Loading...
HomeMy WebLinkAbout0769.97qFOUNDATION CHECKLIST BASEMENT PROJECT INFORMATION HOUSE NAME / ELEV. SET NUMBER PLAN / JOB NUMBER STANDARD OR REVERSED ANY NON -STD. CHANGES? FRONT OR SIDE LOAD STD., ENLARGED, OR FULL BSMT. (IN SET r) (OFT. 293) (OPT. 295) ALL SIDING OR BRICK FRONT (IN SET ") (OPT. 490) BSMT. WINDOW OPT. QTY. (MARK LOCATIONS) ON PRINT FRONT PORCH WALL HT. TO BE ABOVE TOP OF FTN. WALL FLUSH W/ 9 1/4" let FLR TJ.L's 2" ABOVE W/ 11 1/8" Ist FLR TJ_I_'s 6" ABOVE W/ 14" ist FLR T,JJ,'s MASONRY FIREPLACE OPT. PRE -FAB NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES BUILDING PERMIT NUMBER LOT ADDRESS TOWNSHIP CHECKLIST - - -__ - -- SUMP PtP SP LOCATION MARKED - -- SEWER AND WATER SLEEVE StLMP PUMP SLEEVE LOCATION MARKED LOCATIONS MARKED (3' W/ 4" SEU ER COUPLER, 5'W/ 1 1/2" SLEEVE) - -_ - -_ MARK OUT ALL HAUNCHES NOT USED - - HIGHLIGHT ALL BEAM POCKETS MARK IN FRONT PORCH WALL HIGHLIGHT ALL PAD LTG. LOCATIONS IF NOT ON PRINTS _ —. - - -- BEAM TAKE -OFF &HEET COMPL TE AND TURNED IN TO FOUNDATION SUPERVISOR (TO BE COMPLTED EVEN IF NC BEAMS REQUIRED) r PROJECT INFORMATION HOUSE NAME / ELEV. SET NUMBER PLAN / JOB NUMBER STANDARD OR REVERSED ANY NON -STD, CHANGES? FRONT OR SIDE LOAD ALL SIDING OR BRICK FRONT (IN SET ') (OPT, 490) FIREPLACE OPT. NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES BUILDING PERMIT NUMBER LOT ADDRESS TOWNSHIP CHECKLIST MASONRY PRE -FAB ___ -- MARK OUT ALL HAUNCHES NOT USED MARL' IN FRONT PORCH WALLS iF NOT ON PRINTS __--- - - - -__ WATER SLEEVE LOCATION MARKED - -- - HIGHLIGHT ALL THICKENED SLAB FOOTINGS - -- HIGHLIGSHT ALI_ PAD FOOTING LOCATIONS - BEA+ , TAKE -OFF SHEET GOMFLTE AND TURNED IN TO FO NI DATION SUPERVISOR (TO BE COMPLTED EVEN IF NO BEAMS REQUIRED) DO NOT REMOVE BLUEPRINTS FROM JOBSITE 1. EXCAVATOR PLACE PRINT TUBE INSIDE OF EXCAVATION. 2. WALL CONTRACTOR LEAVE ON TOP OF WALL. � 3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL. 4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL. FRAME PUNCH -OUT CHECK LIST 1. GARAGE _.---- - - -_ -- GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: 1' HT_, 8' OR 1 GARAGE ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION. NAILERS AT ALL CORNERS OF GARAGE AND CEILING_ -- - -- —_ -- GARAGE 5TEP FRAMED AND KICK PL ATE UNDER DOOR --- _- .- ___ -_. BOW STUDS — .- - -_ —__ STRAP ANCHOR NAILED CORRECTLY 2. HOUSE —_ - -- CHECK FOR BOW STUDS __ - -_— CHECK VCR NAILERS MARK DOOR SWING DIRECTION AND SIZE CHECK. FOR C45WG ROOM (MIN. 2" ON EACH SIDE) - - - - -- - CHECK CENTERLINE OF K!TCHEN WINDOW __. CHECK BULKHEAD DIMENSIONS (2" LONGER AND 2" WIDER THAN CABINETS) CHECK WALL SIZES IN RELATION TO CABINET SPACE CHECK VANITY SIZES IN RELATION TO WALL SPACE -- CHECK VANITY DEPTH TO DOOR OPENING (MIN. 24 1/2 ") CHECK DOOR OPERATION AND INSTALLATION - - - -- CHECK WINDOW OPERATION AND INSTALLATION — -- CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION - - - -- PITCH RAIL WALL INSTALLED 1/2" BELOW 5TRiNGER AND 1 1/2" SHORT HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS (BOTH STAIRWAYS) -- HALF -WALL AT STAIRS PAST STRINGER 1 1/2" TUB PLATFORM BUILT CORRECTLY 16 1/2" HT_, 39" X 51" INSIDE - - -- NO STUDS is 24" O.C_ AT CERAMIC AREAS. (16" O.C. MAX_) TUB BLOCKS INSTALLED AT CERAMIC AREAS. -_ -- NAILERS FOR FIBERGLASS TUBS INSTALLED —__ -- MEASURE VINYL AREAS FOR SQUARE - -- CB PANELS HAVE BLOCKS ON ENDS - - - - -- CHECK FOR LOAD - BEARING POINTS IN HOUSE AND PROPER LOAD TRANSFER - -- STRAP ANCHORS SECURED IN HOU5E - - - -- CRAWL SPACE AND BASEMENT CLEANED OUT - -- -- STAIRWAY SHIMMED (MAX 112" GAP EACH SIDE) - -___— let AND 2nd FLOORS LINE UP IN STAIR WELL NO GAPS ABOVE STAIRWAY DRAFTSTOP - - -- STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS) _ —__— HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING -_ —_ —_ SAFET`!- BOOTS AND RAILS INSTALLED 3 112" FROM STRiNGER SQUASH BLOCKS INSTALLED PER PLAN AND TJ_I. DETAIL 5HEE T -- `- FLOOR SHEATHING NAILED PER SPEC.'s FALL PROTECTION INSTALLED AT STAIR WALL OPENING -___ -_ EYEBOLT AND ANCHOR POINT IN PLACE ALL DRAFT STOP INSTALLED ON CHASE AND BAND JOISTS ALL TYVECK STAPLED IN -PLACE EXTERIOR ALL HOLES PATCHED IN INSULATION BCARD ' _ ALL TRIM INSTALLED PER PRINT 3 1/2" RIPS 1/2 SHEATHING INSTALLED ON CORNERS ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES ALL DOORS TAPED ABOVE PRINT HUNG ON NAZI_. IN GARAGE ___ -- PERIMETER AND PANELS GLUED INTERIOR WALLS GLUED DOIlN INTERIOR AND EXTERIOR WALLS NAILED INTO TRU5SE5 BELOW' -- -- - SET TU55 INTO ROOM AND WI'E -OUT — „� ATTIC ACCESS INSTALLED IN HOU5E PER PRINT, 12” SIDES ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK -- - -`- JOIST HAti 3ER5 NAILED FRONT AND 51DES SITE RIGKED UP AND PUT IN P'LE E=GH DA"' -- 2X4 4ROUND TOP OF CHIMNEY, 1 1 /2" PAST CHIMNEY SLAT ---- ___. -- ALL GIRDER Tc L' 5Sr5 1`i4iLE °ER ?- �vGINE* G'!TJCs