Loading...
HomeMy WebLinkAbout12100043.12A 0 MEN'S TOILET RM. 104 - - - - - - - - - 75 ELECTRICAL w� �... 6 "0 (TYP.3) I 1 II I ICI I .........- :::.. 106 . .... _...._ _.._ CFM 8 8 "0 1 p� 0 - - ..� TO RELATED RTU-1 1 S C� T i A "C° THERMOSTAT CO �O € € 1 p "0 PAIItTS� E � MO �I I G1 G1 € G1 W` 20� - TO ET RM _.. _ 100 ___... _ ..... 100 T 100 0 G 1 ®2 I • 105 - -- .---- W _ ...... ._.. _ _ S - T LATED ? T 1 X. DUCT - F. . I MCI CAL CO THER STAT � (TYPI s, I fi. 10,10 I I 10,10 Ld 1 ' p°0. 12 "0 III ' 300 �I 300 460 �? I :. _._..... ;......_._.__.W ................ _ G 1 ` G 1 G G 1 Q T.Q.fELATED - TO RELATED 36x14 J E ... .. «__...._£-- _._....._._._...._ «.....36x14 Al 9 TO RELAT D i ._ M \ 26x14 THERMOSTAT O -cOM THERMSAT _ -mm 3060 3060 - COM_..r, _ 9 CFM may. 1800 ::.: _ .: W..._ KCFM. _._ ... ? CFM 4 _.. ( ? TYP I ........3_ SD _... , ..... I RTU 2. -- �4. I .... v_L Iwo _ _ f _ _w.._ L 1 1 10 010 360 1 j RTU -3 TYP. 250 L O 275 «.... ,_..._......_. IT I G1 G1 G1._ ._ _-�- 3� .._ ...... " 10 QJ G1 � G1 PARTS AREA _ E I Im A- AR - ? 10 "0 I 10 110 360 I °A° 100 250 G 1 G 1 G 1 L. L �LLIu �. �> J { r .. .__ 1 , o 360 IX I I� ;'..W_ _ .� :� _ �►_ Lu 250 275 ' °fit U - G1 IL�i `" raG1 g4-1- CG1 CFM 1 « G1 I 450 12 "0 112 1 1 10 "0 I V-90 460 I I 450 ( I 275 I I 10 "0 TO RELATED G1 THERMOSTAT ........... 8 "0 Kll L--- --- - - - - - - - -------- ------- - - - - -� SQUARE OR O 1 HVAC PLAN MI SCALE: 1/8" = V -0" NOTE: THESE DRAWINGS WERE PREPARED FROM PHOTOGRAPHS AND A FIELD SURVEY REPORT (BY OTHERS). SOME ASSUMPTIONS WERE MADE REGARDING EXISTING STRUCTURE, EQUIPMENT, SIZES, AND LOCATIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING A BID. ZSM AOUNTED "ZSM" AT " -3" A.F.F. TO BOTTOM )F SENSOR FLOOR ih t` 1/4" THICK FOAM RUBBER OR CORK PAD. MOUNTING SCREWS PENETI PAD. PAD TO COMPLETELY CC BACK OF SENSOI ZONE SENSOR MODULE "ZSM" NOTE: MOUNT NEW DUCTWORK TIGHT TO STRUCTURE. ALL AIR DEVICES SHALL BE PLACED SO AS NOT TO INTERFERE WITH LIGHTING OR FIXTURE PLACEMENT. GENERAL CONTRACTOR TO PAINT ALL DUCTWORK. SEE ARCHITECTURAL DRAWINGS AND FINISH SCHEDULES FOR SPEC. AND ADDITIONAL INFORMATION. ZONE SENSOR 2 MODULE INSTALLATION M 1 SCALE. N.T.S. f %I DUCT THERMO- I[f J STAT SENSOR F - - - -- --I (DTS) RTU FLOW I � > i - - - - - - - - - - - - - - - - - - :e< - ----- - - - --J i L T J �� 0 (ZSM) SEE 1/M1 FOR / 0 THERMOSTAT LOCATIONS r7v_ -COM- - - CONTINUE TO HUB MODULE (SEE SHEET ES2) 3 RTU EMS WIRING M 1 SCALE. N. T.S. TYPICAL LINING SECURED TO DUCT WITH 100% COVERAGE OF ADHESIVE LINER JOINTS DUCT SIZES GIVEN T CORNERS ARE CLEAR INSIDE `- JOINTS TIGHTLY SHEETMETAL DUCT BUTTED TOGETHER W/ 100% ADHESIVE DUCTS MUST COVERAGE BE AIRTIGHT UNLESS OTHERWISE NOTED DUCT LINING SHALL BE 1" THICK 1 1/2 LB. DENSITY. PROVIDE MECHANICAL FASTENERS WHERE REQUIRED. RECTANGULAR 4 DUCT LINER INSULATION M 1 J SCALE: N.T.S. KEYED NOTES: NEW ROOFTOP(SEE SCHEDULE ON SHEET M2) SHALL BE PLACED ON EXISTING CURB. CONTRACTOR SHALL FIELD VERIFY EXISTING CURB IS ADEQUATE FOR NEW UNITS PRIOR TO PLACING HVAC ORDER. NO CURB ADAPTERS MAY BE INSTALLED AT THIS SITE. CONTACT PROFESSIONAL OF RECORD IMMEDIATELY WITH ANY EXPECTED CONFLICTS. RECONNECT UNIT TO EXISTING SUPPLY AND RETURN DUCT DROPS. RECONNECT NEW UNIT TO EXISTING GAS AND CONDENSATE PIPING - PROVIDE EXTENSIONS / MODIFICATIONS AS REQUIRED. CONTRACTOR SHALL VERIFY EXISTING GAS METER AND PIPING IS IN PROPER WORKING CONDITION AND IS OF ADEQUATE SIZE TO SERVE THE PROPOSED ROOFTOP UNITS. INCLUDE ANY NECESSARY REPAIRS OR REPLACEMENTS IN SUBMITTED BID. EXISTING TOILET EXHAUST FAN(S) TO REMAIN. VERIFY THAT EXHAUST QUANTITY FROM EXISTING FAN(S) IS 100 CFM 0 MINIMUM PER RESTROOM. CONTRACTOR SHALL VERIFY EXACT LOCATION(S) & OPERATION, AND REPAIR OR REPLACE AS REQUIRED. CLEAN AND REFURBISH EXISTING GRILLE TO "LIKE -NEW" CONDITION. 3 INSTALL DUCT SMOKE DETECTOR IN UNIT RETURN. SEE ROOFTOP UNIT SCHEDULE FOR MORE INFORMATION. 4 INSTALL DUCT TEMPERATURE SENSOR (DTS) IN SUPPLY DUCT DROP FROM ROOF TOP UNIT. 5 12 "x12" DUCT WITH ELBOW UP FROM "R2" TO JUST ABOVE THE CEILING PLATFORM. 6 MOUNT "ZSM" IN THIS LOCATION. SEE DETAIL 2 /M1 FOR INSTALLATION. 7 PROVIDE VOLUME DAMPER IF NOT EXISTING. 8 INSTALL COMMUNICATIONS CABLE FROM THERMOSTATS TO THE HUB MODULE MOUNTED WITH THE "EMS" SYSTEM (SEE SHEET ES2). SEE SHEET E2 FOR MOUNTING OF ADM EQUIPMENT. (TYPICAL OF 3). OCOVER OPEN END OF RETURN WITH 1" MESH HARDWARE CLOTH AND FILTER IN A REMOVABLE FRAME. SEE DETAIL ON M2. 10 CONTRACTOR SHALL VERIFY EXACT SIZE, LOCATION AND CONDITION OF ALL EXISTING DUCTWORK AND INCLUDE ANY REQUIRED REPAIRS IN SUBMITTED BID. EXPOSED DUCTWORK DOES NOT NEED TO BE INSULATED. CONTACT PROFESSIONAL OF RECORD IF ANY VERIFIED DATA IS IN CONFLICT WITH THE REMODEL WORK INDICATED IN THESE CONSTRUCTION DOCUMENTS AND /OR SUPPLY DUCTWORK HAS A GREATER THAN .10/100' FRICTION DROP FOR CFM SHOWN. 11 EXISTING AIR DEVICE TO REMAIN. CLEAN AND REFURBISH TO "LIKE -NEW" CONDITION. REBALANCE TO QUANTITY INDICATED ON THE PLAN. HVAC OUTDOOR AIR REQUIREMENTS 1. SALES = 6073 SQUARE FEET 2. OFFICE = 78 SQUARE FEET 2006 INTERNATIONAL MECHANICAL CODE REFERENCES: TABLE FOR REQUIRED OUTDOOR VENTILATION AIR SALES: ( "SPECIALTY SHOPS - HARDWARE" OCCUPANCY) 6073 (SQ. FT.) / 1000 (SQ. FT.) = 6.073 6.073 X 8 (PERSONS PER 1000 SO. FT.) = 49 PEOPLE 49 PEOPLE X 15 (CFM PER PERSON) = 735 CFM OUTSIDE AIR REQ'D OFFICE: ( "OFFICES - OFFICE SPACES" OCCUPANCY) 78 (SQ. FT.) 1 1000 (SQ. FT.) = 0.078 0.078 X 7 (PERSONS PER 1000 SQ. FT.) = 1 PERSON 1 PERSONS X 20 (CFM PER PERSON) = 20 CFM OUTSIDE AIR REQ'D 735 CFM + 20 CFM = 755 CFM TOTAL O.A. REQUIRED RTU -1 340 CFM OUTSIDE AIR RTU -2 340 CFM OUTSIDE AIR RTU -3 200 CFM OUTSIDE AIR TOTAL O.A. PROVIDED = 880 CFM CONTINUOUS VAPOR BARRIER SNAPLOCK SHEETMETAL ROUND DUCT DUCT SIZES GIVEN ARE CLEAR INSIDE 4" WIDE SEALING STRIP SECURED IN PLACE W/ 100% ADHESIVE DUCTS MUST COVERAGE BE AIR TIGHT UNLESS OTHERWISE NOTED DUCT WRAP SHALL BE 1 1/2" THICK 1 LB. DENSITY PROVIDE MECHANICAL FASTENERS WHERE REQUIRED. ROUND DUCT WRAP INSULATION MI J SCALE: N.T.S. DUCT LINER WHERE REQUIRED SINGLE THICKNESS VANES UP TO 16" LONG. DOUBLE THICKNESS VANES OVER 16" LONG. -SHEETMETAL DUCT 6 TURNING VANES M1 SCALE: N.T.S. MECHANICAL LEGEND ® FLOW (-I%- - <1 SQUARE OR O RECTANGULAR EXHAUST REGISTER I ELBOW SO i LL DUCT LINER WHERE REQUIRED SINGLE THICKNESS VANES UP TO 16" LONG. DOUBLE THICKNESS VANES OVER 16" LONG. -SHEETMETAL DUCT 6 TURNING VANES M1 SCALE: N.T.S. MECHANICAL LEGEND ® SUPPLY DIFFUSER (4 -WAY) mSUPPLY DIFFUSER (1 -WAY) RETURN AIR GRILLE ® EXHAUST REGISTER �yEXISTING SUPPLY DIFFUSER SO EXISTING RETURN AIR GRILLE Ry I y I Ic_J EXISTING EXHAUST REGISTER SD RECTANGULAR OR ROUND DUCT EXISTING DUCT (VERIFY SIZE /SHAPE) GENERAL NOTES: 1. DRAWING IS DIAGRAMMATIC AND NOT TO BE SCALED. REFER TO ARCHITECTURAL PLANS OR FIELD MEASUREMENTS FOR DIMENSIONS. 2. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE CODES NOTED ON THE COVER SHEET. 3. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION PRIOR TO SUBMITTING HIS BID. NO EXTRAS WILL BE PAID DUE TO UNANTICIPATED FIELD CONDITIONS. 4. ALL ROOF AND WALL PENETRATIONS SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR. PROVIDE ALL SLEEVES, FLASHINGS, CURBS, REINFORCING ANGLES, SUPPORTING FRAMES, ETC. REQUIRED UNLESS THEY ARE SPECIFICALLY CALLED OUT TO BE FURNISHED BY OTHERS. 5. A SUBMITTAL OF ALL MATERIALS AND EQUIPMENT PROPOSED TO BE USED ON THE JOB SHALL BE PREPARED AS SOON AS POSSIBLE AFTER AWARD OF THE CONTRACT. THE SUBMITTAL WILL BE REVIEWED BY THE OWNER FOR EQUAL QUALITY AND PERFORMANCE TO THE ITEMS SPECIFIED. ALL CONTROL DEVICES SHALL BE INCLUDED IN THE SUBMITTAL. 6. PROPER PERFORMANCE OF THE CONTROL SYSTEM IS THE RESPONSIBILITY OF THE CONTRACTOR. 7. THE CONTRACTOR SHALL COOPERATE AND COORDINATE HIS WORK WITH THE WORK OF OTHER SUBCONTRACTORS OF THE PROJECT. COORDINATION DOES NOT MEAN "I WAS HERE FIRST'. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING A COMPLETE AND FUNCTIONAL SYSTEM IN ACCORDANCE WITH THE INTENT OF THE PLAN, WHETHER OR NOT EVERY ELEMENT THEREOF IS SPECIFICALLY CALLED OUT. 9. DUCT DIMENSIONS ON PLANS ARE TO BE FINISHED INSIDE DIMENSIONS. 10. DUCT MATERIALS SHALL MEET THE LATEST EDITION OF SMACNA HVAC DUCT CONSTRUCTION STANDARDS. INSTALL TURNING VANES IN ALL ELBOWS. DO NOT SUBSTITUTE RADIUSED ELBOWS. SEE DIFFUSER INSTALLATION DETAILS ON SHEET M2. 11. INSULATE HVAC CONDENSATE DRAIN PIPING WITH 1/2" ARMAFLEX. 12. ALL WORK IS TO BE GUARANTEED FOR ONE YEAR UPON OCCUPANCY. 13. NO EQUIPMENT OR FIXTURE SUBSTITUTIONS (THAT ARE NOT CURRENTLY LISTED) WITHOUT PRIOR WRITTEN APPROVAL OF THE OWNER. 14. UPON COMPLETION, BALANCE SYSTEMS TO AIRFLOWS SHOWN. REPORT THE BALANCING MEASUREMENTS ON THE "AS BUILT' DRAWINGS. 15. MOUNT CONDENSATE AND REFRIGERANT LINES AS HIGH AS POSSIBLE. 16. CONTROL WIRING BY HVAC CONTRACTOR, FINAL CONNECTIONS BY HVAC CONTRACTOR. 17. ALL CAULKING ON BUILDING PENETRATIONS SHALL BE A ONE - COMPONENT NON -SAG URETHANE ELASTOMERIC SEALANT. ANY CONTRACTOR WHO USES SILICONE OR ANY OTHER CAULKING WILL BE REQUIRED TO REMOVE AND REPLACE IT AT HIS OWN EXPENSE. 18. THE HVAC SYSTEM SHALL BE CONSTRUCTED IN ACCORDANCE WITH NFPA 101:7 -2 AND NFPA 90A "STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS." 19. ALL HVAC SYSTEM FLUES AND VENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH NFPA 54 (LATEST EDITION). I EXISTING FLEX DUCT - FIELD VERIFY ��. FLEXIBLE DUCT (MAXIMUM LENGTH = 6 -0 ") NOTE: LOCATION OF FLEX DUCT SHALL BE ® cy ONLY AS INDICATED ON PLAN VIEW DRAWINGS OT THERMOSTAT SO ZONE SENSOR MODULE (ZSM) - -COM- - CATEGORY 5 COMMUNICATION CABLE SD DUCT SMOKE DETECTOR DUCT TEMPERATURE SENSOR MOTORIZED DAMPER C CONDENSATE PIPING R REFRIGERANT PIPING �- AIR FLOW INDICATOR W SADDLE TAP FITTING ,11`111 TURNING VANES 150 - AIRFLOW (CFM) REQUIRED G1 - AIR DEVISE MARK #O KEYED NOTE REFERENCE N.I.C. NOT IN CONTRACT NTS NOT TO SCALE F.V. FIELD VERIFY �- VOLUME DAMPER CONNECTION OF NEW TO EXISTING GENERAL NOTES: 1. DRAWING IS DIAGRAMMATIC AND NOT TO BE SCALED. REFER TO ARCHITECTURAL PLANS OR FIELD MEASUREMENTS FOR DIMENSIONS. 2. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE CODES NOTED ON THE COVER SHEET. 3. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION PRIOR TO SUBMITTING HIS BID. NO EXTRAS WILL BE PAID DUE TO UNANTICIPATED FIELD CONDITIONS. 4. ALL ROOF AND WALL PENETRATIONS SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR. PROVIDE ALL SLEEVES, FLASHINGS, CURBS, REINFORCING ANGLES, SUPPORTING FRAMES, ETC. REQUIRED UNLESS THEY ARE SPECIFICALLY CALLED OUT TO BE FURNISHED BY OTHERS. 5. A SUBMITTAL OF ALL MATERIALS AND EQUIPMENT PROPOSED TO BE USED ON THE JOB SHALL BE PREPARED AS SOON AS POSSIBLE AFTER AWARD OF THE CONTRACT. THE SUBMITTAL WILL BE REVIEWED BY THE OWNER FOR EQUAL QUALITY AND PERFORMANCE TO THE ITEMS SPECIFIED. ALL CONTROL DEVICES SHALL BE INCLUDED IN THE SUBMITTAL. 6. PROPER PERFORMANCE OF THE CONTROL SYSTEM IS THE RESPONSIBILITY OF THE CONTRACTOR. 7. THE CONTRACTOR SHALL COOPERATE AND COORDINATE HIS WORK WITH THE WORK OF OTHER SUBCONTRACTORS OF THE PROJECT. COORDINATION DOES NOT MEAN "I WAS HERE FIRST'. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING A COMPLETE AND FUNCTIONAL SYSTEM IN ACCORDANCE WITH THE INTENT OF THE PLAN, WHETHER OR NOT EVERY ELEMENT THEREOF IS SPECIFICALLY CALLED OUT. 9. DUCT DIMENSIONS ON PLANS ARE TO BE FINISHED INSIDE DIMENSIONS. 10. DUCT MATERIALS SHALL MEET THE LATEST EDITION OF SMACNA HVAC DUCT CONSTRUCTION STANDARDS. INSTALL TURNING VANES IN ALL ELBOWS. DO NOT SUBSTITUTE RADIUSED ELBOWS. SEE DIFFUSER INSTALLATION DETAILS ON SHEET M2. 11. INSULATE HVAC CONDENSATE DRAIN PIPING WITH 1/2" ARMAFLEX. 12. ALL WORK IS TO BE GUARANTEED FOR ONE YEAR UPON OCCUPANCY. 13. NO EQUIPMENT OR FIXTURE SUBSTITUTIONS (THAT ARE NOT CURRENTLY LISTED) WITHOUT PRIOR WRITTEN APPROVAL OF THE OWNER. 14. UPON COMPLETION, BALANCE SYSTEMS TO AIRFLOWS SHOWN. REPORT THE BALANCING MEASUREMENTS ON THE "AS BUILT' DRAWINGS. 15. MOUNT CONDENSATE AND REFRIGERANT LINES AS HIGH AS POSSIBLE. 16. CONTROL WIRING BY HVAC CONTRACTOR, FINAL CONNECTIONS BY HVAC CONTRACTOR. 17. ALL CAULKING ON BUILDING PENETRATIONS SHALL BE A ONE - COMPONENT NON -SAG URETHANE ELASTOMERIC SEALANT. ANY CONTRACTOR WHO USES SILICONE OR ANY OTHER CAULKING WILL BE REQUIRED TO REMOVE AND REPLACE IT AT HIS OWN EXPENSE. 18. THE HVAC SYSTEM SHALL BE CONSTRUCTED IN ACCORDANCE WITH NFPA 101:7 -2 AND NFPA 90A "STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS." 19. ALL HVAC SYSTEM FLUES AND VENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH NFPA 54 (LATEST EDITION). I Jeffrey: License # Exp. Date Professlone SHEETS BEARING THIS SE RESPONSIBILITY FOR ALL OR INSTRUMENTS ARE DIE • • � 70 ~ s O CN e Z W th Q � G O N RS s Cs U� U) - LLJ 0 V_ l r� t .o W F H N F cc IL H a i' mi J_ W J W I`- IQ W 0 115 r1 � DRAWN: CHECKED: DATE: JOB NO.: SHEET: SHEET a s - k'��,1ST! �'® �`` ® cy d :No. V Lie 'do m /N, Jeffrey: License # Exp. Date Professlone SHEETS BEARING THIS SE RESPONSIBILITY FOR ALL OR INSTRUMENTS ARE DIE • • � 70 ~ s O CN e Z W th Q � G O N RS s Cs U� U) - LLJ 0 V_ l r� t .o W F H N F cc IL H a i' mi J_ W J W I`- IQ W 0 115 r1 � DRAWN: CHECKED: DATE: JOB NO.: SHEET: SHEET