HomeMy WebLinkAbout0603.97.8ROUGH FRAMING NOTES:
1. USE (2)-2x4 CRIPPLES UNDER EACH END OF HEADER
FOR OPENINGS 8'-0" OR GREATER IN WIDTH
'2. ALL FIREPLACE STACKS ARE TO BE AT A HEIGHT MEASURED HORIZONTALLY
FROM ROOF PLANE OF 10' -0" AND A MIN. OF 24" VERTICALY FROM THE
HORIZONTAL PLANE. (UNLESS NOTED OTHERWISE)
3. ALL BEAMS TO HAVE MINIMUM (2)-2x4 STUDS UNDER
EACH END FOR BEARING SUPPORT
4. ALL WALLS TO BE 2x4 STUDS AT 16" O.C. UNLESS
NOTED OTHERWISE
5. ALL WINDOWS TO HAVE DRIP CAP MATERIAL AT TOP
6. STANDARD HEADER HEIGHT TO BE AT 6'-10 718" A.F.F. (U.N.O.)
7. FINISH FLOOR REFERENCES ARE TO TOP OF DECKING FOR FIRST AND
SECOND FLOOR FRAMING AND TO TOP OF CONCRETE FLOOR FOR BASEMENTS
8. ALL SOLE PLATES UNDER BASEMENT WALLS TO BE TREATED WOOD
eoles.FRMI
WINDOW SCHEDULE
.r
0
CODE
DESCRIPTION
R.O.W.
R.O.H.
HEADER HEIGHT
13
CW3260-IS
WCI -5
2' -9 1/4'
5'-0 112'
STD.
I
OVW2436
OvW -1
2' -1 3/4'
4' -1 3/4'
STD.
1
CV2440 -IS
WC1 -1
2'-0 112'
3'-5 I/4'
STD.
2
WT2424 -2
WT -2
4' -0 112'
2'-1'
1 STD.
3
CW2460 -1L
WC1 -2
2'-0 112'
5'-0 1/2'
STD.
1
ICWP6060
WCPI -6
5'-0 112'
1 5'-0 1/2*1
STD.
DOOR SCHEDULE
SYMBOL
0
LOCATION
DESCRIPTION
R.O.W.
R.O.H.
HEADER SIZE
REMARKS
1DD -9
2
2-1/61NT
3'-2'
6'-10 112'
2x4
W
ISWI -12
1
2 /OINT-R
2'-2'
6'-10 112'
2x4
ISWI -14
2
2 /41NT-L
2' -6'
6'-10 112'
2x4
G
ISWI -14
5
2 /41NT-R
2' -6'
6' -10 112'
2x4
DWO-30
2
2 /6DVO
2'-1'
6' -9"
2x4
ISVI -15
2
2 /61NT -L
2'-8'
6' -10 I 12'
2x4
to
ISWI -15
2
2 /61NT -R
2'-8'
6'-10 112
2x4
Lr
ISWI -16
1
to
2 /81NT -R
2' -10"
6'-10 1/2'
2x4
CVO -36
1
3 /OCO 1
3'-2' 1
6' -10 112'
2x4
q
ro. -7.
SECOND FLOOR FRAME PLAN
.jai,: yr = r -o•
-+ N
4 e
r� N
VJ n
r r.
r � _
PQa
bJ W
m
Q
`J
am.
x
.r
Ln
In
C�;
Z
i
m
m
m
s
-L
CL.
=
�Lnll�
m
W
w
w
w
=
LL-
�
to
CS
8
v
Cn
M
m
W
C-
J
C_7
F—
Cu
~ C>C
rn
W
O O
m
Z J
C;�
CO
O
G
c
_O
Co
tD
>
\
to
Lr
\
LO
to
Co
Z
3
C11
M
Cr
W
W
W
x
W
C�;
Z
i
tOf
s
-L
CL.
=
W
m
W
C3
O
=
LL-
�
to
CS
8
v
Cn
••
C'
x
C�;
Z
i
s
-L
CL.
V
W
C3
L
LL-
_
Cn
••
C'
m
W
C-
J
C_7
F—
Cu
~ C>C
O
W
O O
m
Z J
G
c
A9
DATE:
05/12/97