HomeMy WebLinkAbout12090005.6NEVER CUT LEADER. THIN UP TO 10'3
OF BRANCHES RETAINING NATURAL SHAPE
OF TREE. DO NOT LEAVE STUBS
ATTACH GUY WIRE AND HOSE
ABOVE FIRST BRANCH.
STAKE TREES UNDER 3" CAL, USE WOOD
STAKES 2 PER TREE @ 120'-'
GUY TREES: 3" CAL,. & LARGER USE 2' 'x4" STAKES
DRIVEN BELOW GRADE. (2 STAKES 1200 APART)
SET TOP OF ROOT CROWN AT GROUND LEVEL
REMOVE 50% OR WIRE BASKET AND BURLAP
3" MULCH LAYER AS SPECIFIED
4" DIA. X "4'" SAUCER AROUND PLANTING PIT
PULVERIZE SOIL
EXCAVATED FROM HOLE AND
USE AS BACKFILL
LOOSEN SUBGRAIJE AROUND CENTER MOUND
STAKE TO BE IS" BELOW PIT IN
UNDISTURBED SUBGRADE
UNDISTURBED SUBGRADE BASE
M
I
I
SHADE TREE PLANTING DETAIL
NOT TO SCALE
W&o�%T EnLINE ONLY DAMAGED, DISEASED OR
ES.
_
RMUP RH S A ot I WNRYADE.
2"SHREDDED HARDWOOD BARK MULCH.
CREATE EARTH SAUCER.
CUT AND REMOVE TOP 1/3 OF BURLAP,
BACKFILL WITH EXISTING.
SHRUB PLANTING DETAIL
NOT TO SCALE
F ----
CAUTION![
THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES
SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND
EVIDENCE (including, but not limited to, manholes, inlets,
valves, and marks made upon the ground by others), AND
ARE SPECULATIVE, IN NATURE. THERE MAY ALSO BE OTHER
EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO
ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND
EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID
EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY
THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION.
1-800-382-5544
CALL TOLL FREE
- INDIANA UNDERGROUND -
REMOVE ALL WRAP AFTER PLANTING
EXCAVATE HOLE 12" LARGER
THAN ROOT BALL
SCARIFY SIDES OF HOLE
FINISH GRADE
REMOVE ALL STAKING AS SOON AS THE TREE HAS GROWN SUFFICIENT ROOTS TO OVERCOME THE PROBLEM
THAT REQUIRED THE TREE TO BE STAKED. STAKES SHALL BE REMOVED NO LATER THE END OF THE FIRST
GROWING SEASON AFTER PLANTING,
TREES NORMALLY DO NOT NEED TO BE STAKED AND STAKING CAN BE HARMFUL TO THE TREE. STAKING SHOULD BE DONE
ON ALL NEWLY PLANTED TREES FOR ONE YEAR.
THE FOLLOWING ARE REASONS WHY TREES DO NOT REMAIN STRAIGHT.
o TREES WITH POOR - QUALITY ROOT BALLS OR ROOT BALLS THAT HAVE BEEN CRACKED OR DAMAGED. REJECT RATHER THAN STAKE.
o TREES THAT HAVE GROWN TOO CLOSE TOGETHER IN THE NURSERY, RESULTING IN WEAK TRUNKS. REJECT RATHER THAN STAKE,
o PLANTING PROCEDURES THAT DO NOT ADEQUATELY TAMP SOILS AROUND THE ROOT BALL. CORRECT THE PLANTING PROCEDURE,
o ROOT BALLS PLACED ON SOFT SOIL. TAMP SOILS UNDER ROOT BALL PRIOR TO PLANTING.
o ROOT BALLS WITH VERY SANDY SOIL OR VERY WET CLAY SOIL. STAKING ADVISABLE.
o TREES LOCATED IN A PLACE OF EXTREMELY WINDY CONDITIONS. STAKING ADVISABLE.
r.
x
N
A
SIR (7
IR-Z
1'�
CORATIVE ROC
ILCH DEPENDING
MFRS DISCRETIC
N
ky
ti k
. NN
N
\DF (5)
gini. YW (3) N
-NN
R (3)
AL,
DF (3)
W (3)
�rT 1,
Olt
DF (5) N,
R5 R-MV
S R (6)
%
%N
JP%O W (6)
V
0 .5 k
0
'0.
IN
OA
x
411
T
?to`o
Raqe Levelha Pad Nntes:
s. rhe leveling pad is to be
constructed of crushed stone
or 2.000 psi± unrinforced
Concrete
2-1he bow frAindaticto is to be
cpprcmd by the site geotechnical
engineer jwfor to placement of the
leveling pocL
Ea-a-dation
8* Crushed. Rock or
Unreinforced, Concrete
PLANT MATERIAL SCHEDULE
Elevation
119" x 5 1/'
Fibo0m,fl 71iri�i
M_---Frrnt Foci:
L j W + 12'
Sect,lon
Leveling Pad Detail
KEY
COMMON NAME
QUAN.
SIZE
Y■
DENSE YEW
16
18" - 24"
SR
KNOCK OUT SHRUB ROSE
16
2 GALLON
DF
DWARF FOUNTAIN GRASS
18
2 GALLON
4 z7t
4,
ilJ
j
STAIi
**---.�Ivc
,-; F"
A ,