HomeMy WebLinkAbout05030113-Pool Plans SWIMMING POOL P~CHASE
A~T
THIS PURCHASE AND INSTALLATION CONTRACT ("Contract"), executed on
between hereinafter called the "Purchaser", whose
address is and MIKE McGHEE & ASSOCIATES,
INC., hereinafter called "Contractor".
WHEREAS, Purchaser is desirous of having Contractor build a swimming pool/spa at Lot
;and
WHEREAS, Contractor agrees to build and install a swimming pool/spa for Purchaser at
the above location; and
WHEREAS, Contractor and Purchaser agree that the s~ pool/spa shall be built and
installed under the following terms and conditions.
NOW, THEREFORE, Purchaser and Contractor agree to the following terms and
conditions:
PROJECT
Contractor shall furnish, except for such work specific~ excluded, all labor, materials,
tools, equipment and services as called for in the plans and specifications, said in-ground gunite
pool/~ sl~ be COmpleted in a WOrkmanlike manner:
The Purchaser agrees to make these payments to the Contractor .on the day the Contractor
presems an invoice. The Purchaser agrees that the Contractor has the right to stop work if these
payments are not timely received. The Co~.r~!or agrees that the pool will meet or exceed the
~qatinnal Spa & Pool Institute's residemial swimming pool standards.
The Purchaser agrees to make these payments to the Contractor on the day the Comractor
presems an invoice. The Purchaser agrees that the Contractor has the right to stop work il'these
payments are not timely received. The Contractor agrees that the pool will meet or exceed the
National Spa & Pool Institute's residential swimming pool standards.
SWIMMING POOL MEASUREMENTS
The pool will be built in accordance with plans, specifications and other doeumems
attached to this Contract.
Pool Shape: Rectan,.le
Pool Greatest Width: 20'
SCOP~
Water Depth. 3'5" to 9'
Activity of Pool: ~
and equipment and a scale drawing (on a
ns are as follows:
GENERAL CONSTRUCTION SPECIFICATIONS:
1. POOL LOCATION:~
2. POOL STRUCTURE DESIGN SHAPE:~
POOL FINISH: Gunite She~ _
PIPING MATERIAL: Sch 40 vc ~
3. TILE: 6 x 6 _ TYPE: Frost roof _
COLOR: Owners Choic~
4. SURFACE SKIMMER: 1 _ LOCATION: As det?~_'ed
5. COPING TYPE: Poured in Place _
6. INTERIOR FINISH: Diamond Brite _
7. STEPS: Standard WALKS:__
8. OTHER: P '~cast h'd to match co-'_ ~.
a~zv_roximatel ~e lare ste s ,,--_: shallow end_
PLUMBING AND FILTERING SPECIFICATIONS:
9. PUMP AND MOTOR: MAKE: Sta-Rite~ MODEL: TBD _
SIZE: 1 ½_ HP TYPE: Medium Head_ _
2'~
MAIN SUCTION LINE SIZE z _ _
RETURN TO POOL LINE SIZE: 2"
FILTER SYSTEM: MAKE: Sta-Rite MODEL: 450 · .ff. Modular Media_
10. HEATER: MAKE: Sta-Rit MODEL:
BTU: _335_000 TYPE: Natural
POOL CLEANER: MAKE:_ Paramount TYPE: In-Floor
CHLORINATOR: MAKE: Rainbow . Erosion TYPE:_
OTHER EQuIPMENT:_
LIGHTS: I _ WATTS: 500__ VOLTAGE: 12_
2
11. DIVING BOARD: MAKE: S.R. Smit_ h__ MODEL:~Frontier III SIZE: 10'_
DIVING STAND: MAKE:S.R. Smith_ TYPE: Steel SIZE: _1/2 Meter
LADDER: MAKE: TYPE: SIZE:
HANDRAIL: 1 ~~lwithrecessed, lastic ste s _
12. CLEANING EQUIPMENT: 35' ~ vacuum head 16' telesco .in_
WALL & FLOOR BRUSH:_I 8'} Gunite
LEAF SKIMMER: Deluxe _
WATER TEST KIT: DPD . e
OTHER ACCESSORIES: ~ H: dmstatic valve_
FOR ANY DESIGNATED MATERIAL, EQUIPMENT, PRODUCT, METHOD OF
CONSTRUCTION, INSTALLATION OR SERVICE IDENTIFIED BY SPECIFIC BRAND OR
TRADE NAME, CONTRACTOR HAS THE RIGHT TO SUBSTITUTE AND FURNISH
ANOTHER MATERIAL, EQUIPMENT PRODUCT. METHOD OF CONSTRUCTION.
INSTALLATION OR SERVICE OF COMPARABLE QUALITY OR UTILITY.
ADDITIONAL WOR~
ifps,
to perform ~'
th~ actual ,{
Contractor:
by both patti
be due and
Contractor sl
due.
:baser requests Con_tractor to perform additional work and if the Contractor is ~g
ch additional work, Purchaser agrees to pay Contractor for each item of extra work at
st of subcontracts, labor, materials and equipmem plus Fifteen Percem (15%) for
~verhead and fee. Request for extra work or modifications shall be in writing, signed
.'s and shall become part of this contract. All sums for extras or modifications shall
payable when completed, concurrent with the Other progress payments, and the
~ have the right to stop work and keep the job idle if payments are not made when
Extra work shall include, but is not limited to the following:
Any changes requested by the
S In areas (
ground water or any
systems, electrical wires, water or sewage
: or alteration from the drawings or specifications.
3