Loading...
HomeMy WebLinkAbout12110090 1:44 PM FURTHER NOTES / NOTICES: • CARMEL ZONING.ORDINANCE'.Z-289, SECTION 29.04.02:(3): "The Director shall approve ordeny.the.Improvement.Location Permit within flve,(5) working days of the receipt of the written application form and'accompanying materials: The Improvement Location Permit_shall be issued when-,the proposedhstructure,improvement,or use and its location conform inall:respectstothis ordinance::' > IN ADDITION TO THE ABOVE=LISTED,SUBMITTAL REQUIREMENTS,THE BUILDING INSPECTOR SHALL;BE,PROVIDEDINFORMATION, RELATIVE-TO COMMITMENTS'MADE IN THE ZONING.PROCESS FOR THE PROPERTY INVOLVED THIS INCLUDES'ANY PLAN COMMISION, BOARD OF ZONINGAPPEALS,,AND/OR DEPT. OFCOMMUNITYrSERVICES.ADMINISTRATIVEAPPROVALS REQUIRED. > ADDITIONAL INFORMATION MAY BE REQUESTED BY,.AND!SHALL BE PROVIDED TO THE'BUILDING,INSPECTOR, IF THE SUBMITTED:PLANSARE NOT OF SUFFICIENT IN CLARITY OR DETAIL TO INDICATE THE NATURE.AND EXTENT OF THE WORK PROPOSED'AND TO DETERMINE COMPLIANCE WITH'ALL APPLICABLE CODES AND!ORDINANCES. .PLEASE NOTE: IF ADDITIONAL ITEMS FOR;REVIEW ARE REQUESTED, REVIEW TIME MAY BE EXTENDED:. : ALL CONSTRUCTION IS SUBJECT TO FIELD'INSPECTION,AND SHOULD NOT BEGIN PRIOR TO THE ISSUANCE OF THE BUILDING PERMIT. ONCE THE PERMIT IS;ISSUED,WORK SHOULD NOT„BEAPOURED,,INSULATED/COVERED„AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION Beginning prior to obtaining a building permit and/or proceeding with construction . beyond the;stage.of a required inspection without approval constitutes Late;Fee'penalties, per Z289:ofthe Cannel/Clay'Zoning Ordinance;p29.06.07,and 29:06108. t I BUILDING &;CODE SERVICES CITY OF CARMEL. One Civic Square ,Carmel, IN 46032. Ph ,(317) 571-244.4. J Provide Sq.Ft. for.entire,structure for"new single family home, if remodeling or adding'an.addition / accessory structure provide Sq. Ft. of'Work area: BASEMENT 1st Floor rd Floor 3rd Front Rear Total Sq. TOTAL (Finished and I Floor Porch Porch or Ft. of U ' Unfinished) Sunroom Garages �� o (100 Per the Adopted:Indiana Energy.Code thatwill;besin effect-for all New Buildings,,Additions, Accessory Structures, and Remodels. Therefore three methods of compliance to choose`from.:Itis.REQUIRED to indicate which compliance that will be used at of submittal. Please select from the�following: (Handout for Compliance,of Energy Code can be;picke-'up in our office or found at:'http://www:carmel.in.gov/ ) Prescnptive tine <restncth e)' 7/ _ -, Total UA(allows building envelope.trade-offs) : mane( sfl exb 4 a L;' ..,-S .. a - a _ _ I, the undersigned, dertify.that all.ofthe above listed information:is?shown,completely and accurately on the attached,plot or site plan(s), construction plans;and any other submitted`documentation,;submitted with`the building permit application to the City of Carmel/.Clay Township Department.of Community Services. Iifurther certify that the joining of water supply piping shall be made with lead-free solders,arid fluxes. .Failure;to comply will result in a replacement of the:system. (Plumbing Code`P-509-5) Under the penalties of Perjury( ;diana Code 35-44-2-1), I also:hereby affirm, under',oath, tnatall ofdhe information I have provided in the table below is true and a• urate, to the best of my knowledge and belief, and that I have not knowingly'or intentionally provided or omitted any information ,11 would tend to hide, obscure, or otherwise mislead the,Dept;of Community Services regarding the truth of the matters addr4dherein. • A&___ -dile 11/112AL APPLICANT' rsRE DATE i/,'/'/,/ ern' ` ! L—° No right of way permit needed. Print