July 29, 2004
Mr. Jon Dobosiewicz
Planning Administrator
City of Carmel
One Civic Square, Third Floor
Carmel, Indiana 46032
RE: West Clay Traffic Impact Study Update
EK 0400.48.034
Dear Mr. Dobosiewicz:
As you know, Brenwick Development completed an extensive Traffic Impact Study in 1999 for the
Village of West Clay Mixed-Use Development. At that time, Brenwick committed $1.28 Million for
improvements to the local street system based on identified needs for signals, intersection improvements,
and resurfacing. It is my understanding that roughly half of that amount has been spent to date.
It is our intent that the following information may be used as a tool to aid the City of Carmel and
Brenwick Development in determining the appropriateness of redistributing the previously-committed
and remaining dollars. In addition to the amount that Brenwick has already provided, the City and
County have made some roadway and intersection improvements in the area as needs have arisen. Other
projects are currently planned which will further improve traffic conditions in the area. These completed
and planned projects have resulted in a shifting of priorities for all future improvements.
To this end, we have prepared analyses of traffic conditions under various development scenarios for the
Village of West Clay. In previous submittals, we have provided you and the City of Carmel with the
Levels of Service (LOS) estimates for existing conditions and traffic volumes at twenty-three
intersections in West Clay Township. These intersections were identified by the City of Carmel for 2004
traffic counts and analysis and are within a study area bounded by 1 16th Street, Spring Mill Road, 141 st
Street, and Shelbourne Road. -
In addition to looking at existing conditions, analyses were conducted and are summarized in this letter to
determine the impact that the Village of West Clay site would have on the traffic within that study area. In
order to accomplish this, trip generation estimates were prepared for the modified Village of West Clay
site as is currently being proposed. The land use composition for the project has changed since our
original Traffic Impact Study (TIS) submittal in 1997. The trip generation estimates' from the original
study and the proposed modified project configuration are summarized in Table 1.
222 E. Ohio Str.eet
Suite 400
Indianapolis, Indiana 46204-2156
Voice 317.636.1552
Fax 317.636.1345
www.ekcorp.com
Edward!!i
~Kelceg
July 30, 2004
Mr. Jon Dobosiewicz
Carmel City Hall
Dear Mr. Dobosiewicz:
An incomplete copy of this report was mailed to you yesterday in which ~~<
,,/' ,
30 pages were inadvertently omitted. Please accept the attached report a~9/;":'~:>/\-';~'-~"
discard the one you are to receive in Monday's mail. /~:'_,';v/
::~
Administrative Asst.
to Jennifer Pyrz
,
.,
"
,I
i
:1
!
.~
.1
.~
"~
II
,I
~I,
I
11
I:
I:
Ii
:1
I~
'.1
; J
Eclwarcb;
~Kelceg
Mr. Dobosiewicz
July 29, 2004
Page 2
Table 1. Trips Generation Comparison
Village of West Clay
AM Peak Hour PM Peak Hour Combined Peal;( Hours
In Out Total In Out Total In Out Total
Total External Trips'll
Original Study 648 716 1 ,364 1,111 974 2,085 1,759 1 ,690 3,449
Updated Study 694 853 1,547 1 ,233 1 ,233 2,466 1 ,927 2,086 4,013
0/0 Difference 70/0 190/0 130k 110/0 270/0 180/0 100/0 230k 160/0
Total External, Non-Pass-By Trips**
Original Study 648 716 1 ,364 1,111 974 2,085 1 ,759 1 ,690 3,449
Updated Study 694 853 1 ,547 1,111 1,111 2,222 1 ,805 1 ,964 3,769
0/0 Difference 70/0 190/0 130/0 00/0 140/0 70/0 30/0 160/0 90/0
* Extemaltrips are those trips that enter/exit the subject site from the adjacent roadway system. Internaltrips
which are conducted solely within the site itself (i.e. between the retail and residential portions of the project)
have been deducted since they do not add traffic to the adjacent roadway system.
** Pass-by trips are trips that are attracted to the site from the existing traffic stream. These trips are not new to the
adjacent roadway system. They are already passing by the site and will be added only onto the site driveway
volumes as they exit the adjacent roadway, enter the site, conduct their business, and then return to that same
adjacent roadway.,
Using these updated traffic estimates, site trips were distributed among the study roadways and
intersections based on roadway configuration, distribution of trip destinations, and existing traffic
patterns. Trips from within the Village were distributed differently from trips to and from the retail space
at l3l5t and Towne Road, the latter assumed to be an attractor of trips mostly from within the study area.
Table 2 provides a comparison of 2004 Existing LOS and 2008 Future LOS, for both the modified
("updated") and original WestClay configurations. The Future scenario LOS were estimated using
background information from the original study for the Village of West Clay. In the original WestClay
study, trip generation estimates were individually prepared and distributed for more than 4,000 acres of
then-undeveloped land. In additon to those volumes, a 1 % per year background growth rate was added to
the entire system to simulate regional growth outside of the immediate study area. For the work prepared
for this update, the same background growth and adjacent land growth was assumed and included,
adjusted to account for the six years that have taken place since that study was prepared. The future
scenario LOS therefore includes traffic from the following sources:
~
I
I
I
I
I
~
~
I
I
~
I
I:
11
II
II:
I
Ii
I:
.J
Edwards
~Kelcey
Mr. Dobosiewicz
July 29, 2004
Page 3
1. Existing 2004 traffic volumes, plus
2. Background growth of 1 % per year between 2004 and 2008, plus
3. Traffic volumes from the development of adjacent (and currently undeveloped) parcels to
occur between 2004 and 2008, plus
4. Traffic volumes from the development of the Village of WestClay (originally proposed and
updated)
The intersection configurations for both the original future and updated future scenarios is identical.
Where improvements are currently planned by the City of Carmel, those configurations were utilized. In
most cases, that meant a single-lane roundabout. Where improvements are not currently planned, the
existing (2004) intersection configuration was used.
Based on the results provided in Table 2, the intersection of 131 st Street and Towne Road is currently
operating below expected Levels of Service and will continue to do so in the future under both the
original and updated WestClay development plans. This intersection was estimated at unacceptable levels
of service in the future year of the original. study as well. No improvements are currently plailned by the
City for this intersection. LOS B or better in the peak hours could be attained with the installation of a
two-phase signal and left-turn lanes on each approach once warranted. Alternatively, a roundabout may
be constructed at this location. Capacity analysis indicates that a single-lane roundabout may be reaching
the upperbounds of capacity with the estimated volumes. A two-lane roundabout should be considered at
this location.
The following intersections are expected to degrade from acceptable to unacceptable levels of service as
result of the addition of background, vacant and WestClay site traffic volumes:
131 st and Shelbome
131 st and Ditch
1 16th and Hoover
Each of these intersections is currently stop-controlled, with an all-way stop condition operating at 131 st
and Shelborne and two-way stops at 131 st I Ditch and 1 16th I Hoover. When warranted, the installation of
a two-phase signal and left-turn lanes would bring each of these locations up to acceptable LOS in the
peak hours. Alternatively, single-lane roundabouts would also provide good LOS at any of these
locations. The original study also estimated that all three intersections would fall to unacceptable levels
in future scenarios.
Roundabouts are currently planned for construction at four of the study intersections. The roundabout
planned at 136th and Ditch is expected to operate efficiently as single-lane roundabout under the estimated
traffic volumes. The following locations should be considered for two-lane roundabouts:
.1
I
'I
I
,
,
I
I
I
~
1
I:
I;
I:
I
II
II
II
1
I:
IJ
...J
Edwarcb;
~Kelcey
Mr. Dobosiewicz
July 29, 2004
Page 4
131 st and Spring Mill
116th and Ditch
1 16th and Spring Mill
These same conclusions would be drawn from the traffic volume estimates prepared in the original study.
Overall, Table 2 shows that the original traffic study predicted generally the same levels and locations of
needed improvements, despite the differences in land use assumptions used for the Village of West Clay -
original vs. updated. There are four locations that should continue to be considered for traffic signal or
roundabout installation as buildout of the township progresses; one of those is currently operating below
acceptable levels of service. Four other intersections will be improved to acceptable LOS with planned
roundabout ,construction at those locations.
Please contact us if you have any questions or require additional information. At your request, we will be
happy to provide the Highway Capacity Software output for any or all of the intersection analyses. We
are also prepared to assist in discussions with the City or Plan Commission at your request.
Very truly yours,
EDW ARDS AND KELCEY
G-/1J~
Jennifer Pyrz, P.E.
Transportation Engineer
Cc: Keith Lash
Mike McBride
1:\040048034 West Clay II\Correspondence\07-27-04 Lash Letter (rev).doc
~
I
I
I
~
I
!
I
I
I
.~
I:
I
II
I.
I:
i
, !
II
II
I
II
I
11
Edwards
~Kelceg
Mr. Dobosiewicz
July 29, 2004
Page 5
Table 2. Existing vs. Future LOS
2004 Existing
2008 Future
LOS
2008 Future
LOS
Intersection Period Approach LOS (Updated Study) (Original Study)
NB A A A
5B A A A
Q) ~ EB C C B
c <(
~ WB D C B
0
.... INT
"C - - -
c NB A A A
ro
....... 5B A
tJ) A A
'T"'"
~ ~ EB C C C
'T"'" (l.
WB C C B
INT - - -
NB - - -
5B A A A
Q) ,~ EB
c <( - - -
~ WB C C B
0
I- INT
-c - - -
c: NB
co - - -
.r::. 5B A A A
....
c.o
C') ~ EB
'T"'" (l. - - -
WB C C C
INT - - -
NB A
S8 A
.c. ~ EB A
u <(
..- WB B
(5
"'C INT A Single lane Single lane
c:: roundabout under roundabout
co NB A
.c. capacity under capacity
..-
CD 5B A
("I) ~
or- EB A
0...
WB A
INT' A
,
I
I
I
I
i
~
~
~
Ii
I
II
It
J
I.
I~
I:
I"
I
I:
IJ
j
Edward!!;
~Kelcey
Mr. Dobosiewicz
July 29, 2004
Page 6
Table 2. Existing vs. Future LOS
2004 Existing
2008 Future
LOS
2008 Future
LOS
Intersection Period Approach LOS (Updated Study) (Original Study)
NB C B B
Q) S'B A D F
c: :E
L- EB .8 C B
::J <(
0
.c WB B C C
Q)
J:: INT 8 C E
en
-c NB A F F
c:
co 58 C B F
~ ~
U) EB B C C
~ a..
M
~ WB B D C
INT B F F
NB E F C
SB F F E
Q) ~ EB D F C
c: <(
~ WB F F 0
0
t- INT F F D
-c
c: NB F F F
co
....
(f) 5B E F E
~
('i') ~ EB C F D
0r- a..
WB E F F
INT F F F
NB - - -
SB D F E
.r::. ~ EB A A A
u <(
...... WB
C5 - - -
-c INT - - -
c:
ro NB - - -
......
UJ 5B C
-,:- F F
M ~
~ EB A B B
a..
WB - - -
INT - - -
I
I
I
I
,
,
I
I
I
I
~
I
I
I:
I:
Iii
II
IJ
I
; J
EdwarcIB
~Kelceg
Mr. Dobosiewicz
July 29, 2004
Page 7
Table 2. Existing vs. Future LOS
2004 Existing
2008 Future
LOS
2008 Future
LOS
Intersection Period Approach LOS (Updated Study) (Original Study)
NB C C C
L- S8 - - -
Q)
+-' ~
c EB - - -
Q) <(
() WB A A A
~
co 'NT - - -
(3
'"0 NB C E D
c:
co 5B - - -
...... ~
tn EB
.,.... a.. - - -
ct:) WB A A A
.,....
INT - - -
NB C
5B F
~ ~ EB F
C) <(
c WB 0
.t: Single lane Single lane
0- INT F
en roundabout over roundabout over
'"C NB F capacity
c capacity
co 5B
~ F
en ~
.,.... EB F
("i') (L
.,.... WB F
INT F
NB B C C
58 B C D
Q) :E EB C C C
c: <(
3: WB C C C
0
.... INT C C C
-c
c: NB C C 0
ro
..r:. 58 B C C
..-
C.D
.,.... ~ EB C 0 C
.,.... (L
WB C E B
INT C 0 C
I
I
I
I
I
I
I
I
I
I
I
I
II
II
1'1
I:
II!
I
II
I
. , J
Edwards
~Kelcey
Mr. Dobosiewicz
July 29, 2004
Page 8
Table 2. Existing vs'. Future LOS
2004 Existing
2008 Future
LOS
2008 Future
LOS
Intersection Period Approach LOS (Updated Study) (Original Study)
NB - - -
58 C F F
L- :2 EB
Q) A A A
> <!
0 WB
0 - - -
:r: INT
"C - - -
c NB
OJ - - -
.c 5B C F F
-+-'
CD :2
~ EB A B C
~ a.
WB - - -
INT - - -
NB
5B
.c ~ EB
(..) <!
:t::: WB Single lane
0 Single lane Single lane
-0 INT roundabout
c: roundabout at roundabout over
co NB under
.c:: capacity capacity
-+-' 5B capacity
CD
~ ~
~ EB
a.
WB
INT
NB D
58 F
~ ~ EB F
C') <(
c WB F
"L:
0- INT F Single lane Single lane
en roundabout over roundabout over
"'0 NB F
c capacity capacity
OJ '5B F
.c::
-+-' ~ EB F
(C
~ a.
~ WB F
INT F
I
I
I
I
I
I
I
I
I
I
I:
I!
11
11
11
I
Ii
Ii
, I
IJ
Village of WestClay
Traffic Impact Study Update
2004 Existing Traffic Volumes
Existing Intersection Configurations
Edwards and Kelcey
A-I
~
I
I
I
I
,
~
I
I
I
I'
II
I:
II
11
I
I:
I]
J
Two-Way Stop Control
Page 1 ot"2
nNO-WAYSTOPCONTROLSUMMARY
General Information Site Information
Intersection 141st Street and Towne
Analyst Derek Butler Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 6/4/2004 Analysis Year 2004
Analysis Time Period Existing AM Peak Project 10 040048034 Village of West
Clay Update
EastlWest Street: 141 st street North/South Street: Towne Road
Intersection Orientation: North-South Study Period (hrs )-: 0.25
l\Iehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L' T R
Volume 9 132 17 2 339 11
Peak-Hour Factor, PHF 0.45 0.69 0.47 0.50 0.72 0.69
Hourly Flow Rate, HFR 20 192 36 4 467 16
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized 0, 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal 0 0
Minor ,Street Westbound Eastbound
Movement 7 8 9 10 11 12
L T R L T R
Volume 42 48 4 1 17 2
Peak-Hour Factor, PHF 0.81 0.48 0.50 0.25 0.47 0.50
Hourly Flow Rate, HFR 52 100 8 4 36 4
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (010) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay, Queue Length, and Level of Service
Approach Ns S8 Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
v (vph) 20 4 160 44
C (m) (vph) 1090 1352 332 333
vlc 0.02 0.00 0.48 0.13
950/0 queue length 0.06 0.01 2.50 0.45
Control Delay 8.4 7.7 25.5 17.4
LOS A A D C
Approach Delay -- -- 25.5 17.4
V\pproach LOS -- -- D C
~1 _ . J/~.\ n_n"____QntC'O~ ') ()~T\r10k ')()~ptt1nQs\dhlltler\Local%20Settings\ Temp\u2k5C. tmp
6/4/2004 A-2
~
I
I
I
,
I
I
I
I
I
II
Ii
I:
I
Ii
II
I'i
I
I]
IJ
Two-Way Stop Control
Page 1 ot:l
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Intersection 141st Street and Towne
Analyst Derek Butler Road
~gency/Co. Edwards and Kelcey J u risd iction City of Carmel
Date Performed 6/4/2004 ~nalysis Year 2004
Analysis Time Period Existing PM Peak Project 10 040048034 Village of West
Clay
EastlWest Street: 141 st Street North/South Street: Towne Road
'ntersection Orientation: North-South Study Period (hrs): 0.25
tvehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
f\Jolume 5 378 32 9 202 2
Peak-Hour Factor, PHF 0.25 0.91 0.73 0.45 0.77 0.50
Hourly Flow Rate, HFR 20 415 43 20 264 4
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Config,uration LTR LTR
Upstream Signal 0 0
Minor Street Westbound Eastbound
Movement 7 8 9 10 11 12
L T R L T R
~olume 14 11 4 5 67 3
Peak-Hour Factor, PHF 0.50 0.69 0.50 0.63 0.76 0.38
Hourly Flow Rate, HFR 28 16 8 8 88 8
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (0/0) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay, Queue Length, and Level of Service
~pproach NB SB Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
v (vph) 20 20 52 104
C (m) (vph) 1307 1114 270 319
rv/c 0.02 0.02 0.19 0.33
95% queue length 0.05 0.05 0.70 1.38
Control Delay 7.8 8.3 21.5 21.6
LOS A A C C
!Approach Delay -- -- 21.5 21.6
lApproach LOS -- -- C C
_.. 11r1.\ T"t. _ ______ _~_~~O'_ "()n.....r10~ ")()~ptt1n(J~\nhlltler\Local%20Settings\ Temp\u2k60.tmp
6/4/2004
k
,
I
I
I
I
I
~
I
.~
I,
I,
I:
II
I'~
I
I;
I:
t
II
II
II
, I
I
, j
Two-Way Stop Control
rage, 1 01 ~
~O-WAYSTOPCONTROLSUMMARY
General Information Site Information
Analyst Derek Butler Intersection 136th Street and Towne
Road
~gency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 6/4/2004
Analysis Time Period Existing AM Peak ~nalysis Year 2004
Project Description 040048034 Village of West Clay
EastlWest Street: 1 ~~~1\Street North/South Street: Towne Road
Intersection Orientation: North-South Study Period (hrs): 0.25
~ehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
lVolume 0 131 38 16 402 0
Peak-Hour Factor, PHF 1.00 0.96 0.73 0.50 0.83 1.00
Hourly Flow Rate, HFR 0 135 52 .32 484 0
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT'
Upstream Signal 0 0
Minor Street Westbound Eastbound
Movement 7 8 9 10 11 12
L T R L T R
Volume 69 0 3 0 0 0
Peak-Hour Factor, PHF 0.69 1.00 0.38 1.00 1.00 1.QO
Hourly Flow Rate. HFR '100 0 8 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (Ok) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 0 0
Config u ration LTR
Delay, Queue Length, and Level of Service
~pproach NB 58 Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LTR
v (vph) 32 108
C (m) (vph) 1399 412
v/c 0.02 0.26
950/0 queue length 0.07 1.04
Control Delay 7.6 16.8
LOS A C
Approach Delay -- -- 16.8
A.pproach LOS -- -- C
Rights Reserved
.t:l_. J Jr"1.\ n^""n'\pntt!O~ ')()~nr10/n20~ettlnQs\dbutler\Local%20Settings\ Temp\u2kB 7 .tmp
6/7 /2004 A-~
II
II
I
I
I
I
I
I
I
I
I
I
I
I
I
II
Ii
II
IJ
TWO-WA Y STOP CONTROL SUMMARY
General Information Site Information '
lAnalyst Derek Butler Intersection 136th street and Towne
Road
~gency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 6/4/2004 ~nalysis Year 2004
Analysis Time Period Existing PM Peak
Project Description 040048034 Village of West Clay Update
EastIWest Street: 136th Street North/South Street: Towne ,Road
I ntersection Orientation: North-South Study Period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
rvolume 0 369 100 7 213 0
Peak-Hour Factor, PHF 1.00 0.92 0.86 0.58 ' 0.71 1.00
Hourly Flow Rate, HFR 0 399 116 12 300 0
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 0 0
Minor Street Westbound Eastbound
Movement 7 8 9 10 11 12
L T R L T R
~olume . 56 0 8 0 0 0
Peak-Hour Factor, PHF 0.64 1.00 0.67 1.00 1.00 1.00
Hourly Flow Rate, HFR 88 0 11 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (0/0) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 0 0
Configuration LTR
Delay, Queue Length, and Level of Service
~pproach NB 58 Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LTR
r.J (vph) 12 99
C (m) (vph) 1061 379
~/c 0.01 0.26
950/0 queue length 0.03 1.03
Control Delay 8.4 17.8
LOS A C
Approach Delay, -- -- 17.8
Approach LOS -- - C
Rights Reserved
file:IIC: \Documents%20and %20Settings\dbutler\Local %20Settings\ Temp \u2kBB. tmp
6/7/2004 A-Pj
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II
II
I
ALL-WA Y STOP CONTROL ANA,L YSIS
General Information Site Information
Analyst Derek Butler Intersection 136th Street and Ditch Road
Agency/Co. Edwards and Kelcey ",urisdidion City of Carmel
Date Performed 6/4/2004 nnalysis Year 2004
040048034 Village of West Clay -
Analvsis Time Period Existing AM Peak ProjectlD Update
EastIWest Street: 136th Street North/South Street: Ditch Road
Volume Adjustments and Site ,Characteristics
[Approach Eastbound Westbound
Movement L T R L T R
Volume 8 68 18 26 47 15
0,'0 Thrus Left Lane 50 50
Approach Northbound Southbound
Movement L T R L T R
Volume 4 26 8 53 206 15
Ok Thrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configuration LTR LTR LTR LT R
PHF 0.94 0.81 0.96 0.95 0.75
Flow Rate 99 108 39 271 20
% Heavy Vehicles 0 0 0 0 0
No. Lanes 1 1 1 2
Geometry Group 2 2 4a 5
Duration, T 0.25
Saturation Headway Adjustment Worksheet
Prop. Left-Turns 0.1 0.3 0.1 0.2 0.0
Prop. Right-Turns 0.2 0.2 0.2 0.0 1.0
Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 0.0
hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT-adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 4.79 4.79 4.79 4.79 4.79
Departure Headway and Service Time
hd, initial value 3.20 3.20 3.20 3.20 3.20
lx, initial 0.09 0.10 0.03 0.24 0.02
hd, final value 4.79 4.79 4.79 4.79 4.79
x, final value 0.13 0.14 0.05 0.38 0.02
Move-up time, m 2.0 2.0 2.0 2.3
Service Time 2.8 2.8 2.B 2.8
Capacity and Level of Service
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 349 358 289 521 270
Delay B.51 8.65 B.07 10.95 7.27
LOS A A A B A
~pproach: Delay 8.51 8.65 8.07 10. 70
LOS A A A B
Intersection Delay 9.69
Intersection LOS A
file:/ /C: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \u2k83. tmp
6/4/2004 A-lt
I
I
I
I
I
I
I
I
I
I
II
II
11
11
II
I
Ii
II
IJ
A~L-WA Y STOP CONTROL ANAL YSIS
General Information Site Information
~nalyst Derek Butler Intersection 136th street and Ditch Road
lAgency/Co. Edwards and Kelcey urisdiction City of Carmel
nalysis Year 2004
Date Performed 6/4/2004
!Analysis Time Period Existing PM Peak Project I D 040048034 Village of West Clay
Update
EastlWest Street: 136th Street North/South Street: Ditch Road
tvolume Adjustments and Site Characteristics
IApproach Eastbound Westbound
Movement L T R L T R
Volume 5 98 8 19 110 34
Ok Thrus Left Lane 50 50
[Approach Northbound Southbound
Movement L T R L T R
!Volume 25 142 20 23 73 4
OkThrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configuration LTR LTR LTR LT R
PHF 0.68 0.93 0.95 0.70 0.63
Flow Rate 162 174 196 136 6
Ok Heavy Vehicles 0 0 0 0 0
No. Lanes 1 1 1 2
Geometry Group 2 2 4a 5
Durati~n, T 0.25
Saturation Headway Adjustment Worksheet
Prop. Left-Turns 0.0 0.1 0.1 0.2 0.0
Prop. Right-Turns 0.1 0.2 0.1 0.0 1.0
Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 0.0
hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT-adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1'.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 5.03 5.03 5.03 5.03 5.03
Departure Headway and Service Time
hd, initial value 3.,20 3.20 3.20 3.2'0 3.20
lx, initial 0.14 0.15 0.17 0.12 0.01
hd. final value 5.03 5.03 5.03 5.03 5.03
lX. final value 0.23 0.24 0.28 0.21 0.01
Move-up time, m 2.0 2.0 2.0 2.3
Service Time 3.0 3.0 3.0 3.0
Capacity and Level of Service
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 412 424 446 386 256
Delay 9.50 9.50 10.00- 9.90 7.75
LOS A A A A A
~pproach: Delay 9.50 9.50 10.00- 9.81
LOS A A A A
Intersection Delay 9.71
Intersection LOS A I
file:IIC: \D 0 cuments%2 0 and%2 0 S etting s\dbutl er\L 0 cal %2 OSettings\ Temp \u2k87 · tmp
6/4/2004
A';
"
I
I
'I
I
I
I
I
I
I
I
I
11
II
II
Ii
I
II
1,1
ALL-WA Y STOP CONTROL ANAL YSIS
General Information Site Information
lAnalyst Derek Butler Intersection 131st Street and She/bourne
!Agency/Co. Edwards and Ke/cey ~urisdiction City of Carmel
~nalysis Year 2004
Date Performed 6/3/2004
!Analysis Time. Period Existing PM Peak Project ID 040048034 Village of West Clay
Update
EastlWest Street: 131 st Street North/South Street: She/bourne Road
lVolume Adjustments and Site Characteristics
IApproach Eastbound Westbound
Movement L T R L T R
Volume 17 75 14 36 129 - 16
OJ'o Thrus Left Lane 50 50
lApproach Northbound Southbound
Movement L T R L T R
lVolume 19 350 90 6 43 10
OJ'o Thrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
~onfiguration LTR LTR LTR LTR
PHF 0.95 0.84 0.89 0.82
Flow Rate 109 214 515 71
% Heavy Vehicles 0 0 0' 0
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
Saturati()n Headway Adjustment Worksheet
Prop. Left-Turns 0.2 0.2 0.0 0.1
Prop. Right-Turns 0.1 0.1 0.2 0.2
Prop. Heavy Vehicle 0.0 0.0 0.0 0.0
hL T-adj 0.2 0.2 0.2 ' 0.2 0.2 0.2 0.2 0.2
hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 5.78 5.78 5.78 5.78
Departure Headway and Service Time
hd, initial value 3.20 3.20 3.20 3.20
tx, initial 0.10 0.19 0.46 0.06
hd, final value 5.78 5.78 5.78 5.78
x, final value 0.18 0.33 0.69 0.11
Move-up time, m 2.0 2.Q 2.0 2.0
Service Time 3.8 3.8 . 3.8 3.8
Capacity and Level of Service
Eastbound Westbound Northbound Southbound
L1 L2 L1 'L2 L1 L2 L1 L2
Capacity 359 464 724 321
Delay 10.01 11.40 1 B. 15 9.21
LOS -8 8 C A
Approach: Delay 10.01 11.40 1 B. 15 9.21
LOS 8 B C A
Intersection Delay 14.89
Intersection LOS B
file ://C: \Documents%20and%20Settings\dbutler\Local %2 OSettings\ Temp \u2k63. tmp
6/3/2004
A-~
I
I
I
I
I
I
I
I
I
II
I
II
I
1
1
I
I
Ii
11
ALL-WA Y STOP CONTROL ANALYSIS
General Information Site Information
Analyst Derek Butler Intersection 131 st Street and Shelbourne
Agency/Co. Edwards and Kelcey urisdiction City of Carmel
nnalysis Year 2004
pate Performed 6/3/2004
IAnalysis Time Period Existing AM Peak Project I D 040048034 Village of West Clay
Update
EastIWest Street: 131,st Street North/South Street: She/bourne Road
Volume Adjustments and Site Characteristics
Approach Eastbound Westbound
Movement L T R L T R
Volume 17 108 11 70 70 5
Ok Thrus Left Lane 50 50
Approach Northbound Southbound
Movement L T R L T R
Volume 6 35' 40 37 288 12
OJ'o Thrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configuration LTR LTR LTR LTR
PHF 0.76 0.81 0.81 0.81
Flow Rate 178 178 99 414
OJ'o Heavy Vehicles 0 0 0 0
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
Saturation Headway Adjustment Worksheet
Prop. Left-Turns 0.1 0.5 0.1 0.1
Prop. Right-Turns 0.1 0.0 0.5 (J.O
Prop. Heavy Vehicle 0.0 0.0 0.0 0.0
hL T -adj .0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 '-0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 5.59 5.59 5.59 5.59
Departure H'eadway and Service Time
hd, initial value 3.20 3.20 3.20 3.20
x, initial 0.16 0.16 0.09 0.37
hd, final value 5.59 5.59 5.59 5.59
x, finai value 0.28 0.28 0.15 0.59
Move-up time, m 2.0 2.0 2.0 2.0
Service Time 3.6 3.6 3.6 3.6
Capacity and Level of Service
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 428 428 349 664
Delay 10.71 10.89 9.22 15.06
LOS B B A C
Approach: Delay 10. 71 10.89 9.22 15.06
LOS B B' A C
Intersection Delay 12.65
Intersection LOS B
file ://C: \Documents%20and%20Settings\dbutler\Local %20Settings\ T erop \u2k5F · tmp
6/3/2004
A-C
I
I
I
I
I
I
I
I
I
I
I
II
II
11
I
I
I
I
IJ
ALL-WA Y STOP CONTROL ANAL YSIS
General Information Site Information
~na'yst Derek Butler Intersection 131st Street and Towne Road
lJurisdiction City of Carmel
~Qency/Co. Edwards and Kelcey
If"\nalysis Year 2004
Date Performed 6/3/2004
~na'vsis Time Period Existing AM Peak Project 10 040048034 Village of West Clay
Update
EastIWest Street: 131 sf Street North/South Street: Towne Road
Volume Adjustments and Site Characteristics
APProach Eastbound Westbound
Movement L T R L T R
N'olume 13 189 26 200 117 12
Ok Thrus Left Lane 50 50
APproach Northbound Southbound
Movement L T R L T R
~olume 18 185 82 42 420 28
0/0 Thrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configuration LTR LTR LTR, LTR
PHF 0.85 0.73 0.82 0.86
Flow Rate 267 449 346 568
% Heavy Vehicles 0 0 0 0
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
Saturation Headway Adjustment Worksheet
Prop. Left-Turns 0.1 0.6 0.1 0.1
Prop. Right-Turns 0.1 0.0 0.3 0.1
Prop. Heavy Vehicle 0.0 0.0 0.0 0.0
hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 9.34 9.34 9.34 9.34
Departure Headway and Service Time
hd, initial value 3.20 3.20 3.20 3.20
lx, initial 0.24 0.40 0.31 0.50
hd, final value 9.34 9.34 9.34 9.34
x, final value 0.6,9 1.09 0.85 1.36
Move-up time I m 2.0 2.0 2.0 2.0
Service Time 7.3 7.3 7.3 7.3
Capacity and Level of Service
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 l1 L2 L1 L2
Capacity 377 449 405 568
Delay 30.93 100.84 44.89 201. 72
LOS 0 F E F
Approach: Delay 30.93 100.84 44.89 201.72
LOS 0 F E F
Intersection Delay 112.67
Intersection LOS F
file ://C: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \u2k57 · tmp
6/3/2004
A-\
I
I
I
I
I
I
I
I
I
I
I
I
..11
, I
11
II
I
I
I
I:
II
I]
r'\..11- vv a y t..J LV P '-'U U. \.1. U J.
ALL-WA Y STOP CONTROL ANAL YSIS
General Information Site Information
~nalyst Derek Butler Intersection 131st Street and Towne Road
Jurisdiction City of Carmel
[Agency/Co. Edwards and Kelcey
Date Performed 6/3/2004 f"\nalysis Year 2004
~nalysis Time Period Existing PM Peak Project I D 040048034 Village of West Clay
Update
EastNVest Street: 131 sf Street North/South Street: Towne Road
Volume Adjustments and Site Characteristics
Approach Eastbound Westbound
Movement L T R L T R
Volume 56 111 23 110 152 29
0.4. Thrus Left Lane 50 50
APp~roach Northbound Southbound
Movement L T R L T R
iVolume 118 407 72 15 235 28
OJ'o Thrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Config uration LTR LTR LTR LTR
PHF 0.9,3 0.76 0.88 0.73
Flow Rate 203 382 677 379
% Heavy Vehicles 0 0 0 0
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
Saturation Headway Adjustment Worksheet
Prop. Left-Turns 0.3 0.4 0.2 0.1
Prop. Right-Turns 0.1 0.1 0.1 0.1
Prop. Heavy Vehicle 0.0 0.0 0.0 0.0
hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 9.09 9.09 9.09 9.09
Departure Headway and Service Time,
hd, initial value 3.20 3.20 3.20 3.20
lX,initial 0.18 0.34 0.60 0.34
hd I final value 9.09 9.09 9.09 9.09
x, final value 0.51 0.87 1.48 0.86
Move-up time"m 2.0 2.0 2.0 2.D
Service Time 7.1 7.1 7.1 7.1
Capacity and Level of Service
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 368 431 677 435
Delay 21.28 46.27 248.87 43.29
LOS, C E F E
Approach: Delay 21.28 46.27 248.87 43.29 '
LOS C E F E
Intersection Delay 126.07
Intersection LOS F
file:IIC: \Documents%20and %20Settings\dbutler\Local %20Settings\ Temp \u2k5B. tmp
6/3/2004
A-\
I
I
I
I
I
I
I
I
I
I
I
I
- I
.1; ,
; I
11
II
I
I
I
II
1 WU- VV ~y 0LUP '-'V~U.IUl
nNO-WAYSTOPCONTROLSUMMARY
General Information Site Information
Intersection 131 st Street and Ditch
Analyst Derek Butler Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 6/3/2004 Analysis Year 2004
Analysis Time Period Existing AM Peak Project 10 040048034 Village of West
Clay Update
EastlWest Street: 131 st Street North/South Street: Ditch Road
Intersection Orientation: East-West Study Period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume 22 312 0 0 196 19
Peak-Hour Factor, PHF 0.61 0.88 1.00 1.00 0.91 0.68
Hourly Flow Rate, HFR 36 355 0 0 216 28
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume 0 0 0 170 0 155
Peak~Hour Factor, PHF 1.00 1.00 1.00 0.73 1.00 O~73
Hourly Flow Rate, HFR 0 0 0 231 0 211
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (0/0) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LTR
v (vph) 36 442
C (m) (vph) 1334 547
~/c 0.03 0.81
950/0 queue length 0.08 7.89
Control Delay 7.8 33.6
LOS A 0
Approach Delay -- -- 33.6
Approach LOS -- -- 0
file:IIC: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \u2k4 F. tmp
6/3/2004 A-\:
1
I
I
I
I
I
I
I
I
I
I
I
.11
II
II
I
II
II
IJ
1 WQ- way i:)LUP \...;Ul1lfUl
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Intersection 131st Street and Ditch
Analyst Derek Butler Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 6/3/2004 Analvsis Year 2004
~nalysis Time Period Existing PM Peak Project 10 040048034 Village of West
Clay Update
EastlWest Street: 131st Street North/South Street: Ditch Road
I'ntersection Orientation: East-West Study Period (hrs): 0.25
ehic'le Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
l\Iolume 59 219 0 0 276 121
Peak-Hour Factor, PHF 0.70 0.73 1.00 1.00 0.78 0.89
Hourly F'Iow Rate, HFR 83 299 0 0 351 135
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
i\lolume 0 0 0 50 0 54
Peak-Hour Factor, PHF 1.00 1.00 1.00 0.78 1.00 0.84
Hourly Flow Rate, HFR 0 0 0 64 0 64
Percent Heavy Vehicles 0 0 0 0 0 ,0
Percent Grade (0/0) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LTR
v (vph) 83 128
C (m) (vph) 1087 404
~/c 0.08 0.32
950/0 queue length 0.25 1.34
Control Delay 8.6 18.0
LOS A C
Approach Delay -- -- 18.0
Approach LOS -- -- C
file:IIC: \D ocuments%2 0 and %20Settings\dbutler\Local %20 Settings \ Temp \u2kS 3. tmp
6/3/2004 {.\-\:
J. vvv- Vy a] u\.vp ,-,vJ..,Lu,V.L
I
I
I
I
I
I
I
I
I
'I
Ii
II
'I- 'I
. I
11
II
I
Ii
Ii
11
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst Derek Butler Intersection 131st Street and Clay
Center
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 6/3/2004 Analysis Year 2004
l(.\nalysis Time Period Existing AM Peak Project I D 040048034 Village of West
Clay Update
EasUWest Street: 131 st Street North/South Street: Clay Center Road
Intersection Orientation: East-West Study Period (hrs): 0.25
Wehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume 0 374 69 79 185 0
Peak-Hour Factor, PHF 1.00 0.79 0.75 0.60 0.87 1.00
Hourly Flow Rate, HFR 0 476 92 131 212 0
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type ' Undivided
RT Channelized 0 0
Lanes 0 1 0 0 l' 0
Configuration TR LT
Upstream Signal 0 0
Nlh10r Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume 20 0 69 0 0 0
Peak-Hour Factor, PHF 0.56 1.00 0.86 1.00 1.00 1.00
Hourly Flow Rate, HFR 35 0 79 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (0/0) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 0 0
Config u ration LTR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Con~guration LT LTR
v (vph) 131 114
C (m) (vph) 1014 395
vlc 0.13 0.29
95% queue length 0.44 1.18
Control Delay 9.1 17.8
LOS A C
~pproach Delay -- -- 17.8
~pproach LOS -- -- C
file:IIC: \Documents%2 o and %20Settings\dbutler\Local %2 OSettings\ T emp\u2k 1 F · tmp
6/3/2004 A-\)
1 WU- VV i1Y .:)LU.IJ vUI1LIUl
I
I
I
I
I
I
I
I
I
I
I
I
I
11
1\
I
II
IJ
II
,TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Intersection 131st Street and Clay
Analyst Derek Butler Center
~gency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 6/3/2004 ~nalysis Year 2004
~nalysis Time Period Existing PM Peak Project 10 040048034 Village of West
Clay Update
EastlWest Street: . 131st Street North/South Street: Clay Center
Intersection Orientation: East-West Study Period (hrs): 0.29
!Vehicle Volumes and Adjustments
Major Street' Eastbound ' Westbound
Movement 1 2 3 4 5 6
L T R L T R
lVolume 0 237 18 33 364 0
Peak-Hour Factor, PHF 1.00 0.93 0.50 0.75 0.85 1.00
Hourly Flow Rate, HFR 0 256 36 44 428 0
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 0 0
Minor-Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume 59 0 107 0 0 0
Peak-Hour Factor,PHF 0.82 1.00 0.86 1.00 1.00 1.00
Hourly Flow Rate. HFR 72 0 123 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (0/0) 0 0
Flared Approach N 'N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 0 0
Configuration LTR
Delay, Queue Length, and Level of Service
~pproach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LTR
~ (vph) 44 195
C (m) (vph) 1281 534
~/c 0.03 0'.37
950/0 queue length 0.11 1.66
Control Delay 7.9 15.6
LOS A C
Approach Delay -- -- 15.6
IApproach LOS -- -- C
file:/ /C: \Documents%2 Oand%20Settings\dbutler\Local %20Settings\ T emp\u2k26. trnp
6/3/2004
A-\~
'I
'I
I
I
I
I
I
I
I
I
I
II
II
II
1\
I
I,
II
IJ
~ll- VV ay ....,..Vp vUU.UVJ.
ALL-WA Y STOP CONTROL ANAL YSIS
General Information Site Information
Analyst Derek Butler Intersection 131 st Street and Soring Mill
~gency/Co. Edwards and Kelcey \Jurisdiction City of Carmel
Mnalysis Year 2004
Date Performed 6/4/2004
[Analvsis Time Period Existing AM Peak Project I D 040048034 Village of West Clay
Update
EastlWest Street: 131 st Street North/South Street: Spring Mill Road
Volume Adiustments ,and Site Characteristics
APProach Eastbound Westbound
Movement L T R L. T R
rvolume 53 383 49 34 181 77
OJ'o Thrus Left Lane 50 50
APproach Northbound Southbound
Movement L T R L T R
tvolume 22 123 12 199 260 29
% Thrus Left Lane' 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configurat~on LTR LTR LTR LTR
PHF 0.93 0.88 0.91 0.96
Flow Rate 519, - 330 172 507
OJ'o Heavy Vehicles 0 0 0 0
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
Saturation, Headway Adjustment Worksheet
Prop. Left-Turns 0.1 0.1 0.1 0.4
Prop. Right-Turns 0.1 0.3 0.1 0.1
Prop. Heavy Vehicle 0.0 0.0 0.0 0.0
hL T-adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7. 1.7
hadj, computed 7.77 7.77 7.77 7.77
Departure Headway and Service Time
hd, initial value 3.20 3.20 3.20 3.20
~, initial 0.46 0.29 0.15 0.45
hd, final value 7.77 7.77 7.77 7.77
~, final value 1.12 0.75 0.44 1.11
Move-up time, m 2.0 2.0 2.0 2.0
Service Time 5.B 5.B 5.8 5.8
Capacity and Level of Service
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 519 437 380 507
Delay 106. 16 31.59 18.96 102.02
LOS F 0 C F
~pproach: Delay 106.16 31.59 18.96 102.02
LOS F 0 C F
Intersection Delay 78.87
Intersection LOS F
file:IIC: \Documents%20and%20Settings\dbutler\Local %2 OSettings\ Temp \u2k64. tmp
, 6/4/2004 p...-\l
I
I
I
.1
I
I
I
I
I
I
I
I
II
II
II
1\
I
Ii
IJ
L ~J..J.. - Y y U,] u",v y '-'v......~ 'VA.
ALL-WA Y STOP CONTROL ANAL YSIS
General Information Site Information
Analyst Derek Butler Intersection 131 st Street and Spring Mill
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
f'\nalysis Year 2004
Date Performed 6/4/2004
Analvsis Time Period Existing PM Peak Project I D 040048034 Village of West Clay
Update '
EastlWest Street: 131 sf Street North/South Street: Spring Mill Road
Volume Adjustments and Site Characteristics
Approach Eastbound Westbound
Movement L T R L T R
Wolume 89 244 15 12 260 180
% Thrus Left Lane 50 50
Approach Northbound Southbound
Movement L T R L T R
Volume 83 321 23 115 161 39
Ok Thrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Config uration LTR LTR LTR LTR
PHF 0.85 0.92 0.94 0.94
Flow Rate 408 490 453 334
% Heavy Vehicles 0 0 0 0
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
Saturation Headway Adjustment Worksheet
Prop. Left-Turns 0.3 0.0 0.2 0.4
Prop. Right-Turns 0.0 0.4 0.1 0.1
Prop. Heavy Vehicle 0.0 0.0 0.0 0.0
hL T -adj 0.2 0.2 0.2 ' 0.2 0.2 0.2 0.2 0.2
hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 9.60 9.60 9.60 9.60
Departure Headway and Service Time
hd, initial value 3.20 3.20 3.20 3.20
x, initial 0.36 0.44 0.40 0.30
hd, final value 9.60 9.60 9.60 9.60
x, final value 1.09 1.27 1.21 0.91
Move-up time, m 2.0 2.0 2.0 2.0 '
Service Time 7.6 7.6 7.6 7.6
Capacity and Level of Service
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 408 490 453 367
Delay 103. 76 167.87 144.46 59.20
LOS F F F F
Approach: Delay 103. 76 167.87 144.46 59.20
LOS F F F 'F
Intersection Delay 124.51
Intersection LOS F
file:IIC: \D ocuments%2 o and %20Settings\dbutler\Local %20Settings\ Temp \u2k68. tmp
6/4/2004 A-r
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II
11
I
I
IJ
HCS2000TM DET AILED REPORT
Genera/Information Site Information
Intersection 116th Street and Towne
Analyst Derek Butler Road
Agency or Co. Edwards and Kelcey Area Type All other areas
Date Performed 6a /2004 Jurisdiction City of Carmel
Time Period Existing AM Peak Analysis Year 2004
Project 10 040048034 Village of West
Clay Update
Volume and Timing Input
EB WB NB sa
LT TH RT LT TH RT LT TH RT LT TH RT
Number of lanes, N1 1 2 1 1 2 1 1 1 1 1 1 1
Lane group L T R L T R L T R L T R
Volume, V (vph) 72 276 54 67 235 38 44 165 21 53 403 226
0/0 Heavy vehicles, %HV 0 0 0 0 0 0 0 0 0 0 0 0
Peak-hour factor, PHF 0.85 0.91 0.47 0.76 0.79 0.63 0.73 0.78 0.75 0.80 0.88 ' 0.76
Pretimed (P) or actuated A A A A A A A A A A A A
KA)
Start-up lost time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Extension of effective
green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Arrival type, AT 3 3 3 3 3 3 3 3 3 3 3 3
Unit extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Filtering/metering, I 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1. 000 1.000 1. 000
Initial unmet demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ped / Bike I RTOR
volumes 0 14 0 9 0 5 0 57
Lane width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12~O 12.0 12.0 12.0 12.0
Parking I Grade I Parking N 0 N N 0 N N 0 N N 0 N
Parking maneuvers, Nm
Buses stopping, Ns 0 0 0 0 0 0 0 0 0 0 0 0
Min. time for pedestrians, 3.2 3.2 3.2 3.2
Gp
Phasing Excl. Left EW Perm 03 04 Excl. Left NS Perm 07 08
G = 7. 1 G = 10.4 G= G= G = 7.0 G = 24.5 G= G=
Timing y= 3 y= 8 y= y= y= 3 Y= B y= y=
Duration of Analysis, T = 0.25 Cycle Length, C = 71.0
Lane Group 'Capacity, Control Delay, and LOS Determination
EB WB NB S8
LT TH RT LT TH RT LT TH RT LT TH RT
Adjusted flow rate, v 85 303 85 88 297 46 60 212 21 66 458 222
Lane group capacity, 288 529 578 288 529 578 333 656 901 504 656 901
c
file:/I C: \Documents%20and %20Settings\dbutler\Local %20Settings\ Temp \s2k98. tmp
6/7/2004 p..-\
II
\,1
:1
I
I
I
II
II
I
I
I
,
vlc ratio, X 0.30 0.57 0.15 0.31 0.56 0.08 0.18 0.32 0.02 0.13 0.70 0.25
Total green ratio, g/C I
0.29 0.15 0.36 0.29 0.15 0.36 0.49 0.35 0.56 0.49 0.35 0.56
Uniform delay, d1 19.3 28.2 15.5 19.4 28.2 15.1 11.6 17.1 7.0 10.2 20.1 8.0
Progression factor, 1.000 1.000 1. 000 1.000 1.000 1.000 1. 000 1.000 1. 000 1. 000 1. 000 1. 000
PF
Delay calibration, k 0.11 0.17 0.11 0.11 0.16 0.11 0.11 0.11 0.11 0.11 0.26 0.11
Incremental delay, 0.6 1.5 0.1 0.6 1.4 0.1 0.3 0.3 0.0 0.1 3.3 0.1
d2
Initial queue delay,
d3
Control delay 19.9 29.7 15.6 20.0 29.5 15.1 11.9 17.4 7.0 10.3 23.3 8.2
Lane group LOS B C B B C B B B A B C A
Approach delay 25.4 26.1 15.5 17.7
Approach LOS C C B B
I ntersection delay 21.1 X = 0.75 Intersection LOS C
c
HCS2000™
Copyright (g 2000 University of Florida, All Rights Reserved
Version 4.1d
"
I
I
I
I
I
file:/IC: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \s2k98. tmp
6/7 /2004 ~_\4
I
I
I
I
HCS2000Tf~ DETAILED REPORT
General Information Site Information
Intersection 116th Street and Towne
Analyst Derek Butler Road
Agency or Co. Edwards and Kelcey Area Type All other areas
Date Performed 6fl/2004 Jurisdiction City of Carmel
Time Peri,od Existing PM Peak Analysis Year 2004
Project I D 040048034 Village of West
Clay Update
Volume and Timing Input
EB WB NB SB
LT TH RT LT TH RT LT TH RT LT TH RT '
Number of lanes, N1 1 2 1 1 2 1 1 1 1 1 1 1
Lane group L T R L T R L T R L T R
Volume, V (vph) 119 255 31 100 346 88 63 326 59 93 212 72
0/0 Heavy vehicles, %HV 0 0 0 0 0 0 0 0 0 0 0 0
Peak-hour factor, PHF 0.76 0.87 0.60 0.73 0.83 0.71 0.68 0.87 0.87 0.83 0.88 0.82
Pretimed (P) or actuated A A A A A A A A A A A A
(A)
Start-up lost time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Extension of effective
green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Arrival type, AT 3 3 3 3 3 3 3 3 3 3 3 3
Unit extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Filtering/metering, I 1.000 1.000 1.000 1.000 1.000 1.000 1. 000 1.000 1.000 1.000 1. 000 1.000
Initial, unmet,demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ped I Bike I RTOR
~olumes 0 8 0 22 0 15 0 18
Lane width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 . 12.0 12.0 12.0 12.0
Parking /Grade I Parking N 0 N N 0 N N 0 N N 0 N
Parking maneuvers, Nm
Buses stopping, NB 0 0 0 0 0 0 0 0 0 0 0 0
Min. time for pedestrians, 3.2 3.2 3.2 3.2
Gp
Phasing Excl. Left EW Perm 03 04 Excl. Left NS Perm 07 08
G = 7. 1 G = 17.8 G= G= G = 7.0 G = 20. 1 G= G=
Timing y= 3 y= 8 y= y= y= 3 y= 8 y= y=
Duration of Analysis, T = 0.25 Cycle Length, C = 74.0 '
Lane Group Capacity, Control Delay, and LOS Dete~mination
EB ' WB NB 58
LT TH RT LT TH RT LT TH RT LT TH RT
Adjusted flow rate, v 157 293 38 137 417 93 93 375 51 112 241 66
Lane group capacity, 340 868 716 361 868 716 402 516 768 294 516 768
c
.~
I
~.
~
~
II
I'
Ii
Ii
II
I]
file:IIC: \Documents%20and%20Settings\dbutler\Local %2 0 Settings\ Temp \s2k9 8. tmp
6/7 /2004 ~ ~
1,1
i;1
:1
I
I
~
I
I
,
vIe ratio, X 0.46 0.34 0.05 0.38 0.48 0.13 0.23 0.73 0.07 0.38 0.47 0.09
Total green ratio, g/C 0.38 0.24 0.44 0.38 0.24 0.44 0.41 0.27 0.48 0.41 0.27 0.48
Uniform delay, d1 16.2 23.2 11.7 16.0 24.1 12.2 14.2 24.5 10.5 15.4 22.5 10.6
Progression factor, 1.000 1.000 1. 000 1.000 1.000 1.000 1. 000 1. 000 1.000 1.000 1. 000 1. 000
PF
Delay calibration, k 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.29 0.11 0.11 0.11 0.11
I ncremental delay, 1.0 0.2 0.0 0.7 0.4 0.1 0.3 5.1 0.0 0.8 0.7 0.0
d2
Initial queue delay,
d3
Control delay 17.2 23.5 11.8 16.7 24.6 12.3 14.5 29.6 10.5 16.2 23.2 10.7
Lane group LOS B C B B C B B C B B C B
Approach delay 20.5 21.1 25.0 19.3
Approach LOS C C C B
Intersection delay 21.6 Xc = 0.81 Intersection LOS C
HCS2000™
Copyright cg 2000 University of Florida, All Rights Reserved
Version 4.1d
I
!
I
I
I
I
file:IIC: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \s2k98. tmp
6/7/2004 A-2'
II
\1
I
TWQ-WA Y STOP CON,TROL SUMMARY
General Information Site Information
1 ntersection 116th street and Hoover
Analyst Derek Butler Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 6/1/2004 Analysis Year 2004
Analysis Time Period Existing AM Peak Project ID 040048034 Village of West
Clay Update
EastlWest Street: 116th Street North/South Street: Hoover Road
Intersection Orientation: East-West Study Period (hrs): 0.25
Wehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume 11 387 0 0 309 29
Peak-Hour Factor, PHF 0.69 0.87 1.00 1.00 0.88 0.81
Hourly Flow Rate, HFR 16 444 0 0 351 35
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume 0 0 0 58 0 40
Peak-Hour Factor, PHF 1.00 1.00 1.00 0.66 1.00 0.77
Hourly Flow Rate, HFR 0 0 0 87 0 51
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (0/0) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 1 0
Configu ration LTR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LTR
v (vph) 16 138
C (m) (vph) 1184. 409
vlc 0.01 0.34
950k qu~ue length 0.04 1.46
Control Delay 8.1 18.2
LOS A C
Approach Delay -- -- 18.2
lApproach 'LOS -- -- C
,
I
I
. I
I
I
I
I
I
I
I
Ii
II
file:IIC: \D 0 cuments%2 0 and%20 S ettings \dbutler\Local %20Settings\ Temp \u2k3 7 · tmp
6/1/2004, A-L
II
I
I
I
.~
I
I
I
I
I
I
I
I
I
I
I
I
I:
II
IJ
nNO_WAYSTOPCONTROLSUMMARY
General Information Site Information
Intersection 116th Str~et and Hover
~nalyst Derek Butler Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 6/1/2004 Analysis Year 2004
Analysis Time Period Existing PM Peak Project ID 040048034 Village of West
Clay Update
EastlWest Street: 116th Street North/South Street: Hoover Road
I ntersection Orientation: East-West Study Period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume 30 354 0 39 520 . 39
Peak-Hour Factor, PHF 0.68 0.91 1.00 1.00 0.82 0.81
Hourly Flow Rate, HFR 44 389 0 0 634 48
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume 0 0 0 18 0 27
Peak-Hour Factor, PHF 1.00 1.00 1.00 0.64 1.00 0.75
Hourly Flow Rate, HFR 0 0 0 28 0 36
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (0/0) 0 0
Flared Approach N' N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LTR
v (vph) 44 64
C (m) (vph) 920 309
vie 0.05 0.21
95% queue length 0.15 0.76
Control Delay 9.1 19.7
LOS A C
lApproach Delay . -- -- 19.7
~pproach LOS -- -- C
file:IIC: \Documents%20and%20Settings\dbutler\Local %20 Settings \ Temp \u2k3 D. tmp
6/1/2004 A--r.
I~
I
I
I
I
,
I
i
I
\
I
I
I
I
I
I
I
I
1
I
I'
II
I
ROUNDABOUTS - UNSIGNALlZED INTERSECTIONS WORKSHEET I
General Information Site Information
Analyst Derek Butler Intersection 116th Street and Ditch Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/6/2004 ~nalysis Year 2004
Time Period Existing AM Peak
Project Description 040048034 Village of West Clay
Update
Volume Adjustments
EB WB NB 88
Volume, veh/h, 0 219 41 0
L T Traffic PHF 0.95 0.79 0.68 0.95
Flow rate, veh/h 0 277 60 0
Volume, veh/h 325 272 0 0
TH Traffic PHF 0.90 0.93 0.95 0.95
Flow rate, veh/h 361 292 0 0
Volume, veh/h 82 0 137 0
RT Traffic PHF 0.68 0.95 0.86 0.95
Flow rate, veh/h 120 0 159 0
Approach Flow Computation
Approach Flow (veh/h) Va (veh/h)
Vae 481
Vaw 569
Van 219
Vas 0
Circulating Flow Computation
Approach Flow (veh/h) Ve (veh/h)
Vee 277
Vew 60
Ven 361
Ves 629
Capacity Computation
EB WB NB S8
Upper bound 1114 1321 1042 841
Capacity Lower bound 916 1103 851 673
Upper bound 0.43 0.43 0.21 0.00
vie Ratio
Lower bound 0.53 0.52 0.26 0.00
HCS2000™
Copyright @ 2003 University of Florida, AU Rights Reserved
Version 4.1d
file:IIC: \D o cuments %2 Oand%2 0 Settings\dbutler\Loca1%20Settings\ T emp\u2k 151. tmp
7/6/2004 A-2
l-
II
I
I
I
I
-
L
I
\
~
~
I
I
I
ROUNDABOUTS - UNSIGNALlZED INTERSECTIONS WORKSHEET
General Information ' Site Information
Analyst Derek Butler Intersection 116th Street and Ditch Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/6/2004 ~nalysis Year 2004
Time Period Existing PM Peak
Project Description 040048034 Village of West Clay
Update
Volume Adjustments
EB WB NB SB
Volume, veh/h 0 128 76 0
L T Traffic PHF 0.95 0.B6 0.86 0.95
Flow rate, veh/h 0 148 BB 0
Volume, veh/h 275 435 0 0
TH Traffic PHF 0.93 0.91 0.95 0.95
Flow rate, veh/h 295 478 0 0
Volume, veh/h 51 0 197 0
RT Traffic PHF 0.85 0.95 0.83 0.95
Flow rate, veh/h 59 0 237 0
pproach Flow Computation
Approach, Flow (veh/h) Va (veh/h)
Vae 354
Vaw 626
Van 325
Vas 0
Circulating Flow Computation
Approach Flow (veh/h) Vc (veh/h)
Vee 148
Vew 88
Ven 295
Ves 714
Capacity Computation
EB WB NB sa
Upper bound 1233 1292 1098 785
Capacity Lower bound 1023 1077 902 624
Upper bound 0.29 0.48 0.30 0.00
vIe Ratio 0.35
Lower bound 0.58 0.36 0.00
!
I
i
I
I
HCS2000™
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
.
file ://C: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \u2k 151. tmp
7 /6/2004 A-2~
All-way ~{UP ~UIllrUl
11
\1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ALL-WAY STOP CONTROL ANAL YSIS I
General Information Site Information
Analvst Derek Butler Intersection 116th Street and Spring Mill
Jurisdidion City of Carmel
Agency/Co. Edwards and Kelcey ,
f'\nalvsis Year 2004
Date Performed 6/3/2004
040048034 Vii/age of West Clay
~nalysis Time Period Existing AM Peak Project I D Update
EastJWest Strset: 116th Street North/South Street: Spring Mill Road
Volume Adjustments and Site Characteristics
Approach Eastbound ' Westbound
Movement L T R L T R
Volume 45 399 46 26 265 44
0/0 Thrus Left Lane 50 50
Approach Northbound Southbound
Movement L T R L T R
!Volume 25 90 82 115 302 32
% Thrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configuration LTR LTR LTR LTR
PHF 0.94 0.91 0.72 0.95
Flow Rate 523 367 271 471
Ok Heavy Vehicles 0 0 0 0
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
Saturation Headway Adjustment Worksheet
Prop. Left-Turns 0.1 0.1 0.1 0.3
~rop. Right-Turns 0.1 0.1 '0.4 0.1
Prop. Heavy Vehicle 0.0 0.0 0.0 0.0
hL T-adj 0.2 0.2 0.2' 0.2 0.2 0.2 0.2 0.2
hRT-adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 8.77 8.77 8.77 B.77
Departure Headway and Service Time
hd, initial value 3.20 3.20 3.20 3.20
x, initial 0.46 0.33 0.24 0.42
hd, final value 8.77 8.77 8.77 B.77
x, final value 1.27 0.91 0.70 1.15
Move-up time, m 2.0 2.0 2.0 2.0
Service Time 6.8 6.8 6.8 6.8
Capacity and Level of Service
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 523 401. 377 471
Delay 167.68 55.93 31.66 122.67
LOS F F 0 F
Approach: Delay 167.68 55.93 31.66 122.67
LOS F F 0 F
I ntersection Delay 106.98
Intersection LOS F
file ://C: \Documents%20and%20Settings\dbutler\Local %2 OSettings\ Temp \u2k2A. tmp
6/3/2004 A-lL
All- Way ~top L:Ontrol
11
\1.
I
I
I
I
I
I
I
I
I
I
I
I
I
I'
I:
II
IJ
ALL-WAY STOP CONTROL ANAL YSIS
General Information Si,te Information
[Analyst Derek Butler Intersection 116th Street and Spring Mill
Uurisdiction City of Carmel
!Agency/Co. Edwards and Kelcey
/"\nalysis Year 2004
Date Performed 6/3/2004
IAnalysis Time Period Existing PM Peak Project 10 040048034 Village of West Clay
Update
EastlWest Street: 116th $treet North/South Street: Spring Mill Road
Volume Adjustments and Site Characteristics
Approach Eastbound Westbound
Movement L T R L T R
Volume 43 380 29 22 380 67
% Thrus Left Lane 50 50
Approach Northbound Southbound
Movement L T R L T R
iVolume 107 300 56 32 166 109
OJ'o Thrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configuration LTR LTR LTR LTR
PHF 0.97 0.98 0.96 0.81
Flow Rate 464 477 481 377
% Heavy Vehicles 0 0 0 0
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
Saturation Headway Adjustment Worksheet
Prop. Left-Turns 0.1 0.0 0.2 0.1
Prop. Right-Turns 0.1 0.1 0.1 0.4
Prop. Heavy Vehicle 0.0 0.0 0.0 0.0
hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 9.79 9.79 9.79 9.79
Departure Headway and Service Time
hd, initial value 3.20 3.20 3.20 3.20
x, initial 0.41 0.42 0.43 0.34
hd, final value 9.79 9.79 9.79 9.79
x, final value 1.26 1.29 1.31 1.01
Move-up time, m 2.0 2.0 2.0 2.0
Service Time 7.8 7.8 7.8 7.8
Capacity and Level of Service
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 464 477 481 377
Delay 166.96 177.40 184.68 80.06
LOS F F F F
Approach: Delay 166.96 177.40 184.68 80.06
LOS F F F F
Intersection Delay 156.25
Intersection LOS F
file:IIC: \Documents%20and%20Settings\dbutler\Local %2 0 Settings\ T emp\u2k3 O. tmp
6/3/2004 A.-X
I
I
I
I
I
I
I
I
I
I
I
I
II
Village of WestClay
Traffic Impact Study Update
2008 Future Traffic Volumes, yPdated Study
Existing and Proposed Intersection Configurations
II
II
I:
Ii
II
I, I . Edwards and Kelcey
A-2
Two-Way Stop Control
.L U. 5"" .L 'OJ.L ~
'I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst Derek Butler Intersection 141st Street and Towne
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel '
Date Performed 7/6/2004
Exist + Background + Site Analysis Year 2004
Analysis Time Period AM
Project Description 040048034 Village of West Clay UDdate
EastlWest Street: 141 st Street North/South Street: Towne Road
I ntersection Orientation: North-South Study Period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L' T R
Volume 13 155 26 3 371 11
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 13 163 27 3 390 11
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal 0 0
Minor Street Westbound Eastbound
Movement 7 8 9 10 11 12
L T R L T R
~olume 60 102 8 1 112 11
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95,
Hourly Flow Rate, HFR 63 107 8 1 117 11
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (0/0) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 . 1 0 0 1 0
Configuration LTR LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
v (vph) 13 3 178 129
C (m) (vph) 1169 1396 359 415
vIe 0.01 0.00 0.50 0.31
950/0 queue length 0.03 0.01 ": 2.64 1.31
Control Delay 8.1 7.6 24.5 17.5
LOS A A C C
Approach Delay -- -- 24.5 17.5
Approach LOS -- -- C C
Rights Reserved
file:/ /C: \Documents%20and%20 Settings\dbutler\Local %20Settings\ Temp \u2kE 7 · tmp
7/6/2004 A-);
Two-Way Stop Control
- ~o - - -
I
I
I
I
I
I
I
I
I
I
I
il
I
I
I
I
II
I
'I
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst Derek Butler Intersection 141 st Street and Towne
Agency/Co. Edwards and Kelcey Road
Date Performed 7/6/2004 Jurisdiction City of Carmel
Analysis Time Period Exist + Background + Site Analysis Year 2004
PM
Project Description 040048034 Village of West Clay Update
EastlWest Street: 141 st Street North/South Street: Towne Road
I nterseetion Orientation: North-South Study Period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume 16 242 58 2 239 14
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 16 254 61 2 251 14
Percent Heavy Vehicles 0 -- -- 0 -- --
, Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal 0 0
MinQr Street Westbound Eastbound
Movement 7 8 9 10 11 12
L T R L T R
Volume 37 113 7 5 154 15
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate. HFR 38 118 7 5 162 15
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (oJb) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay, Queue Length, and Level of Service
Approach N8 S8 Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
v (vph) 16 2 163 182
C (m) (vph) 1311 1257 369 418
vie 0.01 0.00 0.44 0.44
950/0 queue length 0.04 0.00 2.19 2.16
Control Delay 7.8 7.9 22.3 20.1
LOS A A C C
Approach Delay -- -- 22.3 20.1
~pproach LOS -- -- C C
Rights Reserved
file:IIC: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \u2kEB. tmp
7/6/2004
~::J
Two- Way Stop Control
... ~6- ... "'--
11
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Ii
I
nNO-WAYSTOPCONTROLSUMMARY
General Information Site Information
Analyst Derek Butler Intersection 136th street and Towne
Agency/Co. Edwards and Kelcey Road
Date Performed 7/6/2004 Jurisdiction City of Carmel
Analysis Time Period Exist + Background + Site Analysis Year 2004
AM
Project Description 040048034 Village of West Clay UDdate
EastIWest Street: 136th Street North/South Street: Towne Road
I ntersection Orientation: North-South Study Period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume 0 165 71 17 461 0
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 0 173 74 17 485 0
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 0 0
Minor Street Westbound Eastbound
Movement 7 8 9 10 11 12
L T R L T R
~olume 101 0 3 0 0 0
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 106 0 3 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 0 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach N8 S8 Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
lane Configuration LT LTR
v (vph) 17 109
C (m) (vph) 1331 394
vie 0.01 0.28
95% queue length 0.04 1.11
Control Delay 7.7 17.6
LOS A C
Approach Delay -- -- 17.6
Approach LOS -- -- C
Rights Reserved
file:/IC: \Documents%20and%20Settings\dbutler\Local %2 OSettings\ Temp \u2kD F · tmp
7/6/2004
A-~
'lWQ- way :stop conrrOl
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I,
Ii
I,
II
II
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst Derek Butler Intersection 136th Street and Towne
Agency/Co. Edwards and Kelcey Road
Date Performed 7/6/2004 Jurisdiction City of Carmel
Analysis Time Period Exist + Background + Site Analysis Year 2004
PM
Project Description 040048034 Village of West Clay Update
EastlWest Street: 136th street INorth/South Street: Towne Road
I ntersection Orientation: North-South Study Period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume 0 451 128 7 286 0
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 0 474 134 7 301 0
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 0 0
Minor Street Westbound Eastbound
Movement 7 8 9 10 11 12
L T R L T R
Volume 90 0 8 0 0 0
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 94 0 8 0 0 0
percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (0/0) 0 0
Flared. Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 0 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB S8, Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LTR
v (vph) 7 102
C (m) (vph) 980 340
vIe 0.01 0.30
95010 queue length 0.02 1.23
Control Delay 8.7 20.1
LOS A C
Approach Delay -- -- 20.1
Approach LOS -- -- C
Rights Reserved
file:/ /C: \Documents%20and%20 Settings\dbutler\Local %2 0 Settings\ Temp \u2kE3. tmp
7/6/2004
A-~
Roundabouts - UnsignallZed. intersectIons W orlCsheet
.L ""5'" ... VL ...
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Ii
I
I
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
Generallhformation Site Information
~nalyst Derek Butler Intersection 136th Street and Ditch Road
~gency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/6/2004 lAnalysis Year 2004
Time Period Exist + Background + Site AM
Project Description 040048034 Village of West Clay
Update
tvolume Adjustments
EB WB NB S8
Volume, veh/h 19 85 4 55
L T Traffic PHF 0.95 0.95 0.95 0.95
Flow. rate, veh/h 20 89 4 57
Volume, veh/h 106 78 78 308
TH Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 111 82 82 324
Volume, veh/h 25 16 81 26
RT Traffic PHF 0.95 0.95 0.95 0.95 '
Flow rate, veh/h 26 16 85 27
lApproach Flow Computation
Approach Flow (veh/h) Va (veh/h)
Vae 157
Vaw 187
Van 171
Vas 408
Circulating Flow Computation
Approach Flow (veh/h) Vc (veh/h)
Vce 470
Vew 106
Ven 188
Ves 175
Capacity Computation
EB WB NB S8
Upper bound 956 1274 1195 1207
Capacity Lower bound 774 1061 989 1000
Upper bound 0.16 0.15 0.14 0.34
vIe Ratio 0.18 0.17 0.41
Lower bound 0.20
HCS2000™
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
file:/ /C: \Documents%20and%20 Settings\dbutler\Loc~l %2 0 Settings\ Temp \u2kD7 · tmp
7/6/2004
~-~
Roundabouts - Unsignallzt::U In[erSeC1IUll~ vv UrK.~lltiti..
-. -0 - - -. -
-11
II
il
I
I
I
I
I
I
I
I
I
.1
I
I
I
I
I
I
ROUNDABOUTS - UNSIGNALlZED INTERSECTIONS WORKSHEET
General Information Site Information
Analyst Derek Butler Intersection 136th Street and Ditch Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/6/2004 Analysis Year 2004
lTime PeriOd Exist. + Background + Site PM
Project Description 040048034 Village of West Clay
Update
Volume Adjustments
EB WB NB sa
Volume, veh/h 13 118 32 24
L T Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 13 124 33 25
Volume, veh/h 125 148 275 145
TH Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 131 155 289 152
Volume, veh/h 8 35 113 12
RT Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 8 36 118 12
Approach Flow Computation
Approach Flow (veh/h) Va (veh/h)
Vae 152
Yaw 315
Van 440
Vas 189
Circulating Flow Computation
Approach Flow (veh/h) Vc (veh/h)
Vee 301
Vew 335
Ven 169
Ves 312
Capacity Computation
EB WB NB SB
Upper bound 1093 1064 1213 1083
Capacity Lower bound 897 871 1005 888
Upper bound 0.14 0.30 0.36 0.17
vIe Ratio Lower bound 0.21
0.17 0.36 0.44
HCS2000™
Copyright (Q 2003 University of Florida, All Rights Reserved
Version 4.1d
file ://C: \Documents%20and %20Settings\dbutler\Local %2 OSettings\ Temp \u2kD B .tmp
7/6/2004
A-~
AII-.Way ~top Control
11
11
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Ii
II
II
ALL-WA Y STOP CONTROL ANAL YSIS
General Information Site Information
Analyst Derek Butler Intersection 131st Street and Shelbourne
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/6/2004 ~nalysis Year 2004
~nidysis Time Period Exist + Background + Site AM
Project I.D 040048034 Village of West Clay Update
EastlWest Street: 131 st Street North/South Street: She/bourne Road
Wolume Adjustments and Site Characteristics
~pproach Eastbound Westbound
Movement L T R L T R
rvolume 18 191 11 130 180 8
Ok Thrus Left Lane 50 50
lApproach Northbound Southbound
Movement L T R L T R
lVolume 7 69 85 57 390 14
0/0 Thrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2 '
Configuration, LTR LTR LTR LTR
PHF 0.95 0.95 0.95 0.95
Flow Rate 230 333 168 484
Ok Heavy Vehicles
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
Saturation Headway Adjustment Worksheet
Prop. Left-Turns 0.1 0.4 0.0 0.1
Prop. Right-Turns 0.0 0.0 0.5 0.0
PJop. Heavy Vehicle
hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 6.97 6.97 6.97 6.97
Departure Headway and Service Time
hd, initial value 3.20 3.20 3.20 3.20
~, initial 0.20 0.30 0.15 0.43
hd, final value 6.97 6.97 6.97 6.97
~, final value 0.45 0.63 0.32 0.85
Move-up time, m 2.0 ' 2.0 2.0 2.0
Service Time 5.0 5.0 5.0 5.0
Capacity and Level of Service
Eastbound Westbound Northbound' Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 463 495 418 558
Delay 15.45 20.40 12.95 34.74
LOS C C B 0
~pproach: Delay 15.45 20.40 12.95 34.74
LOS C C B 0
Intersection Delay 24. 15
Intersection LOS C
file:IIC: \D o cument s%2 o and %20Settings\dbutler\Local %20 Settings\ T emp\u2kB D. tmp
7/6/2004
p..-?J
All-Way Stop Control
- --0-
,
I
I
I
I
I
I
I
I
I
I
I
I
I
II
I
Ii
II
11
ALL-WA Y STOP CONTROL ANAL YSIS
General Information Site Information
Analyst Derek Butler Intersection 131st Street and She/bourne
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/6/2004 p\nalysis Year 2004
Analysis Time Period Exist + Background + Site PM
Project ID 040048034 Village of West Clay Update
EastlWest Street: 131 st Street North/South Street: She/bourne Road
Volume Adjustments and Site Characteristics
Approach Eastbound Westbound
Movement L T R L T R
Volume 18 211 17 109 252 27
% Thrus Left Lane 50 50
Approach Northbound Southbound
Movement L T R L T R
Volume 21 471 183 15 102 11
Ok Thrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configuration LTR LTR LTR LTR
PHF 0.95 0.95 0.95 0.95
Flow Rate 257 407 709 133
% Heavy Vehicles
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
Saturation Headway Adjustment Worksheet
Prop. Left-Turns 0.1 0.3 0.0 0.1
Prop. Right-Turns 0.1 0.1 0.3 0.1
Prop. Heavy Vehicle
hl T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 7.57 7.57 7.57 7.57
Departure Headwav and Service Time
hd, initial value 3.20 3.20 3.20 3.20
x, initial 0.23 0.36 0.63 0.12
hd, final value 7.57 7.57 7.57 7.57
x, final value 0.54 0.81 1.30 0.30
Move-up time, m 2.0 2.0 2.0 2.0
Service Time 5.6 5.6 5.6 5.6
Capacity and Level of Service
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 457 498 709 383
Delay 19.12 33.87 170.42 14.44
LOS C 0 F B
Approach: Delay 19. 12 33.87 170.42 14.44
LOS C 0 F B
Intersection Delay 93.92
Intersection LOS F
file:/ /C: \Documents%20and %20 Settings\dbutler\Local %20 Settings\ Temp \u2kC3 · tmp
7/6/2004
~-:J-
All-way :stop contrOl
11
\1
I
I
I
I
I
I
I
I
I
I
I
I
I
I'
I
II
IJ
ALL-WA Y STOP CONTROL ANAL YSIS
Gen(:!rallnformation Site Information
Analyst Derek Butler Intersection 1315t Street and Towne Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/6/2004 Analysis Year 2004
~nalysis Time Period Exist + Background + Site AM
Proiect ID 040048034 Village of West Clay Update
EastIWest Street: 131 stStreet North/South Street: Towne Road
~olume Adiustments and Site Characteristics
Approach Eastbound Westbound
Movement ~ T R L T R
Volume 14 351 30 218 272 12
Ok Thrus Left Lane 50 50
Approach Northbound Southbound
Movement L T R L T R
Volume 20 262 88 44 497 29
Ok Thrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configuration LTR LTR LTR LTR
PHF 0.95 0.95 0.95 0.95
Flow Rate 414 527 388 599
Ok Heavy Vehicles
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
Saturation Headway Adjustment Worksheet
Prop. Left-Turns 0.0 0.4 0.1 0.1
Prop. Right-Turns 0.1 0.0 0.2 0.1
Prop. Heavy Vehicle
hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 9.77 9.77 9.77 9.77
Departure Headway and Service Time
hd, initial value 3.20 3.20 3.20 3.20
x, initial 0.37 0.47 0.34 0.53
hd, final value 9.77 9.77 9.77 9.77
lx, final value 1.12 1.4,5 1.04 1.63
Move-up time, m 2.0 2.0 2.0 2.0
Service Time 7.8 7.8 7.8 7.8
Capacity and Level of Service
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 414 527 388 599
Delay 116.31 242.53 90.37 319.86
LOS F F, F F
~pproach: Delay 116.31 242.53 90.37 319.86
LOS F F F F
Intersection Delay 208.83
Intersection LOS F
file:IIC: \Documents%20and%20Settings\dbutler\Local %20Settings\ T emp\u2kCF. tmp
7/6/2004
A-:)
All- way ~top contrOl
I
I
I
I
I
I
I
I
I
I
I
I
II
II
II
I
I
I
IJ
ALL-WA Y STOP CONTROL ANAL YSIS
General Information Site Information
[Analyst Derek Butler Intersection 131st Street and Towne Road
iA{)ency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/6/2004 Analysis Year 2004
[Analysis Time Period Exist + Background + Site PM
Proiect 10 040048034 Village of West Clay Update
EastIWest Street: 131 st street North/South Street: Towne Road
l\Iolume Adjustments and Site Characteristics
[Approach Eastbound Westbound
Movement L T R L T R
Wolume 58 340 27 122 389 30
% Thrus Left Lane 50 50
[Approach Northbound Southbound
Movement L T R L T R
rvolume 126 480 84 16 356 29
Ok Thrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Config uration LTR LTR LTR LTR
PHF 0.95 0.95 0.95 0.95
Flow Rate 446 568 725 420
% Heavy Vehicles
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
Saturation Headway Adjustment Worksheet
Prop. Left-Turns 0.1 0.2 0.2 0.0
Prop. Right-Turns 0.1 0.1 0.1 0.1
Prop. Heavy Vehicle
hLT-adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 9.80 9.80 9.80 9.80
Departure Headway and Service Time
hd, initial value 3.20 3.20 3.20 3.20
x, initial 0.40 0.50 0.64 0.37
hd, final value 9.80 9.80 9.80 9.80
lx, final value 1.21 1.55 1.97 1.14
Move-up time, m 2.0 2.0 2.0 2.0
Service Time 7.8 7.8 7.8 7.8
Capacity and Level of Service
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 446 568 725 420
Delay 148. 73 285.66 467. 72 122.00
LOS F F F F
Approach: Delay 148. 73 285.66 467. 72 122.00
LOS F F F F
Intersection Delay 286.67
Intersection LOS F
file :/lC: \Documents%20and%20Settings\dbutler\Local %20Settings\ Temp \u2kD 3. tmp
7 /6/2004 ~-:f.
11
Two-Way Stop Control
Page 1 at 'L
\1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
lAnalyst Derek Butler Intersection 131st Street and Ditch
~gency/Co. Edwards and Kelcey Road
Date Performed 7/6/2004 Jurisdiction City of Carmel
Analysis Time Period Exist + Background + Site Analysis Year 2004
~M
Project Description 040048034 Village of West Clay Update
EastlWest Street: 131st Street North/South Street: Ditch Road
I ntersection Orientation: East-West Study Period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
iVolume (veh/h) 134 527 0 0 319 3'5
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate 141 554 0 0 335 36
I(veh/h)
Proportion of heavy 0 0
~ehicles, PHV -- -- -- --
Median type Undivided
RT Channelized? 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signa' 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume (veh/h) 0 0 0 215 0 294
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate 0 0 0 226 0 309
,(veh/h)
Proportion of heavy 0 0 0 0 0 0
~ehicles, PHV
Percent grade (0/0) 0 0
Flared approach N N
Storage 0 0
RT Channelized? 0 0
Lanes 0 0 0 0 1 0
Configuration LTR
Control Delay, Queue Length, Level of Service
~pproach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LTR
~olume, v (vph) 141 535
Capacity, cm (vph) 1199 321
vie ratio 0.12 1.67
Queue length (950/0) 0.40 32.86
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Ii
I
-h1_.11r'.\ T\"",,~~-n+~Oh- ")(\~nAOi.. ,,)O~~tt;n(1'Q\r1h11tlPO-r\ T {\t'~ 10k ?()~ptt1n(J~\ T~mn\l1?kR 1. tmn
7 /6/2004 ~ ~
II
\1
'I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Two- Way Stop Control
Control Dela s/veh) 8.4
LOS A
pproach delay
(s/veh)
pproach LOS
HCS2000™
342.0
F
Copyright (Q 2003 University of Florida, All Rights I,teserved
f11~.11r'.\ nnt'11mpnt~Ok ')(\~nnO~ ')()~ptt1na~\nhlltl~r\ T .n~::I10~?OSettinQs\ Temn\u2kB3. troD
Page 2 of2
Version 4.1d
7/6/2004 A.-L
Two-Way Stop Control
Page 1 of2
HI
I
I
I
I
I
I
I
I
I
I
I
I
II
II
Ii
I
II
IJ
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
~nalyst Derek Butler Intersection 131st Street and Ditch
Agency/Co. Edwards and Kelcey Road
Date Performed 7/6/2004 Uurisdietion City of Carmel
~nalysis Time Period Exist + Background + Site Analysis Year 2004
PM
Project Description 040048034 Village of West Clay Update
EastlWest Street: 131st street North/South Street: Ditch Road
Intersection Orientation: East-West Study Period (hrs): 0.25
Wehicle Volum'es and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume (veh/h) 258 408 0 0 496 173
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate 271 429 0 0 522 182
(veh/h)
Proportion of heavy 0 0
vehicles, PHV -- -- -- --
Median type Undivided
R,T Channelized? 0 0
Lanes 0 1 , 0 0 1 0
Configuration LT TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume (veh/h) 0 0 0 77 0 219
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate 0 0 0 81 0 230
(veh/h)
Proportion of heavy 0 0 0 0 0 0
vehicles, PHV
Percent grade (0/0) 0 0
Flared approach N N
Storage 0 0
RT Channelized? 0 0
Lanes 0 0 0 0 1 0
Configuration LTR
Control Delay, Queue Length, Level of Service
~pproach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LTR
Volume, v (vph) 271 311
Capacity. cm (vph) 903 220
vIe ratio 0.30 1.41
Queue length (950/0) 1.27 17.89
.&:1 ~ ./Ir".\ T"_"'H.-ri._+nOI.. "}(\n~,.10~ "{\c;;:!o.+t~nlT(.'\r1hl1tl~1"\ T n~~ 10~ ")(\~ptt1nO'~\ Tpmn\n?kR 7 tmn
7/fi/2004 A..A.\
Two-Way Stop Control
Page 2 of2
11
:1
I
I
I
I
I
I
I
I
I
I
I
,I
I
I'
I
I
IJ
Control Dela s/veh) 10. 7
LOS B
pproach delay
( s/veh )
pproach LOS
HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved
252.5
F
Version 4.1d
.f;1o.IIr'.\ nn~11n"\p.nt~O/^ ')(\~nt10k')(\~ptt1na~\r1hlltl~r\T .o~~lO~ ?,O~~tt1np~\ Temn\u2kR7 .tmn
7/6/2004 '" _A
II Two-Way Stop Control
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II
II
II
Page 1 of2
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst Derek Butler Intersection 131st Street and Clay
~gency/Co. Edwards and Kelcey Center
Date Performed 7/6/2004 Jurisdiction City of Carmel
~nalysis Time Period Exist + Background + Site ~nalysis Year 2004
~M
Project Description 040048034 Village of West Clay Update
EastlWest Street: 131 st Street North/South Street: Clay Center Road
Intersection Orientatio n: East-West Study Period (hrs): 0.25
Wehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
rvolume (veh/h) 0 616 86 86 311 0
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate 0 648 90 90 327 0
(veh/h)
Proportion of heavy 0 0
vehicles, P HV -- -- -- --
Median type Undivided
RT Channelized? 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
N'olume (veh/h) 33 0 87 0 0 0
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate 34 0 91 0 0 0
(veh/h)
Proportion of heavy 0 0 0 0 0 0 :
veh icles, P HV
Percent grade (0/0) 0 0
Flared approach N N
Storage 0 0
RT Channelized? 0 0
Lanes 0 1 0 0 0 0
Configuration LTR
Control Delay, Queue Length, Level of Service
~pproach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LTR
~olume, v (vph) 90 125
Capacity, cm (vph) 877 323
vIe ratio 0.10 0.39
Queue length (950/0) 0.34 1.77
~1_ . ",-,.\ T'\__n___4-nO/_ ")()-:\nAO/... ,,)()~ptt;n(Tc\r1hl1t1pr\Tn('~1o~ ?O~ptt1no~\T~mn\11?k A R.tmn
7/6/2004 b..-k
Two-Way Stop Control
Page 2 of2
11
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II
II
Control Dela s/veh)
LOS
pproach delay
(s/veh)
pproach LOS
HCS20DO™
9.6
A
23.0
C
Copyright ~ 2003 University of Florida) All Rights Reserved
Version 4.1d
.f; 1p.//r'.\ n{'\t'l1mpnt(;!9~ ') n~nno~ ?n~~tt1n(J~\nhlltl~r\ T ,O~H 1 ok.20S~ttinQs\ Temn\u2kAB. tmD
7/6/2004 A..-JJ
Two- Way Stop Control
Page 1 of2
.'.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst Derek Butler Intersection 131st Street and Clay
Agency/Co. Edwards and Kelcey Center
Date Performed 7/6/2004 Jurisdiction City of Carmel
~nalysis Time Period Exist + Background + Site ~nalysis Year 2004
PM
Project Description 040048034 Village of West Clay Update
EastlWest Street: 131st Street North/South Street: Clay Center Road
I ntersection Orientation: East-West Study Period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
~olume (veh/h) 0 444 107 49 634 0
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate 0 467 112 51 667 0
(veh/h)
Proportion of heavy 0 0
vehicles, P HV -- -- -- --
Median type Undivided
RT Channelized? 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
rvolume (veh/h) 80 0 121 0 0 0
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate 84 0 127 0 0 0
(veh/h)
Proportion of heavy 0 0 0 0 0 0
vehicles, PHV
Percent grade (0/0) 0 0
Flared approach N N
Storage 0 0
RT Channelized? 0 0
Lanes 0 1 0 0 0 0
Configuration LTR
Control Delay, Queue Length, Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LTR
olume, v (vph) 51 211
Capacity, cm (vph) 1005 296
v/c ratio 0.05 0.71
Queue length (950/0) 0.16 5.05
f11p. / /r.\ n(\~11mp:nt~O~ ?,O::1ni1o/n ?O~ettin p~\dhutler\T JocalOi020SettinQs\ TemD\u2kAF. tmp
7/6/2004 1\ 1.~
'I
I
I
I
I
I
I
I
I
I
I
I
I
II
II
I:
I
Ii
IJ
Two- Way Stop Control
Page 20f2
8.8
A
42.4
E
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
HCS2000™
f11p. Ilr..\ nO~llm~nt~olri ?O::lnc10~20~ettinQs\dhutler\Local %20SettinQs\ TemD\u2kAF .tmp
7/6/2004 A..Al
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
General Information Site Information
~nalyst Derek Butler Intersection 131st Street and Spring Mill
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/6/2004 ~nalysis Year 2004
IT"ime Period Exist +'Background + Site AM
Project Description 040048034 Village of West Clay
Update
rvolume Adjustments
EB WB NB S8
Volume, veh/h 69 42 ' 49' 38
L T Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 72 44 51 4,0
Volume, veh/h 584 270 188 332
TH Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 614 284 197 349
Volume, veh/h 92 88 95 227
RT Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 96 92 100 238
lApproach Flow Computation
Approach Flow (veh/h) Va (veh/h)
Vae 782
Vaw 420
Van 348
Vas 627
Circulating Flow Computation
Approach Flow (veh/h) Vc (veh/h)
Vee 433
Vew 320
Ven 726
Ves 379
Capacity Computation
EB WB NB SB
Upper bound 984 1077 778 1027
Capacity Lower bound 800 882 617 838
Upper bound 0.79 0.39 0.45 0.61
v/c Ratio Lower bound . 0.98 0.56 0.75
0.48
'I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Ii
I:
II
II
Roundabouts - Unsignalized Intersections Worksheet
HCS2000™
Copyright @ 2003 University of Florida, All Rights Reserved
+; 1.c. .11r". \ T)n", 1n'\~nt(.'lO/^ ') (\-;\nr10~ 'J (\~ptt; n CT~\~hlltl pr\ T .n('.~ 1 O~? O~e:tt1n p"~\ T em n\112kC 7 . tmn
Page 1 of 1
Version 4.1d
7/6/2004 A _ A-
'I
I
I
1
1
I
I
I
I
I
I
I
I
I
I
Ii
II
11
11
Roundabouts - Unsignalized Intersections Worksheet
Page 1 of 1
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS, WORKSHEET
General Information Site Information
Analyst Derek Butler Intersection 131st Street and Spring Mill
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/612004 ~nalysis Year 2004
iTime P.eriod Exist + Background + Site PM
Project Description 040048034 Village of West Clay
Update
lVolume Adjustments,
EB WB NB S8
Volume, veh/h 1.11 40 169 132
L T Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 116 42 177 138
Volume, veh/h 403 440 453 216
TH Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 424 463 476 227
Volume, veh/h 44 224 42 50
RT Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 46 235 44 52
.~pproach Flow Computation
Approach Flow (veh/h) Va (veh/h)
Vae 586
Vaw 740
Van 697
Vas 417
Circulating Flow Computation
Approach Flow (veh/h) Vc (veh/h)
Vee 407
Vew 769
Ven 678
Ves 682
Capacity Computation
EB WB NB SB
Upper bound 1005 751 809 806
Capacity Lower bound 818 594 644 642
Upper bound 0.58 0.99 0.86 0.52
vIe Ratio 0.65
Lower bound 0.72 1.25 1.08
HCS2000™
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1 d
f";1o.IIr'.\ nnl"l1",",pntcO,l,. "()!:Inr10~ "()~pttlnac;:\r1hlltl~T\ T .()('.~ lO~?O~~ttinp'~\ Temn\u2kCB.tmn
7 /6/2004 ~ A c
'I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Ii
I,
II
I
Detailed Report
Page 1 of2
HCS2000TM DET AILED REPORT
Genera/Information Site Information
Analyst Derek Butler Intersection 116th Street and Towne
Road
Agency or Co. EdWards and Kelcey Area Type All other areas
Date Performed 7/6/2004
Exist + Background + Site Jurisdiction City of Carmel
Time Period AM Analysis Year 2004
Project ID 040048034 Village of West
Clay Update
Volume and Timing Input
EB WB NB SB
LT TH RT LT TH RT LT TH RT LT TH RT
Number of lanes, N1 1 2 0 1 1 1 1 1 1 1 1 1
Lane group L TR L T R L T R L T R
Volume, V (vph) 118 544 67 78 387 67 50 242 23 103 512 305
oA> Heavy vehicles, %HV 0 0 0 0 0 0 0 0 0 0 0 0
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Pre timed (P) or actuated A A A A A A A A A A A A
(A)
Start-up lost time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Extension of effective
green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Arrival type, AT 3 3 3 3 3 3 3 3 3 3 3
Unit extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Filtering/metering" 1 1. 000 1.000 1.000 1. 000 1.000 1. 000 1.000 1. 000 1. 000 1.000 1.000
Initial unmet demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ped / Bike I RTOR
volumes 0 16 0 16 0 6 0 76
Lane width 1'2.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
Parking / Grade I Parking N 0 N N 0 N N 0 N N 0 N
,Parking maneuvers, Nm
Buses stopping, Ns 0 0 0 0 0 0 0 0 0 0 0
Min. time for pedestrians, 3.2 3.2 3.2 3.2
Gp
Phasing Excl. Left EW Perm 03 04 Excl. Left NS Perm 07 08
G = 8.4 G = 48. 1 G= G= G = 8.6 G = 55.9 G= G=
Timing y= 2 y= 5 y= y= y= 2 y= 5 y= y=
Duration of Analysis, T = 0.25 Cycle Length, C = 135.0
Lane Group Capacity, Control Delay, and LOS Determination
EB WB NB S8'
LT TH RT LT TH RT LT TH RT LT TH RT
Adjusted flow rater v 124 1627 82 407 54 53 255 18 108 539 241
Lane group capacity, 294 1269 290 677 738 272 787 829 495 787 829
c
f11p.! 11'.\ n{'\~,l1mpntc;:O~ ?O~nr1o~ ?,O~ett1np"~\dhutler\ T Jocal%20Settinf!s\ TemD\s2kF7. tmp
7/6/2004 A-1o
vlc ratio, X 0.42 0.49 0.28 0.60 0.07 0.19 0.32 0.02 0.22 0.68 0.29
Total green ratio, g/C 10.43 0.36 0.43 0.36 0.46 0.49 0.41 0.51 0.49 0.41 0.51
Uniform, d~lay, d1 26.0 33.9 24.3 35.6 20.6 22.4 26.8 16.2 19.2 32.3 18.8
Progression factor, 1. 000 1. 000 1.000 1. 000 1. 000 1. 000 1.000 1.000 1. 000 1. 000 1. 000
PF
Delay calibration, k 0.11 0.11 0.11 0.19 0.11 0.11 0.11 0.11 0.11 0.25 0.11
I ncremental delay, d2 1.0 0.3 0.5 1.5 0.0 0.4 0.2 0.0 0.2 2.5 0.2
Initial queue delay, d3
Control delay 27.0 34.2 24.8 37.1 20.6 22.8 27.0 16.2 19.4 34.8 19.0
Lane group LOS C C C 0 C C C B B C B
Approach delay 33.0 33.6 25.7 28.7
Approach LOS C C C C
I ntersection delay 30.7 Xc = 0.73 Intersection LOS C
'I
I
I
I
I
I
I
I
I
I
I
I
II
I
I
II
II
I'
I
Ii
IJ
Detailed Report
HCS2000™
Copyright ~ 2000 University of Florida, All Rights Reserved
fi 1e: lIe. ~ \ Documents%20and%20SettinQs\dbutler\Local %20 Settings\ Temp \s2kF7 · tmp
Page 2 of2
Version 4.1 d
7/6/2004
^ -pt:y
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I:
Ii
I
Detailed Report
Page 1 of2
HCS2000™ DET AILED REPORT
Genera/Information Site Information
Analyst Derek Butler Intersection 116th Street and Towne
Road
Agency or Co. Edwards and Kelcey Area Type All other areas
Date Performed 7/6/2004 Jurisdiction City of Carmel
Exist + Background + Site
Time Period PM Analysis Year 2004
Project 10 040048034 Village of West
Clay Update
Volume and Timing Input
EB WB NB SB
LT TH RT LT TH RT LT TH RT LT TH RT
Number of lanes, N 1 2 0 1 1 1 1 1 1 1 1 1
1
Lane group L TR L T R L T R L T R
Volume, V (vph) 197 458 40 114 651 150 79 470 69 141 330 157
0/0 Heavy vehicles, %HV 0 0 0 0 0 0 0 0 0 0 0 0
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Pre timed (P) or actuated A A A A A A A A A A A A
(A)
Start-up lost time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Extension of effective
green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Arrival type, AT 3 3 3 3 3 3 3 3 3 3 3
Unit extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Filtering/metering, I 1.000 1.000 1.000 1. 000 1. 000 1.000 1.000 1.000 1. 000 1. 000 1.000
Initial unmet demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ped / Bike I RTOR
volumes 0 16 0 16 0 6 0 76
Lane width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
Parking / Grade / Parking N 0 N N 0 N N 0 N N 0 N
Parking maneuvers, Nm
Buses stopping, NB 0 0 0 0 0 0 0 0 0 0 0
Min. time for pedestrians, 3.2 3.2 3.2 3.2
Gp
Phasing Excl. Left EW Perm 03 04 Excl. Left NS Perm 07 08
G = 10. 7 G = 44. 1 G= G= G = 8.3 G = 43.9 G= G=
Timing Y= 2 y= 5 y= y= Y= 2 y= 5 y= y=
Duration of Analysis, T = 0.25 Cycle Length, C = 121.0
Lane Group Capacity, Control Delay, and LOS Determination
EB ,WB NB SB
LT TH RT LT TH RT LT TH RT LT TH RT
Adjusted flow rate, v 207 507 120 685 141 83 495 66 148 347 85
Lane group capacity, 223 1306 399 692 766 363 689 795 250 689 795
c
f11~.llr.\ nnf'l1mpnt~O~ ')()~nnO~ ?n~ptt1no~\nhlltler\ T IOC~ 10~20SettinQs\ Temn\s2k 103 .tmD
7/6/2004 A _~\
vlc ratio, X 0.93 0.39 0.30 0.99 0.18 0.23 0.72 0.08 0.59 0.50 0.11
Total green ratio, g/C 0.47 0.36 0.47 0.36 0.47 0.45 0.36 0.49 0.45 0.36 0.49
Uniform delay, d1 33.1 28.5 19.1 38.2 18.3 20.8 33.2 16.2 24.3 30.1 16.4
Progression factor, 1. 000 1. 000 1.000 1. 000 1. 000 1. 000 1.000 1.000 1. 000 1. 000 1. 000
PF
Delay calibration, k 0.44 0.11 0.11 0.49 0.11 0.11 0.28 0.11 0.18 0.11 0.11
I ncremental delay, d2 40.9 0.2 0.4 31.6 0.1 0.3 3.6 0.0 3.7 0.6 0.1
Initial queue delay, d3
Control delay 74.0 28.7 19.5 69.8 18.4 21.2 36.9 16.3 28.0 30.7 16.5
Lane group LOS E C B E B C 0 B C C B
Approach delay 41.8 55.8 32.7 27.9
Approach LOS 0 E C C
I ntersection delay 41.6 X = 0.93 Intersection LOS 0
c
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I:
II
II
Detailed Report
HCS2000™
Copyright @ 2000 University of Florida, All Rights Reserved
f11~.1 Ir.\ nnt'l1mpnt(;!o~ ')()~nrtO~ ?O~~ttlno~\cihllt1~r\ T .O~~ lOIri20~ettinQ"s\ Temn\s2kl 03 .tmD
Page 2 of2
Version 4.1d
7 /6/2004 A.-~J
"I
I
I
I
I
I
I
I
I
1
I
I
I
I
I
I:
I
II
i
i
I
IJ
Two- Way Stop Control
Page 1 of2
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
~nalyst Derek Butler Intersection 116th Street and Hoover
lAgency/Co. Edwards and Kelcey Road
Date Performed ' 7/6/2004 Jurisdiction City of Carmel
~nalysis Time Period Exist + Background + Site ~nalysis Year 2004
~M
Project Description 040048034 Village of West Clay Update
EastlWest Street: 116th Street North/South Street: Hoover Road'
I ntersection Orientation: East-West Study Period (hrs): 0.25
Wehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement' 1 2 3 4 5 6
L T R L T R
Volume (veh/h) 58 681 0 0 427 84
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate 61 716 0 0 449 88
(veh/h)
Proportion of heavy 0 0
vehicles, PHV -- -- -- --
Median type Undivided
RT Channelized? 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signal 0 0
Minor street Northbound Southbound
Movement 7 8 9 10 11 12
L 'T R L T R
Volume (veh/h) 0 0 0 141 0 107
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate 0 0 0 148 0 112
(veh/h)
Proportion of heavy 0 0 0 0 0 0
vehicles, PHV
Percent grade (%) 0 0
Flared approach N N
Storage 0 0
RT Channelized? 0 0
Lanes 0 0 0 0 1 0
Configuration LTR
Control Delay, Queue Length, Level of Service
pproach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LTR
~olume, v (vph) 61 260 '
Capacity, cm (vph) 1041 235
vIe ratio 0.06 1.11
Queue length (950/0) 0.19 11.56
f11~. /Ir.\ nnl'l1mpnt~O~ ?n~nr1olri? O~~tt1n p"~\ohlltl ~r\ T ,oc~ 1 %20SettinQ"s\ Temn\u2k9B. tmD
7/6/2004 &_~~
'I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I,
Ij
IJ
Two- Way Stop Control
Page 2 of2
Control Dela (s/veh) 8. 7
LOS A
pproach delay
(s/veh)
pproach LOS
HCS2000™
134.8
F
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
fi 1 p. / /r.. \ n()C'.llm~nt~O~ ?O~ndoh.20Setti n Qs\dbutler\Local %2 0 Settings\ Temp \u2k9B. tmp
7/6/2004 ^_rJ
"I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Ii
I,
Ii
IJ
Two- Way Stop Control
Page 1 of2
~O-WAYSTOPCONTROLSUMMARY
General Information Site Information
IAnalyst Derek Butler Intersection 116th Street and Hoover
lAgency/Co. Edwards and Kelcey Road
Date Performed 7/6/2004 Jurisdiction City of Carmel
~nalysis Time Period Exist + Background + Site ~nalysis Year 2004
PM
Project Description 040048034 Village of West Clay Update
EastlWest Street: 116th Street North/South Street: Hoover Road
Intersection Orientation: East-West Study Period (hrs): 0.25
~ehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
lVolume (veh/h) 109 536 0 0 850 133
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate 114 564 0 0 894 140
l(veh/h)
Proportion of heavy 0 0
vehicles, PHV -- -- -- --
Median type Undivided
RT Channelized? 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signal, 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
~olume (veh/h) 0 0 0 106 0 85
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate 0 0 0 111 0 89
(veh/h)
Proportion of heavy 0 0 0 0 0 0
iVehicles, ,PHV
Percent grade (0/0) 0 0
Flared approach N N
Storage 0 0
RT Channelized? 0 0
Lanes 0' 0 0 0 1 0
Configuration LTR
Control Delay, Queue Length, Level of Service
~pproach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LTR
iVolume, v (vph) 114 200
Capacity, cm (vph) 680 118
vIe ratio 0.17 1.69
Queue length (950/0) 0.60 15. 19
f11 p ./1 r. \ f)()~11m~nt~0~ ?O~nci 0/020 S etti n Qs\dbutler\Localo/02 OSettings\ Temp \u2k9F · tmp
7/6/2004
A. e::...~
--i
I
I
I
I
I
'1
I
I
I
I
I
I
I
11
I
I
II
IJ
Two- Way Stop Control
Page 2 of2
11.4
B
410.3
F
HCS20 OOTM Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
fi 1 e:/ IC: \Documents%20and %20Settings\dbutler\Local 0/02 OSettings\ Temp \u2k9F · tmp
7/6/2004
A...A.
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
General Information Site Information
Analyst Derek Butler Intersection 116th Street and Ditch Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/6/2004 Analysis Year 2004
Time Period Exist + Background + Site AM
Project Description 040048034 Village of West Clay
Update
olume Adjustments
EB WB NB 58
Volume, veh/h 0 246 76 0
L T Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 0 258 80 0
Volume, veh/h 647 410 0 0
TH Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 681 431 0 0
Volume, veh/h 138 0 150 0
RT Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 145 0 157 0
[Approach Flow Computation
Approach Flow (veh/h) Va (veh/h)
Vae 826
Vaw 689
Van 237
Vas 0
Circulating Flow Computation
Approach Flow (veh/h) Ve (veh/h)
Vce 258
Vew 80
Vcn 681
Vcs 769
Capacity Computation
EB W8 NB S8
Upper bound 1131 1300 807 751
Capacity Lower bound 931 1084 642 594
Upper bound 0.73 0.53 0.29 0.00
vIe Ratio Lower bound
0.89 0.64 0.37 0.00
'I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II
IJ
Roundabouts - Unsignalized Intersections Worksheet
HCS20 OOTM
Copyright ~ 2003 University of Florida, All Rights Reserved
fi Ie:/ / C: \D ocuments%2 0 and %20Settings\dbutler\Local %20 Settings\ Temp \u2k93 · tmp
Page 1 of 1
Version 4.1 d
7/6/2004
A.-~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I:
II
Roundabouts - Unsignalized Intersections Worksheet
Page 1 of 1
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
General Information Site Information
~nalyst Derek Butler Intersection 116th Street and Ditch Road
~gency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/6/2004 ~nalysis Year 2004
tTime Period Exist + Background + Site PM
Project Description 040048034 Village of West Clay
Update
Volume Adjustments
EB WB NB S8
Volume, veh/h 0 153 162 0
L T Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 0 161 170 0
Volume, veh/h 474 795 0 0
TH Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 498 836 0 0
Volume, veh/h 106 0 227 0
RT Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 111 0 ' 238 0
[Approach Flow Computation
Approach Flow (veh/h) Va (veh/h)
Vae 609
Yaw 997
Van 408
Vas 0
Circulating Flow Computation
Approach Flow (veh/h) Ve (veh/h)
Vee 161
Vew 170
Ven 498
Ves 1167
Capacity Computation
EB WB NB SB
Upper bound 1220 1212 934 542
Capacity Lower bound 1012 1004 755 414
Upper bound 0.50 0.82 0.44 0.00
vIe Ratio Lower bound 0.60 0.54 0.00
0.99
HCS2000™
Copyright ~ 2003 University of Florida, All Rights Reserved
Version 4.1d
file:/ /C: \Documents%2 Oand%20Settings\dbutler\Local %2 o Settings \ Temp \u2k97 · tmp
7/6/2004 Af:i::.
'.
I
I
I
I
I
I
'i
I
I
I
I
, ~
II
II
I]
1\
I
Ii
IJ
Roundabouts - Unsignalized Intersections Worksheet
Page 1 of 1
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
General Information Site Information
~nalyst Derek Butler Intersection 116th Street and Spring Mill
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/6/2004 Analysis Year 2004
Time Period Exist + Background + Site AM
Project Description 040048034 Village of West Clay
Update
Volume Adjustments
EB WB NB 58
Volume, veh/h 154 29 53 65
L T Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 162 30 55 68
Volume, veh/h 564 353 134 359
TH Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 593 371 141 377
Volume, veh/h 108 145 85 186
RT Traffic PHF 0.95 0.95 0.95 0.95 '
Flow rate, veh/h 113 152 89 195
lApproach Flow Computation
Approach Flow (veh/h) Va (veh/h)
Vae 868
Vaw 553
Van 285
Vas 640
Circulating Flow Computation
Approach Flow (yeh/h) Vc (veh/h)
Yee 475
Yew 358
Ven 823
Ves 456
Capacity Computation
EB WB NB SB
Upper bound 952 1045 719 966
Capacity Lower bound 771 854 566 784
Upper bound 0.91 0.53 0.4,0 0.66
vie Ratio
Lower bound 1.13 0.65 0.50 0.82
HCS2000™
Copyright (Q 2003 University of Florida, All Rights Reserved
Version 4.1 d
file:IIC: \Documents%20and%20Settings\dbutler\Local %2 OSettings\ Temp \ u2kA3 · tmp
7/6/2004 AJ3
'I
I
I
I
I
I
I
'I
I
I
I
I
I
I
II
11
I
II
IJ
Roundabouts - Unsignalized Intersections Worksheet
Page 1 of 1
ROUNDABOUTS. UNSIGNALIZED INTERSECTIONS WORKSHEET
General Information Site Information
~nalyst Derek Butler Intersection 116th Street and Spring Mill
~gency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/6/2004 ~nalysis Year 2004
rrime Period Exist + Background + Site PM
Project Description 040048034 Village of West Clay
Update
Wolume Adjustments
EB WB NB SB
Volume, veh/h 99 29 175 75
L T Traffic PHF . 0.95 0.95 0.95 0.95
Flow rate, veh/h 104 30 184 78
Volume, veh/h 507 609 359 243
TH Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 533 641 377 255
Volume, veh/h 69 29 58 202
RT Traffic PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 72 30 61 212
IApproach Flow Computation
Approach Flow (veh/h) Va (veh/h)
Vae 709
, Yaw 701
Van 622
Vas 545
Circulating Flow Computation
Approach Flow (veh/h) Vc (veh/h)
Vee 363
Vew 665
Ven 715
Ves 855
Capacity Computation
EB WB NB SB
Upper bound 1041 817 785 700
Capacity Lower bound 850 652 623 550
Upper bound 0.68 0.86 0.79 0.78
v/c Ratio
Lower bound 0.83 1.08 1.00 0.99
HCS2000™
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1 d
file:/ / C: \Documents%20and%20Settings\dbutler\Local %2 OSettings\ Temp \u2kA 7. tmp
7/6/2004
~jf
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I:
Ii
Ii
II
Village of WestClay
Traffic Impact Study Update
2008 Future Traffic Volumes, Oriainal Study
Existing and Proposed Intersection Configurations
Edwards and Kelcey
A -lD\
'.
I
I
I
I
I
I
I
I
I
I
\
I
I
I
I
I
I
I
I
TWO-WAY STOP CONTROL SUMMARY
141st Street and Towne
Road
City of Carmel
2008 - Ex + Bkgnd + Site
Analyst J. Pyrz
Agency/Co. Edwards and Kelcey
Date Performed 7/08/2004
Analysis Time Period Future AM Peak
Project Description 040048034 Village of West Clay Update
EastlWest Street: 141st Street North/South Street: Towne Road
Intersection Orientation: North-South Study Period (hrs): 0.25
Major Street Northbound Southbound
Movement 1 2 3 4 5
L T R L T
o 131 27 3 212
0.95 0.95 0.95 0.95 0.95
o 137 28 3 223
o -- - 0 --
Intersection
Jurisdiction
Analysis Year
Volume
Peak-Hour Factor, PHF
Hourly Flow Rate, HFR
Percent Heavy Vehicles
Median Type
RT Channelized
Lanes
Configuration
Upstream Signal
Minor Street
Movement
6
R
6
0.95
6
-
Undivided
o
LTR
1
o
o
o
LTR
1
o
o
o
Westbound
7 8
L T
Volume 60 33
Peak-Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 63 34
Percent Heayy Vehicles 0 0
Percent Grade (0/0) 0
Flared Approach N
Storage 0
RT Channelized 0
Lanes 0 1 0 0 1
Configuration L TR L TR
Approach NB 5B Westbound Eastbound
Movement 1 4 7 8 9 10 11
Lane Configuration L TR L TR L TR L TR
v (vph) 0 3 99 135
C (m) (vph) 1351 1426 475 649
vIe 0.00 0.00 0.21 0.21
950/0 queue length 0.00 0.01 0.78 0.78
Control Delay 7.7 7.5 14.6 12.0
LOS A A B B
Approach Delay -- -- 14.6 12.0
Approach LOS -- -- B B
9
R
2
0.95
2
o
10
L
4
0.95
4
o
o
Eastbound
11
T
62
0.95
65
o
o
N
o
12
R
63
0.95
66
o
o
o~
12
Rights Reserved,
HCS2000™
Version 4.1 d
Copyright @ 2003 University of Florida, All Rights' Reserved
Version 4.1 d
A-LDl
I
I
I
I
I
I
:1
I
I
1
1
I
I
11
I]
II
I
II
I]
TWO-WAY STOP CONTROL SUMMARY
Analyst J. Pyrz Intersection 141st Street and Towne
Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/08/2004
Analysis Time Period Future PM Peak Analysis Year 2008 - Ex + Bkgrd + Site
Project Description 040048034 Village of West Clay Update
EastlWest Street: 141 st Street North/South Street: Towne Road
Intersection Orientation: North-South Study Period (hrs): 0.25
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume 10 299 70 2 185 0
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 10 314 73 2 194 0
Percent Heavy Vehicles 0 -- -- 0 -- -
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal 0 0
Minor Street Westbound Eastbound
Movement 7 8 9 10 11 12
L T R L T R
Volume 35 50 2 7 22 15
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 36 52 2 7 23 15
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
-
Approach NB S8 Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
v (vph) 10 2 90 45
C (m) (vph) 1391 1183 419 487
vlc 0.01 0.00 0.21 0.09
950/0 queue length \ 0.02 0.01 0.80 0.30
Control Delay 7.6 8.0 15.9 13.1
LOS A A C B
Approach Delay -- -- 15.9 13.1
Approach LOS -- -- C B
Rights Reserved
HCS2000™
Version 4.1 d
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
~~~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-
TWO-WAY STOP CONTROL SUMMARY
.
1_-
136th Street and Towne
Road
City of Carmel
2008 - Ex + Bkgrnd + Site
Analyst J. Pyrz
Agency/Co. Edwards and Kelcey
Date Performed 7/8/2004
Analysis Time Period Future AM Peak
Project Description 040048034 Village of West Clay Update
EastIWest Street: 136th Street North/South Street: Towne Road
Intersection Orientation: North-South Study Period (hrs): 0.25
Major Street Northbound Southbound
Movement 1 2 3 4 5
L T R L T
151 67 32 304
0.95 0.95 0.95 0.95
158 70 33 320
-- -- 0 -
Intersection
Jurisdiction
Analysis Year
6
R
Volume
Peak-Hour Factor, PHF
Hourly Flow Rate, HFR
Percent Heavy Vehicles
Median Type
RT Channelized
Lanes
Configu ration
Upstream Signal
Minor Street
Movement
0.95
o
o
0.95
o
--
Undivided
o
1
o
o
TR
o
LT
1
o
o
Volume
Peak-Hour Factor, PHF
Hourly Flow Rate, HFR
Percent Heavy Vehicles
Percent Grade (0/0)
Flared Approach
Storage
RT Channelized
Lanes 0 1
Configuration L TR .
Approach NB SB Westbound Eastbound
Movement 1 4 7 8 9 10 11
Lane Configuration L T L TR
v (vph) 33 118
C (m) (vph) 1352 484
vIe 0.02 0.24
95% queue length 0.08 0.95
Control Delay 7.7 14.8
LOS A B
Approach Delay -- -- 14.8
Approach LOS -- -- B
7
L
105
0.95
110
o
o
Westbound
8
T
o
0.95
o
o
o
N
o
9
R
8
0.95
8
o
10
L
o
Eastbound
11
T
12
R
0.95
o
o
0.95
o
o
o
N
o
0.95
o
o
o
o
o
o
o
o
12
Rights Reserved
HCS2000TM
Version 4.1 d
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
A~
-.
I
I
I
I
I
i
I
I
I
I
I
I
I
I
I
I
1\
I
Ii
II
TWO-WAY STOP CONTROL SUMMARY
Analyst J. Pyrz Intersection 136th Street and Towne
Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/08/2004
Analysis Time Period Future PM Peak Analysis Year 2008 - Ex + Bkgrd + Site
Project Description 040048034 Village of West Clay Update
EasUWest Street: 136th Street North/South Street: Towne Road
Intersection Orientation: North-South Study Period (hrs): 0.25
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume 19 330 90 16 219 15
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 0 347 94 16 230 0
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 0 0
Minor Street Westbound Eastbound
Movement 7 8 9 10 11 12
L T R L T R
Volume 82 0 48 31 0 34
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 86 0 50 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (0/0) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
, '~.
Approach NB S8 Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
v (vph) 16 136
C (m) (vph) 1130 490
vlc 0.01 0.28
950k queue length 0.04 1.12
Control Delay 8.2 15.1
LOS A C
Approach Delay -- -- 15.1
Approach LOS -- -- C
Rights Reserved
HCS2000TM
Version 4.1d
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
A-l^~
'--I'
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1\
I:
Ii
IJ
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
Analyst J. Pyrz
Agency/Co. Edwards and Kelcey
Date Performed 7/6/2004
Time Period Future AM Peak
Project Description 040048034 Village of West Clay
U date
Intersection
Jurisdiction
Analysis Year
136th Street and Ditch Road
City of Carmel
2008 - Ex + Bkgrnd + Site
RT Traffic
EB WB NB 5B
Volume, veh/h 7 1 0 14
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 7 1 0 14
Volume, veh/h 119 120 201 178
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 125 126 211 187
Volume, veh/h 0 5 4 2
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 0 5 4 2
L T Traffic
TH Traffic
EB WB NB 58
Upper bound 1182 1167 1235 1253
Capacity Lower bound 977 964 1025 1042
vIe Ratio Upper bound 0.11 0.11 0.17 0.16
Lower bound 0.14 0.14 0.21 0.19
HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d
A-LDlc
'I
I
I
I
I
I
I
I
I
I
I
I
I
I
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
Analyst J. Pyrz
Agency/Co. Edwards and Kelcey
Date Performed 7/8/2004
Time Period Future PM Peak
Project Description 040048034 Village of West Clay
U date
Intersection
Jurisdiction
Analysis Year
136th Street and Ditch Road
City of Carmel
2008 - Ex + Bkgrd ,+ Site
RT Traffic
EB WB NB SB
Volume, veh/h 5 8 4 11
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 5 8 4 11
Volume, veh/h 113 145 326 140
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 118 152 343 147
Volume, veh/h 3 16 6 9
PHF 0.95 0.95 0.95 0.95
Flow r~te, veh/h 3 16 6 9
L T Traffic
TH Traffic
EB WB NB SB
Upper bound 1216 1050 1247 1218
Capacity Lower bound 1008 858 1036 1009
Upper bound 0.10 0.17 0.28 0.14
vie Ratio
Lower bound 0.13 0.21 0.34 0.17
HCS2000TM Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d
II
I'
I
Ii
IJ
A.-t.a,
I
I
I
ALL-WA Y STOP CONTROL ANAL YSIS
Analyst J. Pyrz Intersection 131st Street and She/bourne
Agency/Co. Edwards and Ke/cey Jurisdiction City of Carmel
Date Performed 7/8/2004 Analysis Year 2008 - Ex + Bkgrd + Site
Analysis Time Period Future AM Peak
Proiect ID 040048034 Village of West Clay Update
EastlWest Street: 131st Street - ,~...,~ ~-,,,"
Approach Eastbound Westbound
Movement L T R L T R
Volume 11 68 6 60 136 61
0/0 Thrus Left Lane 50 50
Approach Northbound Southbound
Movement L T R L T R
Volume 14 222 19 84 510 15
OkThrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configuration LTR LTR LTR LTR
PHF 0.95 0.95 0.95 0.95
Flow Rate 88 270 267 639
0/0 Heavy Vehicles
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
.
Prop. Left-Turns 0.1 0.2 0.1 0.1
Prop. Right-Turns 0.1 0.2 0.1 0.0
Prop. Heavy Vehicle
hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT-adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 7.40 7.40 7.40 7.40
hd, initial value 3.20 3.20 3.20 3.20
x, initial 0.08 0.24 0.24 0.57
hd, final value 7.40 7.40 7.40 7.40
x, fi~al value 0.18 0.50 0.47 1.02
Move-up time, m 2.0 2.0 2.0 2.0
Service Time 5.4 5.4 5.4 5.4
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 338 520 517 639
Delay 1'2.03 16.26 14.88 65. 17
LOS B C B F
Approach: Delay , 12.03 16.26 14.88' 65. 17
LOS B C B F
Intersection Delay 40.40
Intersection LOS E
I
I
I
I
I
I
I
I
I
I
I
1\
I'
1,1
I
IJ
HCS2000™
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
A-lD'C
, 1
I
I
Analyst J.Pyrz Intersection 131st Street and She/bourne
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/8/2004 Analysis Year 2008 - Ex + Bkgrd + Site
Analysis Time Period Future PM Peak
Project ID 040048034 Village of West Clay Update
Approach Eastbound Westbound
Movement L T R L T R
Volume 29 118 18 48 78 97
0/0 Thrus Left Lane 50 50
Approach Northbound Southbound
Movement L T R L T R
Volume 15 514 62 78 440 19
0/0 Thrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L 1 L2 L1 L2 L1 L2
Config uration LTR LTR LTR LTR
PHF 0.95 0.95 0.95 0.95
Flow Rate 172 234 621 565
0/0 Heavy Vehicles
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
Prop. Left-Turns 0.2 0.2 0.0 0.1
Prop. Right-Turns 0.1 0.4 0.1 0.0
Prop. Heavy Vehicle
hLT-adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 8.49 8.49 8.49 8.49
hd, initial value 3.20 3.20 3.20 3.20
x, initial 0.15 0.21 0.55 0.50
hd, final value 8.49 8.49 8.49 8.49
x, final value 0.41 0.52 1.20 1.10
Move-up time, m 2.0 2.0 2.0 2.0
Service Time 6.5 6.5 6.5 6.5
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 411 442 621 565
Delay 17. 16 19.28 129.95 95.59
LOS C C F F
Approach: Delay 17. 16 19.28 129.95 95.59
LOS C C F F
Intersection Delay 89.30
Intersection LOS F
I
1
I
I
I
I
I
I
I
I
I
I
I
-I
I
I'
I'
Ii
II
HCS2000TM
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1 d
p.--lb'1
I
I
I
ALL-WAY STOP CONTROL ANAL YSIS
Analyst J. Pyrz Intersection 131st Street and Towne Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/08/2004 Analysis Year 2008 - Ex + Bkgrd + Site
Analysis Time Period Future AM Peak
Project ID 040048034 Village of West Clay Update
Approach Eastbound Westbound
Movement L T R L T R
Volume 5 238 13 100 223 56
0/0 Thrus Left Lane 50 50
Approach Northbound Southbound
Movement L T R L T R
Volume 14 157 47 133 266 11
0/0 Thrus Left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configuration LTR LTR LTR LTR
PHF 0.95 0.95 0.95 0.95
Flow Rate 268 397 228 431
0/0 Heavy Vehicles
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.25
Prop. Left-Turns 0.0 0.3 0.1 0.3
Prop. Right-Turns 0.0 0.1 0.2 0.0
Prop. Heavy Vehicle
hLT-adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT -adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 7.72 7.72 7.72 7.72
;~,,,'
hd, initial value 3.20 3.20 3.20 3.20
x, initial 0.24 I 0.35 0.20 0.38
hd, final value 7.72 7.72 7.72 7.72
x, final value 0.57 0.80 0.49 0.87
Move-up time, m 2.0 2.0 2.0 2.0
Service Time 5.7 5.7 5.7 5.7
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity 417 471 403 482
Delay 20.64 33.81 1 B. 14 41.52
LOS C D C E
Approach: Delay 20.64 33. B 1 18.14 41.52
LOS C D C E
Intersection Delay 30.95
Intersection LOS 0
I
I
I
I
I
-
I
I
I
I
I
I
I
I
I
I
HCS2000™
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
A-1D
"I
I
Analyst J. Pya Intersection 131 st Street and Towne Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/08/2004 Analysis Year 2008 - Ex + Bkgrd + Site
Analysis Time Period Future PM Peak
Project ID 040048034 Village of West Clay Update
Approach Eastbound Westbound
Movement l T R L T R
Volume 38 215 19 70 256 153
0/0 Thrus Left Lane 50 50
Approach Northbound Southbound
Movement L T R L T R
Volume 38 230 169 84 209 6
0/0 Thrus left Lane 50 50
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configuration LTR LTR LTR LTR
PHF 0.95 0.95 0.95 0.95
Flow Rate 286 503 459 314
ot'o Heavy Vehicles
No. Lanes 1 1 1 1
Geometry Group 1 1 1 1
Duration, T 0.;25
Prop. Left-Turns 0.1 0.1 0.1 0.3
Prop. Right-Turn.s 0.1 0.3 0.4 0.0
Prop. Heavy Vehicle
hL T -adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
hRT ..;adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6
hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
hadj, computed 9.25 9.25 9.25 9.25
hd, initial value 3.20 3.20 3.20 3.20
x, initial 0.25 0.45 0.41 0.28
hd, final value 9.25 9.25 9.25 9.25
x, final value 0.74 1.18 1.07 0.80
Move-up time, m 2.0 2.0 2.0 2.0
Service Time 7.3 7.3 7.3 7.3
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L 1 L2
Capacity 383 503 459 389
Delay 33.98 131.03 93.29 39.82
LOS D F F E
Approach: Delay 33.98 131.03 93.29 39.82
LOS D F F E
Intersection Delay 83.84
Intersection LOS F
I
I
I
I
I
I
I
I
I
I
I
11
II
I
I
I
HCS2000TM
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
II
A-I \
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
11
Ii
Ii
I
TWO-WAY STOP CONTROL SUMMARY
Analyst J. Pyrz Intersection 131st Street and Ditch Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/08/2004 Analysis Year 2008 - Ex + Bkgrd + Site
Analysis Time Period Future AM Peak
Project' Description 040049034 Village of West Clay Update
EastlWest Street: 131st Street North/South Street: Ditch Road
Intersection Orientation: East-West Study Period (hrs): 0.25,
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume (veh/h) 174 417 0 0 297 34
Peak-hour factor, PHF 0.95 ,0.95 '0.95 0.95 0.95 0.95
Hourly Flow Rate (veh/h) 183 438 0 0 312 35
Proportion of heavy 0 0
vehicles, P HV -- -- -- --
Median type Undivided
RT Channelized? 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume (veh/h) 0 0 0 104 0 98
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate (veh/h) 0 0 0 109 0 103
Proportion of heavy 0 0 0 0 0 0
vehicles, PHV
Percent grade (0/0) 0 0
Flared approach N N
Storage 0 0
RT Channelized? 0 0
, Lanes 0 0 0 0 0 0
Configuration LR
Approach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
Volume, v (vph) 183 212
Capacity, cm (vph) 1223 298
v/c ratio 0.15 0.71
Queue length (950/0) 0.53 5.04
Control Delay (s/veh) 8.5 42.1
LOS A E
Approach delay (s/veh) -- -- 42.1
Approach LOS -- -- E
HCS2000™
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1 d
A-12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TWO-WAY STOP CONTROL SUMMARY
Analyst J. Pyrz Intersection 131 st Street and Ditch Road
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/8/2004 Analysis Year 2008 - Ex + Bkgrd + Site
Analysis Time Period Future PM Peak
Project Description 040049034 Village of West Clay Update
EastlWest Street: 131st Street North/South Street: Ditch Road
Intersection Orientation: East-West Study Period (hrs): 0.25
Maior Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume (veh/h) 247 300 0 0 549 114
Peak-hour factor,PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rat~ (veh/h) 260 315 0 0 577 120
Proportion of heavy 0 0
vehicles, PHV -- -- -- --
Median type Undivided
RT Channelized? 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signal 0 0
Minor Street Northbo~nd Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume (veh/h) 0 0 0 64 0 96
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate (\ieh/h) 0 0 0 67 0 101
Proportion of heavy 0 0 0 0 0 0
vehicles, P HV
Percent grade (%) 0 0
Flared approach N N
Storage 0 0
RT Channelized? 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Approach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
Volume, v (vph) 260 168
Capacity ,cm (vph) 909 192
vIe ratio 0.29 0.88
Queue length (95%) 1.18 6.58
Control Delay (s/veh) 10.5 86.0
LOS B F
Approach delay (s/veh) -- -- 86.0
Approach LOS -- -- F
HCS2000™
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
A-l-:,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I HCS2000™
TWO-WAY STOP CONTROL SUMMARY
Analyst J. Pyrz Intersection 131st Street and Clay
Center
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/08/2004 Analysis Year 2008 - Ex + Bkgrd + Site
Analysis Time Period Future AM Peak
Project Description 040049034 Village of West Clay Update
EasUWest Street: 131st Street North/South Street: Clay Center Road
Intersection Orientation: East-West Study Period (hrs): 0.25
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume (veh/h) 505 34 98 308
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate (veh/h) 0 531 35 103 324 0
Proportion of heavy 0 0
vehicles, PHV -- -- -- --
Median type Undivided
RT Channelized? 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume (veh/h) 24 0 152
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate (veh/h) 25 0 160 0 0 0
Proportion of heavy 0 0 0 0 0 0
vehicles, PHV
Percent grade (%) 0 0
Flared approach N N
Storage 0 0
RT Channelized? 0 0
Lanes 0 0 0 0 0 0
Configu ration LR
Approach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
Volume, v (vph) 103 185
Capacity, cm (vph) 1016, 451
vIe ratio 0.10 0.41
Queue length (950/0) 0.34 1.97
Control Delay (s/veh) 8.9 18.4
LOS A C
Approach delay (s/veh) -- -- 18.4
Approach LOS -- -- C
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
A-l+
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I HCS2000™
TWO-WAY STOP CONTROL SUMMARY
Analyst . J. Pyrz , Intersection 21~t Street and Clay
. ' en er
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date p~rf~rmed . 7/08/2004. Analysis Year 2008 - Ex + Bkgrd + Site
AnalysIs Time Penod Future PM Peak
ProJect Description 040049034 Village of West Clay Update
EastlWest Street: 131st Street North/South Street: Clay Center Road
Intersection Orientation: East-West Study Period (hrs): 0.25
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume (veh/h) 331 38 151 619
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate (veh/h) 0 348 40 158 651 0
, Proportion of heavy 0 0
vehicles, P HV -- -- -- --
Median type Undivided
RT Channelized? 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume (veh/h) 45 0 131
Peak-hour factor, PHF 0.95 0.95 ,0.95 0.95 0.95 0.95
Hourly Flow Rate (veh/h) 47 0 137 0 0 0
Proportion of heavy 0 0 0 0 0 0
vehicles, P HV
Percent grade (0/0) 0 0
, Flared approach N N
Storage 0 0
RT Channelized? 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Approach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
Volume, v (vph) 158 184
Capacity, cm (vph) 1182 355
v/c ratio 0.13 0.52
Queue length (950/0) 0.46 2.85
Control Delay (s/veh) 8.5 25.6
LOS A 0
Approach delay (s/veh) -- -- 25.6
Approach LOS -- -- 0
Copyright @ 2003 University of Florida, All Rights Reserved,
Version 4.1 d
A-15
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ROUNDABOUTS - U,NSIGNALIZED INTERSECTIONS WORKSHEET
Analyst J.Pyrz
Agency/Co. Edwards and Kelcey
Date Performed 7/08/2004
Time Period Future AM Peak
Project Description 040048034 Village of West Clay
U date
Intersection
Jurisdiction
Analysis Year
131st Street and Spring Mill
City of Carmel
2008 - Ex + Bkgrd + Site
RT Traffic
EB WB NB 5B
Volume, veh/h 106 35 157 108
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 111 36 165 113
Volume, veh/h 209 154 224 714
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 220 162 235 751
Volume, veh/h 342 37 229 95
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 360 38 241 100
L T Traffic
TH Traffic
EB WB NB 58
Upper bound 675 925 976 1041
Capacity Lower bound 528 747 792 850
Upper bound 1.02 0.26 0.66 0.93
vIe Ratio
Lower bound 1.31 0.32 0.81 1.13
HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d
A-ll.o
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ROUNDABOUTS - UNSIGNAllZED INTERSECTIONS WORKSHEET
Analyst J. Pyrz
Agency/Co. Edwards and Kelcey
Date Performed 7/8/2004
Time Period Future PM Peak
Project Description 040048034 Village of West Clay
U date
Intersection
Jurisdiction
Analysis Year
131st Street and Spring Mill
City of Carmel
2008 - Ex + Bkgrd + Site
RT Traffic
EB WB NB 5B
Volume, veh/h 144 44 490 31
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 151 46 515 32
Volume, veh/h 142 219 649 305
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 149 230 683 321
Volume, veh/h 177 129 96 62
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 186 135 101 65
L T Traffic
TH Traffic
EB WB NB 5B
Upper bound 1011 466 1066 738
Capacity Lower bound 824 350 873 582
v/c Ratio Upper bound 0.48 0.88 1.22 0.57
Lower bound 0.59 1.17 1.49 0.72
HCS2000TM Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d
A-ll
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
HCS2000™ DETAILED REPORT
Intersection 116th Street and Towne
Analyst J. Pyrz Road
Agency or Co. Edwards and Kelcey Area Type All other areas
Date Performed 7/8/2004 Jurisdiction City of Carmel
Time Period Future AM Peak Analysis Year 2008 - Ex + Bkgrd + Site
Pro'ect ID 040048034 Village of West
EB WB NB SB
LT TH RT LT TH RT LT TH RT LT TH RT
Number of lanes, N 1 2 0 1 1 1 1 1 1 1 1 1
1
Lane group L TR L T R L T R L T R
Volume, V (vph) 198 1018 108 58 542 41 40 165 52 95 264 318
% Heavy vehicles, %HV 0 0 0 0 0 0 0 0 0 0 0 0
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Pretimed (P) or actuated (A) A A A A A A A A A A A A
Start-up lost time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Extension of effective green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Arrival type, AT 3 3 3 3 3 3 3 3 3 3 3
Unit extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Filtering/metering, I 1.000 1.000 1.000 1. 000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
Initial unmet demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ped / Bike / RTOR volumes 0 16 0 14 0 5 0 24
Lane width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
Parking I Grade / Parking N 0 N N 0 N N 0 N N 0 N
Parking ,maneuvers, Nm
Buses stopping, Ns 0 0 0 0 0 0 0 0 0 0 0
Min. time for pedestrians, Gp 3.2 3.2 3.2 3.2
Phasing EW Perm EW Perm 03 04 Excl. Left NS Perm 07 08
G = 8.0 G = 22. 1 G= G= G = 8.0 G = 8.9 G= G=
Timing y= 2 y= 5 y= y= y= 2 y= 5 y= y=
Duration of Analysis, T = 0~25 Cycle Length, C = 61.0
EB WB NB SB
LT TH RT LT TH RT LT TH RT LT TH RT
Adjusted flow rate, v 208 1169 61 571 28 42 174 49 100 278 309
Lane group capacity, c 361 1292 125 688 1194 362 277 580 362 277 580
vIe ratio, X 0.58 0.90 0.49 0.83 0.02 0.12 0.63 0.08 0.28 1.00 0.53
Total green ratio, g/C 0.53 0.36 0.36 0.36 0.74 0.31 0.15 0.36 0.31 0.15 0.36
Uniform delay, d1 10.9 18.5 15.1 17.7 2.1 15.3 24.5 12.9 15.7 26.0 15.5
Progression factor, PF 1.000 1.000 1.000 1.000 1. 000 1.000 1.000 1.000 1.000 1.000 1.000
Delay calibration, k 0.17 0.43 0.11 0.37 0.11 0.11 0.21 0.11 0.11 0.50 0.14
A-l~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Incremental delay, d2 2.3 9.3 3.0 8.4 0.0 0.1 4.5 0.1 0.4 55.0 1.0
Initial queue delay, d3
Control delay 13.2 27.7 18.0 26.2 2.1 15.4 29.0 13.0 16.1 81.0 16.4
Lane group LOS B C B C A B C B B F B
Approach delay 25.5 24.4 23.9 42.5
Approach LOS C C C 0
Intersection delay 29.0 X = 0.96 Intersection LOS C
c
HCS2000™
Copyright @ 2000 University of Florida, All Rights Reserved
Version 4.1d
A-lq
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Intersection 116th Street and Towne
Analyst J. Pyrz Road
Agency or Co. Edwards'and Kelcey Area Type All other areas
Date Performed 7/8/2004 Jurisdiction City of Carmel
Time Period Future AM Peak Analysis Year 2008 - Ex + Bkgrd + Site
Pro'ect ID 040048034 Village of West
1 Clay Update
EB WB NB S8
TH RT L T TH RT L T TH RT L T TH
2 0 1 1 1 1 1 1 1 1
RT
1
LT
1
Number of lanes, N
1
Lane group
R
T
L
R
T
L
R
T
L
TR
L
58 244 300
000
59 318 94
000
374 748 68 88 112 70
o 0 0 0 0 0
Volume, V (vph)
% Heavy vehicles, %HV
Peak-hour factor, PHF
0.95 0.95 0.95 0.95 0.95 ,0.95 0.95 0.95 0.95 0.95 0.95 0.95
A A A
2.0 2.0 2.0
2.0 2.0 2.0
A
2.0
2.0
3
Pretimed (P) or actuated (A) A
Start-up lost time, 11 2.0
Extension of effective green, e 2.0
A A A
2.0 2.0 2.0
2.0 2.0 '2.0
A A
2.0 2.0
2.0 2.0
A
A
2.0
2.0
3
3
3
3
3
3
Arrival type, AT
Unit extension, UE
Filtering/metering, I
Initial unmet demand, Qb
Ped / Bike / RTOR volumes
Lane width
Parking / Grade / Parking
3
3
3
3.0
3
ao aD aD aD ao aD iao aD
3.0 3.0
1.000 1.000
0.0 0.0
o 7
12.0 12.0
1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
30
o
9
o
7
o
12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
N
o
N
N
N
N
o
o
N
N
o
N
Parking maneuvers, Nm
Buses stopping, NB 0 0 0 0 0 0 0 0 0 0
Min. time f<?r pedestrians, Gp 3.2 3.2 3.2 3.2
Phasing EW Perm EW Perm 03 04 Excl. Left NS Perm 07 08
G = 8.0 G = 18.6 G = G = G = 8.4 G = 11.0 G = G =
Y=2 Y=5 Y= Y= Y=2 Y=5 Y= Y=
Duration of Analysis, T = 0.25 ' Cycle Length, C = 60.0
EB WB NB SB
L T TH RT L T TH RT L T TH RT L T TH RT
394 851 93 118 66 62 .335 89 61 257 284
o
Timing
Adjusted flow rate, v
127 589 1130 380 348 646 380 348 646
0.73 0.20 0.06 0.16 0.96 0.14 0.16 0.74 0.44
0.31 0.31 0.70 0.36 0.18 0.40 0.36 0.18 0.40
18.5 15.2 2.8 13.4 24.3 11.4 13.5 23.1 13.1
1.000 1.000 1.000 1.boo 1.000 1.000 1.000 1.000 1.000
0.29 O. 11 O. 11 O. 11 0.47 O. 11 O. 11 0.30 O. 11
Lane group capacity, c
v/e ratio, X
Total green ratio, g/C
Uniform' delay, d1
Progression factor, PF
Delay calibration, k
577 1106
0.68 0.77
0.48 0.31
12.6 18.8
1.000 1.000
0.25 0.32
~-ro
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Incremental delay, d2 3.3 3.4 19.4 0.2 0.0 0.2 38.3 0.1 0.2 8.1 0.5
Initial queue delay, d3
Control delay 15.9 22.1 37.9 15.4 2.8 13.6 62.6 11.5 13.7 31.2 13.6
Lane group LOS B C D B A B E B B C B
Approach delay 20.1 20.0 47.0 21.1
Approach LOS C B D C
Intersection delay 25.4 X = 0.87 Intersection LOS C
c
HCS2000TM
Copyright (Q 2000 University of Florida, All Rights Reserved
Version 4.1d
A-Bl
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TWO-WAY STOP CONTROL SUMMARY
Analyst J. Pyrz Intersection 116th Street and Hoover
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 07/08/2004 Analysis Year 2008 - Ex + Bkgrd + Site
Analysis Time Period Future AM Peak
Project Description 040048034 Village of West Clay Update
EastlWest Street: 116th Street North/South Street: Hoover Road
Intersection Orientation: East-West, Study Period (hrs): 0.25
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume (veh/h) 14 1207 0 0 582 228
Peak-hour factor, PHF ' 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate (veh/h) 14 1270 0 0 612 240
Proportion of heavy 0 0
vehicles, PHV -- -- -- --
Median type Undivided
RT Channelized? 0 0
Lanes () 1 0 0 1 0
Configu ration LT TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume (veh/h) 0 0 0 326 0 52
Peak.;.hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate (veh/h) O. 0 0 343 0 54
Proportion of heavy 0 0 0 0 0 0
vehicles, P HV
. Percent grade (0/0) 0 0
Flared approach N N
Storage 0 0
RT Channelized? 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Approach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
Volume, v (vph) 14 397
Capacity, cm (vph) 795 71
v/c ratio 0.02 5.59
Queue length (950/0) 0.05 44. 12
Control Delay (s/veh) 9.6 2182
LOS A F
Approach delay (s/veh) -- -- 2182
Approach LOS -- -- F
HCS2000TM
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
A--B2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TWO-WA Y STOP CONTROL SUMMARY
Analyst J. Pyrz Intersection 116th Street and Hoover
Agency/Co. Edwards and Kelcey Jurisdiction City of Carmel
Date Performed 7/8/2004 Analysis Year 2008 - Ex + Bkgrd + Site
Analysis Time Period Future PM Peak
Project Description 040048034 Village of West Clay Update
East/West Street: 116th Street North/South Street: Hoover Road
Intersection Orientation: East-West Study Period (hrs): 0.25
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume (veh/h) 26 875 0 0 1318 375
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate (veh/h) 27 921 0 0 1387 394
Proportion of heavy 0 0
vehicles, PHV -- -- -- --
Median type Undivided
RT Channelized? 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume (veh/h) 0 0 0 350 0 20
Peak~hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate (veh/h) 0 0 0 368 0 21
Proportion of heavy 0 0 0 0 0 0
vehicles, P HV
Percent grade (0/0) 0 0
Flared approach N N
Storage 0 0
RT Channelized? 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Approach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
Volume, v (vph) 27 389
Capacity, cm (vph) 353 29
v/c ratio 0.08 13.41
Queue length (950/0) 0.25 48.04
Control Delay (s/veh) 16.0 5846
LOS C F
Approach delay (s/veh) -- -- 5846
Approach LOS -- -- F
HCS2000™
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
A-B?::>
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
Analyst J. Pyrz
Agency/Co. Edwards and Kelcey
Date Performed 7/08/2004
Time Period Future AM Peak
Project Description 040048034 Village of West Clay
U date
Intersection
Jurisdiction
Analysis Year
116th Street and Ditch Road
City of Carmel
2008 - Ex + Bkgrd + Site
RT Traffic
EB WB NB S8
Volume, veh/h 0 276 75 0
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 0 290 78 0
Volume, veh/h 1417 736 0 0
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 1491 774 0 0
Volume, veh/h 116 0 272 0
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 122 0 286 0
L T Traffic
TH Traffic
EB WB NB SB
Upper bound 1103 1302 413 553
Capacity Lower bound 905 1086 306 424
vIe Ratio Upper bound 1.46 0.82 0.88 0.00
Lower bound 1.78 0.98 1.19 -0.00
HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d
A.-~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Analyst
Agency/Co.
Date Performed
Time Period
Project Description
U date
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
J. Pyrz
Edwards and Kelcey
7/8/2004
Future PM Peak
040048034 Village of West Clay
Intersection
Jurisdiction
Analysis Year
116th Street and Ditch Road
City of Carmel
2008 - Ex + Bkgrd + Site
L T Traffic
TH Traffic
RT Traffic
EB WB NB 5B
Volume, veh/h 0 198 125 0
,PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 0 208 131 0
Volume, veh/h 1158 1569 0 0
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 1218 1651 0 0
Volume, veh/h 88 0 250 0
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 92 0 263 0
EB WB NB 5B
Upper bound 1176 1250 519 270
Capacity Lower bound 972 1038 395 190
Upper bound 1.11 1.49 0.76 0.00
vIe Ratio
Lower bound 1.35 1.79 1.00 0.00
HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d
A-8~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
, ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
Analyst J. Pyrz
Agency/Co. Edwards and Kelcey
Date Performed 7/8/2004
Time Period Future AM Peak
Project Description 040048034 Village of West Clay
U date
Intersection
Jurisdiction
Analysis Year
116th Street and Spring Mill
City of Carmel
2008 - Ex'+ Bkgrd + Site
RT Traffic
EB WB NB 58
281 33 203 162
0.95 0.95 0.95 0.95
295 34 213 170
1109 548 255 623
0.95 0.95 0.95 0.95
1167 576 268 655
349 245 113 92
0.95 0.95 0.95 0.95
367 257 118 96
L T Traffic
TH Traffic'
EB WB NB S8
Upper bound 698 747 367 719
Capacity Lower bound 548 590 268 566
Upper bound 2.62 1.16 1.63 1.28
vIe Ratio
Lower bound 3.34 1.47 2.24 1.63
HCS2000TM Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d
A-~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
Analyst J. Pyrz
Agency/Co. Edwards and Kelcey
Date Performed 7/8/2004
Time Period Future PM Peak
Project Description 040048034 Village of West Clay
U date
Intersection
Jurisdiction
Analysis Year
116th Street and Spring Mill
City of Carmel
2008 - Ex + Bkgrd + Site
RT Traffic
EB WB NB 5B
Volume, veh/h 218 68 506 89
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 229 71 532 93
Volume, veh/h 822 980 433 337
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 865 1031 455 354
Volume, veh/h 260 240 86 303
PHF 0.95 0.95 0.95 0.95
Flow rate, veh/h 273 252 90 318
L T Traffic
TH Traffic
EB WB NB 5B
Upper bound 920 520 533 366
Capacity Lower bound 742 396 406 268
Upper bound 1.49 2.60 2.02 2.09
vIe Ratio
Lower bound 1.84 3.42 2.65 2.85
HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d
~-~-,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Village of WestClay ,
Traffic Impact Study Update
2008 Future Traffic Volumes, Original Study
Existing and Proposed Intersection Configurations
Edwards and Kelcey
~-~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
HCS2000™ DET AILED REPORT
Analyst J. Pyrz Intersection 131st St and Towne Rd
Area Type All other areas
Agency or Co. Edwards and Kelcey Jurisdiction Carmel, Indiana
Date Performed 7/8/2004 Analysis Year 2008 - with Improvements
Time Period PM Peak Hour
Project ID 040048034 Village of
WestCla
EB WB NB 5B
LT TH RT LT TH RT LT TH RT LT TH RT
Number of lanes, N 1 1 0 1 1 0 1 1 0 1 1 0
1
Lane group L TR L TR L TR L TR
Volume, V (vph) 58 340 27 122 389 30 126 480 84 16 356 29
0;'0 Heavy vehicles, %HV 0 0 0 0 0 0 0 0 0 0 0 0
Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Pretimed (P) or actuated (A) A A A A A A A A A A A A
Start-up lost time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Extension of effective green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Arrival type, AT 3 3 3 3 3 3 3 3
Unit extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Filtering/metering, I 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
Initial unmet demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ped / Bike / RTOR volumes 0 3 0 3 0 8 0 3
Lane width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
Parking / Grade / Parking N 0 N N 0 N N 0 N N 0 N
Parking maneuvers, Nm
Buses stopping, Ns 0 0 0 0 0 0 0 0
Min. time for pedestrians, Gp 3.2 3.2 3.2 3.2
Phasing EW Perm 02 03 04 NS Perm 06 07 08
G = 22.0 G= G= G= G = 24.0 G= G= G=
Timing y= 7 ' y= y= y= y= 7 y= Y= y=
Duration of Analysis, T = 0.25 Cycle Length, C = 60.0
EB WB NB S8
LT TH RT LT TH RT LT TH RT LT TH RT
Adjusted flow rate, v 64 405 136 462 140 617 18 425
Lane group capacity, c 250 690 298 690 324 744 167 752
v/c ratio, X 0.26 0.59 0.46 0.67 0.43 0.83 0.11 0.57
Total green ratio, glC 0.37 0.37 0.37 0.37 0.40 0.40 0.40 0.40
Uniform delay, d1 13.3 15.3 14.5 15.9 13.1 16.2 11.3 14.0
Progression factor, PF 1. 000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
Delay calibration, k 0.11 0.18 0.11 0.24 0.11 0.37 0.11 0.16
Incremental delay, d2 0.5 1.3 1.1 2.5 0.9 7.8 0.3 1.0
A-&<1
I
I
I
I HCS2000TM
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Initial queue delay, d3
Control delay 13.8 16.6 15.6 18.5 14.0 24.0 11.6 15.0
Lane group LOS B B B B B C B B
Approach delay 16.3 17.8 22.1 14.8
Approach LOS B B C B
Intersection delay 18.3 X = O. 75 Intersection LOS B
c
Copyright @ 2000 University of Florida, All Rights Reserved
Version 4.1 d
A-~G
I
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
I Intersection ' 131st Street and Towne Road
Analyst J. Pyrz Jurisdiction Carmel, Indiana
I Agency/Co. Edwards and Kelcey Ex + Bkgrd + Vent + Site,
Date Performed 7/27/2004 Analysis Year
Time Period PM Peak Hour 2008
I 0400.48.q34 Village of West Clay
U date
I EB WB NB 5B
VolurlJe, veh/h 58 122 126 16
L T Traffic PHF 0.95 0.95 0.95 0.95
I Flow rate, veh/h 61 128 132 16
Volume, veh/h 340 389 480 356
TH Traffic PHF 0.95 0.95 0.95 0.95
I Flow rate, veh/h 357 409 505 374
Volume, veh/h 27 30 . 84 29
RT Traffic PHF 0.95 0.95 0.95 0.95
I Flow rate, veh/h 28 31 88 30
I
I
I
I
EB WB NB 5B
I Upper bound 920 796 983 814
Capacity Lower bound 742 633 799 649
Upper bound 0.48 0.71 0.74 0.52
I vlc Ratio
Lower bound 0.60 0.90 0.91 0.65
HCS2000™ Copyright <9 2003 University of Florida, All Rights Reserved Version 4.1d
I
I
I
I
I
A-9\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Analyst J. Pyrz Intersection 131 st St and Shelbourne Rd
Agency or Co. Edwards and Kelcey Area Type All other areas
Date Performed 7/8/2004 Jurisdiction Carmel, Indiana
Time Period PM Peak Hour Analysis Year 2008 - with Improvements
P . . t ID 040048034 Village of
EB WB NB SB
LT TH RT LT TH RT LT TH RT LT TH RT
Num'ber of lanes, N 1, 1 0 1 1 0 1 1 0 1 1 0
1
Lane group L TR L TR L TR L TR
Volume, V (vph) 18 211 17 109 252 27 21 471 183 15 102 11
010 Heavy vehicles, %HV 0 0 0 0 0 0 0 0 0 0 0 0
Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 .0.90 .0.90
Pretimed (P) or actuated (A) A A A A A A A A A A A A
Start-up lost time, '1 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Extension of effective green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Arrival type, AT 3 3 3 3 3 3 3 3
Unit extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.,0
Filtering/metering, I 1.000 1. 000 1.000 1.000 1.000 1.000 1. 000 1.000
Initial unmet demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ped / Bike / RTOR volumes 0 0 0 17 0 0 0 22
Lane width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
Parking / Grade / Parking N 0 N N 0 N N 0 N N 0 N
Parking maneuvers, Nm
Buses stopping, Ns 0 0 0 0 0 0 0 0
Min. time for pedestrians, Gp 3.2 3.2 3.2 3.2
Phasing EW Perm 02 03 04 NS Perm 06 07 08
G ~ 17.0 G= G= G= G = 29.0 G= G= G=
Timing y= 7 y= y= y= y= 7 y= y= y=
puration of Analysis, T = 0.25 ' Cycle Length, C = 60.0
NJ
EB WB NB SB
LT TH RT LT TH RT LT TH RT LT TH RT
Adjusted flow rate, v 20 253 121 291 23 726 17 113
Lane group capacity, c 289 532 324 535 628 880 186 918
vlc ratio, X 0.07 0.48 0.37 0.54 0.04 0.82 0.09 0.12
Total green ratio, glC 0.28, 0.28 0.28 0.28 0.48 0.48 0.48 0.48
Uniform delay, d1 15.7 17.8 17.2 18.2 8.2 13.3 8.4 8.5
Progression factor, ~F 1.000 1.000 1.000 1.000 1.000 1.00'0 1.000 1.000
Delay calibration, k 0.11 0.11 0.11 0.14 0.11 0.36 0.11 0.11
Incremental delay, d2 0.1 0.7 0.7 1.2 0.0 6.5 0.2 0.1
A-92
I
I
I
I HCS2000™
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Initial queue delay, d3
Control delay 15.8 18.5 18.0 19.4 8.2 19.8 8.6 8.6
Lane group LOS B B B B A B A A
Approach delay 18.3 19.0 19.4 8.6
Approach LOS B B B A
Intersection delay 18.2 X = O. 72 Intersection LOS B
c
Copyright @ 2000 University of Florida, All Rights Reserved
Version 4.1 d
A-o..~ .
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
Analyst J. Pyrz
Agency/Co. Edwards and Kelcey
Date Performed 7/8/2004
Time Period PM Peak Hour
Project Description 040048034 Village of WestClay
U date
Intersection
Jurisdiction
Analysis Year
131st and Shelbourne
Carmel, Indiana
2008 - with Improvements
RT Traffic
EB WB NB 5B
Volume, veh/h 18 130 7 57
PHF 0.90 0.90 0.90 0.90
Flow rate, veh/h 20 144 7 63
Volume, veh/h 191 180 69 390
PHF 0.90 0.90 0.90 0.90
Flow rate, veh/h 21,2 200 76 433
Volume, veh/h 11 8 85 14
PHF 0.90 0.90 0.90 0.90
Flow rate, veh/h 12 8 94 15
L T Traffic
TH Traffic
Capacity
Upper bound
Lower bound
Upper bound
Lower bound
vIe Ratio
HCS2000™
Copyright @ 2003 University of Florida, All Rights Reserved
Version 4.1d
1\-94
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Analyst
Number of lanes, N
1
Lane group
Volume, V (vph)
0/0 Heavy vehicles, %HV
Peak-hour factor, PHF
Pretimed (P) or actuated (A)
Start-up lost time, 11
Extension of effective green, e
Arrival type , AT
Unit extension, UE
Filtering/metering, I
Initial unmet demand, Qb
Ped I Bike I RTOR volumes
Lane width
Parking / Grade I Parking
Timing
Adjusted flow rate, v
L
258
o
0.90
A
2.0
2.0
3
3.0
HCS2000™ DETAILED REPORT
LT
1
T
408
o
0.90
A
2.0
2.0
3
3.0
TR
496
o
0.90
A
2.0
2.0
3
3.0
1.000
0.0
1.000 1.000
0.0 0.0
RT
o
LR
173
o
0.90
A
77
o
0.90
A
219
o
0.90
A
J. Pyrz Intersection 131st St and Ditch Rd
Area Type All other areas
Agency or Co. Edwards and Kelcey Jurisdiction Carmel, Indiana
Date Performed 7/8/2004
T' P' d PM P k H Analysis Year 2008 - with Improvements
Ime eno ea our ,040048034 Village of
Project ID WestC/ay
EB WB NB S8
TH RT L T TH RT L T TH RT L T TH
1 001000000
Parking maneuvers, Nm
Buses stopping, Ns 0 0 0
Min. time for pedestrians, Gp 3.2 3.2
Phasing EW Perm 02 03 04 S8 Only 06 07
G = 33.0 G = G = G = G = 13.0 G = G =
Y=7 Y= Y= y= Y=7 Y= y=
Duration of Analysis, T = 0.25 Cycle Length, C = 60.0
EB WB NB SB
L T TH RT L T TH RT L T TH RT L T TH
287 453 724 305
12.0
N
o
12.0
o
12.0
o
2.0
2.0
3
3.0
1.000
0.0
17
o
o
22
N
N
N
N
N
N
12.0
o
N
o
3.2
08
G=
Y=
RT
Lane group capacity, c 320 1045 1011 372
vlc ratio, X 0.90 0.43 0.72 0.82
Total green ratio, glC 0.55 0.55 0.55 0.22
Uniform delay, d1 12.0 8.0 10.0 22.4
Progression factor, PF 1.000 1.000 1.000 1.000
Delay calibration, k 0.42 0.11 0.28 0.36
Incremental delay, d2 26.2 0.3 2.5 13.6
A-<15
I
I
I
I HCS2000TM
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Initial queue delay, da
Control delay 38.2 8.3 12.5 36.0
Lane group LOS 0 A B 0
Approach delay 19.9 12.5 36.0
Approach LOS B B 0
Intersection delay 19.6 X = 0.88 Intersection LOS B
c
Copyright @ 2000 University of Florida, An Rights Reserved
Version 4.1d
~-~lo
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
Analyst J. Pyrz
Agency/Co. Edwards and Kelcey
Date Performed 7/8/2004
Time Period PM Peak Hour
Project Description 040048034 Village of WestClay
U date
Intersection
Jurisdiction
Analysis Year
131st and Ditch
Carmel, Indiana
2008 - with Improvements
RT Traffic
EB WB NB 5B
Volume, veh/h 134 0 0 215
PHF 0.90 0.90 0.90 0.90
Flow rate, veh/h 148 0 0 238
Volume, veh/h 527 319 0 0
PHF 0.90 0.90 0.90 0.90
Flow rate, veh/h 585 354 0 0
Volume, veh/h 0 35 0 294
PHF 0.90 0.90 0.90 0.90
Flow rate, veh/h 0 38 0 326
L T Traffic
TH Traffic
EB WB NB 5B
Upper bound 1149 1233 637 1048
Capacity Lower bound 947 1023 495 857
Upper bound 0.64 0.32 0.00 0.54
vie Ratio
Lower bound 0.77 0.38 0.00 0.66
HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1 d
~-~,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
HCS2000™ DETAILED REPORT
Intersection 116th Sf and Hoover Rd
Analyst J. Pyrz Area Type All other areas
Agency or Co. Edwards and Kelcey Jurisdiction Carmel, Indiana
Date Performed 7/8/2004
T. P. d' PM P k H Analysis' Year 2008 - with Improvements
Ime eno ea our . 040048034 Village of
Project ID WestClay
EB WB NB SB
TH RT L T TH RT L T TH RT L T TH
1 001000000
Number of lanes, N
1
Lane group
LT
1
RT
o
L
T
TR
850 133
o 0
0.90 0.90
LR
Pretimed (P) or actuated (A) A A
Start-up lost time, 11 2.0 2.0
Extension of effective green, e 2.0 2.0
A
106
o
0.90
A
85
o
0.90
A
Volume, V (vph)
0/0 Heavy vehicles, %HV
Peak-hour factor, PHF
109 536
o 0
0.90 0.90
Arrival type , AT
Unit extension, UE
Filtering/metering, I
Initial unmet demand, Qb
Ped / Bike / RTOR volumes
Lane width
Parking / Grade / Parking
3 3
3.0 3.0
1.000 1.000
0.0 0.0
A
2.0
2.0
3
3.0
1.000
0.0
2.0
2.0
3
3.0
1.000
0.0
o
13
o
o
9
N
o
N
N
12.0
o
N
N
N
N
12.0
o
N
12.0 12.0
Parking maneuvers, Nm
Buses stopping, Ns 0 0 0
Min. time for pedestrians, Gp 3.2 3.2
Phasing EW Perm 02 03 04 58 Only 06 07
G = 37.0 G = G = G = G = 9.0 G = G =
Y=7 y= Y= Y= Y=7 Y= Y=
Duration of Analysis, T = 0.25 Cycle Length, C= 60.0
EB WB N8 5B
TH RT L T TH RT L T TH RT L T TH
596 1077 202
Timing
o
3.2
08
G=
Y=
Adjusted flow rate, v
LT.
121
RT
Lan'e group capacity, c 247 1172 1152 269
v/c ratio, X 0.49 0.51 0.93 0.75
Total green ratio, g/C 0.62 0.62 0.62 0.15
Uniform delay, d1 6.3 6.4 10.4 24.4
Progression factor, PF 1.000 1.000 1.000 1.000
Delay calibration, k 0.11 0.12 0.45 0.31
Incremental delay, d2 1.5 0.4 13.7 11.2
t\-~&
I
I
I
I HCS2000™
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Initial queue delay, d3
Control delay 7.8 6.8 24.1 35.6
Lane group LOS A A C 0
Approach delay 7.0 24.1 35.6
Approach LOS A C 0
Intersection delay 19.1 X = 0.90 Intersection LOS B
c
Copyright @ 2000 UnIversity of Florida, All Rights Reserved
Version 4.1d
A-c..e:;
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Analyst
Agency/Co.
Date Performed
Time Period
Project Description
U date
ROUNDABOUTS - UNSIGNALIZED INTERSECTIONS WORKSHEET
J. Pyrz
Edwards and Kelcey
7/8/2004
PM Peak Hour
040048034 Villa~e of WestC/ay
Intersection
Jurisdiction
Analysis Year
131st and Hoover
Carmel, Indiana
2008 - with Improvements
L T Traffic
TH Traffic
RT Traffic
EB WB NB 5B
Volume, veh/h 58 0 0 141
PHF 0.90 0.90 0.90 0.90
Flow rate, veh/h 64 0 0 156
Volume, veh/h 681 427 0 0
PHF 0.90 0.90 0.90 0.90
Flow rate, veh/h 756 474 0 0
Volume, veh/h 0 84 0 107
PHF 0.90 0.90 ' 0.90 0.90
Flow rate, veh/h 0 93 0 118
EB WB NB 5B
Upper bound 1225 1317 634 953
Capacity Lower bound 1016 1099 493 771
Upper bound 0.67 0.43 0.00 0.29
vIe. Ratio
Lower bound 0.81 0.52 0.00 0.36
HCS2000™ Copyright @ 2003 University of Florida, All Rights Reserved Version 4.1d