.09 0.85 1.36 Move-up time I m 2.0 2.0 2.0 2.0 Service Time 7.3 7.3 7.3 7.3 Capacity and Level of Service Eastbound Westbound Northbound Southbound L1 L2 L1 L2 l1 L2 L1 L2 Capacity 377 449 405 568 Delay 30.93 100.84 44.89 201. 72 LOS 0 F E F Approach: Delay 30.93 100.84 44.89 201.72 LOS 0 F E F Intersection Delay 112.67 Intersection LOS F file ://C: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \u2k57 · tmp 6/3/2004 A-\ I I I I I I I I I I I I ..11 , I 11 II I I I I: II I] r'\..11- vv a y t..J LV P '-'U U. \.1. U J. ALL-WA Y STOP CONTROL ANAL YSIS General Information Site Information ~nalyst Derek Butler Intersection 131st Street and Towne Road Jurisdiction City of Carmel [Agency/Co. Edwards and Kelcey Date Performed 6/3/2004 f"\nalysis Year 2004 ~nalysis Time Period Existing PM Peak Project I D 040048034 Village of West Clay Update EastNVest Street: 131 sf Street North/South Street: Towne Road Volume Adjustments and Site Characteristics Approach Eastbound Westbound Movement L T R L T R Volume 56 111 23 110 152 29 0.4. Thrus Left Lane 50 50 APp~roach Northbound Southbound Movement L T R L T R iVolume 118 407 72 15 235 28 OJ'o Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Config uration LTR LTR LTR LTR PHF 0.9,3 0.76 0.88 0.73 Flow Rate 203 382 677 379 % Heavy Vehicles 0 0 0 0 No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Saturation Headway Adjustment Worksheet Prop. Left-Turns 0.3 0.4 0.2 0.1 Prop. Right-Turns 0.1 0.1 0.1 0.1 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 9.09 9.09 9.09 9.09 Departure Headway and Service Time, hd, initial value 3.20 3.20 3.20 3.20 lX,initial 0.18 0.34 0.60 0.34 hd I final value 9.09 9.09 9.09 9.09 x, final value 0.51 0.87 1.48 0.86 Move-up time"m 2.0 2.0 2.0 2.D Service Time 7.1 7.1 7.1 7.1 Capacity and Level of Service Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 368 431 677 435 Delay 21.28 46.27 248.87 43.29 LOS, C E F E Approach: Delay 21.28 46.27 248.87 43.29 ' LOS C E F E Intersection Delay 126.07 Intersection LOS F file:IIC: \Documents%20and %20Settings\dbutler\Local %20Settings\ Temp \u2k5B. tmp 6/3/2004 A-\ I I I I I I I I I I I I - I .1; , ; I 11 II I I I II 1 WU- VV ~y 0LUP '-'V~U.IUl nNO-WAYSTOPCONTROLSUMMARY General Information Site Information Intersection 131 st Street and Ditch Analyst Derek Butler Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 6/3/2004 Analysis Year 2004 Analysis Time Period Existing AM Peak Project 10 040048034 Village of West Clay Update EastlWest Street: 131 st Street North/South Street: Ditch Road Intersection Orientation: East-West Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume 22 312 0 0 196 19 Peak-Hour Factor, PHF 0.61 0.88 1.00 1.00 0.91 0.68 Hourly Flow Rate, HFR 36 355 0 0 216 28 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume 0 0 0 170 0 155 Peak~Hour Factor, PHF 1.00 1.00 1.00 0.73 1.00 O~73 Hourly Flow Rate, HFR 0 0 0 231 0 211 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (0/0) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 1 0 Configuration LTR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR v (vph) 36 442 C (m) (vph) 1334 547 ~/c 0.03 0.81 950/0 queue length 0.08 7.89 Control Delay 7.8 33.6 LOS A 0 Approach Delay -- -- 33.6 Approach LOS -- -- 0 file:IIC: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \u2k4 F. tmp 6/3/2004 A-\: 1 I I I I I I I I I I I .11 II II I II II IJ 1 WQ- way i:)LUP \...;Ul1lfUl TWO-WAY STOP CONTROL SUMMARY General Information Site Information Intersection 131st Street and Ditch Analyst Derek Butler Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 6/3/2004 Analvsis Year 2004 ~nalysis Time Period Existing PM Peak Project 10 040048034 Village of West Clay Update EastlWest Street: 131st Street North/South Street: Ditch Road I'ntersection Orientation: East-West Study Period (hrs): 0.25 ehic'le Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R l\Iolume 59 219 0 0 276 121 Peak-Hour Factor, PHF 0.70 0.73 1.00 1.00 0.78 0.89 Hourly F'Iow Rate, HFR 83 299 0 0 351 135 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R i\lolume 0 0 0 50 0 54 Peak-Hour Factor, PHF 1.00 1.00 1.00 0.78 1.00 0.84 Hourly Flow Rate, HFR 0 0 0 64 0 64 Percent Heavy Vehicles 0 0 0 0 0 ,0 Percent Grade (0/0) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 1 0 Configuration LTR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR v (vph) 83 128 C (m) (vph) 1087 404 ~/c 0.08 0.32 950/0 queue length 0.25 1.34 Control Delay 8.6 18.0 LOS A C Approach Delay -- -- 18.0 Approach LOS -- -- C file:IIC: \D ocuments%2 0 and %20Settings\dbutler\Local %20 Settings \ Temp \u2kS 3. tmp 6/3/2004 {.\-\: J. vvv- Vy a] u\.vp ,-,vJ..,Lu,V.L I I I I I I I I I 'I Ii II 'I- 'I . I 11 II I Ii Ii 11 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst Derek Butler Intersection 131st Street and Clay Center Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 6/3/2004 Analysis Year 2004 l(.\nalysis Time Period Existing AM Peak Project I D 040048034 Village of West Clay Update EasUWest Street: 131 st Street North/South Street: Clay Center Road Intersection Orientation: East-West Study Period (hrs): 0.25 Wehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume 0 374 69 79 185 0 Peak-Hour Factor, PHF 1.00 0.79 0.75 0.60 0.87 1.00 Hourly Flow Rate, HFR 0 476 92 131 212 0 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type ' Undivided RT Channelized 0 0 Lanes 0 1 0 0 l' 0 Configuration TR LT Upstream Signal 0 0 Nlh10r Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume 20 0 69 0 0 0 Peak-Hour Factor, PHF 0.56 1.00 0.86 1.00 1.00 1.00 Hourly Flow Rate, HFR 35 0 79 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (0/0) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 0 0 Config u ration LTR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Con~guration LT LTR v (vph) 131 114 C (m) (vph) 1014 395 vlc 0.13 0.29 95% queue length 0.44 1.18 Control Delay 9.1 17.8 LOS A C ~pproach Delay -- -- 17.8 ~pproach LOS -- -- C file:IIC: \Documents%2 o and %20Settings\dbutler\Local %2 OSettings\ T emp\u2k 1 F · tmp 6/3/2004 A-\) 1 WU- VV i1Y .:)LU.IJ vUI1LIUl I I I I I I I I I I I I I 11 1\ I II IJ II ,TWO-WAY STOP CONTROL SUMMARY General Information Site Information Intersection 131st Street and Clay Analyst Derek Butler Center ~gency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 6/3/2004 ~nalysis Year 2004 ~nalysis Time Period Existing PM Peak Project 10 040048034 Village of West Clay Update EastlWest Street: . 131st Street North/South Street: Clay Center Intersection Orientation: East-West Study Period (hrs): 0.29 !Vehicle Volumes and Adjustments Major Street' Eastbound ' Westbound Movement 1 2 3 4 5 6 L T R L T R lVolume 0 237 18 33 364 0 Peak-Hour Factor, PHF 1.00 0.93 0.50 0.75 0.85 1.00 Hourly Flow Rate, HFR 0 256 36 44 428 0 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor-Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume 59 0 107 0 0 0 Peak-Hour Factor,PHF 0.82 1.00 0.86 1.00 1.00 1.00 Hourly Flow Rate. HFR 72 0 123 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (0/0) 0 0 Flared Approach N 'N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 0 0 Configuration LTR Delay, Queue Length, and Level of Service ~pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR ~ (vph) 44 195 C (m) (vph) 1281 534 ~/c 0.03 0'.37 950/0 queue length 0.11 1.66 Control Delay 7.9 15.6 LOS A C Approach Delay -- -- 15.6 IApproach LOS -- -- C file:/ /C: \Documents%2 Oand%20Settings\dbutler\Local %20Settings\ T emp\u2k26. trnp 6/3/2004 A-\~ 'I 'I I I I I I I I I I II II II 1\ I I, II IJ ~ll- VV ay ....,..Vp vUU.UVJ. ALL-WA Y STOP CONTROL ANAL YSIS General Information Site Information Analyst Derek Butler Intersection 131 st Street and Soring Mill ~gency/Co. Edwards and Kelcey \Jurisdiction City of Carmel Mnalysis Year 2004 Date Performed 6/4/2004 [Analvsis Time Period Existing AM Peak Project I D 040048034 Village of West Clay Update EastlWest Street: 131 st Street North/South Street: Spring Mill Road Volume Adiustments ,and Site Characteristics APProach Eastbound Westbound Movement L T R L. T R rvolume 53 383 49 34 181 77 OJ'o Thrus Left Lane 50 50 APproach Northbound Southbound Movement L T R L T R tvolume 22 123 12 199 260 29 % Thrus Left Lane' 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Configurat~on LTR LTR LTR LTR PHF 0.93 0.88 0.91 0.96 Flow Rate 519, - 330 172 507 OJ'o Heavy Vehicles 0 0 0 0 No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Saturation, Headway Adjustment Worksheet Prop. Left-Turns 0.1 0.1 0.1 0.4 Prop. Right-Turns 0.1 0.3 0.1 0.1 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 hL T-adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7. 1.7 hadj, computed 7.77 7.77 7.77 7.77 Departure Headway and Service Time hd, initial value 3.20 3.20 3.20 3.20 ~, initial 0.46 0.29 0.15 0.45 hd, final value 7.77 7.77 7.77 7.77 ~, final value 1.12 0.75 0.44 1.11 Move-up time, m 2.0 2.0 2.0 2.0 Service Time 5.B 5.B 5.8 5.8 Capacity and Level of Service Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 519 437 380 507 Delay 106. 16 31.59 18.96 102.02 LOS F 0 C F ~pproach: Delay 106.16 31.59 18.96 102.02 LOS F 0 C F Intersection Delay 78.87 Intersection LOS F file:IIC: \Documents%20and%20Settings\dbutler\Local %2 OSettings\ Temp \u2k64. tmp , 6/4/2004 p...-\l I I I .1 I I I I I I I I II II II 1\ I Ii IJ L ~J..J.. - Y y U,] u",v y '-'v......~ 'VA. ALL-WA Y STOP CONTROL ANAL YSIS General Information Site Information Analyst Derek Butler Intersection 131 st Street and Spring Mill Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel f'\nalysis Year 2004 Date Performed 6/4/2004 Analvsis Time Period Existing PM Peak Project I D 040048034 Village of West Clay Update ' EastlWest Street: 131 sf Street North/South Street: Spring Mill Road Volume Adjustments and Site Characteristics Approach Eastbound Westbound Movement L T R L T R Wolume 89 244 15 12 260 180 % Thrus Left Lane 50 50 Approach Northbound Southbound Movement L T R L T R Volume 83 321 23 115 161 39 Ok Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Config uration LTR LTR LTR LTR PHF 0.85 0.92 0.94 0.94 Flow Rate 408 490 453 334 % Heavy Vehicles 0 0 0 0 No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Saturation Headway Adjustment Worksheet Prop. Left-Turns 0.3 0.0 0.2 0.4 Prop. Right-Turns 0.0 0.4 0.1 0.1 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 hL T -adj 0.2 0.2 0.2 ' 0.2 0.2 0.2 0.2 0.2 hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 9.60 9.60 9.60 9.60 Departure Headway and Service Time hd, initial value 3.20 3.20 3.20 3.20 x, initial 0.36 0.44 0.40 0.30 hd, final value 9.60 9.60 9.60 9.60 x, final value 1.09 1.27 1.21 0.91 Move-up time, m 2.0 2.0 2.0 2.0 ' Service Time 7.6 7.6 7.6 7.6 Capacity and Level of Service Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 408 490 453 367 Delay 103. 76 167.87 144.46 59.20 LOS F F F F Approach: Delay 103. 76 167.87 144.46 59.20 LOS F F F 'F Intersection Delay 124.51 Intersection LOS F file:IIC: \D ocuments%2 o and %20Settings\dbutler\Local %20Settings\ Temp \u2k68. tmp 6/4/2004 A-r I I I I I I I I I I I I I I I II 11 I I IJ HCS2000TM DET AILED REPORT Genera/Information Site Information Intersection 116th Street and Towne Analyst Derek Butler Road Agency or Co. Edwards and Kelcey Area Type All other areas Date Performed 6a /2004 Jurisdiction City of Carmel Time Period Existing AM Peak Analysis Year 2004 Project 10 040048034 Village of West Clay Update Volume and Timing Input EB WB NB sa LT TH RT LT TH RT LT TH RT LT TH RT Number of lanes, N1 1 2 1 1 2 1 1 1 1 1 1 1 Lane group L T R L T R L T R L T R Volume, V (vph) 72 276 54 67 235 38 44 165 21 53 403 226 0/0 Heavy vehicles, %HV 0 0 0 0 0 0 0 0 0 0 0 0 Peak-hour factor, PHF 0.85 0.91 0.47 0.76 0.79 0.63 0.73 0.78 0.75 0.80 0.88 ' 0.76 Pretimed (P) or actuated A A A A A A A A A A A A KA) Start-up lost time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of effective green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type, AT 3 3 3 3 3 3 3 3 3 3 3 3 Unit extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Filtering/metering, I 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1. 000 1.000 1. 000 Initial unmet demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Ped / Bike I RTOR volumes 0 14 0 9 0 5 0 57 Lane width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12~O 12.0 12.0 12.0 12.0 Parking I Grade I Parking N 0 N N 0 N N 0 N N 0 N Parking maneuvers, Nm Buses stopping, Ns 0 0 0 0 0 0 0 0 0 0 0 0 Min. time for pedestrians, 3.2 3.2 3.2 3.2 Gp Phasing Excl. Left EW Perm 03 04 Excl. Left NS Perm 07 08 G = 7. 1 G = 10.4 G= G= G = 7.0 G = 24.5 G= G= Timing y= 3 y= 8 y= y= y= 3 Y= B y= y= Duration of Analysis, T = 0.25 Cycle Length, C = 71.0 Lane Group 'Capacity, Control Delay, and LOS Determination EB WB NB S8 LT TH RT LT TH RT LT TH RT LT TH RT Adjusted flow rate, v 85 303 85 88 297 46 60 212 21 66 458 222 Lane group capacity, 288 529 578 288 529 578 333 656 901 504 656 901 c file:/I C: \Documents%20and %20Settings\dbutler\Local %20Settings\ Temp \s2k98. tmp 6/7/2004 p..-\ II \,1 :1 I I I II II I I I , vlc ratio, X 0.30 0.57 0.15 0.31 0.56 0.08 0.18 0.32 0.02 0.13 0.70 0.25 Total green ratio, g/C I 0.29 0.15 0.36 0.29 0.15 0.36 0.49 0.35 0.56 0.49 0.35 0.56 Uniform delay, d1 19.3 28.2 15.5 19.4 28.2 15.1 11.6 17.1 7.0 10.2 20.1 8.0 Progression factor, 1.000 1.000 1. 000 1.000 1.000 1.000 1. 000 1.000 1. 000 1. 000 1. 000 1. 000 PF Delay calibration, k 0.11 0.17 0.11 0.11 0.16 0.11 0.11 0.11 0.11 0.11 0.26 0.11 Incremental delay, 0.6 1.5 0.1 0.6 1.4 0.1 0.3 0.3 0.0 0.1 3.3 0.1 d2 Initial queue delay, d3 Control delay 19.9 29.7 15.6 20.0 29.5 15.1 11.9 17.4 7.0 10.3 23.3 8.2 Lane group LOS B C B B C B B B A B C A Approach delay 25.4 26.1 15.5 17.7 Approach LOS C C B B I ntersection delay 21.1 X = 0.75 Intersection LOS C c HCS2000™ Copyright (g 2000 University of Florida, All Rights Reserved Version 4.1d " I I I I I file:/IC: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \s2k98. tmp 6/7 /2004 ~_\4 I I I I HCS2000Tf~ DETAILED REPORT General Information Site Information Intersection 116th Street and Towne Analyst Derek Butler Road Agency or Co. Edwards and Kelcey Area Type All other areas Date Performed 6fl/2004 Jurisdiction City of Carmel Time Peri,od Existing PM Peak Analysis Year 2004 Project I D 040048034 Village of West Clay Update Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT ' Number of lanes, N1 1 2 1 1 2 1 1 1 1 1 1 1 Lane group L T R L T R L T R L T R Volume, V (vph) 119 255 31 100 346 88 63 326 59 93 212 72 0/0 Heavy vehicles, %HV 0 0 0 0 0 0 0 0 0 0 0 0 Peak-hour factor, PHF 0.76 0.87 0.60 0.73 0.83 0.71 0.68 0.87 0.87 0.83 0.88 0.82 Pretimed (P) or actuated A A A A A A A A A A A A (A) Start-up lost time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of effective green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type, AT 3 3 3 3 3 3 3 3 3 3 3 3 Unit extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Filtering/metering, I 1.000 1.000 1.000 1.000 1.000 1.000 1. 000 1.000 1.000 1.000 1. 000 1.000 Initial, unmet,demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Ped I Bike I RTOR ~olumes 0 8 0 22 0 15 0 18 Lane width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 . 12.0 12.0 12.0 12.0 Parking /Grade I Parking N 0 N N 0 N N 0 N N 0 N Parking maneuvers, Nm Buses stopping, NB 0 0 0 0 0 0 0 0 0 0 0 0 Min. time for pedestrians, 3.2 3.2 3.2 3.2 Gp Phasing Excl. Left EW Perm 03 04 Excl. Left NS Perm 07 08 G = 7. 1 G = 17.8 G= G= G = 7.0 G = 20. 1 G= G= Timing y= 3 y= 8 y= y= y= 3 y= 8 y= y= Duration of Analysis, T = 0.25 Cycle Length, C = 74.0 ' Lane Group Capacity, Control Delay, and LOS Dete~mination EB ' WB NB 58 LT TH RT LT TH RT LT TH RT LT TH RT Adjusted flow rate, v 157 293 38 137 417 93 93 375 51 112 241 66 Lane group capacity, 340 868 716 361 868 716 402 516 768 294 516 768 c .~ I ~. ~ ~ II I' Ii Ii II I] file:IIC: \Documents%20and%20Settings\dbutler\Local %2 0 Settings\ Temp \s2k9 8. tmp 6/7 /2004 ~ ~ 1,1 i;1 :1 I I ~ I I , vIe ratio, X 0.46 0.34 0.05 0.38 0.48 0.13 0.23 0.73 0.07 0.38 0.47 0.09 Total green ratio, g/C 0.38 0.24 0.44 0.38 0.24 0.44 0.41 0.27 0.48 0.41 0.27 0.48 Uniform delay, d1 16.2 23.2 11.7 16.0 24.1 12.2 14.2 24.5 10.5 15.4 22.5 10.6 Progression factor, 1.000 1.000 1. 000 1.000 1.000 1.000 1. 000 1. 000 1.000 1.000 1. 000 1. 000 PF Delay calibration, k 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.29 0.11 0.11 0.11 0.11 I ncremental delay, 1.0 0.2 0.0 0.7 0.4 0.1 0.3 5.1 0.0 0.8 0.7 0.0 d2 Initial queue delay, d3 Control delay 17.2 23.5 11.8 16.7 24.6 12.3 14.5 29.6 10.5 16.2 23.2 10.7 Lane group LOS B C B B C B B C B B C B Approach delay 20.5 21.1 25.0 19.3 Approach LOS C C C B Intersection delay 21.6 Xc = 0.81 Intersection LOS C HCS2000™ Copyright cg 2000 University of Florida, All Rights Reserved Version 4.1d I ! I I I I file:IIC: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \s2k98. tmp 6/7/2004 A-2' II \1 I TWQ-WA Y STOP CON,TROL SUMMARY General Information Site Information 1 ntersection 116th street and Hoover Analyst Derek Butler Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 6/1/2004 Analysis Year 2004 Analysis Time Period Existing AM Peak Project ID 040048034 Village of West Clay Update EastlWest Street: 116th Street North/South Street: Hoover Road Intersection Orientation: East-West Study Period (hrs): 0.25 Wehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume 11 387 0 0 309 29 Peak-Hour Factor, PHF 0.69 0.87 1.00 1.00 0.88 0.81 Hourly Flow Rate, HFR 16 444 0 0 351 35 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume 0 0 0 58 0 40 Peak-Hour Factor, PHF 1.00 1.00 1.00 0.66 1.00 0.77 Hourly Flow Rate, HFR 0 0 0 87 0 51 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (0/0) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 1 0 Configu ration LTR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR v (vph) 16 138 C (m) (vph) 1184. 409 vlc 0.01 0.34 950k qu~ue length 0.04 1.46 Control Delay 8.1 18.2 LOS A C Approach Delay -- -- 18.2 lApproach 'LOS -- -- C , I I . I I I I I I I I Ii II file:IIC: \D 0 cuments%2 0 and%20 S ettings \dbutler\Local %20Settings\ Temp \u2k3 7 · tmp 6/1/2004, A-L II I I I .~ I I I I I I I I I I I I I: II IJ nNO_WAYSTOPCONTROLSUMMARY General Information Site Information Intersection 116th Str~et and Hover ~nalyst Derek Butler Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 6/1/2004 Analysis Year 2004 Analysis Time Period Existing PM Peak Project ID 040048034 Village of West Clay Update EastlWest Street: 116th Street North/South Street: Hoover Road I ntersection Orientation: East-West Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume 30 354 0 39 520 . 39 Peak-Hour Factor, PHF 0.68 0.91 1.00 1.00 0.82 0.81 Hourly Flow Rate, HFR 44 389 0 0 634 48 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume 0 0 0 18 0 27 Peak-Hour Factor, PHF 1.00 1.00 1.00 0.64 1.00 0.75 Hourly Flow Rate, HFR 0 0 0 28 0 36 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (0/0) 0 0 Flared Approach N' N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 1 0 Configuration LTR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR v (vph) 44 64 C (m) (vph) 920 309 vie 0.05 0.21 95% queue length 0.15 0.76 Control Delay 9.1 19.7 LOS A C lApproach Delay . -- -- 19.7 ~pproach LOS -- -- C file:IIC: \Documents%20and%20Settings\dbutler\Local %20 Settings \ Temp \u2k3 D. tmp 6/1/2004 A--r. I~ I I I I , I i I \ I I I I I I I I 1 I I' II I ROUNDABOUTS - UNSIGNALlZED INTERSECTIONS WORKSHEET I General Information Site Information Analyst Derek Butler Intersection 116th Street and Ditch Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/6/2004 ~nalysis Year 2004 Time Period Existing AM Peak Project Description 040048034 Village of West Clay Update Volume Adjustments EB WB NB 88 Volume, veh/h, 0 219 41 0 L T Traffic PHF 0.95 0.79 0.68 0.95 Flow rate, veh/h 0 277 60 0 Volume, veh/h 325 272 0 0 TH Traffic PHF 0.90 0.93 0.95 0.95 Flow rate, veh/h 361 292 0 0 Volume, veh/h 82 0 137 0 RT Traffic PHF 0.68 0.95 0.86 0.95 Flow rate, veh/h 120 0 159 0 Approach Flow Computation Approach Flow (veh/h) Va (veh/h) Vae 481 Vaw 569 Van 219 Vas 0 Circulating Flow Computation Approach Flow (veh/h) Ve (veh/h) Vee 277 Vew 60 Ven 361 Ves 629 Capacity Computation EB WB NB S8 Upper bound 1114 1321 1042 841 Capacity Lower bound 916 1103 851 673 Upper bound 0.43 0.43 0.21 0.00 vie Ratio Lower bound 0.53 0.52 0.26 0.00 HCS2000™ Copyright @ 2003 University of Florida, AU Rights Reserved Version 4.1d file:IIC: \D o cuments %2 Oand%2 0 Settings\dbutler\Loca1%20Settings\ T emp\u2k 151. tmp 7/6/2004 A-2 l- II I I I I - L I \ ~ ~ I I I ROUNDABOUTS - UNSIGNALlZED INTERSECTIONS WORKSHEET General Information ' Site Information Analyst Derek Butler Intersection 116th Street and Ditch Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/6/2004 ~nalysis Year 2004 Time Period Existing PM Peak Project Description 040048034 Village of West Clay Update Volume Adjustments EB WB NB SB Volume, veh/h 0 128 76 0 L T Traffic PHF 0.95 0.B6 0.86 0.95 Flow rate, veh/h 0 148 BB 0 Volume, veh/h 275 435 0 0 TH Traffic PHF 0.93 0.91 0.95 0.95 Flow rate, veh/h 295 478 0 0 Volume, veh/h 51 0 197 0 RT Traffic PHF 0.85 0.95 0.83 0.95 Flow rate, veh/h 59 0 237 0 pproach Flow Computation Approach, Flow (veh/h) Va (veh/h) Vae 354 Vaw 626 Van 325 Vas 0 Circulating Flow Computation Approach Flow (veh/h) Vc (veh/h) Vee 148 Vew 88 Ven 295 Ves 714 Capacity Computation EB WB NB sa Upper bound 1233 1292 1098 785 Capacity Lower bound 1023 1077 902 624 Upper bound 0.29 0.48 0.30 0.00 vIe Ratio 0.35 Lower bound 0.58 0.36 0.00 ! I i I I HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d . file ://C: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \u2k 151. tmp 7 /6/2004 A-2~ All-way ~{UP ~UIllrUl 11 \1 I I I I I I I I I I I I I I I I I ALL-WAY STOP CONTROL ANAL YSIS I General Information Site Information Analvst Derek Butler Intersection 116th Street and Spring Mill Jurisdidion City of Carmel Agency/Co. Edwards and Kelcey , f'\nalvsis Year 2004 Date Performed 6/3/2004 040048034 Vii/age of West Clay ~nalysis Time Period Existing AM Peak Project I D Update EastJWest Strset: 116th Street North/South Street: Spring Mill Road Volume Adjustments and Site Characteristics Approach Eastbound ' Westbound Movement L T R L T R Volume 45 399 46 26 265 44 0/0 Thrus Left Lane 50 50 Approach Northbound Southbound Movement L T R L T R !Volume 25 90 82 115 302 32 % Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Configuration LTR LTR LTR LTR PHF 0.94 0.91 0.72 0.95 Flow Rate 523 367 271 471 Ok Heavy Vehicles 0 0 0 0 No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Saturation Headway Adjustment Worksheet Prop. Left-Turns 0.1 0.1 0.1 0.3 ~rop. Right-Turns 0.1 0.1 '0.4 0.1 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 hL T-adj 0.2 0.2 0.2' 0.2 0.2 0.2 0.2 0.2 hRT-adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 8.77 8.77 8.77 B.77 Departure Headway and Service Time hd, initial value 3.20 3.20 3.20 3.20 x, initial 0.46 0.33 0.24 0.42 hd, final value 8.77 8.77 8.77 B.77 x, final value 1.27 0.91 0.70 1.15 Move-up time, m 2.0 2.0 2.0 2.0 Service Time 6.8 6.8 6.8 6.8 Capacity and Level of Service Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 523 401. 377 471 Delay 167.68 55.93 31.66 122.67 LOS F F 0 F Approach: Delay 167.68 55.93 31.66 122.67 LOS F F 0 F I ntersection Delay 106.98 Intersection LOS F file ://C: \Documents%20and%20Settings\dbutler\Local %2 OSettings\ Temp \u2k2A. tmp 6/3/2004 A-lL All- Way ~top L:Ontrol 11 \1. I I I I I I I I I I I I I I' I: II IJ ALL-WAY STOP CONTROL ANAL YSIS General Information Si,te Information [Analyst Derek Butler Intersection 116th Street and Spring Mill Uurisdiction City of Carmel !Agency/Co. Edwards and Kelcey /"\nalysis Year 2004 Date Performed 6/3/2004 IAnalysis Time Period Existing PM Peak Project 10 040048034 Village of West Clay Update EastlWest Street: 116th $treet North/South Street: Spring Mill Road Volume Adjustments and Site Characteristics Approach Eastbound Westbound Movement L T R L T R Volume 43 380 29 22 380 67 % Thrus Left Lane 50 50 Approach Northbound Southbound Movement L T R L T R iVolume 107 300 56 32 166 109 OJ'o Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Configuration LTR LTR LTR LTR PHF 0.97 0.98 0.96 0.81 Flow Rate 464 477 481 377 % Heavy Vehicles 0 0 0 0 No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Saturation Headway Adjustment Worksheet Prop. Left-Turns 0.1 0.0 0.2 0.1 Prop. Right-Turns 0.1 0.1 0.1 0.4 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 9.79 9.79 9.79 9.79 Departure Headway and Service Time hd, initial value 3.20 3.20 3.20 3.20 x, initial 0.41 0.42 0.43 0.34 hd, final value 9.79 9.79 9.79 9.79 x, final value 1.26 1.29 1.31 1.01 Move-up time, m 2.0 2.0 2.0 2.0 Service Time 7.8 7.8 7.8 7.8 Capacity and Level of Service Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 464 477 481 377 Delay 166.96 177.40 184.68 80.06 LOS F F F F Approach: Delay 166.96 177.40 184.68 80.06 LOS F F F F Intersection Delay 156.25 Intersection LOS F file:IIC: \Documents%20and%20Settings\dbutler\Local %2 0 Settings\ T emp\u2k3 O. tmp 6/3/2004 A.-X I I I I I I I I I I I I II Village of WestClay Traffic Impact Study Update 2008 Future Traffic Volumes, yPdated Study Existing and Proposed Intersection Configurations II II I: Ii II I, I . Edwards and Kelcey A-2 Two-Way Stop Control .L U. 5"" .L 'OJ.L ~ 'I I I I I I I I I I I I I I I I I I I TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst Derek Butler Intersection 141st Street and Towne Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel ' Date Performed 7/6/2004 Exist + Background + Site Analysis Year 2004 Analysis Time Period AM Project Description 040048034 Village of West Clay UDdate EastlWest Street: 141 st Street North/South Street: Towne Road I ntersection Orientation: North-South Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L' T R Volume 13 155 26 3 371 11 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate, HFR 13 163 27 3 390 11 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R ~olume 60 102 8 1 112 11 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95, Hourly Flow Rate, HFR 63 107 8 1 117 11 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (0/0) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 . 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR v (vph) 13 3 178 129 C (m) (vph) 1169 1396 359 415 vIe 0.01 0.00 0.50 0.31 950/0 queue length 0.03 0.01 ": 2.64 1.31 Control Delay 8.1 7.6 24.5 17.5 LOS A A C C Approach Delay -- -- 24.5 17.5 Approach LOS -- -- C C Rights Reserved file:/ /C: \Documents%20and%20 Settings\dbutler\Local %20Settings\ Temp \u2kE 7 · tmp 7/6/2004 A-); Two-Way Stop Control - ~o - - - I I I I I I I I I I I il I I I I II I 'I TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst Derek Butler Intersection 141 st Street and Towne Agency/Co. Edwards and Kelcey Road Date Performed 7/6/2004 Jurisdiction City of Carmel Analysis Time Period Exist + Background + Site Analysis Year 2004 PM Project Description 040048034 Village of West Clay Update EastlWest Street: 141 st Street North/South Street: Towne Road I nterseetion Orientation: North-South Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 16 242 58 2 239 14 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate, HFR 16 254 61 2 251 14 Percent Heavy Vehicles 0 -- -- 0 -- -- , Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal 0 0 MinQr Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 37 113 7 5 154 15 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate. HFR 38 118 7 5 162 15 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (oJb) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length, and Level of Service Approach N8 S8 Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR v (vph) 16 2 163 182 C (m) (vph) 1311 1257 369 418 vie 0.01 0.00 0.44 0.44 950/0 queue length 0.04 0.00 2.19 2.16 Control Delay 7.8 7.9 22.3 20.1 LOS A A C C Approach Delay -- -- 22.3 20.1 ~pproach LOS -- -- C C Rights Reserved file:IIC: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \u2kEB. tmp 7/6/2004 ~::J Two- Way Stop Control ... ~6- ... "'-- 11 I I I I I I I I I I I I I I I I Ii I nNO-WAYSTOPCONTROLSUMMARY General Information Site Information Analyst Derek Butler Intersection 136th street and Towne Agency/Co. Edwards and Kelcey Road Date Performed 7/6/2004 Jurisdiction City of Carmel Analysis Time Period Exist + Background + Site Analysis Year 2004 AM Project Description 040048034 Village of West Clay UDdate EastIWest Street: 136th Street North/South Street: Towne Road I ntersection Orientation: North-South Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 0 165 71 17 461 0 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate, HFR 0 173 74 17 485 0 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R ~olume 101 0 3 0 0 0 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate, HFR 106 0 3 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 0 0 Configuration LTR Delay, Queue Length, and Level of Service Approach N8 S8 Westbound Eastbound Movement 1 4 7 8 9 10 11 12 lane Configuration LT LTR v (vph) 17 109 C (m) (vph) 1331 394 vie 0.01 0.28 95% queue length 0.04 1.11 Control Delay 7.7 17.6 LOS A C Approach Delay -- -- 17.6 Approach LOS -- -- C Rights Reserved file:/IC: \Documents%20and%20Settings\dbutler\Local %2 OSettings\ Temp \u2kD F · tmp 7/6/2004 A-~ 'lWQ- way :stop conrrOl I I I I I I I I I I I I I I I, Ii I, II II TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst Derek Butler Intersection 136th Street and Towne Agency/Co. Edwards and Kelcey Road Date Performed 7/6/2004 Jurisdiction City of Carmel Analysis Time Period Exist + Background + Site Analysis Year 2004 PM Project Description 040048034 Village of West Clay Update EastlWest Street: 136th street INorth/South Street: Towne Road I ntersection Orientation: North-South Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 0 451 128 7 286 0 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate, HFR 0 474 134 7 301 0 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 90 0 8 0 0 0 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate, HFR 94 0 8 0 0 0 percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (0/0) 0 0 Flared. Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 0 0 Configuration LTR Delay, Queue Length, and Level of Service Approach NB S8, Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR v (vph) 7 102 C (m) (vph) 980 340 vIe 0.01 0.30 95010 queue length 0.02 1.23 Control Delay 8.7 20.1 LOS A C Approach Delay -- -- 20.1 Approach LOS -- -- C Rights Reserved file:/ /C: \Documents%20and%20 Settings\dbutler\Local %2 0 Settings\ Temp \u2kE3. tmp 7/6/2004 A-~ Roundabouts - UnsignallZed. intersectIons W orlCsheet .L ""5'" ... VL ... II I I I I I I I I I I I I I I I Ii I I ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET Generallhformation Site Information ~nalyst Derek Butler Intersection 136th Street and Ditch Road ~gency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/6/2004 lAnalysis Year 2004 Time Period Exist + Background + Site AM Project Description 040048034 Village of West Clay Update tvolume Adjustments EB WB NB S8 Volume, veh/h 19 85 4 55 L T Traffic PHF 0.95 0.95 0.95 0.95 Flow. rate, veh/h 20 89 4 57 Volume, veh/h 106 78 78 308 TH Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 111 82 82 324 Volume, veh/h 25 16 81 26 RT Traffic PHF 0.95 0.95 0.95 0.95 ' Flow rate, veh/h 26 16 85 27 lApproach Flow Computation Approach Flow (veh/h) Va (veh/h) Vae 157 Vaw 187 Van 171 Vas 408 Circulating Flow Computation Approach Flow (veh/h) Vc (veh/h) Vce 470 Vew 106 Ven 188 Ves 175 Capacity Computation EB WB NB S8 Upper bound 956 1274 1195 1207 Capacity Lower bound 774 1061 989 1000 Upper bound 0.16 0.15 0.14 0.34 vIe Ratio 0.18 0.17 0.41 Lower bound 0.20 HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d file:/ /C: \Documents%20and%20 Settings\dbutler\Loc~l %2 0 Settings\ Temp \u2kD7 · tmp 7/6/2004 ~-~ Roundabouts - Unsignallzt::U In[erSeC1IUll~ vv UrK.~lltiti.. -. -0 - - -. - -11 II il I I I I I I I I I .1 I I I I I I ROUNDABOUTS - UNSIGNALlZED INTERSECTIONS WORKSHEET General Information Site Information Analyst Derek Butler Intersection 136th Street and Ditch Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/6/2004 Analysis Year 2004 lTime PeriOd Exist. + Background + Site PM Project Description 040048034 Village of West Clay Update Volume Adjustments EB WB NB sa Volume, veh/h 13 118 32 24 L T Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 13 124 33 25 Volume, veh/h 125 148 275 145 TH Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 131 155 289 152 Volume, veh/h 8 35 113 12 RT Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 8 36 118 12 Approach Flow Computation Approach Flow (veh/h) Va (veh/h) Vae 152 Yaw 315 Van 440 Vas 189 Circulating Flow Computation Approach Flow (veh/h) Vc (veh/h) Vee 301 Vew 335 Ven 169 Ves 312 Capacity Computation EB WB NB SB Upper bound 1093 1064 1213 1083 Capacity Lower bound 897 871 1005 888 Upper bound 0.14 0.30 0.36 0.17 vIe Ratio Lower bound 0.21 0.17 0.36 0.44 HCS2000™ Copyright (Q 2003 University of Florida, All Rights Reserved Version 4.1d file ://C: \Documents%20and %20Settings\dbutler\Local %2 OSettings\ Temp \u2kD B .tmp 7/6/2004 A-~ AII-.Way ~top Control 11 11 I I I I I I I I I I I I I I Ii II II ALL-WA Y STOP CONTROL ANAL YSIS General Information Site Information Analyst Derek Butler Intersection 131st Street and Shelbourne Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/6/2004 ~nalysis Year 2004 ~nidysis Time Period Exist + Background + Site AM Project I.D 040048034 Village of West Clay Update EastlWest Street: 131 st Street North/South Street: She/bourne Road Wolume Adjustments and Site Characteristics ~pproach Eastbound Westbound Movement L T R L T R rvolume 18 191 11 130 180 8 Ok Thrus Left Lane 50 50 lApproach Northbound Southbound Movement L T R L T R lVolume 7 69 85 57 390 14 0/0 Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 ' Configuration, LTR LTR LTR LTR PHF 0.95 0.95 0.95 0.95 Flow Rate 230 333 168 484 Ok Heavy Vehicles No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Saturation Headway Adjustment Worksheet Prop. Left-Turns 0.1 0.4 0.0 0.1 Prop. Right-Turns 0.0 0.0 0.5 0.0 PJop. Heavy Vehicle hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 6.97 6.97 6.97 6.97 Departure Headway and Service Time hd, initial value 3.20 3.20 3.20 3.20 ~, initial 0.20 0.30 0.15 0.43 hd, final value 6.97 6.97 6.97 6.97 ~, final value 0.45 0.63 0.32 0.85 Move-up time, m 2.0 ' 2.0 2.0 2.0 Service Time 5.0 5.0 5.0 5.0 Capacity and Level of Service Eastbound Westbound Northbound' Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 463 495 418 558 Delay 15.45 20.40 12.95 34.74 LOS C C B 0 ~pproach: Delay 15.45 20.40 12.95 34.74 LOS C C B 0 Intersection Delay 24. 15 Intersection LOS C file:IIC: \D o cument s%2 o and %20Settings\dbutler\Local %20 Settings\ T emp\u2kB D. tmp 7/6/2004 p..-?J All-Way Stop Control - --0- , I I I I I I I I I I I I I II I Ii II 11 ALL-WA Y STOP CONTROL ANAL YSIS General Information Site Information Analyst Derek Butler Intersection 131st Street and She/bourne Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/6/2004 p\nalysis Year 2004 Analysis Time Period Exist + Background + Site PM Project ID 040048034 Village of West Clay Update EastlWest Street: 131 st Street North/South Street: She/bourne Road Volume Adjustments and Site Characteristics Approach Eastbound Westbound Movement L T R L T R Volume 18 211 17 109 252 27 % Thrus Left Lane 50 50 Approach Northbound Southbound Movement L T R L T R Volume 21 471 183 15 102 11 Ok Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Configuration LTR LTR LTR LTR PHF 0.95 0.95 0.95 0.95 Flow Rate 257 407 709 133 % Heavy Vehicles No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Saturation Headway Adjustment Worksheet Prop. Left-Turns 0.1 0.3 0.0 0.1 Prop. Right-Turns 0.1 0.1 0.3 0.1 Prop. Heavy Vehicle hl T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 7.57 7.57 7.57 7.57 Departure Headwav and Service Time hd, initial value 3.20 3.20 3.20 3.20 x, initial 0.23 0.36 0.63 0.12 hd, final value 7.57 7.57 7.57 7.57 x, final value 0.54 0.81 1.30 0.30 Move-up time, m 2.0 2.0 2.0 2.0 Service Time 5.6 5.6 5.6 5.6 Capacity and Level of Service Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 457 498 709 383 Delay 19.12 33.87 170.42 14.44 LOS C 0 F B Approach: Delay 19. 12 33.87 170.42 14.44 LOS C 0 F B Intersection Delay 93.92 Intersection LOS F file:/ /C: \Documents%20and %20 Settings\dbutler\Local %20 Settings\ Temp \u2kC3 · tmp 7/6/2004 ~-:J- All-way :stop contrOl 11 \1 I I I I I I I I I I I I I I' I II IJ ALL-WA Y STOP CONTROL ANAL YSIS Gen(:!rallnformation Site Information Analyst Derek Butler Intersection 1315t Street and Towne Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/6/2004 Analysis Year 2004 ~nalysis Time Period Exist + Background + Site AM Proiect ID 040048034 Village of West Clay Update EastIWest Street: 131 stStreet North/South Street: Towne Road ~olume Adiustments and Site Characteristics Approach Eastbound Westbound Movement ~ T R L T R Volume 14 351 30 218 272 12 Ok Thrus Left Lane 50 50 Approach Northbound Southbound Movement L T R L T R Volume 20 262 88 44 497 29 Ok Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Configuration LTR LTR LTR LTR PHF 0.95 0.95 0.95 0.95 Flow Rate 414 527 388 599 Ok Heavy Vehicles No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Saturation Headway Adjustment Worksheet Prop. Left-Turns 0.0 0.4 0.1 0.1 Prop. Right-Turns 0.1 0.0 0.2 0.1 Prop. Heavy Vehicle hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 9.77 9.77 9.77 9.77 Departure Headway and Service Time hd, initial value 3.20 3.20 3.20 3.20 x, initial 0.37 0.47 0.34 0.53 hd, final value 9.77 9.77 9.77 9.77 lx, final value 1.12 1.4,5 1.04 1.63 Move-up time, m 2.0 2.0 2.0 2.0 Service Time 7.8 7.8 7.8 7.8 Capacity and Level of Service Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 414 527 388 599 Delay 116.31 242.53 90.37 319.86 LOS F F, F F ~pproach: Delay 116.31 242.53 90.37 319.86 LOS F F F F Intersection Delay 208.83 Intersection LOS F file:IIC: \Documents%20and%20Settings\dbutler\Local %20Settings\ T emp\u2kCF. tmp 7/6/2004 A-:) All- way ~top contrOl I I I I I I I I I I I I II II II I I I IJ ALL-WA Y STOP CONTROL ANAL YSIS General Information Site Information [Analyst Derek Butler Intersection 131st Street and Towne Road iA{)ency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/6/2004 Analysis Year 2004 [Analysis Time Period Exist + Background + Site PM Proiect 10 040048034 Village of West Clay Update EastIWest Street: 131 st street North/South Street: Towne Road l\Iolume Adjustments and Site Characteristics [Approach Eastbound Westbound Movement L T R L T R Wolume 58 340 27 122 389 30 % Thrus Left Lane 50 50 [Approach Northbound Southbound Movement L T R L T R rvolume 126 480 84 16 356 29 Ok Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Config uration LTR LTR LTR LTR PHF 0.95 0.95 0.95 0.95 Flow Rate 446 568 725 420 % Heavy Vehicles No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Saturation Headway Adjustment Worksheet Prop. Left-Turns 0.1 0.2 0.2 0.0 Prop. Right-Turns 0.1 0.1 0.1 0.1 Prop. Heavy Vehicle hLT-adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 9.80 9.80 9.80 9.80 Departure Headway and Service Time hd, initial value 3.20 3.20 3.20 3.20 x, initial 0.40 0.50 0.64 0.37 hd, final value 9.80 9.80 9.80 9.80 lx, final value 1.21 1.55 1.97 1.14 Move-up time, m 2.0 2.0 2.0 2.0 Service Time 7.8 7.8 7.8 7.8 Capacity and Level of Service Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 446 568 725 420 Delay 148. 73 285.66 467. 72 122.00 LOS F F F F Approach: Delay 148. 73 285.66 467. 72 122.00 LOS F F F F Intersection Delay 286.67 Intersection LOS F file :/lC: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \u2kD 3. tmp 7 /6/2004 ~-:f. 11 Two-Way Stop Control Page 1 at 'L \1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information lAnalyst Derek Butler Intersection 131st Street and Ditch ~gency/Co. Edwards and Kelcey Road Date Performed 7/6/2004 Jurisdiction City of Carmel Analysis Time Period Exist + Background + Site Analysis Year 2004 ~M Project Description 040048034 Village of West Clay Update EastlWest Street: 131st Street North/South Street: Ditch Road I ntersection Orientation: East-West Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R iVolume (veh/h) 134 527 0 0 319 3'5 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate 141 554 0 0 335 36 I(veh/h) Proportion of heavy 0 0 ~ehicles, PHV -- -- -- -- Median type Undivided RT Channelized? 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signa' 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume (veh/h) 0 0 0 215 0 294 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate 0 0 0 226 0 309 ,(veh/h) Proportion of heavy 0 0 0 0 0 0 ~ehicles, PHV Percent grade (0/0) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 0 0 0 1 0 Configuration LTR Control Delay, Queue Length, Level of Service ~pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR ~olume, v (vph) 141 535 Capacity, cm (vph) 1199 321 vie ratio 0.12 1.67 Queue length (950/0) 0.40 32.86 I I I I I I I I I I I I I I I Ii I -h1_.11r'.\ T\"",,~~-n+~Oh- ")(\~nAOi.. ,,)O~~tt;n(1'Q\r1h11tlPO-r\ T {\t'~ 10k ?()~ptt1n(J~\ T~mn\l1?kR 1. tmn 7 /6/2004 ~ ~ II \1 'I I I I I I I I I I I I I I I I I Two- Way Stop Control Control Dela s/veh) 8.4 LOS A pproach delay (s/veh) pproach LOS HCS2000™ 342.0 F Copyright (Q 2003 University of Florida, All Rights I,teserved f11~.11r'.\ nnt'11mpnt~Ok ')(\~nnO~ ')()~ptt1na~\nhlltl~r\ T .n~::I10~?OSettinQs\ Temn\u2kB3. troD Page 2 of2 Version 4.1d 7/6/2004 A.-L Two-Way Stop Control Page 1 of2 HI I I I I I I I I I I I I II II Ii I II IJ TWO-WAY STOP CONTROL SUMMARY General Information Site Information ~nalyst Derek Butler Intersection 131st Street and Ditch Agency/Co. Edwards and Kelcey Road Date Performed 7/6/2004 Uurisdietion City of Carmel ~nalysis Time Period Exist + Background + Site Analysis Year 2004 PM Project Description 040048034 Village of West Clay Update EastlWest Street: 131st street North/South Street: Ditch Road Intersection Orientation: East-West Study Period (hrs): 0.25 Wehicle Volum'es and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume (veh/h) 258 408 0 0 496 173 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate 271 429 0 0 522 182 (veh/h) Proportion of heavy 0 0 vehicles, PHV -- -- -- -- Median type Undivided R,T Channelized? 0 0 Lanes 0 1 , 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume (veh/h) 0 0 0 77 0 219 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate 0 0 0 81 0 230 (veh/h) Proportion of heavy 0 0 0 0 0 0 vehicles, PHV Percent grade (0/0) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 0 0 0 1 0 Configuration LTR Control Delay, Queue Length, Level of Service ~pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR Volume, v (vph) 271 311 Capacity. cm (vph) 903 220 vIe ratio 0.30 1.41 Queue length (950/0) 1.27 17.89 .&:1 ~ ./Ir".\ T"_"'H.-ri._+nOI.. "}(\n~,.10~ "{\c;;:!o.+t~nlT(.'\r1hl1tl~1"\ T n~~ 10~ ")(\~ptt1nO'~\ Tpmn\n?kR 7 tmn 7/fi/2004 A..A.\ Two-Way Stop Control Page 2 of2 11 :1 I I I I I I I I I I I ,I I I' I I IJ Control Dela s/veh) 10. 7 LOS B pproach delay ( s/veh ) pproach LOS HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved 252.5 F Version 4.1d .f;1o.IIr'.\ nn~11n"\p.nt~O/^ ')(\~nt10k')(\~ptt1na~\r1hlltl~r\T .o~~lO~ ?,O~~tt1np~\ Temn\u2kR7 .tmn 7/6/2004 '" _A II Two-Way Stop Control II I I I I I I I I I I I I I I II II II Page 1 of2 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst Derek Butler Intersection 131st Street and Clay ~gency/Co. Edwards and Kelcey Center Date Performed 7/6/2004 Jurisdiction City of Carmel ~nalysis Time Period Exist + Background + Site ~nalysis Year 2004 ~M Project Description 040048034 Village of West Clay Update EastlWest Street: 131 st Street North/South Street: Clay Center Road Intersection Orientatio n: East-West Study Period (hrs): 0.25 Wehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R rvolume (veh/h) 0 616 86 86 311 0 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate 0 648 90 90 327 0 (veh/h) Proportion of heavy 0 0 vehicles, P HV -- -- -- -- Median type Undivided RT Channelized? 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R N'olume (veh/h) 33 0 87 0 0 0 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate 34 0 91 0 0 0 (veh/h) Proportion of heavy 0 0 0 0 0 0 : veh icles, P HV Percent grade (0/0) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 1 0 0 0 0 Configuration LTR Control Delay, Queue Length, Level of Service ~pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR ~olume, v (vph) 90 125 Capacity, cm (vph) 877 323 vIe ratio 0.10 0.39 Queue length (950/0) 0.34 1.77 ~1_ . ",-,.\ T'\__n___4-nO/_ ")()-:\nAO/... ,,)()~ptt;n(Tc\r1hl1t1pr\Tn('~1o~ ?O~ptt1no~\T~mn\11?k A R.tmn 7/6/2004 b..-k Two-Way Stop Control Page 2 of2 11 II I I I I I I I I I I I I I I I II II Control Dela s/veh) LOS pproach delay (s/veh) pproach LOS HCS20DO™ 9.6 A 23.0 C Copyright ~ 2003 University of Florida) All Rights Reserved Version 4.1d .f; 1p.//r'.\ n{'\t'l1mpnt(;!9~ ') n~nno~ ?n~~tt1n(J~\nhlltl~r\ T ,O~H 1 ok.20S~ttinQs\ Temn\u2kAB. tmD 7/6/2004 A..-JJ Two- Way Stop Control Page 1 of2 .'. I I I I I I I I I I I I I I I I I - TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst Derek Butler Intersection 131st Street and Clay Agency/Co. Edwards and Kelcey Center Date Performed 7/6/2004 Jurisdiction City of Carmel ~nalysis Time Period Exist + Background + Site ~nalysis Year 2004 PM Project Description 040048034 Village of West Clay Update EastlWest Street: 131st Street North/South Street: Clay Center Road I ntersection Orientation: East-West Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R ~olume (veh/h) 0 444 107 49 634 0 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate 0 467 112 51 667 0 (veh/h) Proportion of heavy 0 0 vehicles, P HV -- -- -- -- Median type Undivided RT Channelized? 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R rvolume (veh/h) 80 0 121 0 0 0 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate 84 0 127 0 0 0 (veh/h) Proportion of heavy 0 0 0 0 0 0 vehicles, PHV Percent grade (0/0) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 1 0 0 0 0 Configuration LTR Control Delay, Queue Length, Level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR olume, v (vph) 51 211 Capacity, cm (vph) 1005 296 v/c ratio 0.05 0.71 Queue length (950/0) 0.16 5.05 f11p. / /r.\ n(\~11mp:nt~O~ ?,O::1ni1o/n ?O~ettin p~\dhutler\T JocalOi020SettinQs\ TemD\u2kAF. tmp 7/6/2004 1\ 1.~ 'I I I I I I I I I I I I I II II I: I Ii IJ Two- Way Stop Control Page 20f2 8.8 A 42.4 E Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d HCS2000™ f11p. Ilr..\ nO~llm~nt~olri ?O::lnc10~20~ettinQs\dhutler\Local %20SettinQs\ TemD\u2kAF .tmp 7/6/2004 A..Al ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET General Information Site Information ~nalyst Derek Butler Intersection 131st Street and Spring Mill Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/6/2004 ~nalysis Year 2004 IT"ime Period Exist +'Background + Site AM Project Description 040048034 Village of West Clay Update rvolume Adjustments EB WB NB S8 Volume, veh/h 69 42 ' 49' 38 L T Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 72 44 51 4,0 Volume, veh/h 584 270 188 332 TH Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 614 284 197 349 Volume, veh/h 92 88 95 227 RT Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 96 92 100 238 lApproach Flow Computation Approach Flow (veh/h) Va (veh/h) Vae 782 Vaw 420 Van 348 Vas 627 Circulating Flow Computation Approach Flow (veh/h) Vc (veh/h) Vee 433 Vew 320 Ven 726 Ves 379 Capacity Computation EB WB NB SB Upper bound 984 1077 778 1027 Capacity Lower bound 800 882 617 838 Upper bound 0.79 0.39 0.45 0.61 v/c Ratio Lower bound . 0.98 0.56 0.75 0.48 'I I I I I I I I I I I I I I I Ii I: II II Roundabouts - Unsignalized Intersections Worksheet HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved +; 1.c. .11r". \ T)n", 1n'\~nt(.'lO/^ ') (\-;\nr10~ 'J (\~ptt; n CT~\~hlltl pr\ T .n('.~ 1 O~? O~e:tt1n p"~\ T em n\112kC 7 . tmn Page 1 of 1 Version 4.1d 7/6/2004 A _ A- 'I I I 1 1 I I I I I I I I I I Ii II 11 11 Roundabouts - Unsignalized Intersections Worksheet Page 1 of 1 ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS, WORKSHEET General Information Site Information Analyst Derek Butler Intersection 131st Street and Spring Mill Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/612004 ~nalysis Year 2004 iTime P.eriod Exist + Background + Site PM Project Description 040048034 Village of West Clay Update lVolume Adjustments, EB WB NB S8 Volume, veh/h 1.11 40 169 132 L T Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 116 42 177 138 Volume, veh/h 403 440 453 216 TH Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 424 463 476 227 Volume, veh/h 44 224 42 50 RT Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 46 235 44 52 .~pproach Flow Computation Approach Flow (veh/h) Va (veh/h) Vae 586 Vaw 740 Van 697 Vas 417 Circulating Flow Computation Approach Flow (veh/h) Vc (veh/h) Vee 407 Vew 769 Ven 678 Ves 682 Capacity Computation EB WB NB SB Upper bound 1005 751 809 806 Capacity Lower bound 818 594 644 642 Upper bound 0.58 0.99 0.86 0.52 vIe Ratio 0.65 Lower bound 0.72 1.25 1.08 HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d f";1o.IIr'.\ nnl"l1",",pntcO,l,. "()!:Inr10~ "()~pttlnac;:\r1hlltl~T\ T .()('.~ lO~?O~~ttinp'~\ Temn\u2kCB.tmn 7 /6/2004 ~ A c 'I I I I I I I I I I I I I I I Ii I, II I Detailed Report Page 1 of2 HCS2000TM DET AILED REPORT Genera/Information Site Information Analyst Derek Butler Intersection 116th Street and Towne Road Agency or Co. EdWards and Kelcey Area Type All other areas Date Performed 7/6/2004 Exist + Background + Site Jurisdiction City of Carmel Time Period AM Analysis Year 2004 Project ID 040048034 Village of West Clay Update Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Number of lanes, N1 1 2 0 1 1 1 1 1 1 1 1 1 Lane group L TR L T R L T R L T R Volume, V (vph) 118 544 67 78 387 67 50 242 23 103 512 305 oA> Heavy vehicles, %HV 0 0 0 0 0 0 0 0 0 0 0 0 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Pre timed (P) or actuated A A A A A A A A A A A A (A) Start-up lost time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of effective green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type, AT 3 3 3 3 3 3 3 3 3 3 3 Unit extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Filtering/metering" 1 1. 000 1.000 1.000 1. 000 1.000 1. 000 1.000 1. 000 1. 000 1.000 1.000 Initial unmet demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Ped / Bike I RTOR volumes 0 16 0 16 0 6 0 76 Lane width 1'2.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Parking / Grade I Parking N 0 N N 0 N N 0 N N 0 N ,Parking maneuvers, Nm Buses stopping, Ns 0 0 0 0 0 0 0 0 0 0 0 Min. time for pedestrians, 3.2 3.2 3.2 3.2 Gp Phasing Excl. Left EW Perm 03 04 Excl. Left NS Perm 07 08 G = 8.4 G = 48. 1 G= G= G = 8.6 G = 55.9 G= G= Timing y= 2 y= 5 y= y= y= 2 y= 5 y= y= Duration of Analysis, T = 0.25 Cycle Length, C = 135.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB S8' LT TH RT LT TH RT LT TH RT LT TH RT Adjusted flow rater v 124 1627 82 407 54 53 255 18 108 539 241 Lane group capacity, 294 1269 290 677 738 272 787 829 495 787 829 c f11p.! 11'.\ n{'\~,l1mpntc;:O~ ?O~nr1o~ ?,O~ett1np"~\dhutler\ T Jocal%20Settinf!s\ TemD\s2kF7. tmp 7/6/2004 A-1o vlc ratio, X 0.42 0.49 0.28 0.60 0.07 0.19 0.32 0.02 0.22 0.68 0.29 Total green ratio, g/C 10.43 0.36 0.43 0.36 0.46 0.49 0.41 0.51 0.49 0.41 0.51 Uniform, d~lay, d1 26.0 33.9 24.3 35.6 20.6 22.4 26.8 16.2 19.2 32.3 18.8 Progression factor, 1. 000 1. 000 1.000 1. 000 1. 000 1. 000 1.000 1.000 1. 000 1. 000 1. 000 PF Delay calibration, k 0.11 0.11 0.11 0.19 0.11 0.11 0.11 0.11 0.11 0.25 0.11 I ncremental delay, d2 1.0 0.3 0.5 1.5 0.0 0.4 0.2 0.0 0.2 2.5 0.2 Initial queue delay, d3 Control delay 27.0 34.2 24.8 37.1 20.6 22.8 27.0 16.2 19.4 34.8 19.0 Lane group LOS C C C 0 C C C B B C B Approach delay 33.0 33.6 25.7 28.7 Approach LOS C C C C I ntersection delay 30.7 Xc = 0.73 Intersection LOS C 'I I I I I I I I I I I I II I I II II I' I Ii IJ Detailed Report HCS2000™ Copyright ~ 2000 University of Florida, All Rights Reserved fi 1e: lIe. ~ \ Documents%20and%20SettinQs\dbutler\Local %20 Settings\ Temp \s2kF7 · tmp Page 2 of2 Version 4.1 d 7/6/2004 ^ -pt:y I I I I I I I I I I I I I I I I I: Ii I Detailed Report Page 1 of2 HCS2000™ DET AILED REPORT Genera/Information Site Information Analyst Derek Butler Intersection 116th Street and Towne Road Agency or Co. Edwards and Kelcey Area Type All other areas Date Performed 7/6/2004 Jurisdiction City of Carmel Exist + Background + Site Time Period PM Analysis Year 2004 Project 10 040048034 Village of West Clay Update Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Number of lanes, N 1 2 0 1 1 1 1 1 1 1 1 1 1 Lane group L TR L T R L T R L T R Volume, V (vph) 197 458 40 114 651 150 79 470 69 141 330 157 0/0 Heavy vehicles, %HV 0 0 0 0 0 0 0 0 0 0 0 0 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Pre timed (P) or actuated A A A A A A A A A A A A (A) Start-up lost time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of effective green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type, AT 3 3 3 3 3 3 3 3 3 3 3 Unit extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Filtering/metering, I 1.000 1.000 1.000 1. 000 1. 000 1.000 1.000 1.000 1. 000 1. 000 1.000 Initial unmet demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Ped / Bike I RTOR volumes 0 16 0 16 0 6 0 76 Lane width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Parking / Grade / Parking N 0 N N 0 N N 0 N N 0 N Parking maneuvers, Nm Buses stopping, NB 0 0 0 0 0 0 0 0 0 0 0 Min. time for pedestrians, 3.2 3.2 3.2 3.2 Gp Phasing Excl. Left EW Perm 03 04 Excl. Left NS Perm 07 08 G = 10. 7 G = 44. 1 G= G= G = 8.3 G = 43.9 G= G= Timing Y= 2 y= 5 y= y= Y= 2 y= 5 y= y= Duration of Analysis, T = 0.25 Cycle Length, C = 121.0 Lane Group Capacity, Control Delay, and LOS Determination EB ,WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Adjusted flow rate, v 207 507 120 685 141 83 495 66 148 347 85 Lane group capacity, 223 1306 399 692 766 363 689 795 250 689 795 c f11~.llr.\ nnf'l1mpnt~O~ ')()~nnO~ ?n~ptt1no~\nhlltler\ T IOC~ 10~20SettinQs\ Temn\s2k 103 .tmD 7/6/2004 A _~\ vlc ratio, X 0.93 0.39 0.30 0.99 0.18 0.23 0.72 0.08 0.59 0.50 0.11 Total green ratio, g/C 0.47 0.36 0.47 0.36 0.47 0.45 0.36 0.49 0.45 0.36 0.49 Uniform delay, d1 33.1 28.5 19.1 38.2 18.3 20.8 33.2 16.2 24.3 30.1 16.4 Progression factor, 1. 000 1. 000 1.000 1. 000 1. 000 1. 000 1.000 1.000 1. 000 1. 000 1. 000 PF Delay calibration, k 0.44 0.11 0.11 0.49 0.11 0.11 0.28 0.11 0.18 0.11 0.11 I ncremental delay, d2 40.9 0.2 0.4 31.6 0.1 0.3 3.6 0.0 3.7 0.6 0.1 Initial queue delay, d3 Control delay 74.0 28.7 19.5 69.8 18.4 21.2 36.9 16.3 28.0 30.7 16.5 Lane group LOS E C B E B C 0 B C C B Approach delay 41.8 55.8 32.7 27.9 Approach LOS 0 E C C I ntersection delay 41.6 X = 0.93 Intersection LOS 0 c I I I I I I I I I I I I I I I I I: II II Detailed Report HCS2000™ Copyright @ 2000 University of Florida, All Rights Reserved f11~.1 Ir.\ nnt'l1mpnt(;!o~ ')()~nrtO~ ?O~~ttlno~\cihllt1~r\ T .O~~ lOIri20~ettinQ"s\ Temn\s2kl 03 .tmD Page 2 of2 Version 4.1d 7 /6/2004 A.-~J "I I I I I I I I I 1 I I I I I I: I II i i I IJ Two- Way Stop Control Page 1 of2 TWO-WAY STOP CONTROL SUMMARY General Information Site Information ~nalyst Derek Butler Intersection 116th Street and Hoover lAgency/Co. Edwards and Kelcey Road Date Performed ' 7/6/2004 Jurisdiction City of Carmel ~nalysis Time Period Exist + Background + Site ~nalysis Year 2004 ~M Project Description 040048034 Village of West Clay Update EastlWest Street: 116th Street North/South Street: Hoover Road' I ntersection Orientation: East-West Study Period (hrs): 0.25 Wehicle Volumes and Adjustments Major Street Eastbound Westbound Movement' 1 2 3 4 5 6 L T R L T R Volume (veh/h) 58 681 0 0 427 84 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate 61 716 0 0 449 88 (veh/h) Proportion of heavy 0 0 vehicles, PHV -- -- -- -- Median type Undivided RT Channelized? 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor street Northbound Southbound Movement 7 8 9 10 11 12 L 'T R L T R Volume (veh/h) 0 0 0 141 0 107 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate 0 0 0 148 0 112 (veh/h) Proportion of heavy 0 0 0 0 0 0 vehicles, PHV Percent grade (%) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 0 0 0 1 0 Configuration LTR Control Delay, Queue Length, Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR ~olume, v (vph) 61 260 ' Capacity, cm (vph) 1041 235 vIe ratio 0.06 1.11 Queue length (950/0) 0.19 11.56 f11~. /Ir.\ nnl'l1mpnt~O~ ?n~nr1olri? O~~tt1n p"~\ohlltl ~r\ T ,oc~ 1 %20SettinQ"s\ Temn\u2k9B. tmD 7/6/2004 &_~~ 'I I I I I I I I I I I I I I I I I, Ij IJ Two- Way Stop Control Page 2 of2 Control Dela (s/veh) 8. 7 LOS A pproach delay (s/veh) pproach LOS HCS2000™ 134.8 F Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d fi 1 p. / /r.. \ n()C'.llm~nt~O~ ?O~ndoh.20Setti n Qs\dbutler\Local %2 0 Settings\ Temp \u2k9B. tmp 7/6/2004 ^_rJ "I I I I I I I I I I I I I I I Ii I, Ii IJ Two- Way Stop Control Page 1 of2 ~O-WAYSTOPCONTROLSUMMARY General Information Site Information IAnalyst Derek Butler Intersection 116th Street and Hoover lAgency/Co. Edwards and Kelcey Road Date Performed 7/6/2004 Jurisdiction City of Carmel ~nalysis Time Period Exist + Background + Site ~nalysis Year 2004 PM Project Description 040048034 Village of West Clay Update EastlWest Street: 116th Street North/South Street: Hoover Road Intersection Orientation: East-West Study Period (hrs): 0.25 ~ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R lVolume (veh/h) 109 536 0 0 850 133 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate 114 564 0 0 894 140 l(veh/h) Proportion of heavy 0 0 vehicles, PHV -- -- -- -- Median type Undivided RT Channelized? 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal, 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R ~olume (veh/h) 0 0 0 106 0 85 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate 0 0 0 111 0 89 (veh/h) Proportion of heavy 0 0 0 0 0 0 iVehicles, ,PHV Percent grade (0/0) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0' 0 0 0 1 0 Configuration LTR Control Delay, Queue Length, Level of Service ~pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR iVolume, v (vph) 114 200 Capacity, cm (vph) 680 118 vIe ratio 0.17 1.69 Queue length (950/0) 0.60 15. 19 f11 p ./1 r. \ f)()~11m~nt~0~ ?O~nci 0/020 S etti n Qs\dbutler\Localo/02 OSettings\ Temp \u2k9F · tmp 7/6/2004 A. e::...~ --i I I I I I '1 I I I I I I I 11 I I II IJ Two- Way Stop Control Page 2 of2 11.4 B 410.3 F HCS20 OOTM Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d fi 1 e:/ IC: \Documents%20and %20Settings\dbutler\Local 0/02 OSettings\ Temp \u2k9F · tmp 7/6/2004 A...A. ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET General Information Site Information Analyst Derek Butler Intersection 116th Street and Ditch Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/6/2004 Analysis Year 2004 Time Period Exist + Background + Site AM Project Description 040048034 Village of West Clay Update olume Adjustments EB WB NB 58 Volume, veh/h 0 246 76 0 L T Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 0 258 80 0 Volume, veh/h 647 410 0 0 TH Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 681 431 0 0 Volume, veh/h 138 0 150 0 RT Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 145 0 157 0 [Approach Flow Computation Approach Flow (veh/h) Va (veh/h) Vae 826 Vaw 689 Van 237 Vas 0 Circulating Flow Computation Approach Flow (veh/h) Ve (veh/h) Vce 258 Vew 80 Vcn 681 Vcs 769 Capacity Computation EB W8 NB S8 Upper bound 1131 1300 807 751 Capacity Lower bound 931 1084 642 594 Upper bound 0.73 0.53 0.29 0.00 vIe Ratio Lower bound 0.89 0.64 0.37 0.00 'I I I I I I I I I I I I I I I I I II IJ Roundabouts - Unsignalized Intersections Worksheet HCS20 OOTM Copyright ~ 2003 University of Florida, All Rights Reserved fi Ie:/ / C: \D ocuments%2 0 and %20Settings\dbutler\Local %20 Settings\ Temp \u2k93 · tmp Page 1 of 1 Version 4.1 d 7/6/2004 A.-~ I I I I I I I I I I I I I I I I I I: II Roundabouts - Unsignalized Intersections Worksheet Page 1 of 1 ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET General Information Site Information ~nalyst Derek Butler Intersection 116th Street and Ditch Road ~gency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/6/2004 ~nalysis Year 2004 tTime Period Exist + Background + Site PM Project Description 040048034 Village of West Clay Update Volume Adjustments EB WB NB S8 Volume, veh/h 0 153 162 0 L T Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 0 161 170 0 Volume, veh/h 474 795 0 0 TH Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 498 836 0 0 Volume, veh/h 106 0 227 0 RT Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 111 0 ' 238 0 [Approach Flow Computation Approach Flow (veh/h) Va (veh/h) Vae 609 Yaw 997 Van 408 Vas 0 Circulating Flow Computation Approach Flow (veh/h) Ve (veh/h) Vee 161 Vew 170 Ven 498 Ves 1167 Capacity Computation EB WB NB SB Upper bound 1220 1212 934 542 Capacity Lower bound 1012 1004 755 414 Upper bound 0.50 0.82 0.44 0.00 vIe Ratio Lower bound 0.60 0.54 0.00 0.99 HCS2000™ Copyright ~ 2003 University of Florida, All Rights Reserved Version 4.1d file:/ /C: \Documents%2 Oand%20Settings\dbutler\Local %2 o Settings \ Temp \u2k97 · tmp 7/6/2004 Af:i::. '. I I I I I I 'i I I I I , ~ II II I] 1\ I Ii IJ Roundabouts - Unsignalized Intersections Worksheet Page 1 of 1 ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET General Information Site Information ~nalyst Derek Butler Intersection 116th Street and Spring Mill Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/6/2004 Analysis Year 2004 Time Period Exist + Background + Site AM Project Description 040048034 Village of West Clay Update Volume Adjustments EB WB NB 58 Volume, veh/h 154 29 53 65 L T Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 162 30 55 68 Volume, veh/h 564 353 134 359 TH Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 593 371 141 377 Volume, veh/h 108 145 85 186 RT Traffic PHF 0.95 0.95 0.95 0.95 ' Flow rate, veh/h 113 152 89 195 lApproach Flow Computation Approach Flow (veh/h) Va (veh/h) Vae 868 Vaw 553 Van 285 Vas 640 Circulating Flow Computation Approach Flow (yeh/h) Vc (veh/h) Yee 475 Yew 358 Ven 823 Ves 456 Capacity Computation EB WB NB SB Upper bound 952 1045 719 966 Capacity Lower bound 771 854 566 784 Upper bound 0.91 0.53 0.4,0 0.66 vie Ratio Lower bound 1.13 0.65 0.50 0.82 HCS2000™ Copyright (Q 2003 University of Florida, All Rights Reserved Version 4.1 d file:IIC: \Documents%20and%20Settings\dbutler\Local %2 OSettings\ Temp \ u2kA3 · tmp 7/6/2004 AJ3 'I I I I I I I 'I I I I I I I II 11 I II IJ Roundabouts - Unsignalized Intersections Worksheet Page 1 of 1 ROUNDABOUTS. UNSIGNALIZED INTERSECTIONS WORKSHEET General Information Site Information ~nalyst Derek Butler Intersection 116th Street and Spring Mill ~gency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/6/2004 ~nalysis Year 2004 rrime Period Exist + Background + Site PM Project Description 040048034 Village of West Clay Update Wolume Adjustments EB WB NB SB Volume, veh/h 99 29 175 75 L T Traffic PHF . 0.95 0.95 0.95 0.95 Flow rate, veh/h 104 30 184 78 Volume, veh/h 507 609 359 243 TH Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 533 641 377 255 Volume, veh/h 69 29 58 202 RT Traffic PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 72 30 61 212 IApproach Flow Computation Approach Flow (veh/h) Va (veh/h) Vae 709 , Yaw 701 Van 622 Vas 545 Circulating Flow Computation Approach Flow (veh/h) Vc (veh/h) Vee 363 Vew 665 Ven 715 Ves 855 Capacity Computation EB WB NB SB Upper bound 1041 817 785 700 Capacity Lower bound 850 652 623 550 Upper bound 0.68 0.86 0.79 0.78 v/c Ratio Lower bound 0.83 1.08 1.00 0.99 HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d file:/ / C: \Documents%20and%20Settings\dbutler\Local %2 OSettings\ Temp \u2kA 7. tmp 7/6/2004 ~jf I I I I I I I I I I I I I I I I: Ii Ii II Village of WestClay Traffic Impact Study Update 2008 Future Traffic Volumes, Oriainal Study Existing and Proposed Intersection Configurations Edwards and Kelcey A -lD\ '. I I I I I I I I I I \ I I I I I I I I TWO-WAY STOP CONTROL SUMMARY 141st Street and Towne Road City of Carmel 2008 - Ex + Bkgnd + Site Analyst J. Pyrz Agency/Co. Edwards and Kelcey Date Performed 7/08/2004 Analysis Time Period Future AM Peak Project Description 040048034 Village of West Clay Update EastlWest Street: 141st Street North/South Street: Towne Road Intersection Orientation: North-South Study Period (hrs): 0.25 Major Street Northbound Southbound Movement 1 2 3 4 5 L T R L T o 131 27 3 212 0.95 0.95 0.95 0.95 0.95 o 137 28 3 223 o -- - 0 -- Intersection Jurisdiction Analysis Year Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type RT Channelized Lanes Configuration Upstream Signal Minor Street Movement 6 R 6 0.95 6 - Undivided o LTR 1 o o o LTR 1 o o o Westbound 7 8 L T Volume 60 33 Peak-Hour Factor, PHF 0.95 0.95 Hourly Flow Rate, HFR 63 34 Percent Heayy Vehicles 0 0 Percent Grade (0/0) 0 Flared Approach N Storage 0 RT Channelized 0 Lanes 0 1 0 0 1 Configuration L TR L TR Approach NB 5B Westbound Eastbound Movement 1 4 7 8 9 10 11 Lane Configuration L TR L TR L TR L TR v (vph) 0 3 99 135 C (m) (vph) 1351 1426 475 649 vIe 0.00 0.00 0.21 0.21 950/0 queue length 0.00 0.01 0.78 0.78 Control Delay 7.7 7.5 14.6 12.0 LOS A A B B Approach Delay -- -- 14.6 12.0 Approach LOS -- -- B B 9 R 2 0.95 2 o 10 L 4 0.95 4 o o Eastbound 11 T 62 0.95 65 o o N o 12 R 63 0.95 66 o o o~ 12 Rights Reserved, HCS2000™ Version 4.1 d Copyright @ 2003 University of Florida, All Rights' Reserved Version 4.1 d A-LDl I I I I I I :1 I I 1 1 I I 11 I] II I II I] TWO-WAY STOP CONTROL SUMMARY Analyst J. Pyrz Intersection 141st Street and Towne Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/08/2004 Analysis Time Period Future PM Peak Analysis Year 2008 - Ex + Bkgrd + Site Project Description 040048034 Village of West Clay Update EastlWest Street: 141 st Street North/South Street: Towne Road Intersection Orientation: North-South Study Period (hrs): 0.25 Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 10 299 70 2 185 0 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate, HFR 10 314 73 2 194 0 Percent Heavy Vehicles 0 -- -- 0 -- - Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 35 50 2 7 22 15 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate, HFR 36 52 2 7 23 15 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR - Approach NB S8 Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR v (vph) 10 2 90 45 C (m) (vph) 1391 1183 419 487 vlc 0.01 0.00 0.21 0.09 950/0 queue length \ 0.02 0.01 0.80 0.30 Control Delay 7.6 8.0 15.9 13.1 LOS A A C B Approach Delay -- -- 15.9 13.1 Approach LOS -- -- C B Rights Reserved HCS2000™ Version 4.1 d Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d ~~~ I I I I I I I I I I I I I I I I I I - TWO-WAY STOP CONTROL SUMMARY . 1_- 136th Street and Towne Road City of Carmel 2008 - Ex + Bkgrnd + Site Analyst J. Pyrz Agency/Co. Edwards and Kelcey Date Performed 7/8/2004 Analysis Time Period Future AM Peak Project Description 040048034 Village of West Clay Update EastIWest Street: 136th Street North/South Street: Towne Road Intersection Orientation: North-South Study Period (hrs): 0.25 Major Street Northbound Southbound Movement 1 2 3 4 5 L T R L T 151 67 32 304 0.95 0.95 0.95 0.95 158 70 33 320 -- -- 0 - Intersection Jurisdiction Analysis Year 6 R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type RT Channelized Lanes Configu ration Upstream Signal Minor Street Movement 0.95 o o 0.95 o -- Undivided o 1 o o TR o LT 1 o o Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (0/0) Flared Approach Storage RT Channelized Lanes 0 1 Configuration L TR . Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 Lane Configuration L T L TR v (vph) 33 118 C (m) (vph) 1352 484 vIe 0.02 0.24 95% queue length 0.08 0.95 Control Delay 7.7 14.8 LOS A B Approach Delay -- -- 14.8 Approach LOS -- -- B 7 L 105 0.95 110 o o Westbound 8 T o 0.95 o o o N o 9 R 8 0.95 8 o 10 L o Eastbound 11 T 12 R 0.95 o o 0.95 o o o N o 0.95 o o o o o o o o 12 Rights Reserved HCS2000TM Version 4.1 d Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d A~ -. I I I I I i I I I I I I I I I I 1\ I Ii II TWO-WAY STOP CONTROL SUMMARY Analyst J. Pyrz Intersection 136th Street and Towne Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/08/2004 Analysis Time Period Future PM Peak Analysis Year 2008 - Ex + Bkgrd + Site Project Description 040048034 Village of West Clay Update EasUWest Street: 136th Street North/South Street: Towne Road Intersection Orientation: North-South Study Period (hrs): 0.25 Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 19 330 90 16 219 15 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate, HFR 0 347 94 16 230 0 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 82 0 48 31 0 34 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate, HFR 86 0 50 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (0/0) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR , '~. Approach NB S8 Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR v (vph) 16 136 C (m) (vph) 1130 490 vlc 0.01 0.28 950k queue length 0.04 1.12 Control Delay 8.2 15.1 LOS A C Approach Delay -- -- 15.1 Approach LOS -- -- C Rights Reserved HCS2000TM Version 4.1d Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d A-l^~ '--I' I I I I I I I I I I I I I I 1\ I: Ii IJ ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET Analyst J. Pyrz Agency/Co. Edwards and Kelcey Date Performed 7/6/2004 Time Period Future AM Peak Project Description 040048034 Village of West Clay U date Intersection Jurisdiction Analysis Year 136th Street and Ditch Road City of Carmel 2008 - Ex + Bkgrnd + Site RT Traffic EB WB NB 5B Volume, veh/h 7 1 0 14 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 7 1 0 14 Volume, veh/h 119 120 201 178 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 125 126 211 187 Volume, veh/h 0 5 4 2 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 0 5 4 2 L T Traffic TH Traffic EB WB NB 58 Upper bound 1182 1167 1235 1253 Capacity Lower bound 977 964 1025 1042 vIe Ratio Upper bound 0.11 0.11 0.17 0.16 Lower bound 0.14 0.14 0.21 0.19 HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d A-LDlc 'I I I I I I I I I I I I I I ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET Analyst J. Pyrz Agency/Co. Edwards and Kelcey Date Performed 7/8/2004 Time Period Future PM Peak Project Description 040048034 Village of West Clay U date Intersection Jurisdiction Analysis Year 136th Street and Ditch Road City of Carmel 2008 - Ex + Bkgrd ,+ Site RT Traffic EB WB NB SB Volume, veh/h 5 8 4 11 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 5 8 4 11 Volume, veh/h 113 145 326 140 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 118 152 343 147 Volume, veh/h 3 16 6 9 PHF 0.95 0.95 0.95 0.95 Flow r~te, veh/h 3 16 6 9 L T Traffic TH Traffic EB WB NB SB Upper bound 1216 1050 1247 1218 Capacity Lower bound 1008 858 1036 1009 Upper bound 0.10 0.17 0.28 0.14 vie Ratio Lower bound 0.13 0.21 0.34 0.17 HCS2000TM Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d II I' I Ii IJ A.-t.a, I I I ALL-WA Y STOP CONTROL ANAL YSIS Analyst J. Pyrz Intersection 131st Street and She/bourne Agency/Co. Edwards and Ke/cey Jurisdiction City of Carmel Date Performed 7/8/2004 Analysis Year 2008 - Ex + Bkgrd + Site Analysis Time Period Future AM Peak Proiect ID 040048034 Village of West Clay Update EastlWest Street: 131st Street - ,~...,~ ~-,,," Approach Eastbound Westbound Movement L T R L T R Volume 11 68 6 60 136 61 0/0 Thrus Left Lane 50 50 Approach Northbound Southbound Movement L T R L T R Volume 14 222 19 84 510 15 OkThrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Configuration LTR LTR LTR LTR PHF 0.95 0.95 0.95 0.95 Flow Rate 88 270 267 639 0/0 Heavy Vehicles No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 . Prop. Left-Turns 0.1 0.2 0.1 0.1 Prop. Right-Turns 0.1 0.2 0.1 0.0 Prop. Heavy Vehicle hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT-adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 7.40 7.40 7.40 7.40 hd, initial value 3.20 3.20 3.20 3.20 x, initial 0.08 0.24 0.24 0.57 hd, final value 7.40 7.40 7.40 7.40 x, fi~al value 0.18 0.50 0.47 1.02 Move-up time, m 2.0 2.0 2.0 2.0 Service Time 5.4 5.4 5.4 5.4 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 338 520 517 639 Delay 1'2.03 16.26 14.88 65. 17 LOS B C B F Approach: Delay , 12.03 16.26 14.88' 65. 17 LOS B C B F Intersection Delay 40.40 Intersection LOS E I I I I I I I I I I I 1\ I' 1,1 I IJ HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d A-lD'C , 1 I I Analyst J.Pyrz Intersection 131st Street and She/bourne Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/8/2004 Analysis Year 2008 - Ex + Bkgrd + Site Analysis Time Period Future PM Peak Project ID 040048034 Village of West Clay Update Approach Eastbound Westbound Movement L T R L T R Volume 29 118 18 48 78 97 0/0 Thrus Left Lane 50 50 Approach Northbound Southbound Movement L T R L T R Volume 15 514 62 78 440 19 0/0 Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L 1 L2 L1 L2 L1 L2 Config uration LTR LTR LTR LTR PHF 0.95 0.95 0.95 0.95 Flow Rate 172 234 621 565 0/0 Heavy Vehicles No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Prop. Left-Turns 0.2 0.2 0.0 0.1 Prop. Right-Turns 0.1 0.4 0.1 0.0 Prop. Heavy Vehicle hLT-adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 8.49 8.49 8.49 8.49 hd, initial value 3.20 3.20 3.20 3.20 x, initial 0.15 0.21 0.55 0.50 hd, final value 8.49 8.49 8.49 8.49 x, final value 0.41 0.52 1.20 1.10 Move-up time, m 2.0 2.0 2.0 2.0 Service Time 6.5 6.5 6.5 6.5 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 411 442 621 565 Delay 17. 16 19.28 129.95 95.59 LOS C C F F Approach: Delay 17. 16 19.28 129.95 95.59 LOS C C F F Intersection Delay 89.30 Intersection LOS F I 1 I I I I I I I I I I I -I I I' I' Ii II HCS2000TM Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d p.--lb'1 I I I ALL-WAY STOP CONTROL ANAL YSIS Analyst J. Pyrz Intersection 131st Street and Towne Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/08/2004 Analysis Year 2008 - Ex + Bkgrd + Site Analysis Time Period Future AM Peak Project ID 040048034 Village of West Clay Update Approach Eastbound Westbound Movement L T R L T R Volume 5 238 13 100 223 56 0/0 Thrus Left Lane 50 50 Approach Northbound Southbound Movement L T R L T R Volume 14 157 47 133 266 11 0/0 Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Configuration LTR LTR LTR LTR PHF 0.95 0.95 0.95 0.95 Flow Rate 268 397 228 431 0/0 Heavy Vehicles No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Prop. Left-Turns 0.0 0.3 0.1 0.3 Prop. Right-Turns 0.0 0.1 0.2 0.0 Prop. Heavy Vehicle hLT-adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 7.72 7.72 7.72 7.72 ;~,,,' hd, initial value 3.20 3.20 3.20 3.20 x, initial 0.24 I 0.35 0.20 0.38 hd, final value 7.72 7.72 7.72 7.72 x, final value 0.57 0.80 0.49 0.87 Move-up time, m 2.0 2.0 2.0 2.0 Service Time 5.7 5.7 5.7 5.7 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 417 471 403 482 Delay 20.64 33.81 1 B. 14 41.52 LOS C D C E Approach: Delay 20.64 33. B 1 18.14 41.52 LOS C D C E Intersection Delay 30.95 Intersection LOS 0 I I I I I - I I I I I I I I I I HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d A-1D "I I Analyst J. Pya Intersection 131 st Street and Towne Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/08/2004 Analysis Year 2008 - Ex + Bkgrd + Site Analysis Time Period Future PM Peak Project ID 040048034 Village of West Clay Update Approach Eastbound Westbound Movement l T R L T R Volume 38 215 19 70 256 153 0/0 Thrus Left Lane 50 50 Approach Northbound Southbound Movement L T R L T R Volume 38 230 169 84 209 6 0/0 Thrus left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Configuration LTR LTR LTR LTR PHF 0.95 0.95 0.95 0.95 Flow Rate 286 503 459 314 ot'o Heavy Vehicles No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.;25 Prop. Left-Turns 0.1 0.1 0.1 0.3 Prop. Right-Turn.s 0.1 0.3 0.4 0.0 Prop. Heavy Vehicle hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT ..;adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 9.25 9.25 9.25 9.25 hd, initial value 3.20 3.20 3.20 3.20 x, initial 0.25 0.45 0.41 0.28 hd, final value 9.25 9.25 9.25 9.25 x, final value 0.74 1.18 1.07 0.80 Move-up time, m 2.0 2.0 2.0 2.0 Service Time 7.3 7.3 7.3 7.3 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L 1 L2 Capacity 383 503 459 389 Delay 33.98 131.03 93.29 39.82 LOS D F F E Approach: Delay 33.98 131.03 93.29 39.82 LOS D F F E Intersection Delay 83.84 Intersection LOS F I I I I I I I I I I I 11 II I I I HCS2000TM Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d II A-I \ I I I I I I I I I I I I I I I 11 Ii Ii I TWO-WAY STOP CONTROL SUMMARY Analyst J. Pyrz Intersection 131st Street and Ditch Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/08/2004 Analysis Year 2008 - Ex + Bkgrd + Site Analysis Time Period Future AM Peak Project' Description 040049034 Village of West Clay Update EastlWest Street: 131st Street North/South Street: Ditch Road Intersection Orientation: East-West Study Period (hrs): 0.25, Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume (veh/h) 174 417 0 0 297 34 Peak-hour factor, PHF 0.95 ,0.95 '0.95 0.95 0.95 0.95 Hourly Flow Rate (veh/h) 183 438 0 0 312 35 Proportion of heavy 0 0 vehicles, P HV -- -- -- -- Median type Undivided RT Channelized? 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume (veh/h) 0 0 0 104 0 98 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate (veh/h) 0 0 0 109 0 103 Proportion of heavy 0 0 0 0 0 0 vehicles, PHV Percent grade (0/0) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 , Lanes 0 0 0 0 0 0 Configuration LR Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR Volume, v (vph) 183 212 Capacity, cm (vph) 1223 298 v/c ratio 0.15 0.71 Queue length (950/0) 0.53 5.04 Control Delay (s/veh) 8.5 42.1 LOS A E Approach delay (s/veh) -- -- 42.1 Approach LOS -- -- E HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d A-12 I I I I I I I I I I I I I I I I I I I TWO-WAY STOP CONTROL SUMMARY Analyst J. Pyrz Intersection 131 st Street and Ditch Road Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/8/2004 Analysis Year 2008 - Ex + Bkgrd + Site Analysis Time Period Future PM Peak Project Description 040049034 Village of West Clay Update EastlWest Street: 131st Street North/South Street: Ditch Road Intersection Orientation: East-West Study Period (hrs): 0.25 Maior Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume (veh/h) 247 300 0 0 549 114 Peak-hour factor,PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rat~ (veh/h) 260 315 0 0 577 120 Proportion of heavy 0 0 vehicles, PHV -- -- -- -- Median type Undivided RT Channelized? 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbo~nd Southbound Movement 7 8 9 10 11 12 L T R L T R Volume (veh/h) 0 0 0 64 0 96 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate (\ieh/h) 0 0 0 67 0 101 Proportion of heavy 0 0 0 0 0 0 vehicles, P HV Percent grade (%) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 0 0 0 0 0 Configuration LR Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR Volume, v (vph) 260 168 Capacity ,cm (vph) 909 192 vIe ratio 0.29 0.88 Queue length (95%) 1.18 6.58 Control Delay (s/veh) 10.5 86.0 LOS B F Approach delay (s/veh) -- -- 86.0 Approach LOS -- -- F HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d A-l-:, I I I I I I I I I I I I I I I I I I I HCS2000™ TWO-WAY STOP CONTROL SUMMARY Analyst J. Pyrz Intersection 131st Street and Clay Center Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/08/2004 Analysis Year 2008 - Ex + Bkgrd + Site Analysis Time Period Future AM Peak Project Description 040049034 Village of West Clay Update EasUWest Street: 131st Street North/South Street: Clay Center Road Intersection Orientation: East-West Study Period (hrs): 0.25 Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume (veh/h) 505 34 98 308 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate (veh/h) 0 531 35 103 324 0 Proportion of heavy 0 0 vehicles, PHV -- -- -- -- Median type Undivided RT Channelized? 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume (veh/h) 24 0 152 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate (veh/h) 25 0 160 0 0 0 Proportion of heavy 0 0 0 0 0 0 vehicles, PHV Percent grade (%) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 0 0 0 0 0 Configu ration LR Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR Volume, v (vph) 103 185 Capacity, cm (vph) 1016, 451 vIe ratio 0.10 0.41 Queue length (950/0) 0.34 1.97 Control Delay (s/veh) 8.9 18.4 LOS A C Approach delay (s/veh) -- -- 18.4 Approach LOS -- -- C Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d A-l+ I I I I I I I I I I I I I I I I I I I HCS2000™ TWO-WAY STOP CONTROL SUMMARY Analyst . J. Pyrz , Intersection 21~t Street and Clay . ' en er Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date p~rf~rmed . 7/08/2004. Analysis Year 2008 - Ex + Bkgrd + Site AnalysIs Time Penod Future PM Peak ProJect Description 040049034 Village of West Clay Update EastlWest Street: 131st Street North/South Street: Clay Center Road Intersection Orientation: East-West Study Period (hrs): 0.25 Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume (veh/h) 331 38 151 619 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate (veh/h) 0 348 40 158 651 0 , Proportion of heavy 0 0 vehicles, P HV -- -- -- -- Median type Undivided RT Channelized? 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume (veh/h) 45 0 131 Peak-hour factor, PHF 0.95 0.95 ,0.95 0.95 0.95 0.95 Hourly Flow Rate (veh/h) 47 0 137 0 0 0 Proportion of heavy 0 0 0 0 0 0 vehicles, P HV Percent grade (0/0) 0 0 , Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 0 0 0 0 0 Configuration LR Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR Volume, v (vph) 158 184 Capacity, cm (vph) 1182 355 v/c ratio 0.13 0.52 Queue length (950/0) 0.46 2.85 Control Delay (s/veh) 8.5 25.6 LOS A 0 Approach delay (s/veh) -- -- 25.6 Approach LOS -- -- 0 Copyright @ 2003 University of Florida, All Rights Reserved, Version 4.1 d A-15 I I I I I I I I I I I I I I I I I I I ROUNDABOUTS - U,NSIGNALIZED INTERSECTIONS WORKSHEET Analyst J.Pyrz Agency/Co. Edwards and Kelcey Date Performed 7/08/2004 Time Period Future AM Peak Project Description 040048034 Village of West Clay U date Intersection Jurisdiction Analysis Year 131st Street and Spring Mill City of Carmel 2008 - Ex + Bkgrd + Site RT Traffic EB WB NB 5B Volume, veh/h 106 35 157 108 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 111 36 165 113 Volume, veh/h 209 154 224 714 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 220 162 235 751 Volume, veh/h 342 37 229 95 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 360 38 241 100 L T Traffic TH Traffic EB WB NB 58 Upper bound 675 925 976 1041 Capacity Lower bound 528 747 792 850 Upper bound 1.02 0.26 0.66 0.93 vIe Ratio Lower bound 1.31 0.32 0.81 1.13 HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d A-ll.o I I I I I I I I I I I I I I I I I I I ROUNDABOUTS - UNSIGNAllZED INTERSECTIONS WORKSHEET Analyst J. Pyrz Agency/Co. Edwards and Kelcey Date Performed 7/8/2004 Time Period Future PM Peak Project Description 040048034 Village of West Clay U date Intersection Jurisdiction Analysis Year 131st Street and Spring Mill City of Carmel 2008 - Ex + Bkgrd + Site RT Traffic EB WB NB 5B Volume, veh/h 144 44 490 31 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 151 46 515 32 Volume, veh/h 142 219 649 305 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 149 230 683 321 Volume, veh/h 177 129 96 62 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 186 135 101 65 L T Traffic TH Traffic EB WB NB 5B Upper bound 1011 466 1066 738 Capacity Lower bound 824 350 873 582 v/c Ratio Upper bound 0.48 0.88 1.22 0.57 Lower bound 0.59 1.17 1.49 0.72 HCS2000TM Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d A-ll I I I I I I I I I I I I I I I I I I I HCS2000™ DETAILED REPORT Intersection 116th Street and Towne Analyst J. Pyrz Road Agency or Co. Edwards and Kelcey Area Type All other areas Date Performed 7/8/2004 Jurisdiction City of Carmel Time Period Future AM Peak Analysis Year 2008 - Ex + Bkgrd + Site Pro'ect ID 040048034 Village of West EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Number of lanes, N 1 2 0 1 1 1 1 1 1 1 1 1 1 Lane group L TR L T R L T R L T R Volume, V (vph) 198 1018 108 58 542 41 40 165 52 95 264 318 % Heavy vehicles, %HV 0 0 0 0 0 0 0 0 0 0 0 0 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Pretimed (P) or actuated (A) A A A A A A A A A A A A Start-up lost time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of effective green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type, AT 3 3 3 3 3 3 3 3 3 3 3 Unit extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Filtering/metering, I 1.000 1.000 1.000 1. 000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Initial unmet demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Ped / Bike / RTOR volumes 0 16 0 14 0 5 0 24 Lane width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Parking I Grade / Parking N 0 N N 0 N N 0 N N 0 N Parking ,maneuvers, Nm Buses stopping, Ns 0 0 0 0 0 0 0 0 0 0 0 Min. time for pedestrians, Gp 3.2 3.2 3.2 3.2 Phasing EW Perm EW Perm 03 04 Excl. Left NS Perm 07 08 G = 8.0 G = 22. 1 G= G= G = 8.0 G = 8.9 G= G= Timing y= 2 y= 5 y= y= y= 2 y= 5 y= y= Duration of Analysis, T = 0~25 Cycle Length, C = 61.0 EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Adjusted flow rate, v 208 1169 61 571 28 42 174 49 100 278 309 Lane group capacity, c 361 1292 125 688 1194 362 277 580 362 277 580 vIe ratio, X 0.58 0.90 0.49 0.83 0.02 0.12 0.63 0.08 0.28 1.00 0.53 Total green ratio, g/C 0.53 0.36 0.36 0.36 0.74 0.31 0.15 0.36 0.31 0.15 0.36 Uniform delay, d1 10.9 18.5 15.1 17.7 2.1 15.3 24.5 12.9 15.7 26.0 15.5 Progression factor, PF 1.000 1.000 1.000 1.000 1. 000 1.000 1.000 1.000 1.000 1.000 1.000 Delay calibration, k 0.17 0.43 0.11 0.37 0.11 0.11 0.21 0.11 0.11 0.50 0.14 A-l~ I I I I I I I I I I I I I I I I I I I Incremental delay, d2 2.3 9.3 3.0 8.4 0.0 0.1 4.5 0.1 0.4 55.0 1.0 Initial queue delay, d3 Control delay 13.2 27.7 18.0 26.2 2.1 15.4 29.0 13.0 16.1 81.0 16.4 Lane group LOS B C B C A B C B B F B Approach delay 25.5 24.4 23.9 42.5 Approach LOS C C C 0 Intersection delay 29.0 X = 0.96 Intersection LOS C c HCS2000™ Copyright @ 2000 University of Florida, All Rights Reserved Version 4.1d A-lq I I I I I I I I I I I I I I I I I I I Intersection 116th Street and Towne Analyst J. Pyrz Road Agency or Co. Edwards'and Kelcey Area Type All other areas Date Performed 7/8/2004 Jurisdiction City of Carmel Time Period Future AM Peak Analysis Year 2008 - Ex + Bkgrd + Site Pro'ect ID 040048034 Village of West 1 Clay Update EB WB NB S8 TH RT L T TH RT L T TH RT L T TH 2 0 1 1 1 1 1 1 1 1 RT 1 LT 1 Number of lanes, N 1 Lane group R T L R T L R T L TR L 58 244 300 000 59 318 94 000 374 748 68 88 112 70 o 0 0 0 0 0 Volume, V (vph) % Heavy vehicles, %HV Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 ,0.95 0.95 0.95 0.95 0.95 0.95 0.95 A A A 2.0 2.0 2.0 2.0 2.0 2.0 A 2.0 2.0 3 Pretimed (P) or actuated (A) A Start-up lost time, 11 2.0 Extension of effective green, e 2.0 A A A 2.0 2.0 2.0 2.0 2.0 '2.0 A A 2.0 2.0 2.0 2.0 A A 2.0 2.0 3 3 3 3 3 3 Arrival type, AT Unit extension, UE Filtering/metering, I Initial unmet demand, Qb Ped / Bike / RTOR volumes Lane width Parking / Grade / Parking 3 3 3 3.0 3 ao aD aD aD ao aD iao aD 3.0 3.0 1.000 1.000 0.0 0.0 o 7 12.0 12.0 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30 o 9 o 7 o 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 N o N N N N o o N N o N Parking maneuvers, Nm Buses stopping, NB 0 0 0 0 0 0 0 0 0 0 Min. time f<?r pedestrians, Gp 3.2 3.2 3.2 3.2 Phasing EW Perm EW Perm 03 04 Excl. Left NS Perm 07 08 G = 8.0 G = 18.6 G = G = G = 8.4 G = 11.0 G = G = Y=2 Y=5 Y= Y= Y=2 Y=5 Y= Y= Duration of Analysis, T = 0.25 ' Cycle Length, C = 60.0 EB WB NB SB L T TH RT L T TH RT L T TH RT L T TH RT 394 851 93 118 66 62 .335 89 61 257 284 o Timing Adjusted flow rate, v 127 589 1130 380 348 646 380 348 646 0.73 0.20 0.06 0.16 0.96 0.14 0.16 0.74 0.44 0.31 0.31 0.70 0.36 0.18 0.40 0.36 0.18 0.40 18.5 15.2 2.8 13.4 24.3 11.4 13.5 23.1 13.1 1.000 1.000 1.000 1.boo 1.000 1.000 1.000 1.000 1.000 0.29 O. 11 O. 11 O. 11 0.47 O. 11 O. 11 0.30 O. 11 Lane group capacity, c v/e ratio, X Total green ratio, g/C Uniform' delay, d1 Progression factor, PF Delay calibration, k 577 1106 0.68 0.77 0.48 0.31 12.6 18.8 1.000 1.000 0.25 0.32 ~-ro I I I I I I I I I I I I I I I I I I I Incremental delay, d2 3.3 3.4 19.4 0.2 0.0 0.2 38.3 0.1 0.2 8.1 0.5 Initial queue delay, d3 Control delay 15.9 22.1 37.9 15.4 2.8 13.6 62.6 11.5 13.7 31.2 13.6 Lane group LOS B C D B A B E B B C B Approach delay 20.1 20.0 47.0 21.1 Approach LOS C B D C Intersection delay 25.4 X = 0.87 Intersection LOS C c HCS2000TM Copyright (Q 2000 University of Florida, All Rights Reserved Version 4.1d A-Bl I I I I I I I I I I I I I I I I I I I TWO-WAY STOP CONTROL SUMMARY Analyst J. Pyrz Intersection 116th Street and Hoover Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 07/08/2004 Analysis Year 2008 - Ex + Bkgrd + Site Analysis Time Period Future AM Peak Project Description 040048034 Village of West Clay Update EastlWest Street: 116th Street North/South Street: Hoover Road Intersection Orientation: East-West, Study Period (hrs): 0.25 Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume (veh/h) 14 1207 0 0 582 228 Peak-hour factor, PHF ' 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate (veh/h) 14 1270 0 0 612 240 Proportion of heavy 0 0 vehicles, PHV -- -- -- -- Median type Undivided RT Channelized? 0 0 Lanes () 1 0 0 1 0 Configu ration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume (veh/h) 0 0 0 326 0 52 Peak.;.hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate (veh/h) O. 0 0 343 0 54 Proportion of heavy 0 0 0 0 0 0 vehicles, P HV . Percent grade (0/0) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 0 0 0 0 0 Configuration LR Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR Volume, v (vph) 14 397 Capacity, cm (vph) 795 71 v/c ratio 0.02 5.59 Queue length (950/0) 0.05 44. 12 Control Delay (s/veh) 9.6 2182 LOS A F Approach delay (s/veh) -- -- 2182 Approach LOS -- -- F HCS2000TM Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d A--B2 I I I I I I I I I I I I I I I I I I I TWO-WA Y STOP CONTROL SUMMARY Analyst J. Pyrz Intersection 116th Street and Hoover Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel Date Performed 7/8/2004 Analysis Year 2008 - Ex + Bkgrd + Site Analysis Time Period Future PM Peak Project Description 040048034 Village of West Clay Update East/West Street: 116th Street North/South Street: Hoover Road Intersection Orientation: East-West Study Period (hrs): 0.25 Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume (veh/h) 26 875 0 0 1318 375 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate (veh/h) 27 921 0 0 1387 394 Proportion of heavy 0 0 vehicles, PHV -- -- -- -- Median type Undivided RT Channelized? 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume (veh/h) 0 0 0 350 0 20 Peak~hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate (veh/h) 0 0 0 368 0 21 Proportion of heavy 0 0 0 0 0 0 vehicles, P HV Percent grade (0/0) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 0 0 0 0 0 Configuration LR Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR Volume, v (vph) 27 389 Capacity, cm (vph) 353 29 v/c ratio 0.08 13.41 Queue length (950/0) 0.25 48.04 Control Delay (s/veh) 16.0 5846 LOS C F Approach delay (s/veh) -- -- 5846 Approach LOS -- -- F HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d A-B?::> I I I I I I I I I I I I I I I I I I I ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET Analyst J. Pyrz Agency/Co. Edwards and Kelcey Date Performed 7/08/2004 Time Period Future AM Peak Project Description 040048034 Village of West Clay U date Intersection Jurisdiction Analysis Year 116th Street and Ditch Road City of Carmel 2008 - Ex + Bkgrd + Site RT Traffic EB WB NB S8 Volume, veh/h 0 276 75 0 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 0 290 78 0 Volume, veh/h 1417 736 0 0 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 1491 774 0 0 Volume, veh/h 116 0 272 0 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 122 0 286 0 L T Traffic TH Traffic EB WB NB SB Upper bound 1103 1302 413 553 Capacity Lower bound 905 1086 306 424 vIe Ratio Upper bound 1.46 0.82 0.88 0.00 Lower bound 1.78 0.98 1.19 -0.00 HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d A.-~ I I I I I I I I I I I I I I I I I I I Analyst Agency/Co. Date Performed Time Period Project Description U date ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET J. Pyrz Edwards and Kelcey 7/8/2004 Future PM Peak 040048034 Village of West Clay Intersection Jurisdiction Analysis Year 116th Street and Ditch Road City of Carmel 2008 - Ex + Bkgrd + Site L T Traffic TH Traffic RT Traffic EB WB NB 5B Volume, veh/h 0 198 125 0 ,PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 0 208 131 0 Volume, veh/h 1158 1569 0 0 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 1218 1651 0 0 Volume, veh/h 88 0 250 0 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 92 0 263 0 EB WB NB 5B Upper bound 1176 1250 519 270 Capacity Lower bound 972 1038 395 190 Upper bound 1.11 1.49 0.76 0.00 vIe Ratio Lower bound 1.35 1.79 1.00 0.00 HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d A-8~ I I I I I I I I I I I I I I I I I I I , ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET Analyst J. Pyrz Agency/Co. Edwards and Kelcey Date Performed 7/8/2004 Time Period Future AM Peak Project Description 040048034 Village of West Clay U date Intersection Jurisdiction Analysis Year 116th Street and Spring Mill City of Carmel 2008 - Ex'+ Bkgrd + Site RT Traffic EB WB NB 58 281 33 203 162 0.95 0.95 0.95 0.95 295 34 213 170 1109 548 255 623 0.95 0.95 0.95 0.95 1167 576 268 655 349 245 113 92 0.95 0.95 0.95 0.95 367 257 118 96 L T Traffic TH Traffic' EB WB NB S8 Upper bound 698 747 367 719 Capacity Lower bound 548 590 268 566 Upper bound 2.62 1.16 1.63 1.28 vIe Ratio Lower bound 3.34 1.47 2.24 1.63 HCS2000TM Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d A-~ I I I I I I I I I I I I I I I I I I I ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET Analyst J. Pyrz Agency/Co. Edwards and Kelcey Date Performed 7/8/2004 Time Period Future PM Peak Project Description 040048034 Village of West Clay U date Intersection Jurisdiction Analysis Year 116th Street and Spring Mill City of Carmel 2008 - Ex + Bkgrd + Site RT Traffic EB WB NB 5B Volume, veh/h 218 68 506 89 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 229 71 532 93 Volume, veh/h 822 980 433 337 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 865 1031 455 354 Volume, veh/h 260 240 86 303 PHF 0.95 0.95 0.95 0.95 Flow rate, veh/h 273 252 90 318 L T Traffic TH Traffic EB WB NB 5B Upper bound 920 520 533 366 Capacity Lower bound 742 396 406 268 Upper bound 1.49 2.60 2.02 2.09 vIe Ratio Lower bound 1.84 3.42 2.65 2.85 HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d ~-~-, I I I I I I I I I I I I I I I I I I I Village of WestClay , Traffic Impact Study Update 2008 Future Traffic Volumes, Original Study Existing and Proposed Intersection Configurations Edwards and Kelcey ~-~ I I I I I I I I I I I I I I I I I I I HCS2000™ DET AILED REPORT Analyst J. Pyrz Intersection 131st St and Towne Rd Area Type All other areas Agency or Co. Edwards and Kelcey Jurisdiction Carmel, Indiana Date Performed 7/8/2004 Analysis Year 2008 - with Improvements Time Period PM Peak Hour Project ID 040048034 Village of WestCla EB WB NB 5B LT TH RT LT TH RT LT TH RT LT TH RT Number of lanes, N 1 1 0 1 1 0 1 1 0 1 1 0 1 Lane group L TR L TR L TR L TR Volume, V (vph) 58 340 27 122 389 30 126 480 84 16 356 29 0;'0 Heavy vehicles, %HV 0 0 0 0 0 0 0 0 0 0 0 0 Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Pretimed (P) or actuated (A) A A A A A A A A A A A A Start-up lost time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of effective green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type, AT 3 3 3 3 3 3 3 3 Unit extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Filtering/metering, I 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Initial unmet demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Ped / Bike / RTOR volumes 0 3 0 3 0 8 0 3 Lane width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Parking / Grade / Parking N 0 N N 0 N N 0 N N 0 N Parking maneuvers, Nm Buses stopping, Ns 0 0 0 0 0 0 0 0 Min. time for pedestrians, Gp 3.2 3.2 3.2 3.2 Phasing EW Perm 02 03 04 NS Perm 06 07 08 G = 22.0 G= G= G= G = 24.0 G= G= G= Timing y= 7 ' y= y= y= y= 7 y= Y= y= Duration of Analysis, T = 0.25 Cycle Length, C = 60.0 EB WB NB S8 LT TH RT LT TH RT LT TH RT LT TH RT Adjusted flow rate, v 64 405 136 462 140 617 18 425 Lane group capacity, c 250 690 298 690 324 744 167 752 v/c ratio, X 0.26 0.59 0.46 0.67 0.43 0.83 0.11 0.57 Total green ratio, glC 0.37 0.37 0.37 0.37 0.40 0.40 0.40 0.40 Uniform delay, d1 13.3 15.3 14.5 15.9 13.1 16.2 11.3 14.0 Progression factor, PF 1. 000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Delay calibration, k 0.11 0.18 0.11 0.24 0.11 0.37 0.11 0.16 Incremental delay, d2 0.5 1.3 1.1 2.5 0.9 7.8 0.3 1.0 A-&<1 I I I I HCS2000TM I I I I I I I I I I I I I I I Initial queue delay, d3 Control delay 13.8 16.6 15.6 18.5 14.0 24.0 11.6 15.0 Lane group LOS B B B B B C B B Approach delay 16.3 17.8 22.1 14.8 Approach LOS B B C B Intersection delay 18.3 X = O. 75 Intersection LOS B c Copyright @ 2000 University of Florida, All Rights Reserved Version 4.1 d A-~G I ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET I Intersection ' 131st Street and Towne Road Analyst J. Pyrz Jurisdiction Carmel, Indiana I Agency/Co. Edwards and Kelcey Ex + Bkgrd + Vent + Site, Date Performed 7/27/2004 Analysis Year Time Period PM Peak Hour 2008 I 0400.48.q34 Village of West Clay U date I EB WB NB 5B VolurlJe, veh/h 58 122 126 16 L T Traffic PHF 0.95 0.95 0.95 0.95 I Flow rate, veh/h 61 128 132 16 Volume, veh/h 340 389 480 356 TH Traffic PHF 0.95 0.95 0.95 0.95 I Flow rate, veh/h 357 409 505 374 Volume, veh/h 27 30 . 84 29 RT Traffic PHF 0.95 0.95 0.95 0.95 I Flow rate, veh/h 28 31 88 30 I I I I EB WB NB 5B I Upper bound 920 796 983 814 Capacity Lower bound 742 633 799 649 Upper bound 0.48 0.71 0.74 0.52 I vlc Ratio Lower bound 0.60 0.90 0.91 0.65 HCS2000™ Copyright <9 2003 University of Florida, All Rights Reserved Version 4.1d I I I I I A-9\ I I I I I I I I I I I I I I I I I I I Analyst J. Pyrz Intersection 131 st St and Shelbourne Rd Agency or Co. Edwards and Kelcey Area Type All other areas Date Performed 7/8/2004 Jurisdiction Carmel, Indiana Time Period PM Peak Hour Analysis Year 2008 - with Improvements P . . t ID 040048034 Village of EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num'ber of lanes, N 1, 1 0 1 1 0 1 1 0 1 1 0 1 Lane group L TR L TR L TR L TR Volume, V (vph) 18 211 17 109 252 27 21 471 183 15 102 11 010 Heavy vehicles, %HV 0 0 0 0 0 0 0 0 0 0 0 0 Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 .0.90 .0.90 Pretimed (P) or actuated (A) A A A A A A A A A A A A Start-up lost time, '1 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of effective green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type, AT 3 3 3 3 3 3 3 3 Unit extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.,0 Filtering/metering, I 1.000 1. 000 1.000 1.000 1.000 1.000 1. 000 1.000 Initial unmet demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Ped / Bike / RTOR volumes 0 0 0 17 0 0 0 22 Lane width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Parking / Grade / Parking N 0 N N 0 N N 0 N N 0 N Parking maneuvers, Nm Buses stopping, Ns 0 0 0 0 0 0 0 0 Min. time for pedestrians, Gp 3.2 3.2 3.2 3.2 Phasing EW Perm 02 03 04 NS Perm 06 07 08 G ~ 17.0 G= G= G= G = 29.0 G= G= G= Timing y= 7 y= y= y= y= 7 y= y= y= puration of Analysis, T = 0.25 ' Cycle Length, C = 60.0 NJ EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Adjusted flow rate, v 20 253 121 291 23 726 17 113 Lane group capacity, c 289 532 324 535 628 880 186 918 vlc ratio, X 0.07 0.48 0.37 0.54 0.04 0.82 0.09 0.12 Total green ratio, glC 0.28, 0.28 0.28 0.28 0.48 0.48 0.48 0.48 Uniform delay, d1 15.7 17.8 17.2 18.2 8.2 13.3 8.4 8.5 Progression factor, ~F 1.000 1.000 1.000 1.000 1.000 1.00'0 1.000 1.000 Delay calibration, k 0.11 0.11 0.11 0.14 0.11 0.36 0.11 0.11 Incremental delay, d2 0.1 0.7 0.7 1.2 0.0 6.5 0.2 0.1 A-92 I I I I HCS2000™ I I I I I I I I I I I I I I I Initial queue delay, d3 Control delay 15.8 18.5 18.0 19.4 8.2 19.8 8.6 8.6 Lane group LOS B B B B A B A A Approach delay 18.3 19.0 19.4 8.6 Approach LOS B B B A Intersection delay 18.2 X = O. 72 Intersection LOS B c Copyright @ 2000 University of Florida, All Rights Reserved Version 4.1 d A-o..~ . I I I I I I I I I I I I I I I I I I I ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET Analyst J. Pyrz Agency/Co. Edwards and Kelcey Date Performed 7/8/2004 Time Period PM Peak Hour Project Description 040048034 Village of WestClay U date Intersection Jurisdiction Analysis Year 131st and Shelbourne Carmel, Indiana 2008 - with Improvements RT Traffic EB WB NB 5B Volume, veh/h 18 130 7 57 PHF 0.90 0.90 0.90 0.90 Flow rate, veh/h 20 144 7 63 Volume, veh/h 191 180 69 390 PHF 0.90 0.90 0.90 0.90 Flow rate, veh/h 21,2 200 76 433 Volume, veh/h 11 8 85 14 PHF 0.90 0.90 0.90 0.90 Flow rate, veh/h 12 8 94 15 L T Traffic TH Traffic Capacity Upper bound Lower bound Upper bound Lower bound vIe Ratio HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d 1\-94 I I I I I I I I I I I I I I I I I I I I Analyst Number of lanes, N 1 Lane group Volume, V (vph) 0/0 Heavy vehicles, %HV Peak-hour factor, PHF Pretimed (P) or actuated (A) Start-up lost time, 11 Extension of effective green, e Arrival type , AT Unit extension, UE Filtering/metering, I Initial unmet demand, Qb Ped I Bike I RTOR volumes Lane width Parking / Grade I Parking Timing Adjusted flow rate, v L 258 o 0.90 A 2.0 2.0 3 3.0 HCS2000™ DETAILED REPORT LT 1 T 408 o 0.90 A 2.0 2.0 3 3.0 TR 496 o 0.90 A 2.0 2.0 3 3.0 1.000 0.0 1.000 1.000 0.0 0.0 RT o LR 173 o 0.90 A 77 o 0.90 A 219 o 0.90 A J. Pyrz Intersection 131st St and Ditch Rd Area Type All other areas Agency or Co. Edwards and Kelcey Jurisdiction Carmel, Indiana Date Performed 7/8/2004 T' P' d PM P k H Analysis Year 2008 - with Improvements Ime eno ea our ,040048034 Village of Project ID WestC/ay EB WB NB S8 TH RT L T TH RT L T TH RT L T TH 1 001000000 Parking maneuvers, Nm Buses stopping, Ns 0 0 0 Min. time for pedestrians, Gp 3.2 3.2 Phasing EW Perm 02 03 04 S8 Only 06 07 G = 33.0 G = G = G = G = 13.0 G = G = Y=7 Y= Y= y= Y=7 Y= y= Duration of Analysis, T = 0.25 Cycle Length, C = 60.0 EB WB NB SB L T TH RT L T TH RT L T TH RT L T TH 287 453 724 305 12.0 N o 12.0 o 12.0 o 2.0 2.0 3 3.0 1.000 0.0 17 o o 22 N N N N N N 12.0 o N o 3.2 08 G= Y= RT Lane group capacity, c 320 1045 1011 372 vlc ratio, X 0.90 0.43 0.72 0.82 Total green ratio, glC 0.55 0.55 0.55 0.22 Uniform delay, d1 12.0 8.0 10.0 22.4 Progression factor, PF 1.000 1.000 1.000 1.000 Delay calibration, k 0.42 0.11 0.28 0.36 Incremental delay, d2 26.2 0.3 2.5 13.6 A-<15 I I I I HCS2000TM I I I I I I I I I I I I I I I Initial queue delay, da Control delay 38.2 8.3 12.5 36.0 Lane group LOS 0 A B 0 Approach delay 19.9 12.5 36.0 Approach LOS B B 0 Intersection delay 19.6 X = 0.88 Intersection LOS B c Copyright @ 2000 University of Florida, An Rights Reserved Version 4.1d ~-~lo I I I I I I I I I I I I I I I I I I I ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET Analyst J. Pyrz Agency/Co. Edwards and Kelcey Date Performed 7/8/2004 Time Period PM Peak Hour Project Description 040048034 Village of WestClay U date Intersection Jurisdiction Analysis Year 131st and Ditch Carmel, Indiana 2008 - with Improvements RT Traffic EB WB NB 5B Volume, veh/h 134 0 0 215 PHF 0.90 0.90 0.90 0.90 Flow rate, veh/h 148 0 0 238 Volume, veh/h 527 319 0 0 PHF 0.90 0.90 0.90 0.90 Flow rate, veh/h 585 354 0 0 Volume, veh/h 0 35 0 294 PHF 0.90 0.90 0.90 0.90 Flow rate, veh/h 0 38 0 326 L T Traffic TH Traffic EB WB NB 5B Upper bound 1149 1233 637 1048 Capacity Lower bound 947 1023 495 857 Upper bound 0.64 0.32 0.00 0.54 vie Ratio Lower bound 0.77 0.38 0.00 0.66 HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d ~-~, I I I I I I I I I I I I I I I I I I I HCS2000™ DETAILED REPORT Intersection 116th Sf and Hoover Rd Analyst J. Pyrz Area Type All other areas Agency or Co. Edwards and Kelcey Jurisdiction Carmel, Indiana Date Performed 7/8/2004 T. P. d' PM P k H Analysis' Year 2008 - with Improvements Ime eno ea our . 040048034 Village of Project ID WestClay EB WB NB SB TH RT L T TH RT L T TH RT L T TH 1 001000000 Number of lanes, N 1 Lane group LT 1 RT o L T TR 850 133 o 0 0.90 0.90 LR Pretimed (P) or actuated (A) A A Start-up lost time, 11 2.0 2.0 Extension of effective green, e 2.0 2.0 A 106 o 0.90 A 85 o 0.90 A Volume, V (vph) 0/0 Heavy vehicles, %HV Peak-hour factor, PHF 109 536 o 0 0.90 0.90 Arrival type , AT Unit extension, UE Filtering/metering, I Initial unmet demand, Qb Ped / Bike / RTOR volumes Lane width Parking / Grade / Parking 3 3 3.0 3.0 1.000 1.000 0.0 0.0 A 2.0 2.0 3 3.0 1.000 0.0 2.0 2.0 3 3.0 1.000 0.0 o 13 o o 9 N o N N 12.0 o N N N N 12.0 o N 12.0 12.0 Parking maneuvers, Nm Buses stopping, Ns 0 0 0 Min. time for pedestrians, Gp 3.2 3.2 Phasing EW Perm 02 03 04 58 Only 06 07 G = 37.0 G = G = G = G = 9.0 G = G = Y=7 y= Y= Y= Y=7 Y= Y= Duration of Analysis, T = 0.25 Cycle Length, C= 60.0 EB WB N8 5B TH RT L T TH RT L T TH RT L T TH 596 1077 202 Timing o 3.2 08 G= Y= Adjusted flow rate, v LT. 121 RT Lan'e group capacity, c 247 1172 1152 269 v/c ratio, X 0.49 0.51 0.93 0.75 Total green ratio, g/C 0.62 0.62 0.62 0.15 Uniform delay, d1 6.3 6.4 10.4 24.4 Progression factor, PF 1.000 1.000 1.000 1.000 Delay calibration, k 0.11 0.12 0.45 0.31 Incremental delay, d2 1.5 0.4 13.7 11.2 t\-~& I I I I HCS2000™ I I I I I I I I I I I I I I I Initial queue delay, d3 Control delay 7.8 6.8 24.1 35.6 Lane group LOS A A C 0 Approach delay 7.0 24.1 35.6 Approach LOS A C 0 Intersection delay 19.1 X = 0.90 Intersection LOS B c Copyright @ 2000 UnIversity of Florida, All Rights Reserved Version 4.1d A-c..e:; I I I I I I I I I I I I I I I I I I I Analyst Agency/Co. Date Performed Time Period Project Description U date ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET J. Pyrz Edwards and Kelcey 7/8/2004 PM Peak Hour 040048034 Villa~e of WestC/ay Intersection Jurisdiction Analysis Year 131st and Hoover Carmel, Indiana 2008 - with Improvements L T Traffic TH Traffic RT Traffic EB WB NB 5B Volume, veh/h 58 0 0 141 PHF 0.90 0.90 0.90 0.90 Flow rate, veh/h 64 0 0 156 Volume, veh/h 681 427 0 0 PHF 0.90 0.90 0.90 0.90 Flow rate, veh/h 756 474 0 0 Volume, veh/h 0 84 0 107 PHF 0.90 0.90 ' 0.90 0.90 Flow rate, veh/h 0 93 0 118 EB WB NB 5B Upper bound 1225 1317 634 953 Capacity Lower bound 1016 1099 493 771 Upper bound 0.67 0.43 0.00 0.29 vIe. Ratio Lower bound 0.81 0.52 0.00 0.36 HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d A -lex:.)