Loading...
HomeMy WebLinkAbout0210.99.5L ly W n m I m Y E 4)I 10 a n �I wa cl a CD N N W I I 1 � 1 I li I' \ , k�YYY Y' I r ,I t i ! 1 i i \ 1 `\ f l W a r W LD Z O N f t T 1 � I i / 1 v] LEGEND - STRAW BAR- INLET PROTECTION - RIP -RAP W rEWP~Y SEED-N,: uSE PLANTING CHAR1 10 - EROWN CONTROL ULANKET a z L ly W n m I m Y E 4)I 10 a n �I wa cl a CD N N W I I 1 � 1 I li I' \ , k�YYY Y' I r ,I t i ! 1 i i \ 1 `\ f l W a r W LD Z O N f t T 1 � I i / / as , J / o / - I N� . 1 -' GO 00 , 0 GUY ®T0.. PED. i I 1 i i t 1 f` r ,ri r r, 1 SM • f J , +W / c r ! i W y W W w , W i 1 W .Y W W W i /At, r• y / �, D I I / I i / I 1 , it x 10 9 - 1 8 1 7 I 6 4 EROSION CONTROL STATEMENT: 1. LOT 4, A PART OF BLOCK 12 IN CARMEL SCIENCE TECHNOLOGY PARK. 2. PROPOSED START DATE FOR CONSTRUCTION IS FALL OF 1998, WITH COMPLETION IN THE SPRING OF 1999. 3. THE SITE CURRENTLY DRAINS FROM THE NORTHWEST BOUNDARY TO THE SOUTHEAST TOWARDS A SWALE THEN INTO CARMEL CREEK, WHICH IS PART OF THE FERTIG REGULATED DRAN. 4. CONSTRUCTION ACCESS POINTS AND EQUIPMENT PARKING AREAS SHALL BE ESTABLISHED AS SHOWN ON THE PLANS AND STABILIZED IMMEDIATELY WITH A MINIMUM OF 12. OF /2 STONE OVER FILTER FABRIC (WHERE SPECIFIED) TO MINIMIZE MUD ACCUMULATION ONTO ADJACENT STREETS. DUST ON THE PROJECT SHALL BE KEPT TO A MINIMUM BY UTILIZING SPRINKLING, CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY ON ADHESIVES OR OTHER APPROVED METHODS. 5. LAND CLEARING AND GRADING CAN NOW COMMENCE. THE INITIAL PHASE WILL BE TO STRIP TOPSOIL FROM THE SITE AND STOCKPILE. ALL STOCKPILED SOIL SHALL BE SURROUNDED WITH SILT FENCE OR OTHER SUITABLE SILTATION BARRIER TO PROTECT SEDIMENTATION ONTO ADJACENT PROPERTY OR CONSTRUCTION AREAS. AREAS THAT CAN BE FINAL GRADED AND SEEDED SHOULD BE DONE SO IMMEDIATELY. AFTER FINISH GRADING ALL CONSTRUCTION AREAS ARE TO BE SEEDED FOR EROSION CONTROL. PERMANENT AND TEMPORARY SEEDING SHALL BE IN ACCORDANCE WITH THE DETAIL SPECIFICATIONS SHOWN. 6. THE STORM CONVEYANCE SYSTEM SHALL NOW BE INSTALLED. SILTATION BARRIERS SHALL BE INSTALLED AT ALL STORM BEEHIVE INLETS AND IN ALL DRAINAGE SWALES AS SHOWN ON THE PLANS AND DETAILS. 7. AFTER COMPLETION OF THE CUT /FILL REQUIREMENTS OF THE SITE, FINAL GRADING AND SEEDING SHALL BE DONE. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED AS SHOWN ON THE PLANS. TEMPORARY EROSION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PHASE OF THIS PROJECT MAINTENANCE • REQUIREMENTS ARE SHOWN IN THE DETAILS OF EACH EROSION CONTROL MEASURE. REMOVAL OF THESE MEASURES IS ACCEPTABLE ONLY WHEN THERE IS SUFFICIENT GROUND COVER TO PREVENT FURTHER EROSION /SILTATION. ADDITIONAL SEEDING /MULCHING MAY BE REQUIRED DURING CONSTRUCTION DUE TO THE INSTALLATION OF THE VARIOUS OTHER UTILITIES. & IT SHALL BE THE CONTRACTORS AND /OR OWNERS RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON -SITE CONSTRUCTION ACTIVITY) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS /DITCHES IN STRICT COMPLIANCE WITH -RULE 5- (327 AC 15 -5, CONSTRUCTION ACTIVITY STORMWATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTORS OR OWNERS RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, IND" DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. 9. THE IMPLEMENTATION AND MAINTENANCE OF THIS EROSION CONTROL PLAN IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND /OR OWNER. 10. SEE ADDITIONAL SPECIFICATIONS ON SHEET C7. 3 i 2 1 v] LEGEND - STRAW BAR- INLET PROTECTION - RIP -RAP W rEWP~Y SEED-N,: uSE PLANTING CHAR1 - EROWN CONTROL ULANKET a z uSE STAPLE PATTERN C) °w � NAG. S75 IN SWAT E � � F E✓; SI50 ON LAKE SLuPES - CONSTRUCTION ENTRANCE (12' Of 02 STONE ON FILTER FABRIC) W a d —SF- - SILT FENCE in z CAI aVU Cl z W l Wa w z Z a d' Q o I Z GO GO zWWO, W CQ eCDvV CK a WVZ<LNf) <ry W > vz_o M W = W W °0mW z I /* OZ— a ONE r w r W •P v w 4 y P r W W W rr W r o 0) rn OG v A� O JO� w� r) rr z a � In 0a0) s0000 04 x < 0. Arn A U A � V O A O / as , J / o / - I N� . 1 -' GO 00 , 0 GUY ®T0.. PED. i I 1 i i t 1 f` r ,ri r r, 1 SM • f J , +W / c r ! i W y W W w , W i 1 W .Y W W W i /At, r• y / �, D I I / I i / I 1 , it x 10 9 - 1 8 1 7 I 6 4 EROSION CONTROL STATEMENT: 1. LOT 4, A PART OF BLOCK 12 IN CARMEL SCIENCE TECHNOLOGY PARK. 2. PROPOSED START DATE FOR CONSTRUCTION IS FALL OF 1998, WITH COMPLETION IN THE SPRING OF 1999. 3. THE SITE CURRENTLY DRAINS FROM THE NORTHWEST BOUNDARY TO THE SOUTHEAST TOWARDS A SWALE THEN INTO CARMEL CREEK, WHICH IS PART OF THE FERTIG REGULATED DRAN. 4. CONSTRUCTION ACCESS POINTS AND EQUIPMENT PARKING AREAS SHALL BE ESTABLISHED AS SHOWN ON THE PLANS AND STABILIZED IMMEDIATELY WITH A MINIMUM OF 12. OF /2 STONE OVER FILTER FABRIC (WHERE SPECIFIED) TO MINIMIZE MUD ACCUMULATION ONTO ADJACENT STREETS. DUST ON THE PROJECT SHALL BE KEPT TO A MINIMUM BY UTILIZING SPRINKLING, CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY ON ADHESIVES OR OTHER APPROVED METHODS. 5. LAND CLEARING AND GRADING CAN NOW COMMENCE. THE INITIAL PHASE WILL BE TO STRIP TOPSOIL FROM THE SITE AND STOCKPILE. ALL STOCKPILED SOIL SHALL BE SURROUNDED WITH SILT FENCE OR OTHER SUITABLE SILTATION BARRIER TO PROTECT SEDIMENTATION ONTO ADJACENT PROPERTY OR CONSTRUCTION AREAS. AREAS THAT CAN BE FINAL GRADED AND SEEDED SHOULD BE DONE SO IMMEDIATELY. AFTER FINISH GRADING ALL CONSTRUCTION AREAS ARE TO BE SEEDED FOR EROSION CONTROL. PERMANENT AND TEMPORARY SEEDING SHALL BE IN ACCORDANCE WITH THE DETAIL SPECIFICATIONS SHOWN. 6. THE STORM CONVEYANCE SYSTEM SHALL NOW BE INSTALLED. SILTATION BARRIERS SHALL BE INSTALLED AT ALL STORM BEEHIVE INLETS AND IN ALL DRAINAGE SWALES AS SHOWN ON THE PLANS AND DETAILS. 7. AFTER COMPLETION OF THE CUT /FILL REQUIREMENTS OF THE SITE, FINAL GRADING AND SEEDING SHALL BE DONE. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED AS SHOWN ON THE PLANS. TEMPORARY EROSION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PHASE OF THIS PROJECT MAINTENANCE • REQUIREMENTS ARE SHOWN IN THE DETAILS OF EACH EROSION CONTROL MEASURE. REMOVAL OF THESE MEASURES IS ACCEPTABLE ONLY WHEN THERE IS SUFFICIENT GROUND COVER TO PREVENT FURTHER EROSION /SILTATION. ADDITIONAL SEEDING /MULCHING MAY BE REQUIRED DURING CONSTRUCTION DUE TO THE INSTALLATION OF THE VARIOUS OTHER UTILITIES. & IT SHALL BE THE CONTRACTORS AND /OR OWNERS RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON -SITE CONSTRUCTION ACTIVITY) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS /DITCHES IN STRICT COMPLIANCE WITH -RULE 5- (327 AC 15 -5, CONSTRUCTION ACTIVITY STORMWATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTORS OR OWNERS RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, IND" DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. 9. THE IMPLEMENTATION AND MAINTENANCE OF THIS EROSION CONTROL PLAN IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND /OR OWNER. 10. SEE ADDITIONAL SPECIFICATIONS ON SHEET C7. 3 i 2 1 v] LEGEND - STRAW BAR- INLET PROTECTION - RIP -RAP W rEWP~Y SEED-N,: uSE PLANTING CHAR1 - EROWN CONTROL ULANKET a z uSE STAPLE PATTERN C) °w � NAG. S75 IN SWAT E � � F E✓; SI50 ON LAKE SLuPES - CONSTRUCTION ENTRANCE (12' Of 02 STONE ON FILTER FABRIC) W a d —SF- - SILT FENCE SCALE: 1 " = 30' 0 15 30 6G 1A) SEE TITLE SHEET. 1B) THIS IS A ONE LOT DEVELOPMEN' ON ;.3t ACRES IN BLOCK 12 OF CARMEL SCIENCS AND TECHNOLOGY PARK. THE CONSTRUCTION SWILL CONSIST JF A NEW BUILDING, ASPHALT PAVEMENT AND PARKING AREAS WITH CONCRETE CURB & ENCLOSED STORM SEWERS. THE CONSTRUCTION SEQUENCING SHALL BE AS SHOWN ON THE TABLE BELOW. CONSTRUCTION SEQUENCE: A. CONSTRUCTION ACCESS DRIVE - STk:P TOPSOIL AND PLACE STONE AT ACCESS TO THE SITE FROM CHASE COURT (12 -1 -98) B. TEMPORARY EROSION CONTROL - CCNSTRUCT SILT BASIN AND SILT FENCING AT ENTRANCE - ONE DAY (12 -1 -98) C. SANITARY SEWER - INSTALL LATERIA, FROM EXISTING SEINER - TWO WEEKS (12 -3 -98 THRU 12- 17 -98) 0. EARTHWORK - STRIP TOPSOIL AND it-STALL PERIMETER SILT FENCING TO PREVENT SILTATION OFFSITE - THREE WEEKS (12 -3 -98 THRU 12- 24 -98) E. STORM SEWER - INSTALL CURB INLETS, STORM SEWERS, YARD INLETS PARKING LOT INLETS - THREE WEEKS (12 -31 -98 THRU 1- 21 -99) F. FINISH GRADING AND PERMANENT EkJSION CONTROL - FINISH GRADE SITE, FILTER FENCE AROUND ALL INLETS AND SITE, PERMANENT SEEDING OF SITE - ONE WEEK (1 -21 -99 THRU 2- 28 -99) G. PAVEMENT - INSTALL CONCRETE CUkaS, PARKING LOT FINISH GRADE, ADJUST SILT FENCING AROUND CURB INLETS AND TEMPORARY SEED BACK OF CURB - TWO WEEKS (3 -1 -99 THRU 3- 12 -99) H. PUBLIC UTILITIES - COORDINATE INSTALLATION OF WATERMAIN, GASMAIN, TELEPHONE AND ELECTRIC TRUNK LINES - THREE WEEKS (1 -28 -99 THRU 2- 19 -99) 1. CLEANUP - CONTRACTOR SHALL REMOVE ALL EXCESS MATERIALS, REGRADE AND STABILIZE ALL AREAS DISTURBED BY UTILITY INSTALLATION AND RESEED ALONG CURBS - ONE WEEK (2 -19 -99 THRU 2- 26 -99) J. BUILDING CONSTRUCTION - CONSTRUCTION OF COMMERCIAL BUILDING BY BUILDERS WHICH SHALL INCLUDE STONE CONSTRUCTION DRIVES, SILT FENCING BACK OF CURB AND TOP OF BANK ALONG BACK OF BUILDING - ONE YEAR (12 -98 THRU 11 -99) 1C) SHOWN ON PLANS 1 D) SHOWN ON PLANS 1E) LANDUSE OF ADJACENT AREAS: COMMERCIAL 2A) THE SITE WAS PRESENTLY PART OF A COMMERCIAL SUBDIVISION, PRESENTLY UNUSED. (SEE PLANS FOR TREE LINE LOCATION) 28) NO LAKES OR DESIGNATED (NAMED) WATERCOURSES ARE LOCATED ONSITE. WETLANDS INVENTORY MAPS INDICATE NO WETLANDS ON SITE. 2C) DOES NOT ENCROACH INTO A 100 YR FLOOD AREA 2D) A SOILS MAP FOR THIS IS PROVIDED IN THESE PLANS. 2E) EXISTING CONTOURS ARE SHOWN. PROPOSED SPOT ELEVATIONS ARE LOCATED ON THE DEVELOPMENT PLAN. 2F) THE SITE WATER WILL DISCHARGE INTO THE PROPOSED STORM SEWER IN THE PARKING LOT AND CONNECTING DRIVES, THE WEST SIDE OF THE SITE WILL DISCHARGE FROM NORTH TO SOUTH, AS IT DOES NOW, INTO CARMEL CREEK. 2G) THE SITE WILL OUTLET INTO CARMEL CREEK BEING PART OF THE FERTIG REGULATED DRAIN. 2H) THERE ARE NO DETENTION AREAS ON SITE. 21) SHOWN ON THE PLANS 3A) SHOWN ON THE PLANS 38) SHOWN ON THE PUNS (EXCESS DIRT WILL BE REMOVED FROM THE SITE) 4A) SEE 18 4B) SHOWN ON THE PLANS 4C) SHOWN ON THE PLANS 4D) SHOWN ON THE PLANS 4E) SHOWN ON THE PLANS 4F) SHOWN ON THE PLMIS 4G), SHOWN ON THE PLANS _ 4H) SHOWN ON THE PLANS 41) SHOWN ON THE PLANS -WARNING - 4J) SHOWN ON THE PLANS TH13 PLAN TO K USED FOR ILK) SHOWN ON THE PUNS EROSION CONTROL PURPOSES ONLY. FOR ALL OTHER INFORMATION SEE APPLICABLE SHEETS. .1 1 1 S T ABIL; ZALON PRACTICE AN FES MAR. APR. MAY JUNE JULY AUG SEPT DC NOv DEC - PERMANENT A SEEDING • / / / /1 / / / /•— • /I /Hr D DORMANr g.-- SEEO,NG TEMPORARY C�� SEEDING E •////1////•� -► SCCD,NC F w- '/////1/////' --i D MULCHING G A - KENTUCKY BLUEGRASS 40 LBS /ACRE; CREEPING RED FESCUE 40 LEIS /ACNE. PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE 8 - KENTUCKY BLUEGRASS 60 LBS /ACRE, CREEPING RED FESCUE 60 LBS /ACRE. PLUS 2 TONS STRAW MULCH /ACRE, OR ADO ANNUAL R+EGRASS 30 LBS /ACRE - SPRING OATS 3 BUSREL /ACRE. D . AHEAT OR RYE 2 BUSNEL/ACRE. E - ANNUAL RYECRASS 40 LAS/ACRE 0 LB/ 1000 5;; k7, F - SOD - STRAW MULCH 2 TONS /ACRE. • /I /• ARIC,ATION NEEDED OARING JUNE. JULY, AND /OR SEPTEMBER •• IRRIGATION NEEDED FOR 2 TO 3 WEEAS AfTER APPLYING 500 SEASONAL SOIL PROTECTION CHART STRAw 9A.ES IIVRILD 3' %raft eful"t V -04 NEW SIAKE 1 AIL• SILT TRAP TYf,Gy SLOTTED LASER (CAI K USED INSTEAD 1 1 OF STRAW &ALES) PUN NERD TYPICAL SLOTTED RISER CAN 8E USED INSTEAD STRAW Ii SrOAM KENNE 1 1 P -/L REBAR STAKE STRAIN BALES BURIED 3" r 2'X6• SILT TRAP SeCTIOW OEW STRAW BALE PLACEMENT FOR EROSION CONTROL MAINTENANCE: ' INSPECT THE STRUCTURE PROTECTION AFTER EACH STORM EvLNT. 2 REMOVE ACCUMULATED SEDIMENT AND MAKE NEEDED REPAIRS 3 WHEN DRANAGE AREA HAS BEEN STABILIZED, REMOVE ALL SEC.mENT AND CONSTRUCTION MATERIALS, GRADE DISTURBED AREA TO ELEVATION OF TOP OF INLET AND STABILIZE. Z POST p 2•33- LBS /FOOTR STEEL 5• MAA. SPACING WIRE FENCE _ 14 GAGE (MIN) -6 MESH REO'D. IN SALES OR I AREAS OF CONCENTRATED FLOW NONWOVEN FILTER 1 c FABRIC - SECVRE TO I n 3 POSTS WITH 2 LATH I 4'x4• TRENCH T O oowN- BOMUAPTpp O ANDCPSLOPE SLOPE I i - I I I MAINTENANCE: I INSPECT WEEKLY AND AFTER EACH STORM EVENT 2 IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMECLATELI 3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT C THE FENCE OR IS CAUSING FABRIC TO BULGE 4 TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC 5. AFTER DRAINAGE AREA IS STABILIZED. REMOVE FENCE AND SEDIMENT. BRING DISTURBED AREA TO GRADE AND STAB,L12E IT SILT FENCE SECTION (NO SCALE) u�C # CrA "I (NO SCALE) M TnC 2 a 1 CrA ( Br MInB2 MmB CrA vv , 1 0 j Br i ' •F� (•, -� C. TAek f r A SOILS MAP i v O s 0 U z a O O �z z tA 4 `�tt►t►Huu�I // / P�ptSTEgFO No. = 8827 • STATE OF Y0 , �fce ALLAN H. WEIHE P.E. 8829 u i 2 4 i? 4 Q� 0 n 0 O V � � q � w r ` a 0 q 0 0 a o o SHEET NO. C5 v] a � V a z C) °w � � � F E✓; a ,.a xw-a0. Aw I W a d L in z CAI aVU Cl z W Wa w z Z a d' Q o I Z GO GO zWWO, W CQ eCDvV CK a WVZ<LNf) <ry W > vz_o M = m W °0mW z OZ— a ONE v z W U r o 0) rn OG v A� O JO� w� r) ago z a � In 0a0) s0000 04 x < 0. Arn A U A � V O A O i v O s 0 U z a O O �z z tA 4 `�tt►t►Huu�I // / P�ptSTEgFO No. = 8827 • STATE OF Y0 , �fce ALLAN H. WEIHE P.E. 8829 u i 2 4 i? 4 Q� 0 n 0 O V � � q � w r ` a 0 q 0 0 a o o SHEET NO. C5