Loading...
HomeMy WebLinkAbout12100043.11O EW EXISTING MB W4TOILET N :R0 0 - ___ k 0 _:OMS MEN'S 2 TOILET RM 104 O 3 EXISTING LAV O / EXISTING " io ° FD \ �\ EXISTING y HWC (o) EXISTING LAV EXISTING FD WOMEN'S HDF EXISTING TOILET ��L HWC RM 105 O 1 I ENLARGED PLUMBING PLAN P1 J SCALE: 3/8" = V -O" MOP HANGER co It in cn EYEWASH (EW) ;RACKET -ING MOP BASIN (M I — FINISHED FLR. WALL BASE 2 I ELEVATION AT MOP BASIN P1 j SCALE: NOT TO SCALE (SIMILAR) KEY NOTES: OROUTE NEW SANITARY IN WALL AND DROP TO 3" (MINIMUM) SANITARY AT WATER CLOSETS TO MINIMIZE WORK BELOW THE SLAB. EXTEND NEW 1 -1/2" VENT PIPING UP AND CONNECT TO NEAREST EXISTING VENT OF SAME SIZE OR LARGER. FIELD VERIFY EXACT SIZE, LOCATION, PRESSURE, ETC. OF EXISTING PIPING PRIOR TO ROUGHING IN OR INSTALLING NEW PIPING. 0 EXISTING WATER HEATER TO REMAIN. CONTRACTOR SHALL VERIFY EXACT LOCATION & CONDITION OF WATER HEATER AND CONNECTED PIPING PRIOR TO SUBMITTING BID. CONTRACTOR SHALL DRAIN, CLEAN AND RESTORE TO "LIKE NEW" CONDITION OR CONTACT OWNER'S REPRESENTATIVE IMMEDIATELY IF REPLACEMENT IS RECOMMENDED. CONTRACTOR SHALL VERIFY PRESENCE AND CONDITION OF EXISTING T &P VALVE AND REPLACE IF NOT IN PROPER WORKING ORDER. ROUTE DRAIN PIPING INTO MOP BASIN AS REQUIRED. OEXISTING FIXTURE TO REMAIN AND BE REUSED. CONTRACTOR SHALL CLEAN AND REFURBISH TO "LIKE NEW" CONDITION AND ENSURE ALL DRAINS AND PIPING IS FREE - FLOWING, OR CONTACT OWNER'S REPRESENTATIVE IMMEDIATELY IF REPLACEMENT IS RECOMMENDED. 4O EXTEND NEW 1/2" COLD WATER TO DRINKING FOUNTAIN FROM NEAREST EXISTING 3/4" OR LARGER COLD WATER PIPING. FIELD VERIFY EXACT SIZE, LOCATION, PRESSURE, ETC. OF EXISTING PIPING PRIOR TO ROUGHING IN OR INSTALLING NEW PIPING. 5O INSTALL NEW EYEWASH AS INDICATED IN PLAN AND DETAILS, THIS SHEET. VERIFY PRIOR TO PLACING FIXTURE ORDERS THAT NEW EYEWASH IS COMPATIBLE WITH EXISTING MOP BASIN FAUCET. IF IT IS NOT, PROVIDE NEW FAUCET PER PLUMBING FIXTURE SCHEDULE, THIS SHEET. 6O INSTALL MOP BASIN ACCESSORIES (SEE MB ON FIXTURE SCHEDULE AND DETAIL #2 /P1), IF NOT ALREADY EXISTING. PLUMBING FIXTURE SCHEDULE CU CHECKED: g4 v S. p DATE: 08/ PIPING REQUIREMENTS 0 APPROVED MARK DESCRIPTION MANUFACTURER CATALOG NO. ACCESSORIES REMARKS MANUFACTURERS WASTE VENT SUPPLY HANDICAP ACCESSIBLE HWC WATER CLOSET NOT USED (TANK TYPE) HANDICAP ACCESSIBLE LAV LAVATORY NOT USED (WALL MOUNTED) HDF BARRIER -FREE TWO STATION HI /LO ELKAY EZSTL8LC ACCESSORY APRON #LKAPREZL ON UPPER UNIT 1 -1/2" 1 -1/2" 1/2" UPPER HEIGHT 40" A.F.F. LOWER HEIGHT 33" A.F.F. HALSEY TAYLOR (THREE SIDES OF CONTROL) (ADA COMPLIANT WHEN MOUNTED ON EXPOSED WALL) ADA COMPLY DRINKING FOUNTAIN FD FLOOR DRAIN I NOT USED CO CLEANOUT (INTERIOR) NOT USED TMV THERMAL MIXING VALVE NOT USED TP TRAP PRIMER NOT USED WHA WATER HAMMER NOT USED ARRESTER FIAT #832 -AA HOSE /BRACKET & #889 -CC -24 HANGER 3" 2" 3/4" WITH VACUUM BREAKER HAWS, ZURN MB MOP BASIN EXISTING TO REMAIN SPEAKMAN SC- 5811 -RCP FAUCET EW EYE WASH SPEAKMAN SEF -9000 SEF -9000 EYE WASH - - 1/2" - - BFP BACKFLOW PREVENTOR NOT USED WH WATER HEATER NOT USED NOTE: 1. COORDINATE ROUGH -IN OF ALL PLUMBING FIXTURES WITH ARCHITECTURAL DRAWINGS. 3. FOR HANDICAPPED - ACCESSIBLE WATER CLOSETS, FURNISH AND INSTALL WITH FLUSH HANDLE ON THE WIDE SIDE OF THE RESTROOM. 2. SINKS AND LAVATORIES FOR HANDICAPPED ACCESS SHALL BE INSTALLED WITH OFFSET TAILPIECES. ALL SINK AND LAVATORY DRAIN AND WATER LINES SHALL BE INSULATED WITH PROTECTIVE DEVICES EQUAL TO "McGUIRE" #PW 2150 WC WHITE MOLDED CLOSED CELL VINYL, OR "TRUEBRO" #103W, WHITE MOLDED VINYL. PIPING LEGEND — — — EX GAS — — — EXISTING GAS PIPING GAS NEW GAS PIPING —�— W WATER (BELOW GRADE) -- HW — — HOT WATER CW — S S —f— O COLD WATER WASTE WASTE (BELOW GRADE) VENT WATER HAMMER ARRESTER FLOOR DRAIN, SEE SCHEDULE GENERAL PLUMBING NOTES: 1. DRAWING IS DIAGRAMMATIC AND IS NOT TO BE SCALED. REFER TO ARCHITECTURAL PLANS FOR DIMENSIONS. 2. ALL PLUMBING WORK IS TO BE DONE IN ACCORDANCE WITH THE APPLICABLE CODE(S) NOTED ON THE COVER SHEET. 3. PIPING MATERIAL (UNDERGROUND & ABOVE GROUND WATER, DRAIN, WASTE & VENT) SHALL BE PER APPLICABLE CODE NOTED ON THE COVER SHEET. 4. VALVES ON WATER LINES SHALL BE BRONZE BALL VALVES. DO NOT SUBSTITUTE GATE OR GLOBE VALVES. VALVES SHALL BE THE SAME SIZE AS THEIR INLET PIPING. 5. ALL PLUMBING FIXTURES ARE TO BE FURNISHED COMPLETE WITH NECESSARY STOPS, TRAPS, TAILPIECES, TRIM, ETC. 6. THE CONTRACTOR SHALL COOPERATE AND COORDINATE WITH ALL OTHER CONTRACTORS AND SUBCONTRACTORS IN LAYING OUT AND INSTALLINGT HIS WORK. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING A COMPLETE AND FUNCTIONAL SYSTEM IN ACCORDANCE WITH THE INTENT OF THE PLANS, WHETHER OR NOT EVERY ELEMENT THEREOF IS SPECIFICALLY CALLED OUT. 8. DO NOT INSTALL CAPPED AIR CHAMBERS AT FIXTURES. INSTALL WATER HAMMER ARRESTORS AS CALLED FOR ON PLAN. ARRESTORS ARE TO BE RATED FOR INSTALLATION IN CONCEALED LOCATIONS. 9. ALL HOT AND COLD WATER SUPPLY PIPING CONNECTIONS TO FIXTURES SHALL BE 1/2" UNLESS NOTED OTHERWISE. 10. PLUMBING PIPING SHALL NOT BE INSTALLED ABOVE ELECTRICAL PANELS. PROVIDE REQUIRED CLEARANCES PER "N.E.C. ". COORDINATE ELECTRICAL PANELS LOCATIONS WITH THE ELECTRICAL CONTRACTOR. 11. INSTALL PIPE INSULATION ON ALL DOMESTIC WATERLINES ABOVE FINISHED FLOOR INSULATIONTHERMAL CONDUCTIVITY 0.25 BTU- IN. /HR- SF - - °F. 12. CONTRACTOR SHALL COORDINATE WITH ALL STATE AND LOCAL BUILDING REGULATION AGENCIES AND UTILITY COMPANY(S) IN THE PROCUREMENT OF AND PAYMENT OF ALL PERMITS, LICENSES, FEES AND CHARGES REQUIRED FOR THE PERFORMANCE OF THE WORK. 13. PROVIDE CHROME ESCUTCHEON COVERPLATES AT ALL PIPE PENETRATIONS OF FINISHED WALL SURFACES. 14. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ROUTE ALL WATER PIPING AROUND SPACES WITH TEMPERATURES BELOW FREEZING (i.e. ATTICS, CHASES, EXTERIOR WALLS, ETC.) IF FREEZING OF ANY WATER PIPING OCCURS IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR THE PIPING THRU A NON - FREEZING SPACE TO THE FIXTURE / APPLIANCE ORIGINALLY SERVED BY THE FROZEN PIPING. 15. ALL CAULKING ON BUILDING PENETRATIONS SHALL BE ELASTOMERIC POLYURETHANE (NO EXCEPTIONS) EQUIVALENT TO "VULKEM" 116. ANY CONTRACTOR WHO USED SILICONE OR ANY OTHER CAULKING WILL BE REQUIRED TO REMOVE AND REPLACE WITH ELASTOMERIC POLYURETHANE AT HIS OWN EXPENSE. 16. CONTRACTOR SHALL PROVIDE A ONE YEAR WARRANTY FROM THE DATE OF ACCEPTANCE BY THE OWNER ON ALL WORK PERFORMED. 17. PLUMBING SUB - CONTRACTOR SHALL INFORM THE ELECTRICAL SUB - CONTRACTOR OF THE VOLTAGE AND POWER REQUIREMENTS OF ALL PLUMBING EQUIPMENT TO BE INSTALLED. 18. INSTALL ACCESS PANELS OR DOORS WHERE EQUIPMENT AND /OR VALVES ARE INSTALLED IN CONCEALED LOCATIONS. 19. ALL WATER HEATERS AND HOT WATER STORAGE TANKS SHALL HAVE A DRAIN VALVE INSTALLED AT THE BOTTOM OF THE TANK AS REQUIRED BY CODE. r DISTRIBU7 O OWNER REVIE1 ' PERMIT /BID Jeffrey S. Ti License #110, Exp. Date: 7/: Professional of I SHEETS BEARING THIS SEAL A RESPONSIBILITY FOR ALL OTHI OR INSTRUMENTS ARE DISCLAI O w O W r- (� O CN Z w ( N o O �- �Z!! _ LJ;� o�J C Of O U) a IM N F a CL 0 a 0 DRAWN: CU CHECKED: g4 v S. p DATE: 08/ JOB NO.: 31 0 G+'9 Jeffrey S. Ti License #110, Exp. Date: 7/: Professional of I SHEETS BEARING THIS SEAL A RESPONSIBILITY FOR ALL OTHI OR INSTRUMENTS ARE DISCLAI O w O W r- (� O CN Z w ( N o O �- �Z!! _ LJ;� o�J C Of O U) a IM N F a CL 0 a 0 DRAWN: CU CHECKED: JS' DATE: 08/ JOB NO.: 31 SHEET: 1 c