Loading...
HomeMy WebLinkAbout12090005.6NEVER CUT LEADER. THIN UP TO 10'3 OF BRANCHES RETAINING NATURAL SHAPE OF TREE. DO NOT LEAVE STUBS ATTACH GUY WIRE AND HOSE ABOVE FIRST BRANCH. STAKE TREES UNDER 3" CAL, USE WOOD STAKES 2 PER TREE @ 120'-' GUY TREES: 3" CAL,. & LARGER USE 2' 'x4" STAKES DRIVEN BELOW GRADE. (2 STAKES 1200 APART) SET TOP OF ROOT CROWN AT GROUND LEVEL REMOVE 50% OR WIRE BASKET AND BURLAP 3" MULCH LAYER AS SPECIFIED 4" DIA. X "4'" SAUCER AROUND PLANTING PIT PULVERIZE SOIL EXCAVATED FROM HOLE AND USE AS BACKFILL LOOSEN SUBGRAIJE AROUND CENTER MOUND STAKE TO BE IS" BELOW PIT IN UNDISTURBED SUBGRADE UNDISTURBED SUBGRADE BASE M I I SHADE TREE PLANTING DETAIL NOT TO SCALE W&o�%T EnLINE ONLY DAMAGED, DISEASED OR ES. _ RMUP RH S A ot I WNRYADE. 2"SHREDDED HARDWOOD BARK MULCH. CREATE EARTH SAUCER. CUT AND REMOVE TOP 1/3 OF BURLAP, BACKFILL WITH EXISTING. SHRUB PLANTING DETAIL NOT TO SCALE F ---- CAUTION![ THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND EVIDENCE (including, but not limited to, manholes, inlets, valves, and marks made upon the ground by others), AND ARE SPECULATIVE, IN NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION. 1-800-382-5544 CALL TOLL FREE - INDIANA UNDERGROUND - REMOVE ALL WRAP AFTER PLANTING EXCAVATE HOLE 12" LARGER THAN ROOT BALL SCARIFY SIDES OF HOLE FINISH GRADE REMOVE ALL STAKING AS SOON AS THE TREE HAS GROWN SUFFICIENT ROOTS TO OVERCOME THE PROBLEM THAT REQUIRED THE TREE TO BE STAKED. STAKES SHALL BE REMOVED NO LATER THE END OF THE FIRST GROWING SEASON AFTER PLANTING, TREES NORMALLY DO NOT NEED TO BE STAKED AND STAKING CAN BE HARMFUL TO THE TREE. STAKING SHOULD BE DONE ON ALL NEWLY PLANTED TREES FOR ONE YEAR. THE FOLLOWING ARE REASONS WHY TREES DO NOT REMAIN STRAIGHT. o TREES WITH POOR - QUALITY ROOT BALLS OR ROOT BALLS THAT HAVE BEEN CRACKED OR DAMAGED. REJECT RATHER THAN STAKE. o TREES THAT HAVE GROWN TOO CLOSE TOGETHER IN THE NURSERY, RESULTING IN WEAK TRUNKS. REJECT RATHER THAN STAKE, o PLANTING PROCEDURES THAT DO NOT ADEQUATELY TAMP SOILS AROUND THE ROOT BALL. CORRECT THE PLANTING PROCEDURE, o ROOT BALLS PLACED ON SOFT SOIL. TAMP SOILS UNDER ROOT BALL PRIOR TO PLANTING. o ROOT BALLS WITH VERY SANDY SOIL OR VERY WET CLAY SOIL. STAKING ADVISABLE. o TREES LOCATED IN A PLACE OF EXTREMELY WINDY CONDITIONS. STAKING ADVISABLE. r. x N A SIR (7 IR-Z 1'� CORATIVE ROC ILCH DEPENDING MFRS DISCRETIC N ky ti k . NN N \DF (5) gini. YW (3) N -NN R (3) AL, DF (3) W (3) �rT 1, Olt DF (5) N, R5 R-MV S R (6) % %N JP%O W (6) V 0 .5 k 0 '0. IN OA x 411 T ?to`o Raqe Levelha Pad Nntes: s. rhe leveling pad is to be constructed of crushed stone or 2.000 psi± unrinforced Concrete 2-1he bow frAindaticto is to be cpprcmd by the site geotechnical engineer jwfor to placement of the leveling pocL Ea-a-dation 8* Crushed. Rock or Unreinforced, Concrete PLANT MATERIAL SCHEDULE Elevation 119" x 5 1/' Fibo0m,fl 71iri�i M_---Frrnt Foci: L j W + 12' Sect,lon Leveling Pad Detail KEY COMMON NAME QUAN. SIZE Y■ DENSE YEW 16 18" - 24" SR KNOCK OUT SHRUB ROSE 16 2 GALLON DF DWARF FOUNTAIN GRASS 18 2 GALLON 4 z7t 4, ilJ j STAIi **---.�Ivc ,-; F" A ,