Loading...
HomeMy WebLinkAboutCorrespondence Conn, Angelina V From: Foley, Amanda J Sent: Friday, November 02, 2012 11:41 AM To: Conn, Angelina V Cc: Duncan, Gary R; Barnes, David R Subject: Engineering staff report •Wedgewood: Our office has received a site plan to review but has not received construction plans. We issued comments accordingly on 11/1/12. The site plan submitted was not to scale. Our office has requested engineered construction plans,including a grading and drainage plan,in order to fully review the project and ensure there are no negative impacts to the surrounding properties or right-of-way. The site plan indicates three parallel parking spaces along the alley. Per the site plan,the property only has 65-feet fronting the alley, and parallel parking generally requires 22-25 feet for maneuvering. Three parking spaces would require between 66 and 75-feet,in addition to any buffering required. The developer has indicated a rain garden on the site plan for stormwater quality and detention. Since this is in excess of the stormwater standards for this size site,the Engineering Department appreciates the developer's desire to construct this stormwater improvement. McDonald's The developer has made changes to the south entrance to the site,per concerns from the Engineering Department. While the entrance is not ideal,the changes that have been made are sufficient for the Engineering Department to approve the entrance location. The developer has not submitted all items necessary to fully review the stormwater drainage and water quality for this project. However, the Engineering Department has no issues with the project moving forward,conditional upon the developer addressing any issues that may arise as additional stormwater details are provided to the Department during the construction plan review process. 146th and Gray Rezone The Engineering Department has not received any new submittals for this project. Kunkle Family Minor Subdivision The Department has requested a buffer strip in lieu of stormwater detention and stormwater quality requirements. The buffer strip shall include the entire extent of the floodplain or the regulated drain easement, whichever is greater, plus an additional 10-feet. This has not been indicated on the most recent primary plat submitted to the Engineering Department. A 20-foot easement shall be indicated on the plat,centered on the property line between Lots 1 and 2, per the Subdivision Control Ordinance. Mr. Kunkle has submitted an acceptable draft commitment for the required alternative transportation path. We will work with him to finalize this commitment. Ultimate Car Wash Modifications The Engineering Department has not received construction plans for full review of this project. A site plan was submitted via email. Amanda Foley Staff Engineer City of Carmel Department of Engineering 317-571-2309 (direct) afoley @carmel.in.gov 1 dxi -t • �rG w ,I. F1.1104 CITY ` RMEL October 31,2012 JAMES BRAINARD, MAYOR Mr. Paul Owen Wedgewood Building Company 704 Adams Street Cannel,IN 46032 RE: Wedgewood Office Building,Review#1 Dear Mr.Owen: The Engineering Department received your site plans on October 16,2012. We offer the following comments: CONSTRUCTION DRAWING REVIEW COMMENTS 1. Please provide construction plans,certified by a Professional Engineer. for this project,including: a. Title Sheet with project name,site location map, legal description, index and contact information for the developer and project manager. b. Grading and Drainage Plan c. A construction phase Storm Water Pollution Prevention Plan 2. The site plan is not to scale. 3. Please label the right-of-way line along 1'"Street NE and 15`Avenue NE on the plans. Private improvements require a variance of City Code and a Consent to Encroach Agreement if located within the public right-of-way. 4. Please indicate the limits of the public right-of-way in the alley. 5. Please include the construction limits on all plan sheets. 6. Please include the names of adjacent landowners and the location of any section corners on the plans. 7. Please label all existing and proposed utilities onsite. 8. Please label all existing and proposed easements. 9. City standards require commercial curb return radii to be 30 feet; however,in this instance.we would allow 10-foot radii with 5-foot fillets. 10. The City's standard commercial driveway is required. Please include the City Standard Commercial Driveway detail in the plan set. I I. The proposed commercial curb cut on 1"Avenue NE and the parallel parking along the alley require Board of Public Works and Safety approval. 12. Please label the distance of the commercial driveway from the intersection. 13. Is any sidewalk planned to be replaced with this project? If so,please include the City's Standard Sidewalk Detail. 14. Please ensure the sidewalk crossing at the commercial entrance is ADA compliant. 15. Please provide ADA compliant ramps anywhere the sidewalk will be effected. Please include the applicable INDOT standard ADA ramp details. 16. Are any street cuts proposed for this project for the installation of utilities? If so,please indicate the sawcut,removal, and replacement of pavement on the plans and include the City standard street cut patch detail. 17. Please indicate City standard curb for all interior parking areas,and include the applicable City standard curb detail. 18. The maximum:spacing of concrete.curb control joints shall be 10 feet on tangents and 5 feet on radii. The maximum spacing of concrete curb expansion joints shall be 50 feet. DEPARTMENT OF ENGINEERING ONE Civic SQUARE, CARMEL,.IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAIL engineertngecannet.in.gov Mr. Paul Owen October 31,2012 RE: Wedgewood Office—Project Review#1 Page 2 of 5 19. Please include the City Curbing Policy in the plan set. 20. Please ensure the parallel parking along the alley is outside the alley right-of-way. 21. It appears there is only 65 feet of your property fronting the alley. Parallel parking spaces shall be 22 to 25-feet,for adequate maneuvering. 22. Please label the downstream stonnwater receiving system,including the size,material,and invert elevation. 23. Please provide our office with the proposed release rate from this site. Is all stormwater runoff from the site routed through the rain garden? To ensure there are no downstream restrictions, please verify the capacity of the curb inlet at the intersection and the next downstream pipe. 24. All stormwater subsurface drains shall be double wall Hancor Hi-Q or equivalent. GENERAL INFORMATION • These comments represent the Department of Engineering's first review of the construction plans for this project. • We request that all responses to our comments be provided in writing and be accompanied by a drawing reflecting the requested revisions. Failure to provide written responses may result in the delay of the review process. • it is critical that this office be made aware of all modifications made on the plans being re- submitted,particularly if any such changes are considered"new"or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes,including changes resulting from Plan Commission, BZA or other committee meetings. • We have engaged Crossroad Engineers,PC to review all drainage plans and drainage calculations submitted to this office for review. If you have not already done so,please provide a set of drainage plans and calculations to their office for review.We will share Crossroad's comments as they are received. • Final drawings will not be approved for construction until: o All Engineering Department and Utility Department and Hamilton County Surveyor issues have been resolved. o All bonds and performance guarantees are posted. o All Board of Public Works and Safety approvals and any other governing agency approvals(if required)are obtained. o All off-site easements necessary to install utilities to serve the development are secured. o SWPPP is approved. o All fees are paid. • The Department reserves the right to provide additional comments based upon subsequent reviews. • An approved right-of-way permit is required prior to commencing any work in the public right-of- way and for construction equipment access from the City's right-of-way. • if it will be necessary to relocate existing utilities,the costs.for such relocation shall be borne solely by the developer. Any utility poles requiring relocation shall be relocated to within one foot of the outside edge of the proposed right-of-way. • The Department requires that the construction drawings be developed in accordance with the City of Carmel digital submission standards and that all required submittals for primary plat,secondary plat,and construction drawings be made. The digital files must be submitted to the Department of Engineering prior to the approval of the construction plans. Please contact the City GIS Department for the requirements. • Jurisdictions: o The project site is located within current City of Carmel Corporate Limits. o Perimeter Street and Right-of-Way—City of Cannel o Water—City of Carmel Utilities o Sanitary Sewers—City of Carmel Utilities Mr.Paul Owen October 31,2012 RE: Wedgewood Office—Project Review#1 Page 3 of 5 o Storm Sewers/Drainage—City of Carmel o Legal Drains—Hamilton County Surveyor's Office • Drawings submitted for approval: o The design engineer must certify all drawings submitted for final approval. o This office will require 9 sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and signed by the.City Engineer and by Carmel Utilities. The Owner will receive 3 sets,one of which must be maintained on the construction site at all times. If this project is subject to review and approval by the Hamilton County Surveyor's Office,a total of 11 sets will be required for final approval. o Carmel Utilities will provide separate reviews of this project for water issues. Please assure that copies of all drawings are sent to: Paul Pace Paul Arnone Carmel Utilities.Distribution Carmel Utilities Collection 3450 West 131st Street 901 North Range Line Road Westfield,IN 46074 Carmel,IN 46032 • Cannel Utilities subscribes to"Holey Mole),"who should be contacted directly for all water main locations. a The following items will be sent electronically upon request regarding this correspondence and project: o Project Approval Checklist o Performance/Maintenance Guarantees o Utility Jurisdictions/Right of Way Permits o Availability(acreage)Fees BOARD OF PUBLIC WORKS AND.SAFETY o A schedule,for Board of Public Works and Safety meeting dates and agenda deadlines will be sent electronically for your use upon request. Please use the Engineering Department deadlines for submissions to the Board. o Any submission to the Board requires prior approval by the Carmel Clay Plan Commission and/or the Board of Zoning Appeals(if applicable)and completion of review by the Technical Advisory Committee. All written requests to be placed on the Board's agenda must include the appropriate Docket Number and the date(or dates)of approval by.the Plan Commission and/or the Board of Zoning Appeals(if applicable). • Water Availability and Sanitary Sewer approval from the Board will berequired. This is an EDU approval based upon the proposed use of the site Reference Items#33 to#35 below for additional details/explanations. Please note that if an entryway or other irrigation system is planned for this development,additional Water Availability Approval from the:Board will be required and additional Water Connection Fees will be assessed based upon the size and usage of the system as determined by the Director of Carmel Utilities. • Temporary Construction Entrance Approval. If the construction entrance will be located in a separate location from the planned commercial entrance,then Board of Public Works and Safety approval is required. • The installation of any permanent,privately owned and/or maintained improvement(signs, decorative street signs,walls,streetlights,etc.)within dedicated right of way or dedicated easements requires the execution of a.Consent to Encroach Agreement between the Owner and the City of Carmel. Such agreements are executed by the Board of Public Works and Safety. The City Engineer may approve irrigation system agreements. • Secondary Plat approval if applicable. All performance guarantees must be posted prior to submission of secondary plats for Board of Public Works and Safety approval. o Dedication of right-of-way if not platted. This is based upon the City of Carmel 20-Year Thoroughfare Plan requirements. Dedication documents are available upon request. Please be Mr. Paul Owen October31,2012 RE: Wedgewood Office—Project Review t#1 Page 4 of 5 advised that all Right-of-Way Dedications must be accompanied by a Sales Disclosure Agreement completed by the owner for the property being dedicated to the City. The dedication document cannot be recorded without,a completed Sales Disclosure. The form is available upon request. • Any open pavement cuts of City right-of-way will require Cannel Board of Public Works and Safety approval. The cut on Hayne Street will require BPW approval. BONDING REQUIREMENTS • Please contact Mr.Dave Barnes to review performance guarantee requirements. Please contact Mr.John Duffy to review water and sanitary sewer bonding requirements. • The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements,to be provided by the design engineer. Please provide detailed Engineer's Estimates for each improvement including quantities, unit costs,pipe sizes,and materials,etc. • Upon completion and release of individual Performance Guarantees,a three-year Maintenance Guarantee will be required(see Street Sign comments above). The Maintenance Guarantee amount is based upon 15%of the Performance amount for Streets and Curbs,and 10%of the Performance amount for all other improvements. • Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. • Please reference the available enclosures for more detailed explanation of our procedures. RIGHT OF WAY PERMIT AND BONDING • Any work in the dedicated right-of-way will require an approved Right-of-Way Permit and a License&Permit Bond. • The bond amount is determined by our Right-of-Way Manager. However, if the work is included in the scope of work of a required and posted Performance Guarantee,the Performance Guarantee may be used to satisfy the bond requirements of the Right-of-Way Permit. • Please contact our Right-of-Way Manager,Fred Glaser,to arrange right-of-way permitting and bonding. AVAILABILITY AND CONNECTION FEES • We defer to Carmel Utilities regarding this issue. • Ifan entryway or overall site irrigation system is planned for this development,additional Water Connection Fees will be assessed based upon the size and usage of the system and upon the recommendations of the Director of Carmel Utilities. • These fees are required to be paid prior to final approval of construction plans by Engineering and prior to issuance of building permits by Building Codes Services. Please confirm these fees and calculations with Cannel Utilities. If you have questions,please contact me at 571-2441. Sincerely, ,97 a. !ru .. r. , '. Assists City Engineer Department of Engineering cc: Angelina Conn, Department of Community Services John Duffy,Cannel Utilities Mr.Paul Owen October 31,2012 RE: Wedgewood Office—Project Review#1 Page 5 of 5 Paul Pace,Carmel Utilities Paul Arnone,Cannel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko,Crossroad Engineers, PC issvrapps\user data\z:\+hared\PROsRLV 12\W dgewood Office Review 41 Conn, Angelina V From: Greg R. Noyes [Greg.Hoyes @hamiltoncounty.in.govj Sent: Monday, October 29, 2012 2:04 PM To: 'Paul Owen' Cc: Brad Love; Gary McNutt; powen @wedgewoodbc.com.; Barnes, David R; Foley, Amanda J; Duncan, Gary R; Thomas, John G; gilko @crossroadengineers.com; Donahue-Wold, Alexia K; Conn, Angelina V Subject: RE: Proposed Building Improvements @ 32 1st Avenue NE Paul I have reviewed the building layout/design and have not comments regarding the building. The detention area (which is needed for the increased impervious area in Old Town Carmel) outlet will connect to the Morrow-Follett Regulated Drain, so we will need an outlet permit for the direct connection to the drain. The permit can be found at http://www.hamiltoncounty.in.gov/egov/documents/1320628574 10804.pdf. Please complete the application and submit it back to our office per the instructions. If you have any questions, please let me know. O ` d� , thee to Ese Plan Reviewer Hamilton County Surveyor's Office From: Paul Owen [mailto:powen @wedgewoodbc.com] � � Sent: Tuesday, October 16, 2012 2:45 PM To: Conn, Angelina V; awold @carmel.in.gov; Mindham, Daren; dlittlejohn @carmel.in.gov; Lux, Pamela K; dhuffman @carmel.in.gov; Greg R. Hayes; oilko @crossroadengineers.com; jthomas@carmel.in.gov; gduncan @carmel.in.gov; afoley @carmel.in.gov; nredden @carmel.in.gov; dbarnes @carmel.in.gov; David E. Lucas; whohlt @carmel.in.gov; iblanchard @carmel.in.gov; jduffy @carmel.in.gov; tgreen @carmel.in.gov; cellison @carmel.in.gov; tkrueskamp @carmel.in.gov; mwestermeier @carmelclayparks.com; Jason T. LeMaster; Brooke M. Gajownik; jason.kirkman@mybrighthouse.com; Hunter, Shirley A; garv.mcnamee @duke-energy.com; ilclark @vectren.com; dan.davenport @aes.com; dwhiting @citizensenergygroup.com; rfarrand @ccs.k12.in.us; rvan.hartman@ctrwd.orq; trov.vackle@sug.com; doland.w.wise @usos.gov; sk4986 @att.com Cc: Brad Love; Gary McNutt; powen @wedgewoodbc.com. Subject: Proposed Building Improvements @ 32 1st Avenue NE Good afternoon everyone, Please see the attached documents regarding our proposed remodel and addition to the property we purchased at 32 1st Avenue NE. This property will be our new company office and design center. Our building addition will match the existing brick and colors on the current building. The completed project will blend both old and new into a beautiful and architecturally-pleasing Craftsman-style building. Please respond to me if you also need a paper hard copy of the above plans, as well as any other information. I look forward to hearing from you soon. Thanks for your time. Paul Owen Wedgewood Building Company 317-669-8530 1 Conn, Angelina V From: Greg Ilko [gilko @crossroadengineers.com] Sent: Monday, October 29, 2012 2:18 PM To: 'Greg R. Hoyes'; 'Paul Owen' Cc: 'Brad Love'; 'Gary McNutt'; 'powen @wedgewoodbc.com.'; Barnes, David R; Foley, Amanda J; Duncan, Gary R; Thomas, John G; Donahue-Wold, Alexia K; Conn, Angelina V Subject: RE: Proposed Building Improvements @ 32 1st Avenue NE Paul, I will require a full size, hard copy of all site construction plans and drainage calculations. Please deliver them to my attention. Thanks, Gregory J. Ilko, P.E. CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 Office: 317-780-1555 ext. 112 Mobile: 317-408-3609 Fax: 317-780-6525 From: Greg R. Hoyes [mailto:Greg.Hoyes @hamiltoncounty.in.gov] Sent: Monday, October 29, 2012 2:04 PM To: 'Paul Owen' Cc: Brad Love; Gary McNutt; powen @wedgewoodbc.com.; dbarnes @carmel.in.gov; afoley @carmel.in.gov; gduncan @carmel.in.gov; ithomas @carmel.in.gov; gilko @crossroadengineers.com; awold @carmel.in.gov; Conn, Angelina V Subject: RE: Proposed Building Improvements @ 32 1st Avenue NE Paul I have reviewed the building layout/design and have not comments regarding the building. The detention area (which is needed for the increased impervious area in Old Town Carmel)outlet will connect to the Morrow-Follett Regulated Drain, so we will need an outlet permit for the direct connection to the drain. The permit can be found at http://www.hamiltoncounty.in.gov/egov/documents/1320628574 10804.pdf. Please complete the application and submit it back to our office per the instructions. If you have any questions, please let me know. ae, e5Jl e &ce Plan Reviewer Hamilton County Surveyor's Office From: Paul Owen [mailto:powen @wedgewoodbc.com] Sent: Tuesday, October 16, 2012 2:45 PM To: Conn, Angelina V; awold @carmel.in.gov; Mindham, Daren; dlittlejohn@carmel.in.gov; Lux, Pamela K; dhuffman @carmel.in.gov; Greg R. Hoyes; gilko @crossroadengineers.com; jthomas @carmel.in.gov; gduncan @carmel.in.gov; afoley @carmel.in.gov; nredden @carmel.in.gov; dbarnes @carmel.in.gov; David E. Lucas; whohlt @carmel.in.gov; iblanchard @carmel.in.gov; jduffy @carmel.in.gov; tgreen @carmel.in.gov; cellison @carmel.in.gov; 1 G`Z1otCgq\ ;�swrcvr/s,.( �s City of C 4 / ,,,w,,„.pNA� DEPARTMENT OF COMMUNITY SERVICES October 18,2012 Mr. Paul Owen Internal Operations Coordinator 704 Adams St, Ste A Carmel,IN 46032 RE: Wedgewood Building Companies Dear Mr.Owen: The following letter represents comments for this project specifically addressing the area of alternative transportation. I have reviewed the project submitted for Technical Advisory Committee review, and offer the following comments: Alternative Transportation Review and Comments 1) Please ensure that ADA compliant ramps are implemented at all sidewalk intersections with streets, alleys,and driveways. 2) Please review the City of Cannel's Parking Ordinance in order to determine the construction details for the required bicycle parking. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in delay of the review process. It is critical that this office be made aware of all modification made on the plans being re-submitted,particularly if any such changes are considered"new"or fall outside of our previous reviews.Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes,including changes resulting from Plan Commission,Special Studies or other committee meetings. The Department of Community Services reserves the right to provide additional comments based on subsequent reviews. If you have questions,please contact me at 571-2417. Sincerely, David Littlejohn Alternative Transportation Coordinator Department of Community Services cc: Angie Conn; Department of Community Services Engineering Department Review Page '1 ONE CIVIC SQUARE CARMEI,,INDIANA 46032 317/571-2417 Conn, Angelina V From: Paul Owen [powen @wedgewoodbc.com] Sent: Tuesday, October 16, 2012 2:45 PM To: Conn, Angelina V; Donahue-Wold, Alexia K; Mindham, Daren; Littlejohn, David W; Lux, Pamela K; Huffman, David; greg.hoyes @hamiltoncounty.in.gov; gilko @crossroadengineers.com; Thomas, John G; Duncan, Gary R; Foley, Amanda J; Redden, Nick; Barnes, David R; david.lucas@hamiltoncounty.in.gov; Hohlt, William G; Blanchard, Jim E; Duffy, John M; Green, Timothy J; Ellison, Christopher M; Krueskamp, Theresa A; Forward for Westermeier, Mark;jason.lemaster @hamiltoncounty.in.gov; brooke.gajownik @hamiltoncounty.in.gov; jason.kirkman @mybrighthouse.com; Hunter, Shirley A; gary.mcnamee @duke-energy.com; jlclark @vectren.com; dan.davenport @aes.com; dwhiting @citizensenergygroup.com; rfarrand @ccs.k12.in.us; ryan.hartman @ctrwd.org; troy.yackle @ sug.com; doland.w.wise @ usps.gov; sk4986@att.com Cc: Brad Love; Gary McNutt; powen @wedgewoodbc.com. Subject: Proposed Building Improvements @ 32 1st Avenue NE Attachments: Wedgewood Office Presentation Binder 101212.pdf; SURVEY.PDF Good afternoon everyone, Please see the attached documents regarding our proposed remodel and addition to the property we purchased at 32 1St Avenue NE. This property will be our new company office and design center. Our building addition will match the existing brick and colors on the current building. The completed project will blend both old and new into a beautiful and architecturally-pleasing Craftsman-style building. Please respond to me if you also need a paper hard copy of the above plans, as well as any other information. I look forward to hearing from you soon. Thanks for your time. Paul Owen Wedgewood Building Company 317-669-8530 Conn, Angelina V From: Conn, Angelina V Sent: Tuesday, October 16, 2012 12:33 PM To: 'Paul Owen' Cc: Donahue-Wold, Alexia K Subject: RE: Wedgewood Building Company ADLS Presentation (32 1st Ave NE) Attachments: TAC Members 7-27-2012.pdf Good afternoon, Paul— We need you to email your plans to all Technical Advisory Committee(TAC) members. In the email you send to them, include a short paragraph about the project and please also ask if they need paper copies,too. Attached is the TAC members list,with their email addresses, and also some of their plan preferences for paper, digital, or both. Thanks, Angie Conn, Planning Administrator City of Carmel Planning &Zoning Division Dept. of Community Services 1 Civic Square, 3rd Fir. Carmel, IN 46032 0: 317-571-2417 I F: 317-571-2426 I E: aconn @carmel.in.gov W: www.carmeldocs.com Please consider the environment before printing this e-mail From: Paul Owen [mailto:powen@wedgewoodbc.com] Sent: Tuesday, October 16, 2012 11:06 AM To: Conn, Angelina V Subject: RE: Wedgewood Building Company ADLS Presentation (32 1st Ave NE) Thanks Angie! Guess it helps to spell correctly! Paul Owen Wedgewood Building Company 317-669-8530 From: Conn, Angelina V [mailto:Aconn@carmel.in.gov] Sent: Tuesday, October 16, 2012 11:00 AM To: Paul Owen Subject: FW: Wedgewood Building Company ADLS Presentation (32 1st Ave NE) Good morning, Paul— Alexia forwarded me your last email, and we also received the paper copies of the plans and application. And, I just wanted to let you know my correct email address,for future correspondence: aconn@carmel.in.gov Angie Conn, Planning Administrator City of Carmel Planning &Zoning Division Dept. of Community Services 1 Civic Square, 3rd FIr. Carmel, IN 46032 0: 317-571-2417 I F: 317-571-2426 I E: aconn@carmel.in.gov W: www.carmeldocs.com Please consider the environment before printing this e-mail 1 Conn, Angelina V From: Donahue-Wold, Alexia K Sent: Friday, October 12, 2012 3:04 PM To: Conn, Angelina V Subject: FW: Wedgewood Building Company ADLS Presentation Attachments: Wedgewood Office Presentation Binder 101212.pdf; Existing Building Photos.pdf; WBC - ADLS Application.pdf; WBC - Legal Description.pdf; WBC - Exterior Lighting.pdf; WBC - Signage.pdf; WBC - Landscaping.pdf; WBC - Floodplain.pdf; SURVEY.PDF; Exhibit A.JPG; Exhibit B.JPG; Exhibit C.JPG Hi Angie, I think you were supposed to receive this as well, but it looks like he might have your wrong email. :) ' Lex From: Paul Owen [mailto:DowenCa wedgewoodbc.com] Sent: Friday, October 12, 2012 2:12 PM To: Donahue-Wold, Alexia K; akahnCa�carmel.in.gov Cc:•Brad Love; Gary McNutt; Greg Cradick; Shawn ONeill; powen( wedgewoodbc.com. Subject: Wedgewood Building Company ADLS Presentation Good afternoon Angie and Alexia, Here is the electronic copy of the ADLS package we are submitting. I will submit the hard copies this afternoon. You will find the following documents attached: 1. Office Prints with Site Plan 2. Existing Building Photo 3. ADLS Application 4. Legal Description 5. Exterior Lighting 6. Signage 7. Landscaping 8. Floodplain Info 9. Survey of Area 10. Exhibits A, B, C & D 11. Exhibit E (Signage Color) does not scan well in color and is not submitted electronically. Please refer to hard copy submitted. I look forward to continuing to work with you on this exciting project! Very best, Paul Owen Wedgewood Building Company 317-669-8530 1