Loading...
HomeMy WebLinkAbout12080008.6I i N/F W & W PROPERTIES LLC I D.B_ 2010 PG. 22983 i TMP #: 16- 10- 31- 00 -00- 022.001 CATCH BASIN CATCH BASIN TOP: 827.79' TOP: 826.40' 2.7' DEPTH 2.5' DEPTH I I SANITAR ER HOLE N/F YEAGER OF CARMEL LLC I D.B. 2010 PG. 22982 D.B. 826.36' IN V: 3.7' TMP #: 16- 10- 31- 00 -00- 022.000 i I � � j N89- 55'00 "E, 273.60'(M &R) IPF I >� MAG NAIL - 5�g "RB (SET) - - - - - - -- -- •-- •-- •-- •-- • - -• -- -- -- - -- -- -- -- -- - ' �S89 530 "W- 27 .41 -- -- -- -- -- -- CATCH BASIN I I \ TOP: 828.19' I I FG= 828.87 FG= 828.93 FG= 829.00 FG= 828.70 FG= 828.40 FG= 828.47 / 3.7' DEPTH fG= 828.23 F= 77 FG= 828.31 I FFE= 827.90 / I FG = M.E. z I FG= 828.28 - -a4ff FG= 828.09 I � FG =8 8.55 Fc= s2s.24 Fc= 828.00 STR #BMP BENCHMARK A I I I o FG= 827.83 T Cstg= 828.00 MAG NAIL I I = I N/F ELV: 828.01' HARRIS NA I I I FG= 828.74 STR t # 828.40 148 Ift of f2" HOP FG- 828.82 6 Ift of 6 Ift t STR # 1 A.M. 2007 PG. 48376 of I I 9 FG= 829.00 E AF-L-82-8-8-21 12° PVC 1 ° P C T Cstg= 824.00 TMP #• 16- 10- 31- 00 -00- 021.000 23.4 FG= 828.57 _ I • II I Q I I z N un I I I > 3 O w y I I I 4 1 Iry " CONC. MON. / o (FOUND) I •z 3 I ERGENC OVERFLOW ELEVA N = 827.5 ro 6' R ENT RIPRAP ;r 1 syd GE LE FABRIC '� I \ ix 1 I I i I I I I I FG- 828.57 JJ I I 12 Ift of 25 Ift o 15 HDPE 48 Ift o 15' H(P I � FG=828.80 F = 829.12 FG =829.0 FG= 828.81 15' HDPE I O l I - 245.00' j GRADE e T - - - - FG= 829. FG= 828.69 I I ° FG= 828.92 STR #2 FG= 828.72 T Cstg= 828.00 I I I I Fc =82 .09 STR #3 o I T Cstg= 827.50 I I r.I FG = M.E. 1 I I a ❑ ¢ I FG= 828.72 a >- FG= 828.66 iQ 8. I I I LI1 57 FG= 82 o C I G =29. C= 829.88 , C= 829.45 Fc= 828.84 I ' I I I Z a w �� z FG =82 89 FG= 829.28 - FG= 828.50 FG= 828.00 \ '�fi� o FG= 828.75 / I w Q ` I �_ I FG= 828.63 I} z _ FG= 829.38 FG= 828.61 / I Z i -' w h C0 I TW= 829.19 1 vl' w W Q CL BASIN CREST p i Z w Q w a- FG= 828.69 o 829.35 0 828.20 QJ o O- hC GRADE BREAK ----- - - - - -_ cD CL I 0 0 I III FG= 828.67 I I I I I Q = 6 FG= 828.50 26" DOUBLE -- Y v It 1 I I I I I = . HA DWOOD I_ v� w i I ; � co 16 I L0 � :2 ° NW � FG- 828.77 FG= 828.64 97 J � 1 L0 1 C\4 o - I I .32 FG= 828.85 _ FG= 828 I I _ O I I I cn! m, I 3 I I I AE-G=-8-28-.851 I I O FG= 828.58 0 1 Ln( I I O I I FG= 828.85 FG -82.3 20" HARDWOOD = Z I I ° ° ° Fc= 828.85 I FG M.E. . / I I I = I<I I IIPF CAP Iz I I I STR I I (2200081) / _ 1 zo I T CCst =827.75 McDonald's N ( I m FG= 828.85 _ 3 / I YI I I F =9 7.7 FINISHED FLOOR ' - FG- 828.85 ELEVATION = 829.50 - Tw= o • FG = / Z I FG= 826.85 = 828.16 F = 7 LLJ FG= 828.58 FG 27.56 I FG= 828.85 � I ° FG =8 TW= 829.40 STR I = 827.4 • ! FG= 828.67 T g = FG= 829.14 N I FG= 827.33 F =8 7.88 FG= 828.67 FG 827.48 \�, j�� �" , / \ w oI FG = 828.84 `� / \s\ \ m 'nl 14 FG= 828.84 / �J� I • pi __ FG= 828.89 FG= 828.93 FG= 827.60 Z o CD FG= 828.74 Z z FG =827. of I FG= 827.65 w z m I FG= 827.33 �f �� ,6 V) w I FG= 827.53 \ G. ❑ ,�' f_ ° �� tio� STR #5 1 z I I F T Cstg= 826.10 G= 827.80 20' ELECTRIC EASEMENT PER () 0 I � Z I I FG= 827.71 // ,/ SANITARY SEWER - - - INSTRUMENT N0. 7349- - - - MANHOLE -- -{-- - - - / ELV: 829.18' FG -82 .31 FG- 827.46 // I N V: 14.1' i I FG = M.E. c�- •. -- c. -"�� loe j J I Li -- .L -� -- - -- �2020008P BENCHMARK B TCH 1 BASIN _ C m _ .._ - MAG NAIL �� T P: 825.72' o O ELV: 826.35' 7 °.6' DEPTH O CATCH BASIN .ATCH BASIN TOP: 825.83 TOP: 825.87' 3.3' DEPTH 25' DEPTH MAG NAIL \ I-(SFT') S89 *55'00 "W. 1 CATCH BASIN I In � TOP: 826.31' 00 4.0' DEPTH I p O O O 54.57'(M &R) MAG . I ,t I -- -- -- -- -- -- -- -- - -1y - -- -- -- -- -- -- -- -- -- -- -- -- -- -- t, P�O�ATER G,�G "�uWW W11Dli"' LEGEND FIFE = FINISHED FLOOR FG = FINISHED GRADE T Cstg = TOP OF CASTING ® GRATE TC = TOP OF CURB TW = TOP OF SIDEWALK M.E. = MATCH EXISTING -MEN - - - - = GRADE BREAK FG =827.1 = FINISHED GRADE LABEL = EXISTING GROUND CONTOUR 828 = PROPOSED GROUND CONTOUR NOTICES AND PERMITS 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING OR VERIFYING THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY OR STATE AGENCIES PRIOR TO STARTING ANY CONSTRUCTION. 2. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT LOCATION OF ALL UTILITIES IN THE VICINITY OF THE CONSTRUCTION AREA PRIOR TO STARTING ANY CONSTRUCTION. 3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY FOR NOTIFICATION AND COORDINATION OF ALL CONSTRUCTION WITH THE RESPECTIVE UTILITY COMPANIES PRIOR TO STARTING ANY CONSTRUCTION. CONSTRUCTION NOTES 1. THE TOPS OF CURBS ARE TO BE SET AT 6" ABOVE FINISHED PAVEMENT ELEVATIONS UNLESS OTHERWISE SPECIFIED 2. FINISHED GRADE SLOPES ARE TO BE CONSISTANTLY UNIFORM BETWEEN THE FINISHED GRADE ELEVATIONS SHOWN. STORM SEWER NOTE: THE VERTICAL LOCATION OF STORM SEWER STRUCTURES SHOWN HEREON IS AS FOLLOWS: CURB INLETS ARE LOCATED AT THE CENTER OF THE CURB BOX AT THE GUTTER LINE OF CURB. ALL OTHER STRUCTURES ARE LOCATED AT THE CENTER OF CASTING. qEENMPrw Know. mars b @IOW. Call before you dig. IT IS AGAINST THE LAW (IC 8 -1 -26) TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO WORKING DAYS BEFORE COMMENCING WORK, DIAL 811 OR 1- 800 - 382 -5544 I.U.P.P.S. P.O. Box 50392 Indianapolis, IN 46250 NOTE: THE EXISTING FEATURES, UNDERLYING TOPOGRAPHY, SITE BOUNDARY AND EASEMENT DATA, ETC SHOWN ON THESE PLAN SHEETS IS PROVIDED BY OTHERS AND LANDWATER GROUP, INC. MAKES NO REPRESENTATION AS TO THE ACCURACY OF THAT BASELINE DATA. THEREFORE, THE CONTRACTOR SHOULD VERIFY THAT EXISTING FEATURES ARE AS SHOWN AND IMMEDIATELY REPORT ANY DESCREPENCIES TO THE McDONALD'S CONSTRUCTION MANAGER PRIOR TO STARTING CONSTRUCTION. z 0 0 cn w 0 w a 0 tWiii R PREPARED FOR McDonah M. PROJECT NAME McDONALD'S USA, LLC INDIANAPOL REGION SITE ID 013-01C PROJECT LOCATION 750 E CARMEI CARMEL, IN PROJECT NUMBER 1116 DRAWN BY G. LUKAS CHECKED 0 Ln N CERTIFIED NI I ISI II4 = 920256 00o I STATE OF 1 s7DNAL �� /nlinn SHEEI NAME GRADING DRAINAG PLAN SHEET NUMBER C3*C PLAN DATE JUNE 13, 20