Loading...
HomeMy WebLinkAboutPacket ~ Cla:!bourne, Section 3 DEVELOPMENT REPORT Submitted by: Boomerang Development, LLC 11911 Lakeside Drive Fishers, IN 46038 (317) 849-7607 Prepared for: CARMEL PLAN COMMISSION Prepared by: The Schneider Corporation Historic Fort Harrison 8901 Otis Ave. Indianapolis, IN 46216 (317) 826-7306 June 2004 -..,. TABLE OF CONTENTS Development Report A. Claybourne Color Rendering B. Aerial Photograph C. Area Map D. Site Map E. Site Narrative E. Water Service F. Sanitary Sewer Service G. Storm Drainage H. Soils E. Soils Map o <t o '" cu Z '" ::> o '" ~ cu :r: '" CLAYBOURNE BOOMERANG DEVELOPMENT, LLC N W+E S Schneider ~:\3K\.3690\OOl \GRAPHICS\AlL 11 XI7.CRD 4/10/02 lJ 0:::: lJ L r<) ~ ~ SITE ~ en Q) ~ W 1 41st St SITE I -~- I lJ g W 126th 0:::: Q) C L o ..0 Q) L: (f) AREA MAP SCALE: 1.'=1000' LAKE , 5 BLOCK .N. COMMON AREA 258 257 256 >- ~ 255 ~ 254 ~' 253 252 251 131 ST STREET SITE MAP o <: o a::: w :z a::: o (]) --.J W :r: (f) BlOCK . c.A. I -~- I '. E. Site Narrative Claybourne, Section 3 is the third and final section of Claybourne in Western Clay Township that will provide a variety of exclusive custom home sites and upscale home sites set in park like setting with woodland preserves, parks, lakes, fonnal boulevards, entry walls, walking paths and recreation areas including a community swimming pool. The site is located at the intersection of 131 st Street and Shelbourne Road. The third section contains 77 lots on 73.26 acres. The property is zoned S-l and the project will be developed meeting all the requirements of the Cannel Open Space Ordinance. F. Water Service Water for the project will be supplied by the City of Cannel. Water main serving the project will be extended through Section 3 from the previous two sections of Claybourne. G. Sanitary Sewer Service The sanitary sewer service will be provided by Clay Township Regional Waste District. The sewers in Claybourne, Section 3 will connect to the existing sewers in Claybourne Section 2. H. Storm Drainage The stonn water runoff will be collected in stonn sewers and routed to a series of seven lakes providing stonn detention for the site. Claybourne, Section 3 includes the last two lakes for the project. The stonn sewers will be dedicated to the Hamilton County Drainage Board as regulated drains and the system design will meet the requirements set by the Hamilton County Surveyor. I. Soils Soil types found on the site are primarily Brookston-Crosby soils with some areas of Miami soils Miami soils are typically deep well-drained soils, while Brookston- Crosby soils are generally deep and somewhat poorly drained. -., j. tJr ~ {'" MmC2 MmB2 CrA CrA lB2 Br CrA I I-~- I CrA SOilS MAP SCALE: 1.'=600'