HomeMy WebLinkAbout12100043.12A 0
MEN'S
TOILET RM.
104
- - - - - - - - -
75 ELECTRICAL
w� �...
6 "0
(TYP.3)
I
1 II
I
ICI
I
.........- :::.. 106
. .... _...._ _.._ CFM 8
8 "0 1 p� 0 - -
..�
TO RELATED RTU-1 1 S C� T
i A "C° THERMOSTAT CO �O
€ € 1
p "0 PAIItTS� E � MO �I I
G1 G1 € G1 W` 20� - TO ET RM
_.. _
100 ___... _ ..... 100 T 100 0 G 1 ®2 I •
105
- --
.----
W _ ...... ._.. _ _ S - T LATED ? T 1 X. DUCT - F. .
I
MCI
CAL
CO THER STAT � (TYPI
s,
I fi.
10,10 I I 10,10
Ld
1 ' p°0.
12 "0 III '
300 �I
300
460 �? I :. _._..... ;......_._.__.W ................ _
G 1 ` G 1 G G 1 Q T.Q.fELATED
-
TO RELATED 36x14 J E ... .. «__...._£-- _._....._._._...._ «.....36x14 Al
9 TO RELAT D i ._ M \
26x14 THERMOSTAT O -cOM THERMSAT _ -mm 3060
3060
- COM_..r, _ 9 CFM may.
1800 ::.: _ .: W..._ KCFM. _._ ... ?
CFM 4 _.. ( ? TYP I ........3_ SD
_...
, ..... I RTU 2. -- �4. I
....
v_L Iwo _ _ f _
_w.._ L 1 1 10 010
360 1 j RTU -3 TYP. 250 L O 275 «.... ,_..._......_. IT I G1 G1 G1._ ._ _-�- 3�
.._ ......
"
10 QJ G1 � G1
PARTS AREA
_ E
I
Im A- AR - ? 10 "0 I 10 110
360 I °A° 100 250
G 1 G 1 G 1 L. L
�LLIu �. �>
J { r
..
.__ 1 , o
360 IX I I� ;'..W_ _ .� :� _ �►_
Lu 250
275 ' °fit U -
G1 IL�i `"
raG1 g4-1- CG1
CFM
1
« G1 I 450
12 "0 112 1 1 10 "0 I V-90
460 I I 450 ( I 275 I I 10 "0
TO RELATED
G1 THERMOSTAT
...........
8 "0
Kll
L--- ---
- - - - - - -
-------- ------- - - - - -�
SQUARE OR
O
1 HVAC PLAN
MI SCALE: 1/8" = V -0"
NOTE:
THESE DRAWINGS WERE PREPARED FROM PHOTOGRAPHS AND
A FIELD SURVEY REPORT (BY OTHERS). SOME ASSUMPTIONS
WERE MADE REGARDING EXISTING STRUCTURE, EQUIPMENT,
SIZES, AND LOCATIONS. CONTRACTOR SHALL FIELD VERIFY
ALL EXISTING CONDITIONS PRIOR TO SUBMITTING A BID.
ZSM
AOUNTED "ZSM" AT
" -3" A.F.F. TO BOTTOM
)F SENSOR
FLOOR
ih
t`
1/4" THICK FOAM
RUBBER OR CORK
PAD. MOUNTING
SCREWS PENETI
PAD. PAD TO
COMPLETELY CC
BACK OF SENSOI
ZONE SENSOR
MODULE "ZSM"
NOTE:
MOUNT NEW DUCTWORK TIGHT TO STRUCTURE. ALL AIR DEVICES
SHALL BE PLACED SO AS NOT TO INTERFERE WITH LIGHTING OR
FIXTURE PLACEMENT.
GENERAL CONTRACTOR TO PAINT ALL DUCTWORK. SEE
ARCHITECTURAL DRAWINGS AND FINISH SCHEDULES FOR SPEC.
AND ADDITIONAL INFORMATION.
ZONE SENSOR
2 MODULE INSTALLATION
M 1 SCALE. N.T.S.
f %I DUCT THERMO-
I[f J STAT SENSOR
F - - - -- --I (DTS)
RTU FLOW
I � >
i
- - - - - - - - - - - - - - - - - -
:e< - ----- - - - --J
i
L T
J �� 0 (ZSM)
SEE 1/M1 FOR / 0
THERMOSTAT LOCATIONS r7v_
-COM- - -
CONTINUE TO HUB
MODULE (SEE SHEET ES2)
3 RTU EMS WIRING
M 1 SCALE. N. T.S.
TYPICAL
LINING SECURED TO DUCT
WITH 100% COVERAGE OF
ADHESIVE
LINER JOINTS
DUCT SIZES GIVEN T
CORNERS
ARE CLEAR INSIDE
`- JOINTS TIGHTLY
SHEETMETAL DUCT BUTTED TOGETHER
W/ 100% ADHESIVE
DUCTS MUST COVERAGE
BE AIRTIGHT
UNLESS OTHERWISE NOTED DUCT LINING
SHALL BE 1" THICK 1 1/2 LB. DENSITY.
PROVIDE MECHANICAL FASTENERS
WHERE REQUIRED.
RECTANGULAR
4 DUCT LINER INSULATION
M 1 J SCALE: N.T.S.
KEYED NOTES:
NEW ROOFTOP(SEE SCHEDULE ON SHEET M2) SHALL BE PLACED ON EXISTING CURB. CONTRACTOR SHALL FIELD VERIFY
EXISTING CURB IS ADEQUATE FOR NEW UNITS PRIOR TO PLACING HVAC ORDER. NO CURB ADAPTERS MAY BE INSTALLED
AT THIS SITE. CONTACT PROFESSIONAL OF RECORD IMMEDIATELY WITH ANY EXPECTED CONFLICTS. RECONNECT UNIT
TO EXISTING SUPPLY AND RETURN DUCT DROPS. RECONNECT NEW UNIT TO EXISTING GAS AND CONDENSATE PIPING -
PROVIDE EXTENSIONS / MODIFICATIONS AS REQUIRED. CONTRACTOR SHALL VERIFY EXISTING GAS METER AND PIPING IS
IN PROPER WORKING CONDITION AND IS OF ADEQUATE SIZE TO SERVE THE PROPOSED ROOFTOP UNITS. INCLUDE ANY
NECESSARY REPAIRS OR REPLACEMENTS IN SUBMITTED BID.
EXISTING TOILET EXHAUST FAN(S) TO REMAIN. VERIFY THAT EXHAUST QUANTITY FROM EXISTING FAN(S) IS 100 CFM
0
MINIMUM PER RESTROOM. CONTRACTOR SHALL VERIFY EXACT LOCATION(S) & OPERATION, AND REPAIR OR REPLACE AS
REQUIRED. CLEAN AND REFURBISH EXISTING GRILLE TO "LIKE -NEW" CONDITION.
3 INSTALL DUCT SMOKE DETECTOR IN UNIT RETURN. SEE ROOFTOP UNIT SCHEDULE FOR MORE INFORMATION.
4 INSTALL DUCT TEMPERATURE SENSOR (DTS) IN SUPPLY DUCT DROP FROM ROOF TOP UNIT.
5 12 "x12" DUCT WITH ELBOW UP FROM "R2" TO JUST ABOVE THE CEILING PLATFORM.
6 MOUNT "ZSM" IN THIS LOCATION. SEE DETAIL 2 /M1 FOR INSTALLATION.
7 PROVIDE VOLUME DAMPER IF NOT EXISTING.
8 INSTALL COMMUNICATIONS CABLE FROM THERMOSTATS TO THE HUB MODULE MOUNTED WITH THE "EMS" SYSTEM (SEE
SHEET ES2). SEE SHEET E2 FOR MOUNTING OF ADM EQUIPMENT. (TYPICAL OF 3).
OCOVER OPEN END OF RETURN WITH 1" MESH HARDWARE CLOTH AND FILTER IN A REMOVABLE FRAME. SEE DETAIL ON M2.
10 CONTRACTOR SHALL VERIFY EXACT SIZE, LOCATION AND CONDITION OF ALL EXISTING DUCTWORK AND INCLUDE ANY
REQUIRED REPAIRS IN SUBMITTED BID. EXPOSED DUCTWORK DOES NOT NEED TO BE INSULATED. CONTACT
PROFESSIONAL OF RECORD IF ANY VERIFIED DATA IS IN CONFLICT WITH THE REMODEL WORK INDICATED IN THESE
CONSTRUCTION DOCUMENTS AND /OR SUPPLY DUCTWORK HAS A GREATER THAN .10/100' FRICTION DROP FOR CFM
SHOWN.
11 EXISTING AIR DEVICE TO REMAIN. CLEAN AND REFURBISH TO "LIKE -NEW" CONDITION. REBALANCE TO QUANTITY
INDICATED ON THE PLAN.
HVAC OUTDOOR AIR
REQUIREMENTS
1. SALES = 6073 SQUARE FEET
2. OFFICE = 78 SQUARE FEET
2006 INTERNATIONAL MECHANICAL CODE REFERENCES:
TABLE FOR REQUIRED OUTDOOR VENTILATION AIR
SALES: ( "SPECIALTY SHOPS - HARDWARE" OCCUPANCY)
6073 (SQ. FT.) / 1000 (SQ. FT.) = 6.073
6.073 X 8 (PERSONS PER 1000 SO. FT.) = 49 PEOPLE
49 PEOPLE X 15 (CFM PER PERSON) = 735 CFM OUTSIDE AIR REQ'D
OFFICE: ( "OFFICES - OFFICE SPACES" OCCUPANCY)
78 (SQ. FT.) 1 1000 (SQ. FT.) = 0.078
0.078 X 7 (PERSONS PER 1000 SQ. FT.) = 1 PERSON
1 PERSONS X 20 (CFM PER PERSON) = 20 CFM OUTSIDE AIR REQ'D
735 CFM + 20 CFM = 755 CFM TOTAL O.A. REQUIRED
RTU -1 340 CFM OUTSIDE AIR
RTU -2 340 CFM OUTSIDE AIR
RTU -3 200 CFM OUTSIDE AIR
TOTAL O.A. PROVIDED = 880 CFM
CONTINUOUS
VAPOR BARRIER
SNAPLOCK
SHEETMETAL
ROUND DUCT
DUCT SIZES GIVEN
ARE CLEAR INSIDE
4" WIDE SEALING STRIP
SECURED IN PLACE
W/ 100% ADHESIVE
DUCTS MUST COVERAGE
BE AIR TIGHT
UNLESS OTHERWISE NOTED DUCT WRAP
SHALL BE 1 1/2" THICK 1 LB. DENSITY
PROVIDE MECHANICAL FASTENERS
WHERE REQUIRED.
ROUND DUCT
WRAP INSULATION
MI J SCALE: N.T.S.
DUCT LINER
WHERE REQUIRED
SINGLE THICKNESS VANES
UP TO 16" LONG.
DOUBLE THICKNESS VANES
OVER 16" LONG.
-SHEETMETAL
DUCT
6 TURNING VANES
M1 SCALE: N.T.S.
MECHANICAL LEGEND
®
FLOW
(-I%- -
<1
SQUARE OR
O
RECTANGULAR
EXHAUST REGISTER
I
ELBOW
SO
i LL
DUCT LINER
WHERE REQUIRED
SINGLE THICKNESS VANES
UP TO 16" LONG.
DOUBLE THICKNESS VANES
OVER 16" LONG.
-SHEETMETAL
DUCT
6 TURNING VANES
M1 SCALE: N.T.S.
MECHANICAL LEGEND
®
SUPPLY DIFFUSER (4 -WAY)
mSUPPLY
DIFFUSER (1 -WAY)
RETURN AIR GRILLE
®
EXHAUST REGISTER
�yEXISTING
SUPPLY DIFFUSER
SO
EXISTING RETURN AIR GRILLE
Ry
I y I
Ic_J
EXISTING EXHAUST REGISTER
SD
RECTANGULAR OR ROUND DUCT
EXISTING DUCT (VERIFY SIZE /SHAPE)
GENERAL NOTES:
1. DRAWING IS DIAGRAMMATIC AND NOT TO BE SCALED. REFER TO ARCHITECTURAL PLANS OR FIELD
MEASUREMENTS FOR DIMENSIONS.
2. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE CODES NOTED ON THE
COVER SHEET.
3. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION PRIOR TO SUBMITTING HIS BID.
NO EXTRAS WILL BE PAID DUE TO UNANTICIPATED FIELD CONDITIONS.
4. ALL ROOF AND WALL PENETRATIONS SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR.
PROVIDE ALL SLEEVES, FLASHINGS, CURBS, REINFORCING ANGLES, SUPPORTING FRAMES, ETC.
REQUIRED UNLESS THEY ARE SPECIFICALLY CALLED OUT TO BE FURNISHED BY OTHERS.
5. A SUBMITTAL OF ALL MATERIALS AND EQUIPMENT PROPOSED TO BE USED ON THE JOB SHALL BE
PREPARED AS SOON AS POSSIBLE AFTER AWARD OF THE CONTRACT. THE SUBMITTAL WILL BE
REVIEWED BY THE OWNER FOR EQUAL QUALITY AND PERFORMANCE TO THE ITEMS SPECIFIED. ALL
CONTROL DEVICES SHALL BE INCLUDED IN THE SUBMITTAL.
6. PROPER PERFORMANCE OF THE CONTROL SYSTEM IS THE RESPONSIBILITY OF THE CONTRACTOR.
7. THE CONTRACTOR SHALL COOPERATE AND COORDINATE HIS WORK WITH THE WORK OF OTHER
SUBCONTRACTORS OF THE PROJECT. COORDINATION DOES NOT MEAN "I WAS HERE FIRST'.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING A COMPLETE AND FUNCTIONAL SYSTEM
IN ACCORDANCE WITH THE INTENT OF THE PLAN, WHETHER OR NOT EVERY ELEMENT THEREOF IS
SPECIFICALLY CALLED OUT.
9. DUCT DIMENSIONS ON PLANS ARE TO BE FINISHED INSIDE DIMENSIONS.
10. DUCT MATERIALS SHALL MEET THE LATEST EDITION OF SMACNA HVAC DUCT CONSTRUCTION
STANDARDS. INSTALL TURNING VANES IN ALL ELBOWS. DO NOT SUBSTITUTE RADIUSED ELBOWS.
SEE DIFFUSER INSTALLATION DETAILS ON SHEET M2.
11. INSULATE HVAC CONDENSATE DRAIN PIPING WITH 1/2" ARMAFLEX.
12. ALL WORK IS TO BE GUARANTEED FOR ONE YEAR UPON OCCUPANCY.
13. NO EQUIPMENT OR FIXTURE SUBSTITUTIONS (THAT ARE NOT CURRENTLY LISTED) WITHOUT PRIOR
WRITTEN APPROVAL OF THE OWNER.
14. UPON COMPLETION, BALANCE SYSTEMS TO AIRFLOWS SHOWN. REPORT THE BALANCING
MEASUREMENTS ON THE "AS BUILT' DRAWINGS.
15. MOUNT CONDENSATE AND REFRIGERANT LINES AS HIGH AS POSSIBLE.
16. CONTROL WIRING BY HVAC CONTRACTOR, FINAL CONNECTIONS BY HVAC CONTRACTOR.
17. ALL CAULKING ON BUILDING PENETRATIONS SHALL BE A ONE - COMPONENT NON -SAG URETHANE
ELASTOMERIC SEALANT. ANY CONTRACTOR WHO USES SILICONE OR ANY OTHER CAULKING WILL BE
REQUIRED TO REMOVE AND REPLACE IT AT HIS OWN EXPENSE.
18. THE HVAC SYSTEM SHALL BE CONSTRUCTED IN ACCORDANCE WITH NFPA 101:7 -2 AND NFPA 90A
"STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS."
19. ALL HVAC SYSTEM FLUES AND VENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH NFPA 54
(LATEST EDITION).
I
EXISTING FLEX DUCT - FIELD VERIFY
��.
FLEXIBLE DUCT (MAXIMUM LENGTH = 6 -0 ")
NOTE: LOCATION OF FLEX DUCT SHALL BE
®
cy
ONLY AS INDICATED ON PLAN VIEW DRAWINGS
OT
THERMOSTAT
SO
ZONE SENSOR MODULE (ZSM)
- -COM- -
CATEGORY 5 COMMUNICATION CABLE
SD
DUCT SMOKE DETECTOR
DUCT TEMPERATURE SENSOR
MOTORIZED DAMPER
C
CONDENSATE PIPING
R
REFRIGERANT PIPING
�-
AIR FLOW INDICATOR
W
SADDLE TAP FITTING
,11`111
TURNING VANES
150 -
AIRFLOW (CFM) REQUIRED
G1 -
AIR DEVISE MARK
#O
KEYED NOTE REFERENCE
N.I.C.
NOT IN CONTRACT
NTS
NOT TO SCALE
F.V.
FIELD VERIFY
�-
VOLUME DAMPER
CONNECTION OF NEW TO EXISTING
GENERAL NOTES:
1. DRAWING IS DIAGRAMMATIC AND NOT TO BE SCALED. REFER TO ARCHITECTURAL PLANS OR FIELD
MEASUREMENTS FOR DIMENSIONS.
2. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE CODES NOTED ON THE
COVER SHEET.
3. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION PRIOR TO SUBMITTING HIS BID.
NO EXTRAS WILL BE PAID DUE TO UNANTICIPATED FIELD CONDITIONS.
4. ALL ROOF AND WALL PENETRATIONS SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR.
PROVIDE ALL SLEEVES, FLASHINGS, CURBS, REINFORCING ANGLES, SUPPORTING FRAMES, ETC.
REQUIRED UNLESS THEY ARE SPECIFICALLY CALLED OUT TO BE FURNISHED BY OTHERS.
5. A SUBMITTAL OF ALL MATERIALS AND EQUIPMENT PROPOSED TO BE USED ON THE JOB SHALL BE
PREPARED AS SOON AS POSSIBLE AFTER AWARD OF THE CONTRACT. THE SUBMITTAL WILL BE
REVIEWED BY THE OWNER FOR EQUAL QUALITY AND PERFORMANCE TO THE ITEMS SPECIFIED. ALL
CONTROL DEVICES SHALL BE INCLUDED IN THE SUBMITTAL.
6. PROPER PERFORMANCE OF THE CONTROL SYSTEM IS THE RESPONSIBILITY OF THE CONTRACTOR.
7. THE CONTRACTOR SHALL COOPERATE AND COORDINATE HIS WORK WITH THE WORK OF OTHER
SUBCONTRACTORS OF THE PROJECT. COORDINATION DOES NOT MEAN "I WAS HERE FIRST'.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING A COMPLETE AND FUNCTIONAL SYSTEM
IN ACCORDANCE WITH THE INTENT OF THE PLAN, WHETHER OR NOT EVERY ELEMENT THEREOF IS
SPECIFICALLY CALLED OUT.
9. DUCT DIMENSIONS ON PLANS ARE TO BE FINISHED INSIDE DIMENSIONS.
10. DUCT MATERIALS SHALL MEET THE LATEST EDITION OF SMACNA HVAC DUCT CONSTRUCTION
STANDARDS. INSTALL TURNING VANES IN ALL ELBOWS. DO NOT SUBSTITUTE RADIUSED ELBOWS.
SEE DIFFUSER INSTALLATION DETAILS ON SHEET M2.
11. INSULATE HVAC CONDENSATE DRAIN PIPING WITH 1/2" ARMAFLEX.
12. ALL WORK IS TO BE GUARANTEED FOR ONE YEAR UPON OCCUPANCY.
13. NO EQUIPMENT OR FIXTURE SUBSTITUTIONS (THAT ARE NOT CURRENTLY LISTED) WITHOUT PRIOR
WRITTEN APPROVAL OF THE OWNER.
14. UPON COMPLETION, BALANCE SYSTEMS TO AIRFLOWS SHOWN. REPORT THE BALANCING
MEASUREMENTS ON THE "AS BUILT' DRAWINGS.
15. MOUNT CONDENSATE AND REFRIGERANT LINES AS HIGH AS POSSIBLE.
16. CONTROL WIRING BY HVAC CONTRACTOR, FINAL CONNECTIONS BY HVAC CONTRACTOR.
17. ALL CAULKING ON BUILDING PENETRATIONS SHALL BE A ONE - COMPONENT NON -SAG URETHANE
ELASTOMERIC SEALANT. ANY CONTRACTOR WHO USES SILICONE OR ANY OTHER CAULKING WILL BE
REQUIRED TO REMOVE AND REPLACE IT AT HIS OWN EXPENSE.
18. THE HVAC SYSTEM SHALL BE CONSTRUCTED IN ACCORDANCE WITH NFPA 101:7 -2 AND NFPA 90A
"STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS."
19. ALL HVAC SYSTEM FLUES AND VENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH NFPA 54
(LATEST EDITION).
I
Jeffrey:
License #
Exp. Date
Professlone
SHEETS BEARING THIS SE
RESPONSIBILITY FOR ALL
OR INSTRUMENTS ARE DIE
•
•
� 70 ~ s
O
CN e
Z W th
Q � G
O
N RS s
Cs
U� U) -
LLJ
0
V_
l
r�
t
.o
W
F
H
N
F
cc
IL
H
a
i'
mi
J_
W
J
W
I`- IQ
W
0 115
r1 �
DRAWN:
CHECKED:
DATE:
JOB NO.:
SHEET:
SHEET
a s - k'��,1ST!
�'® �``
®
cy
d :No. V
Lie
'do m /N,
Jeffrey:
License #
Exp. Date
Professlone
SHEETS BEARING THIS SE
RESPONSIBILITY FOR ALL
OR INSTRUMENTS ARE DIE
•
•
� 70 ~ s
O
CN e
Z W th
Q � G
O
N RS s
Cs
U� U) -
LLJ
0
V_
l
r�
t
.o
W
F
H
N
F
cc
IL
H
a
i'
mi
J_
W
J
W
I`- IQ
W
0 115
r1 �
DRAWN:
CHECKED:
DATE:
JOB NO.:
SHEET:
SHEET