NOTES:
1. AN OAT OR WHEAT COMPANION OR NURSE CROP MAY BE USED WITH ANY OF THE ABOVE PERMANENT SEEDIN= MIXTURES, AT THE
FOLLOWING RATES:
(A) SPRING OATS - ONE- FOURTH TO THREE - FOURTHS BUSHEL PER ACRE
(B) WHEAT - NO MORE THAN ONE -HALF BUSHEL PER ACRE
2. A HIGH POTENTIAL FOR FERTILIZER, SEED, AND MULCH TO WASH EXISTS ON STEEP BANKS, CUTS, AND IN CHAN'IELS AND AREAS OF
CONCENTRATED
INSTALLATION
1. GRADE THE SITE TO ACHIEVE POSITIVE DRAINAGE.
2. ADD TOPSOIL OR COMPOST MULCH TO ACHIEVE NEEDED DEPTH FOR ESTABLISHMENT OF VEGETATION. rCOMPOST '14TERIAL MAY BE ADDED
TO IMPROVE SOIL MOISTURE HOLDING CAPACITY, SOIL FRIABILITY, AND NUTRIENT AVAILABILITY.)
SEEDBED PREPARATION
1. TEST SOIL TO DETERMINE PH AND NUTRIENT LEVELS.
2. APPLY SOIL AMENDMENTS AS RECOMMENDED BY THE SOIL TEST AND WORK INTO THE
UPPER TWO TO FOUR INCHES OF SOIL. IF TESTING IS NOT DONE, APPLY 400 TO 600
POUNDS PER ACRE OF 12 -12 -12 ANALYSIS FERTILIZER, OR EQUIVALENT.
3. TILL THE SOIL TO OBTAIN A UNIFORM SEEDBED. USE A DISK OR RAKE, OPERATED ACROSS
THE SLOPE, TO WORK THE SOIL AMENDMENTS INTO THE UPPER TWO TO FOUR INCHES OF
THE SOIL.
SEEDING
OPTIMUM SEEDING DATES ARE MARCH 1 TO MAY 10 AND AUGUST 10 TO SEPTEMBER 30.
PERMANENT SEEDING DONE BETWEEN MAY 10 AND AUGUST 10 MAY NEED TO BE IRRIGATED.
SEEDING OUTSIDE OR BEYOND OPTIMUM SEEDING DATES IS STILL POSSIBLE WITH THE
UNDERSTANDING THAT RESEEDING OR OVERSEEDING MAY BE REQUIRED IF ADEQUATE SURFACE
COVER IS NOT ACHIEVED. RESEEDING OR OVERSEEDING CAN BE EASILY ACCOMPLISHED IF
THE SOIL SURFACE REMAINS WELL PROTECTED WITH MULCH.
1. SELECT A SEEDING MIXTURE AND RATE FROM TABLE 1. SELECT SEED MIXTURE BASED ON
SITE CONDITIONS, SOIL PH, INTENDED LAND USE, AND EXPECTED LEVEL OF MAINTENANCE.
2. APPLY SEED UNIFORMLY WITH A DRILL OR CULTIPACKER SEEDER OR BY BROADCASTING. PLANT OR -OVEP THE EEED TO A DEPTH OF
ONE- FOURTH TO ONE -HALF INCH. IF DRILLING OR BROADCASTING THE SEED, ENSURE GOOD SEED TlD- SO L _ T BY FIRMING THE
SEEDBED WITH A ROLLER OR CULTIPACKER AFTER COMPLETING SEEDING OPERATIONS. (IF SEEDING I< CONE Vv!-- = HYDROSEEDER,
FERTILIZER AND MULCH CAN BE APPLIED WITH THE SEED IN A SLURRY MIXTURE.)
3. MULCH ALL SEEDED AREAS AND USE APPROPRIATE METHODS TO ANCHOR THE MULCH IN PLACE- CONSIDER EROSION CONTROL
BLANKETS ON SLOPING AREAS AND CONVEYANCE CHANNELS
MAINTENANCE
_ INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN
CALENDAR DAYS UNTIL THE VEGETATION IS SUCCESSFULLY ESTABLISHED.
_ CHARACTERISTICS OF A SUCCESSFUL STAND INCLUDE VIGOROUS DARK GREEN OR BLUISHGREEN SEEDLINGS 'Al-- ? UNIFORM VEGETATIVE
COVER DENSITY OF 90 PERCENT OR MORE.
_ CHECK FOR EROSION OR MOVEMENT OF MULCH.
_ REPAIR DAMAGED, BARE, GULLIED, OR SPARSELY VEGETATED AREAS AND THEN FERTILIZE,
RESEED, AND APPLY AND ANCHOR MULCH.
_ IF PLANT COVER IS SPARSE OR PATCHY, EVALUATE THE PLANT MATERIALS CHOSEN, SOIL
FERTILITY, MOISTURE CONDITION, AND MULCH APPLICATION, REPAIR AFFECTED AREAS
EITHER BY OVERSEEDING OR PREPARING A NEW SEEDBED AND RESEEDING. APPLY
AND ANCHOR MULCH ON THE NEWLY SEEDED AREAS.
_ IF VEGETATION FAILS TO GROW, CONSIDER SOIL TESTING TO DETERMINE SOIL PH OR
NUTRIENT DEFICIENCY PROBLEMS. (CONTACT YOUR SOIL AND WATER CONSERVATION
DISTRICT OR COOPERATIVE EXTENSION OFFICE FOR ASSISTANCE.)
_ IF ADDITIONAL FERTILIZATION IS NEEDED TO GET A SATISFACTORY STAND, DO SO ACCORDING
TO SOIL TEST RECOMMENDATIONS.
_ ADD FERTILIZER THE FOLLOWING GROWING SEASON FERTILIZE ACCORDING TO SOIL TEST
RECOMMENDATIONS.
_ FERTILIZE TURF AREAS ANNUALLY. APPLY FERTILIZER IN A SPLIT APPLICATION. FOR
COOL - SEASON GRASSES, APPLY ONE -HALF OF THE FERTILIZER IN LATE SPRING AND ONE HALF IN EARLT F --_ FOR WARM - SEASON
GRASSES, APPLY ONE -THIRD IN EARLY SPRING,
ONE -THIRD IN LATE SPRING, AND THE REMAINING ONE -THIRD IN MIDDLE SUMMER.
TABLE 1. PERMANENT SEEDING RECOMMENDATIONS
THIS TABLE PROVIDES SEVERAL SEED MIXTURE OPTIONS. ADDITIONAL SEED MIXTURES ARE
AVAILABLE COMMERCIALLY. WHEN SELECTING A MIXTURE, CONSIDER INTENDED LAND USE
AND SITE CONDITIONS, INCLUDING SOIL PROPERTIES (E.G., SOIL PH AND DRAINAGE), SLOPE
ASPECT, AND THE TOLERANCE OF EACH SPECIES TO SHADE AND DROUGHT.
REFERENCE IN CHAPTER 7 PAGES 35 -40 IN THE INDIANA STORM WATER QUALITY MANUAL
PERMANENT SEED
LAWNS AND HIGH - MAINTENANCE AREAS
SEED MIXTURES
RATE PER ACRE PURE LIVE SEED
OPTIMUM SOIL PH
1. BLUEGRASS
140 LBS.
5.5 TO 7.0
2. PERENNIAL RYEGRASS
60 LBS.
5.6 TO 7.0
(TURF TYPE)
90 LBS.
FT.
3. TALL FESCUE (TURF TYPE)
170 LBS.
5.6 TO 7.5
- BLUEGRASS
30 LBS.
5.5 TO 7.5
CHANNELS AND AREAS OF CONCENTRATED FLOW
SEED MIXTURES
RATE PER ACRE PURE LIVE SEED
OPTIMUM SOIL PH
1. PERENNIAL RYEGRASS
150 LBS.
FT.
- WHFrE
2 LBS.
5.5 TO 7.0
2. KENTUCKY BLUEGRASS
20 IBS.
FT.
- SMOOTH BROMEGRASS
10 LBS.
FT.
- SWITCHGRASS
3 LBS.
5.5 TO 7.5
- TIMOTHY
4 LBS.
WITHOUT WIRE SUPPORT
- PERENNIAL RYEGRASS
10 LBS.
MANUAL.
- WHITE CLOVER
2 LBS.
3. TALL FESCUE
150 LBS.
5.5 TO 7.5
- WHITE CLOVER
2 LBS.
4. TALL FESCUE
150 LBS.
2. DEPENDENT UPON THE TYPE OF SYSTEM, EITHER EXCAVATE THE PIT OR INSTALL THE
- PERENNIAL RYEGRASS
20 LBS.
5.5 TO 7.5
- KENTUCKY BLUEGRASS
20 LBS.
DEBRIS THAT MAY CAUSE TEARS OR PUNCTURES IN THE POLYETHYLENE LINING.
3/8" TREATED PL'A -, -D
48 %24" PAINTED 'AH'TF
CONCRETE
WASHOUT i
•
3'
3'
f
tiDACK LETTER 6"
-EIGHT
X0.5" LAG SCREWS
WOOD POST 3 "x3 "x8'
VNU
2 -WOOD POST /STAKES
WRAPPED WITH SILT FENCE
AND ROTATED AT LEAST ONE
FULL TURN TO SECURE SILT
FENCE END IN PLACE
SILT FENCE,,,
2 -WOOD POST /STAKES WRAPPED
WITH SILT FENCE AND ROTATED AT
LEAST TWO FULL TURNS TO
PROVIDE A SECURE CONNECTION POST
SILT FENCE
TO JOIN TO
ENDS OF TWO
FENCES.
POST 2 "X2" WOOD OR
1.33 LBS /FOOT STEEL
6' MAX. SPACING
WOVEN FILTER
FABRIC SILT FENCE
MATERIAL COVER
Q
MAXIMUM LOAD SLOPE AND DISTANCE
FOR WHICH A SILT FENCE IS APPLICABLE
LOAD SLOPE
MAX.
DISTANCE ABOVE FENCE
LESS THAN 2%
100
FT.
2 TO 5%
75
FT.
5 TO 10%
50
FT.
10 TO 20%
25
FT.
MORE THAN 20%
15
FT.
POSTS: STEEL T OR U TYPE, OR 2 "X2" HARD WOOD POST
FENCE: WOVEN WIRE, 14 -1/2 GA., 6° MAX. MESH OPENING
FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION.
POST 2 "X2" WOOD OR
1.33 LBS /FOOT STEEL
8' MAX. SPACING
WIRE FENCE 14 GUAGE
(MIN) -6" MESH REQ'D. IN
SWALES OR AREAS OF
CONCENTRATED FLOW
NONWOVEN FILTER
FABRIC - SECURE TO
POSTS WITH 2" LATH
8 "X4" TRENCH TO ° 8 "X4" TRENCH TO
BE BACKFILLED BE BACKFILLED
AND COMPACTED 5i AND COMPACTED
FINISH GRADE FINISH GRADE
F- LOW FLOW
0
MAINTENANCE.
_I_
III-
-m I - -i - i- GEOTEXTILE FABRIC
III
UNDISTURBED z
-I tl. - LAID ON DOWN SLOPE
GROUND
-__I I SIDE AND BOTTOM OF
I - TRENCH
Ir
EMBEDDED SILT FENCE MATERIAL MIN. 8"
_
INTO GROUND W/ 4" LAID ALONG
BOTTOM OF TRENCH. SOIL SLICING IN
j ACCORDANCE WITH ASTM D 6462 8.2.2
- IS ALSO ACCEPTABLE.
WITHOUT WIRE SUPPORT
X
a
o
M
W
Q
GEOTEXTILE FABRIC
UNDISTURBED III z _I� III C LAID ON DOWN SLOPE
GROUND I- SIDE AND BOTTOM OF
TRENCH
I r
ICI I- EMBEDDED SILT FENCE MATERIAL MIN. 8
D- INTO GROUND W/ 4" LAID ALONG
-� BOTTOM OF TRENCH. SOIL SLICING IN
III_ ACCORDANCE WITH ASTM D 6462 8.2.2
IS ALSO ACCEPTABLE.
I =! I I1
1 11 i
WITH WIRE SUPPORT
INSTALLATION
PREFABRICATED SILT FENCE
1. LAY OUT THE LOCATION OF THE FENCE SO THAT IT IS PARALLEL TO THE CONTOUR OF THE SLOPE AND AT LEAST 10 FEET BEYOND THE TOE OF THE SLOPE TO
PROVIDE A SEDIMENT STORAGE AREA. TURN THE ENDS OF THE FENCE UP SLOPE SUCH THAT THE POINT OF CONTACT BETWEEN THE GROUND AND THE BOTTOM OF
THE FENCE END TERMINATES AT A HIGHER ELEVATION THAN THE TOP OF THE FENCE AT ITS LOWEST POINT.
2. EXCAVATE AN EIGHT -INCH DEEP BY FOUR -INCH WIDE TRENCH ALONG THE ENTIRE LENGTH OF THE FENCE LINE. INSTALLATION BY PLOWING IS ALSO ACCEPTABLE.
3. INSTALL THE SILT FENCE WITH THE FILTER FABRIC LOCATED ON THE UP -SLOPE SIDE OF THE EXCAVATED TRENCH AND THE SUPPORT POSTS ON THE DOWN -SLOPE
SIDE OF THE TRENCH.
4. DRIVE THE SUPPORT POSTS AT LEAST 18 INCHES INTO THE GROUND, TIGHTLY STRETCHING THE FABRIC BETWEEN THE POSTS AS EACH IS DRIVEN INTO THE SOIL.
MINIMUM OF 12 INCHES OF THE FILTER FABRIC SHOULD EXTEND INTO THE TRENCH.
5. LAY THE LOWER FOUR INCHES OF FILTER FABRIC ON THE BOTTOM OF THE TRENCH AND EXTEND IT TOWARD THE UP -SLOPE SIDE OF THE TRENCH.
6. BACKFILL THE TRENCH WITH SOIL MATERIAL AND COMPACT IT IN PLACE.
NOTE: IF THE SILT FENCE IS BEING CONSTRUCTED ON -SITE, ATTACH THE FILTER FABRIC TO THE SUPPORT POSTS AND ATTACH WOODEN LATHE TO SECURE THE
FABRIC TO THE POSTS. ALLOW FOR AT LEAST 12 INCHES OF FABRIC BELOW GROUND LEVEL. COMPLETE THE SILT FENCE INSTALLATION, FOLLOWINGSTEPS 1 THROUGH 6
ABOVE.
MAINTENANCE
_ INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS.
_ IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. NOTE: ALL REPAIRS SHOULD
MEET SPECIFICATIONS AS OUTLINED WITHIN THIS MEASURE.
_ REMOVE DEPOSITED SEDIMENT WHEN IT IS CAUSING THE FILTER FABRIC TO BULGE OR WHEN IT REACHES ONE -HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT.
WHEN CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, GRADE THE SITE TO BLEND WITH THE SURROUNDING AREA,
AND STABILIZE.
REFFERENCE IN CHAPTER 7 PAGES 215 --221 IN THE INDIANA STORM WATER QUALITY MANUAL
SEDIMENTATION /SILT FENCE
10' MIN.
w
a
SECTION LINE
10 MIL. PLASTIC LINING
(NO SCALE)
N OTES:
1. ACTUAL LAYOUT DETERMINED IN FIELD.
2. THE CONCRETE WASHOUT SIGN SHALL
BE INSTALLED WITHIN 30FT. OF THE TEMP.
CONCRETE WASHOUT FACILITY
WOOD OR METAL
STAKES TO SECURE WOOD OR METAL
THE STRAW BALES (TWO STAKES TO SECURE _
PER BALE) THE STRAW BALES (TWO
PER BALE)
POLYETHYLENE LINING 10
MIL. EXTENDING OVER
BALES
�''"
-'�- STRAW BALE (TYP) 1 � I =1 I I =I I l
\ POLYETHYLENE LINING 10 FI
MIL. EXTENDING OVER
BALES
\METAL PINS OR STAPLES NATIVE MATERIAL ( OPTIONA SECTI N
PLAN TO SECURE THE
POLYETHYLENE LINING TO
THE STRAW BALES
X
LoQ
NZ
�g
2 "x2" OR2-�4
WOOD FRAME
DROP INLET
WITH GRATE
ATTACH THE WOVEN
WIRE FENCE TO EACH
POST WITH THREE WIRE
TIES OR OTHER
FASTENERS
36" MAX.
(TYP.)
CROSS BRACE 1I 1 _
1 "x2" or 1 "x3 ". '
5' MIN. SECURELY FASTEN
100 OVERLAP OVERLAPPING ENDS
OF SILT FENCE
MATERIAL TO
2 "x2" ,r 2"x4" STAKE ADJACENT STAKES
WITH THREE WIRE
TIES OR OTHER
FASTENERS
WOVEN WIRE FENCE
WITH SILT FENCE
MATERIAL COVER
4 "x8" TRENCH
EXTEND WIRE FENCE A i I II
MIN. OF 8" INTO GROUND -
-- _GEOTEXTILE FABRIC LAID ON
- DOWN -SLOPE SIDE AND
BOTTOM OF TRENCH
POSTS: 2 X 4 WOODEN STAKE
FENCE: WOVEN WIRE, 14 -1/2 GA., 6" MAX. MESH OPENING
FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION.
INSTALLATION
1. DIG AN EIGHT -INCH DEEP, FOUR -INCH WIDE TRENCH AROUND THE PERIMETER OF
THE
INLET
2. IF USING PRE - ASSEMBLED GEOTEXTILE FABRIC AND POSTS, DRIVE THE POSTS INTO
THE
SOIL, TIGHTLY STRETCHING THE GEOTEXTILE FABRIC BETWEEN POSTS AS EACH IS
DRIVEN.
(POSTS MUST BE PLACED ON THE INLET SIDE OF THE ANCHOR TRENCH WITH THE
GEOTEXTILE FABRIC ON THE SIDE OF THE TRENCH FARTHEST FROM THE INLET.)
NOTE: IF ASSEMBLING THE GEOTEXTILE FABRIC AND POSTS ON -SITE, DRIVE THE
POSTS
INTO THE SOIL AND THEN SECURE THE GEOTEXTILE FABRIC TO THE POSTS BY
PLACING A PIECE OF LATHE OVER THE FABRIC AND FASTENING IT TO THE POST
(STRETCHING THE FABRIC BETWEEN POSTS AS IT IS FASTENED),
3. USE THE WRAP JOIN METHOD WHEN JOINING POSTS.
4. PLACE THE BOTTOM 12 INCHES OF GEOTEXTILE FABRIC INTO THE EIGHT -INCH DEEP
TRENCH,
LAYING THE REMAINING FOUR INCHES IN THE BOTTOM Of THE TRENCH AND
EXTENDING
AWAY FROM THE INLET.
5. BACKFILL THE TRENCH WITH SOIL MATERIAL AND COMPACT IT IN PLACE.
6. BRACE THE POSTS BY NAILING BRACES INTO EACH CORNER POST OR UTILIZE RIGID
PANELS
TO SUPPORT FABRIC.
NOTE: IN SITUATIONS WHERE STORM WATER MAY BYPASS THE STRUCTURE,
EITHER:
SET THE TOP OF THE GEOTEXTILE FABRIC FILTER AT LEAST SIX INCHES LOWER THAN
THE GROUND ELEVATION ON THE DOWN -SLOPE SIDE ()F THE STORM DRAIN INLET,
BUILD A TEMPORARY DIKE, COMPACTED TO SIX INCHES HIGHER THAN THE FABRIC, ON
THE DOWN -SLOPE SIDE OF THE STORM DRAIN INLET, AND /OR USE IN CONJUNCTION
WITH EXCAVATED DROP INLET PROTECTION.
SILT FENCE MATERIAL
TO BE FASTENED
SECURELY TO WOVEN
WIRE FENCE WITH
THREE TIES SPACED
AT 3" ON CENTER
MAINTENANCE.
_ INSPECT DAILY.
_ INSPECT GEOTEXTILE FABRIC AND MAKE NEEDED REPAIRS IMMEDIATELY.
_ REMOVE SEDIMENT FROM POOL AREA TO PROVIDE STORAGE FOR THE NEXT
STORM EVENT. AVOID DAMAGING OR UNDERCUTTING FABRIC DURING
SEDIMENT REMOVAL.
_ WHEN CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE
SEDIMENT, PROPERLY DISPOSE OF ALL CONSTRUCTION MATERIAL, GRADE
AREA TO THE ELEVATION OF THE STORM DRAIN INLET TOP, THEN
STABILIZE IMMEDIATELY.
i
REFERENCED IN CHAPTER 7 PAGE 153 -157 IN THE INDIANA STORM WATER QUALITY
MANUAL.
SILT FENCE INLET PROTECTION
FOR NON PAVED AREAS (NO SCALE)
INSTALLATION
1. UTILIZE AND FOLLOW THE DESIGN IN THE STORM WATER POLLUTION PREVENTION PLAN TO
INSTALL THE SYSTEM.
2. DEPENDENT UPON THE TYPE OF SYSTEM, EITHER EXCAVATE THE PIT OR INSTALL THE
CONTAINMENT SYSTEM.
3. A BASE SHALL BE CONSTRUCTED AND PREPANED THAT IS FREE OF ROCKS AND OTHER
DEBRIS THAT MAY CAUSE TEARS OR PUNCTURES IN THE POLYETHYLENE LINING.
4, INSTALL THE POLYETHYLENE LINING. FOR EXCAVATED SYSTEMS, THE LINING SHOULD EXTEND
OVER THE ENTIRE EXCAVATION. THE LINING FOR BERMED SYSTEMS SHOULD BE INSTALLED
OVER THE POOLING AREA WITH ENOUGH MATERIAL TO EXTEND THE LINING OVER THE BERM
OR CONTAINMENT SYSTEM. THE LINING SHOULD BE SECURED WITH PINS, STAPLES, OR OTHER
METAL PINS OR STAPLES FASTENERS.
TO SECURE THE
POLYETHYLENE LINING
TO 5, PLACE FLAGS, SAFETY FENCING, OR EQUIVALENT TO PROVIDE A BARRIER TO CONSTRUCTION
THE STRAW BALES
EQUIPMENT AND OTHER TRAFFIC.
BINDING WIRE
6. PLACE A NON - COLLAPSING, NON -WATER HOLDING COVER OVER THE WASHOUT FACILITY
PRIOR TO A PREDICTED RAINFALL EVENT TO PREVENT ACCUMULATION OF WATER AND
POSSIBLE OVERFLOW OF THE SYSTEM (OPTIONAL).
7. INSTALL SIGNAGE THAT IDENTIFIES CONCRETE WASHOUT AREAS.
STRAW BALE (TYP)
I1
8. POST SIGNS DIRECTING CONTRACTORS AND SUPPLIERS TO DESIGNATED LOCATIONS.
GUI/
9- WHERE NECESSARY, PROVIDE STABLE INGRESS AND EGRESS (SEE TEMPORARY CONSTRUCTION
-I �-
INGRESS /EGRESS PAD ON PAGE 17) OR ALTERNATIVE APPROACH PAD FOR CONCRETE
WASHOUT SYSTEMS.
WOOD OR METAL STAKES
CONCRETE WASHOUT
(TYP) - 2 PER BALE
TYPE "ABOVE GRADE (NO SCALE)
W/ STRAW BALES"