Loading...
HomeMy WebLinkAbout0629.97.10 M M N C, N i i i 3-GAR 51PE ENTRY GARAGE 1/411 = 11.0" O � M =o 0 1-4 LEAD WALL PASTI OVER Di6-_ e I 0 M 551-8" FOUNDATION PLAN 1/411 : 1141 NOTE: 50ME COLUMN OIMEN51ON5 ARE FROM CENTER OF COLUMN TO EXTERIOR FACE OF BASEMENT WALL. NOTE ERRORS AND OM1551M WHICH MAY OCCUR IN THE CONTRACT DOGUMENT5 SHALL M BROUGHT TO THE ATTENTION OF THE ARCHITECT, IN WRITING, AND WRITTEN IN5TRUCTION 5HALL BE OBTAINED PRIOR TO PROCEEDIN6 WITH CONSTRUCTION. THE CONTRACTOR SHALL BE HELP RE5PON5113LE FOR ANY ERROR5, D156REPANGIE5 OR OM15510N5 FOR WHICH THE CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR TO CONSTRUCTION AND /OR FABRICATION OF THE WORK. O �O r- III 5EWER - SLEEVE Qp 0 M II I�11 0 o �I VERIFY SUMP LOCATION W/ 5UPERINTENOANT 0 m 1 NOTE: FIELD VERIFY UTILITY LOCATIONS FOR 51DE OF HOUSE W/ 5UPERINTENDANT s G. M IGHAEL WAN60UR Architects / Consultants 1365 5henandoah Rochester Hips Michigan 48306 PIJLIM ! aster Builder 'ro ject NDI-ANA IV 1510N 2220 North Meridian 5t. iuite 1185 ,arme), Indiana 46032 5ub&i%m / P& W I N P 50R Job No. 2779 Sheet Title FOUNDATION PLAN AND OPT IONS FULL 5A5EMENT w c oc w Y� Ua p� 2 mQ Sheet No. IAB 5HT of N Field verify all dimensions DO NOT SCALE DRA WINGS! 1 244" 111.411 131_$u 201-4 1/2" 4'-3 1/2" 61-1" 51-211 61-111 o 1101 1110 p I 0 I N � — —— --�J re W8x185TLBM - -- tf) OC o Q 8" POURED GONG WALL uj w ",III �> u W/ 4x12 BRICK LEDGE ° ° III i° o 81-0" POURED HT ON l III ° III X ° 8" x 20" CONT. SPREAD r, �? FOOTING V-: cs -- POINT LOAF PG — FROM A60VE POINT LOAD PG M w �, PG o I FROM AbOV IL k- �, a o KNEEWALL 32" ABOVE `n - � � � 'o o ,STAIR TREAD N05E III N x CIN w 6 5 4 _ 6 41-011 v w �.0 TYP BEAM POCKET; BLEEDER 1� i Q�--j 6 - -- -- - - -- -- - - - - - -- 61,WiDE, 5 DEEP - Uu cv to o __ _ _ _ 1 8 " HIGH - voo -- - - -- - -�_� O68 WALL ( I i 12 BLEEDER 11111 111 O UP 13 w - 2 "2x10 HDR — - Nx31 5TL BEAM o - " PIA. 5% P05T ON 3 °• _ — FAU - - - - - - - - - 2x12 5YP W/ - - - - - - I 30" x 30" x12" GONG PAD FTG xb WALL ON 1611 x 811 GOVT. CONIC THICKENED SLAB -' N I 2- 1/2" PLYWO FL ITCHES 5 1/2" � 11 I f I 1 I I i I I 20'- 11 I FD OUCH IN 3 PIPE FOR BA5EMENT II I I I I I I I - - - - - - I I I ® ( RADON N EXHAUST W/ "T" BELOW 5LAB -0- 4" CONC. SLAB ON MIN 4° COMP. SAND FILL () `n D ~ � _ _N PG = ROUGH IN I I/2" PIPE v TO FLOOR DRAIN FOR - ° > ° L o~° >- YY PG Q!: BLEEDER I 1 - - - - - I FAU CONDENSATE o ° ov '4 REBAR a 24" O.G., 7' LONG BLEEDER III 1 111 0 uj TO SPAN OVER-016 201-4 1 /2" I x 351-3 1/211 N II N o UNEXGAVATED SUMP 1102 — — 1101 — i — 4 "CONC.5LABW/ - -1 - MIN. 4" GLEAN COMP. SAND FILL LEAD WALL PAST OVER DIG SEE ELEVATIONS FOR o FOUNDATION LAYOUT I I WATqR AND WER ENTRANCE LOCATION IN TH15 AREA NOTE: PROVIDE (2) '4 REBAR, TEN FT. LONG TO SPAN UTILITY TRENCH 1120 21-6" 161 -4" 341-4" 21.611 211-411 FOUNDATION PLAN 1/411 : 1141 NOTE: 50ME COLUMN OIMEN51ON5 ARE FROM CENTER OF COLUMN TO EXTERIOR FACE OF BASEMENT WALL. NOTE ERRORS AND OM1551M WHICH MAY OCCUR IN THE CONTRACT DOGUMENT5 SHALL M BROUGHT TO THE ATTENTION OF THE ARCHITECT, IN WRITING, AND WRITTEN IN5TRUCTION 5HALL BE OBTAINED PRIOR TO PROCEEDIN6 WITH CONSTRUCTION. THE CONTRACTOR SHALL BE HELP RE5PON5113LE FOR ANY ERROR5, D156REPANGIE5 OR OM15510N5 FOR WHICH THE CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR TO CONSTRUCTION AND /OR FABRICATION OF THE WORK. O �O r- III 5EWER - SLEEVE Qp 0 M II I�11 0 o �I VERIFY SUMP LOCATION W/ 5UPERINTENOANT 0 m 1 NOTE: FIELD VERIFY UTILITY LOCATIONS FOR 51DE OF HOUSE W/ 5UPERINTENDANT s G. M IGHAEL WAN60UR Architects / Consultants 1365 5henandoah Rochester Hips Michigan 48306 PIJLIM ! aster Builder 'ro ject NDI-ANA IV 1510N 2220 North Meridian 5t. iuite 1185 ,arme), Indiana 46032 5ub&i%m / P& W I N P 50R Job No. 2779 Sheet Title FOUNDATION PLAN AND OPT IONS FULL 5A5EMENT w c oc w Y� Ua p� 2 mQ Sheet No. IAB 5HT of N Field verify all dimensions DO NOT SCALE DRA WINGS! 1