HomeMy WebLinkAbout12100043.3a- = A D2 D2 D2 rq I I Lei-z m eiei a D1 j SCALE: 1/8" = 1' -O" GENERAL DEMOLITION NOTES: REMOVE ALL EXISTING SITE CONSTRUCTION AND DELETERIOUS MATERIALS UNLESS OTHERWISE NOTED. ALL DEMOLISHED MATERIALS SHALL BECOME PROPERTY OF CONTRACTOR FOR PROPER DISPOSAL UNLESS OTHERWISE NOTED. GC TO VERIFY LOCATION OF EXISTING STRUCTURAL COLUMNS BEFORE DEMOLITION BEGINS. PROTECT ALL STRUCTURAL COLUMNS DURING DEMOLITION REMOVE ALL TEMPERATURE CONTROLS AND ALL ASSOCIATED WIRING. ALL EXISTING CONSTRUCTION SHOWN IS BASED ON LIMITED EXISTING CONSTRUCTION DOCUMENTS AND CAN BE USED FOR BIDDING PURPOSES. THE GENERAL CONTRACTOR SHALL FIELD VERIFY ALL EXISTING SITE CONDITIONS, REVIEW ALL DRAWINGS, AND VERIFY ALL DIMENSIONS, ELEVATIONS, AND MEMBER SIZES PRIOR TO THE START OF DEMOLITION WORK. THE CONTRACTOR SHALL NOTIFY THE PROFESSIONAL -OF- RECORD IN WRITING OF ALL DISCREPANCIES AND EXCEPTIONS BEFORE PROCEEDING WITH THE WORK. THE GENERAL CONTRACTOR SHALL DESIGN, PROVIDE, AND INSTALL ALL TEMPORARY SHORING, AS REQUIRED, PRIOR TO THE START OF ANY DEMOLITION WORK. THE REMOVAL, CUTTING, DRILLING, ETC. OF EXISTING CONSTRUCTION SHALL BE PERFORMED WITH GREAT CARE IN ORDER NOT TO JEOPARDIZE THE STRUCTURAL INTEGRITY OF ANY EXISTING CONSTRUCTION. IF STRUCTURAL MEMBERS, MECHANICAL, ELECTRICAL, OR ARCHITECTURAL FEATURES NOT INDICATED FOR REMOVAL INTERFERE WITH THE NEW WORK, THE PROFESSIONAL- OF- RECORD SHALL BE IMMEDIATELY NOTIFIED AND PRIOR WRITTEN APPROVAL SHALL BE OBTAINED BEFORE THE REMOVAL OR MODIFICATION OF ANY STRUCTURAL MEMBERS. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR LIMITING THE AMOUNT OF CONSTRUCTION LOAD IMPOSED UPON THE EXISTING STRUCTURAL FRAMING. CONSTRUCTION LOADS SHALL NOT EXCEED THE DESIGN CAPACITY OF THE EXISTING FRAMING AT THE TIME THE LOADS ARE IMPOSED. THE GENERAL CONTRACTOR'S CONSTRUCTION AND /OR ERECTION SEQUENCES SHALL RECOGNIZE AND CONSIDER THE EFFECTS OF THERMAL MOVEMENTS OF STRUCTURAL ELEMENTS DURING THE CONSTRUCTION PERIOD. THE GENERAL CONTRACTOR SHALL PROMPTLY REPAIR DAMAGE CAUSED DURING CONSTRUCTION WITH SIMILAR MATERIALS AND WORKMANSHIP. THE GENERAL CONTRACTOR SHALL PROVIDE ADEQUATE SITE AND BUILDING BARRIERS AS REQUIRED TO PROTECT THE SAFETY AND WELFARE OF WORKERS AND PUBLIC DURING ALL PHASES OF DEMOLITION AND CONSTRUCTION. I I I I !w"w"'Ic 1w DEMOLITION SHORING NOTE: 1. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS AND METHODS OF ALL DEMOLITION WORK AND FOR PROVIDING ALL NECESSARY TEMPORARY SHORING, BRACING, AND PROTECTION AS NECESSARY FOR THE SAFETY, STABILITY, AND PROTECTION OF ALL BUILDING ELEMENTS AND STRUCTURE DURING CONSTRUCTION AND DEMOLITION. ALL TEMPORARY SHORING AND BRACING SHALL BE ADEQUATE TO RESIST ALL APPLIED LOADS INCLUDING DEAD LOADS, LIVE LOADS, SNOW LOADS, AND CONSTRUCTION LOADS TO PROVIDE STRUCTURAL STABILITY, AND TO PROVIDE FOR RESISTANCE TO WIND AND SEISMIC FORCES UNTIL ANY REQUIRED MODIFICATIONS TO THE STRUCTURE ARE COMPLETE. SPECIAL HAZARDOUS MATERIALS NOTE: 1 IF THIS PROJECT IS FOUND TO CONTAIN HAZARDOUS MATERIALS, CONTRACTOR IS TO PROVIDE IMMEDIATE NOTICE TO LL AND /OR OWNER FOR DIRECTION FOR PROPER HANDLING, REMOVAL AND DISPOSAL. HAZARDOUS MATERIAL SURVEY NOT A PART OF ARCHITECTS SCOPE_ VERIFY WITH PROPERTY OWNER. SYMBOLS LEGEND — -- - - -- -- EXISTING ITEMS TO BE REMOVED CP EXISTING ITEMS TO REMAIN 08 1. ...... .. „.,. _...� .,..,» t F_- i d � ix 4.� z D8 s �ai z }17 i 1 � FN I t I i % II I II II 1 I I�_ A B .....m _ . _... _ _� ..... _ .. _ _.m I n f 8 1 DEMOLITION CEILING PLAN D1 j SCALE: 1/8" = V -O" DEMOLITION KEYED NOTES: D1 PORTION OF EXISTING INTERIOR WALL TO BE REMOVED. PROTECT EXISTING STRUCTURAL COLUMNS DURING DEMOLITION. D2 EXISTING STOREFRONT SYSTEM, OR PORTION OF STOREFRONT SYSTEM, TO BE REMOVED COMPLETE. D3 EXISTING VESTIBULE AND STOREFRONT TO BE REMOVED COMPLETE. PATCH AND REPAIR REMAINING STOREFRONT AS NECESSARY TO LIKE NEW CONDITION. D4 EXISTING DROP BOX, OPAQUE PANELS AND PORTION OF EXISTING STOREFRONT SYSTEM, TO BE REMOVED COMPLETE. PATCH AND REPAIR AS REQUIRED FOR NEW GLAZING. D5 LANDLORD TO REMOVED EXISTING CASEWORK COMPLETE. D6 EXISTING DOOR, FRAME, AND HARDWARE TO BE REMOVED COMPLETE. D7 EXISTING CARPET /TILE FLOORING TO BE REMOVED COMPLETE. GC TO PREPARE SURFACE FOR NEW FINISH. SEE FINISH SCHEDULE FOR MORE INFORMATION. D8 EXISTING SUSPENDED CEILING TILE AND GRID TO BE REMOVED COMPLETE. PATCH AND REPAIR DAMAGED WALL SURFACES TO LIKE NEW CONDITION TO RECEIVE NEW FINISHES. SEE FINISH SCHEDULE FOR FURTHER INFORMATION. D9 EXISTING GYP. BOARD SOFFIT AND CEILING TO BE REMOVED COMPLETE. 1Q ALL EXISTING LIGHTING TO BE REMOVED COMPLETE UNLESS NOTED OTHERWISE. 11 EXISTING RESTROOM CEILINGS AND LIGHTING TO REMAIN. 12 EXISTING STOREFRONT SYSTEM TO BE REMOVED AND /OR MODIFIED TO ACCOMMODATE ONE NEW PAIR OF STOREFRONT DOORS AS SHOWN ON SHEET A1.1 13 REMOVE AND PROPERLY DISPOSE OF EXISTING DRINKING FOUNTAIN AND ASSOCIATED PIPING. REMOVE ALL SANITARY PIPING ABOVE SLAB AND CAP SANITARY LINES FLUSH AT SLAB ELEVATION. REMOVE ALL WATER PIPING TO THE MAIN LINES SUPPLYING THE REST ROOMS, WATER LINES TO BE CAPPED FOR FUTURE USE. PATCH AND REPAIR ALL EXISTING SURFACES TO REMAIN TO LIKE NEW CONDITION TO RECEIVE NEW FINISHES. 14 LANDLORD TO REMOVE ALL INVENTORY, TRASH, DEBRIS AND SIGNAGE COMPLETE. II II II II 744,01c E I i 15 REMOVE AND PROPERLY DISPOSE OF EXISTING BRANCH DUCT AND ASSOCIATED AIR DEVICES AS SHOWN. (FIELD VERIFY EXACT LOCATION.) REFER TO MECHANICAL PLANS FOR MORE INFO. D16 REMOVE AND PROPERLY DISPOSE OF EXISTING AIR DEVICE AS SHOWN. SECURE REMAINING DUCTWORK AND OTHER EQUIPMENT FOR RECONNECTION TO FUTURE DEVICES. DISCONNECT AND TEMPORARILY TERMINATE ALL SERVICES TO EXISTING ROOFTOP UNITS FOR LATER RECONNECTION TO NEW UNIT_ REMOVE AND PROPERLY DISPOSE OF EXISTING UNIT, EXISTING CURB TO REMAIN AND BE REUSED. TEMPORARILY CAP OPENING AIR- AND WEATHER -TIGHT UNLESS NEW UNIT IS TO BE IMMEDIATELY PLACED. • :4331 PERMIT/BID I A f E arr�glt�6 Professional SHEETS BEARING THIS SEAL RESPONSIBILITY FOR ALL 01 OR INSTRUMENTS ARE DISCI /vJ O { i.. Q LIJ (D O N � Q L Qa7 oO-- cu U uiM O ti J N C ofo -+ -ss d W a- 0 a oC C C W F N H 1- Ic Q J J J �W 00 a� DRAWN: JA CHECKED: CP DATE: 08 JOB NO.: 31 SHEET: L SHEET 1