Loading...
HomeMy WebLinkAbout12090001.6CO\ 0� 4P O� )A CURB RAVA P \1 \\ I 1 ADA qURB RA P2 J i RAMP_ � JJ (f t J C tt Q JJ In I JJ Jt U-) J J CD I iJ z tt t It I it DADA CURB t i RAMP WEST ROAD RAMP �I .I z � �I w 7 AD CURB �- MP I GENERAL SITE NOTES 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING, THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION. 2. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES IN THE VICINITY OF THE CONSTRUCTION AREA PRIOR TO STARTING CONSTRUCTION. 3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY FOR NOTIFICATION AND COORDINATION OF ALL CONSTRUCTION WITH RESPECTIVE UTILITY COMPANIES. 4. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR TO MAINTAIN QUALITY CONTROL THROUGHOUT THE PROJECT; FAILURE TO DO SO MAY RESULT IN REMOVAL AND REPLACEMENT OF THE DEFECTIVE WORK. IT IS RECOMMENDED THAT THE DEVELOPER HAVE A QUALIFIED INSPECTOR ON THE JOB SITE AT ALL TIMES DURING CONSTRUCTION. 5. IT IS ESSENTIAL THAT THE WORK TO BE DONE IN CONJUNCTION WITH THIS PROJECT SHALL BE INSTALLED ACCORDING TO THESE SPECIFICATIONS. THE ENGINEER WILL BE REQUIRED TO CERTIFY TO CERTAIN PORTIONS OF THIS PROJECT UPON COMPLETION. THEREFORE, IT IS NECESSARY TO OBTAIN APPROVAL AND ACCEPTANCE BY THE CITY THAT CONSTRUCTION WAS DONE IN COMPLIANCE WITH THESE PLANS AND SPECIFICATIONS. 6. IF IT WILL BE NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OF SUCH RELOCATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. ALL UTILITY POLES SHALL BE LOCATED WITHIN ONE FOOT OF THE PROPOSED RIGHT -OF -WAY. 7. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. EROSION CONTROL NOTES 1. INLET PROTECTION TO BE INSTALLED PRIOR TO CONSTRUCTION Jl 2. EROSION CONTROL MEASURES TO BE MAINTAINED THROUGHOUT JJ THE ENTIRE CONSTRUCTION PROCESS Jt tf 3. STORM WATER DISCHARGE WILL NOT ENTER THE GROUNDWATER ' JJ Jt FOR THIS PROJECT 4. SEE SWPPP DETAILS FOR ALL EROSION CONTROL MEASURES JTt tt SCHEDULES AND SEQUENCES JJ 5. CONTRACTOR TO PROVIDE A STABLE TEMPORARY GRAVEL JJ CONSTRUCTION ENTRANCE /EXIT CONDITION FROM THE Jlt CONSTRUCTION SITE TO KEEP MUD AND SEDIMENT OFF PUBLIC JJ ROADS ' fjt 6. EROSION CONTROL MAINTENANCE - SITE TO BE INSPECTED AT JJ LEAST ONCE A WEEK AND MAKE REPAIRS IMMEDIATELY AFTER JJ PERIODS OF RAINFALL. N J! 7. THE 100 YEAR FLOODPLAIN, FLOODWAY FRINGE AND FLOODWAYS JJ JJ IS NOT PRESENT, I JJ 8. ANY DISCREPANCIES OR CONFLICTS WHICH BECOME APPARENT BEFORE OR DURING CONSTRUCTION SHALL BE BROUGHT TO THE t�J ATTENTION OF THE DESIGN ENGINEER PRIOR TO CONSTRUCTION JJ JJ SO THAT CLARIFICATION OR REDESIGN MAY OCCUR. JJ 9. ESTABLISH VEGETATION IN ALL BARE AREAS AS PER OEPA Jl JJ N.P.D.E.S. REGULATIONS. CONTRACTOR IS RESPONSIBLE FOR tf I JJ N.P.D.E.S. INSPECTION DURING CONSTRUCTION PERIOD. It I JJ CURB INLET PROTECTION TREE TYPE QUANTITY RED MAPLE 11 I BALD CYPRESS 11 v- ELM TOTAL 11 33 MR 20 0 10 20 40 GRAPHIC SCALE (IN FEET) 1 inch= 20ft. !!!!III z J CL W � U)H }U � _ Z Q Z U) W a V) I-- U w 2 V) U0:� �O • w cr> > w w z_ z w SCALE: AS NOTE DATE: OCTOBER JOB NO.: DESIGN: DRAWN: CHECKED: SHEET NI 2 OF i