Loading...
HomeMy WebLinkAbout0728.97ec� a O m K PLASTIC, LAMINATE COUNTERTOP BACK /END_ i SPLAHES, d APRON NOTE: BACK d END SPLASH TO BE APPLIED IN FIELD. RECONFIGURE WA5TE PIPING OUT OF REQUIRED KNEE CLEARANCE Z 8" MIN, PLASTIC, LAMINATE COUNTERTOP NO SGALE I REMOVEABLE PLASTIC LAMINATE - PANEL z_ CLEAT TO SIDE 5 � _ N _ In I CV I I I � I KNEE CLEARANCE DIAGRAM SGALE: I" = 1' -0" 636 BREAK #510 SGALE: 112" = 1' -0" B36 5636 5A N2. PLASTIC LAMINATE PL -I UPPER 8 BASE GAOINET5 COUNTER TOP AND OAGK /END SPLASH UNDER COUNTER LIOHTIN6 DOUBLE BOWL - ADA STAINLESS STEEL SINK 6005ENEGK FAUCET W/ LEVER CONTROLS r~ ELEVATlc�DN FULL HE16HT GLASS BLOCK WALL PITT5E3UR&H GORN16 DEGORA 8 "X8" 3/4" PLYWD SHELF, PAINTED DOOR SGHEDUL E 16" FLOOR GENERAL NOTES 1/4" x 3/4' WOOD EDGING I x 2 NAILER REMARKS 12' DETAILS HDV4R. I x 2 SKIRT 3O1 N I x 2 SUPPORT FRAME TO MATCH PT -I PT -I � NO. DIMENSIONS YPE MATERIAL FINISH HEADI-JAME31 PT- I 51LL SET REMARKS ROD BRACKET TRAININ&/REP DELTA TAU DELTA I. ALL PLAN DIMEN510145 ARE TAKEN FROM CENTER OF NEW WALL TO CENTER OF NEW WALL AND PT -I I x 2 BRACKET SUPPORT PT -2 PT -1 ANGLED WALL 304 GOATS CPT -I ~W PT -I PT -I FRAMES ON 15T FLOOR CENTER OF NEW WALL TO FACE OF EXISTING WALL. OI (PR) 3'- O "x7' -O "xl 3/4" B GLASS GLASS — 4 PT -I PT -2 PT -1 AN6LED WALL 306 INTERVIEW GPT -1 PT-2 PT -I PT -I PT -1 30-1 CORRIDOR GPT -I S.G. WOOD 2. ALL DOOR ROUGH OPENINGS SHALL BE FRAMED 4" FROM ADJACENT WALL CORNER UNLESS OTHERWISE 02 3'- O "x7' -O "xl 3/4" A S.G. WOOD STAINED 2" H.M. FRAME I VGT -I PT -I STAINED NOTED. PT -I 30q OPEN AREA CPT-I v, PT -2 PT -I PT -I PT -2 3. PROVIDE BLOCKING IN WALL5 FOR ALL MILLWORK, WALL STOPS, HARDWARE AND CABINETRY WHERE OFFICE GPT - I / GPT -2 V F WC, -I FWG -I FWG -I FWG -I 311 OFFICE 03 EXISTING "x- "xl A PT -I PT -I PT -2 PT -1 312 OFFICE GPT -I 3 PT -2 PT -I PT -I PT -I SPECIFIED. ALL WOOD BLOGKIN6 SHALL BE FIRE TREATED. 313 3'- O 1' -O 3/4" CPT-I PT -I PT -I PT -I PT -2 tu Q 314 OPEN AREA GPT`1 PT -1 PT -I PT -1 PT -I V 04 3'- O "x- 1' -O "xi 3/4" A W PT -I PT -I PT -I PT -2 O 316 CORRIDOR GPT_I 2 PT -I PT -I � 4. GEILIN6: EXISTING 24" X 24" SUSPENDED 6RID d TILE. REPLACE DAMAGED TILES AS NEGE55ARY. 317 OFFIGE GPT -I PT -I PT -1 PT -1 PT -2 Q 318 BREAK VGT -2 u t T VWG -I VWG -I VWG -1 LEVER STYLE 31q OPEN AREA GPT -I 0ifi,'�i= No. �. PT -I PT -I PT -2 PT -1 ANGLED WALL 320 GOATS GPT -1 PT -I 05 3'- O "x7'-O "xl 3/4" A & /I& /q7 321 EQUIPMENT VGT -3 PT -I PT -1 PT -1 PT -1 2 HARDWARE 5. LIGHTS: 24" X 48" FLUORESCENT FIXTURES WITH PRISMATIG LEN5E. 6. TENANT IS RESPONSIBLE FOR PROVIDING AND IN5TALLIN6 ALL TELEPHONE d GOMPUTER WIRING. 06 3'- O "x- 1' -O "xl 3/4" A 2 ALL GABLE MUST BE TELFON COATED OR IN CONDUIT. 07 3'- O "x7' -O "xl 3/4" A 2 7. WHERE STRUCTURAL BEAMS, DUGTWORK ETC. PENETRATE RATED PARTITIONS, 6YP5UM WALL BOARD 3'- O "x7'-O "xi 3/4" A I DOOR TYPE A SHALL BE SCRIBED TO FIT TIGHT AND CAULKED. O8 6. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD GHECKINO ALL DIMEN510N5 AND Oq 3'- O "x7' -O "xl 3/4" A MEASUREMENTS. IF JOB CONDITIONS PREVENT OBTAINING DIMENSIONS OR RESULTS AS SHOWN OR SPECIFIED, CONTRACTOR SHALL BE RESPONSIBLE FOR INFORMING LAM50N d LONDON, INC. BEFORE 10 3'- O "x7'-O "xl 3/4" A I ANY CONSTRUCTION 15 COMPLETED. q. EACH CONTRAGTOR SHALL VERIFY EXISTING CONDITIONS AS INDICATED ON THE DRAWINGS AND 11 3'- O "x7'-O "xl 3/4" A I REPORT ANY DISCREPANCY THAT MAY OCCUR TO THE GENERAL GONTRAGTOR. ANY IRREGULARITIES SHALL BE REPORTED TO LAMSON E GONDON, INC., FROM THE 6ENERAL CONTRACTOR. 12 3'- O "x7'-O "xl 3/4" A 2 10. ALL DETAILS, MATERIALS, AND INSTALLATIONS OF SAME ARE SUBJECT TO FINAL APPROVAL BY 13 3'- O "xl'-O "xl 3/4" A I LAM50N d CONDON, INC. I HR 60 MIN. 11. SHOP PRAWIN&5 OR GATALO& GUTS MUST BE SUBMITTED TO LAM50N d LONDON, INC. AND MGCOY, 14 3'- O "x7'-O "xl 3/4" A 3 DOOR d FRAME ON ALL MATERIALS OR ITEMS IF THE GONTRACTOR GHOO5E5 TO DEVIATE FROM THAT SHOWN ON THE PRANIN65 OR IF THE DRAWING DOES NOT INDICATE A 5PEGIFIG MANUFACTURER OR MODEL NUMBER. IS 3'- O "x7'-O "xl 314° A 2 12. GENERAL CONTRACTOR SHALL EXPEDITE PREPARATION AND SUBMITTAL OF ALL SHOP DRAWINGS TO ALLOW SUFFICIENT TIME FOR CHEGKIN& FABRICATION AND /OR ORDERIN6 AND DELIVERY OF MATERIALS I6 3'- O "x7'-O "xl 3/4" A 2 AND EQUIPMENT. STRUCTURAL &LASS 17 3'- O "x7'-0 "xl 3/4" A I DOORS WITH OUT FRAME 13. THE GENERAL GONTRAGTOR SHALL BE RE5PON51BLE FOR OVERSEEING THAT ALL MATERIAL AND LABOR, SHALL BE IN ACCORDANCE WITH THE BEST QUALITY STANDARDS OF THE RESPECTED TRADE. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OVERSEEING THAT ALL WORK SHALL BE IN 18 3'- O "x7' -O "xi 3/4" A 3 ACCORDANCE WITH THE STATE UNIFORM BUILDING CODES AND STANDARDS FOR ALL GENERAL CONSTRUCTION, MECHANICAL, AND ELECTRICAL WORK AND LOCAL AND FEDERAL GODE5 AND STANDARDS. HARDWARE SETS: 14. ALL TRADE GONTRACTOR5 SHALL WARRANTY ALL MATERIALS AND WORKMANSHIP FOR ONE YEAR FROM DATE OF CONSTRUCTION COMPLETION. l J 3'VENT Y 15. THE 6ENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, DAILY WORKING HOURS, HARDWARE SET #I WEEKEND HOURS AND HOURS THAT MAY BE WORKED PRIOR TO AND DURING HOLIDAYS. 1 1/2 PAIR HIN&E5 ; DOOR TYPE �� B �� Q I LOGKSET 16. THE GENERAL GONTRACTOR SHALL ESTABLISH WITH THE LANDLORD GLEAN -UP PROGEDURE5 AND I DOOR STOP 1 GUIDELINES TO BE FOLLOWED ON A DAILY BASIS IN ORDER TO GONDUGT BUSINESS IN A SAFE AND 1 1/2' GLEAN ENVIRONMENT. THE 6ENERAL CONTRACTOR SHALL COORDINATE ELEVATOR USE AND PROTECT THE ELEVATOR GABS AS THE LANDLORD REQUIRES. HARDWARE SET #2 I 17. THE 6ENERAL CONTRACTOR SHALL MAINTAIN A CLEAR AND UNOBSTRUGTED PATHWAY TO ALL EXITS 1 112 PAIR HIN&E5 i DURING DEMOLITION AND NEW CONSTRUCTION. ILATGH5ET I DOOR STOP I 18. THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, AN AREA FOR STAGING OF CONSTRUCTION MATERIALS, EQUIPMENT, DUMPSTER AND PARKIN& CONSTRUCTION AND DELIVERY HARDWARE SET #3 VEHICLES. THE USE OF EXISTING RE5TROOM FAGILITIE5 SHALL BE APPROVED BY THE LANDLORD. 51NK ONLY THOSE DESIGNATED AREAS SHALL BE USED BY CONSTRUCTION CREWS. 1 1/2 PAIR HINGES 1112' 1 LOGK5ET Iq. IN CONSTRUCTION OF A MULTI- TENANT FLOOR, OR A REMODEL OF EXISTING TENANT, THE GENERAL I DOOR STOP CONTRACTOR SHALL USE DUST PARTITIONS TO MINIMIZE DISTURBANCES OF DAILY TENANT I CLOSER OPERATIONS DURING DEMOLITION AND CONSTRUCTION WORK. DUST PARTITIONS SHALL BE CONSTRUCTED OF 2 X 4 WOOD STUDS AT 24" ON CENTER, INSULATION AND 6 MIL VAPOR BARRIER ON EACH SIDE. DUST PARTITIONS SHALL EXTEND FROM FLOOR TO GEILIN6. THE USE AND LOCATION OF HARDWARE SET #4 DUST PARTITIONS SHALL BE GOORDINATED WITH THE LANDLORD. MANUFACTURE5 STANDARD HARDWARE PACKAGE W/ 20. CONTRACTOR TO ALLOW FOR UNLEVEL FLOOR CONDITIONS. ALL EXI5TIN6 FLOOR AND WALL SUBSTRATES CLOSERS AND CYLINDER SHALL BE LEVELED AND PATCHED AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES. LOOKS ADJUST DOORS AND FRAMES AS REQUIRED. STAIN 13RA55 FINISH TUBULAR PULLS AND P L U M E3 I I N C� D I A G� j� f� A j�j M TOP AND BOTTOM TRIM K PLASTIC, LAMINATE COUNTERTOP BACK /END_ i SPLAHES, d APRON NOTE: BACK d END SPLASH TO BE APPLIED IN FIELD. RECONFIGURE WA5TE PIPING OUT OF REQUIRED KNEE CLEARANCE Z 8" MIN, PLASTIC, LAMINATE COUNTERTOP NO SGALE I REMOVEABLE PLASTIC LAMINATE - PANEL z_ CLEAT TO SIDE 5 � _ N _ In I CV I I I � I KNEE CLEARANCE DIAGRAM SGALE: I" = 1' -0" 636 BREAK #510 SGALE: 112" = 1' -0" B36 5636 5A N2. PLASTIC LAMINATE PL -I UPPER 8 BASE GAOINET5 COUNTER TOP AND OAGK /END SPLASH UNDER COUNTER LIOHTIN6 DOUBLE BOWL - ADA STAINLESS STEEL SINK 6005ENEGK FAUCET W/ LEVER CONTROLS r~ ELEVATlc�DN FULL HE16HT GLASS BLOCK WALL PITT5E3UR&H GORN16 DEGORA 8 "X8" 3/4" PLYWD SHELF, PAINTED DRYWALL I 6' 1 r� � (3LASS BLOCK ELEVATION SGALE: 112" = 1' -0" 0 LATERAL FILE UNDER — COUNTER LIGHT _ N �t 5 ROD SHELF DETAIL 4 RE(�,EPTI ON DESK X2.1 A2.1 SGALE: 112" = 1' -O" SGALE: 112" = 1' -0" Ue Lw 4" PAINTED WOOD GAP SEMI -GLOSS FIN15H 14 GAUGE &ALVINIZED STEEL PAN W/ EXTERIOR SEAL AND LIP 3/4" PLYWOOD LINER 5/8" 6YB. OD. ON 2 112" METAL STUDS o 24" O.G. II� 16 11 VINYL BASE PLANTER SECTION SGALE: 112" = I' -O" 12" WOOD - STAINED TRAN51 T I ON TOP m� PLASTIC LAMINATE - T.B.D. GROMMETS COUNTER TOP 24" GENTER — — DRAWER — GROMMET5 BBF BBF 15" 15" ROOM FINISH 4 GOLOR SCHEDULE NO. 16" FLOOR BASE 1/4" x 3/4' WOOD EDGING I x 2 NAILER REMARKS 12' EAST SOUTH I x 2 SKIRT 3O1 N I x 2 SUPPORT VB -I PT -I PT -I � u REG EHI N DESK METAL GL05ET ROD 5TORA6E Q PT- I PT- I ADJ. PAINTED CLOSET PT- I ROD BRACKET TRAININ&/REP GPT -I PT -I I x 2 BRACKET SUPPORT DRYWALL I 6' 1 r� � (3LASS BLOCK ELEVATION SGALE: 112" = 1' -0" 0 LATERAL FILE UNDER — COUNTER LIGHT _ N �t 5 ROD SHELF DETAIL 4 RE(�,EPTI ON DESK X2.1 A2.1 SGALE: 112" = 1' -O" SGALE: 112" = 1' -0" Ue Lw 4" PAINTED WOOD GAP SEMI -GLOSS FIN15H 14 GAUGE &ALVINIZED STEEL PAN W/ EXTERIOR SEAL AND LIP 3/4" PLYWOOD LINER 5/8" 6YB. OD. ON 2 112" METAL STUDS o 24" O.G. II� 16 11 VINYL BASE PLANTER SECTION SGALE: 112" = I' -O" 12" WOOD - STAINED TRAN51 T I ON TOP m� PLASTIC LAMINATE - T.B.D. GROMMETS COUNTER TOP 24" GENTER — — DRAWER — GROMMET5 BBF BBF 15" 15" ROOM FINISH 4 GOLOR SCHEDULE NO. ROOM NAME FLOOR BASE WALLS C co REMARKS NORTH EAST SOUTH WEST 3O1 RECEPTION CPT-[ � VB -I PT -I PT -I PT -2 PT -1 REG EHI N DESK 302 5TORA6E VGT - I PT- I PT- I PT -1 PT- I 303 TRAININ&/REP GPT -I PT -I PT -I PT -2 PT -1 ANGLED WALL 304 GOATS CPT -I ~W PT -I PT -I PT -I PT -1 305 GONFERENGE CPT -1 / GPT -2 ry PT -I PT -I PT -2 PT -1 AN6LED WALL 306 INTERVIEW GPT -1 PT-2 PT -I PT -I PT -1 30-1 CORRIDOR GPT -I PT -I PT -I PT -I PT -1 nO !L 308 STORAGE VGT -I PT -I PT -I PT -I PT -I 30q OPEN AREA CPT-I v, PT -2 PT -I PT -I PT -2 Z 310 OFFICE GPT - I / GPT -2 V F WC, -I FWG -I FWG -I FWG -I 311 OFFICE GPT -I PT -I PT -I PT -2 PT -1 312 OFFICE GPT -I � PT -2 PT -I PT -I PT -I 313 OPEN AREA CPT-I PT -I PT -I PT -I PT -2 tu Q 314 OPEN AREA GPT`1 PT -1 PT -I PT -1 PT -I V 315 GOPY/MAIL VGT -I W PT -I PT -I PT -I PT -2 O 316 CORRIDOR GPT_I 7— PT -I PT -I PT -I PT -1 317 OFFIGE GPT -I PT -I PT -1 PT -1 PT -2 Q 318 BREAK VGT -2 u t T VWG -I VWG -I VWG -1 VWG -1 31q OPEN AREA GPT -I 0ifi,'�i= No. �. PT -I PT -I PT -2 PT -1 ANGLED WALL 320 GOATS GPT -1 PT -I PT -I PT -I PT -I & /I& /q7 321 EQUIPMENT VGT -3 PT -I PT -1 PT -1 PT -1 FIN15HE5: FINISHES: TO MEET CHAPTER 40 UBC STANDARDS CARPET: GPT -I PRINCE STREET, ATLANTIS #4815 THE FISH THAT 60T AWAY GPT -2 MONTEREY, SPECTRUM II #2g8q GRAPHITE CARPET BORDER VINYL BASE: VB -I BURKE VINYL BASE IRONWOOD 523P 2 112" STRAIGHT AT CARPET, COVED AT TILE VINYL FLOOR TILE: VGT -1 ARMSTRONG, STONETEX 52132 DU5TY KHAKI VGT -2 CON&OLEUM ALTERNATES AL -35 HEATHERED BLUE/RO5E VGT -3 VPI - CONDUGTIVE FLOORING GON -3 BEI&E d 4" PAINTED WOOD GAP SEMI -GLOSS FINISH I/2" 14 6AU6E 6ALVINIZED STEEL PAN W/ EXTERIOR C co SEAL AND LIP 3/4" PLYWOOD LINER — 5/8" 6YB. BD. ON 2 112" METAL STUDS & 24" O.G. — VINYL BASE 16" 8 fi LANTER SD�,TION X2.1 SCALE: 112" = 1' -0" �l T NOTE: WOOD F I N I5H TG OF DELTA TA D WOOD - STAINED TRANSITION TOP PAINT: PT -1 BENJAMIN MOORE - MAIN PAINT #q 75 PT -2 BENJAMIN MOORE - ACCENT PAINT #q77 WALLGOVERING: FWG -1 DE516NTEX -FABRIC LEXIN6TON 6011 -401 VWG -1 SYMPHONY - VINYL MEDLEY INTERLUDE AZ50083 PLASTIC LAMINATE: PL -I FORMICA 7208 -58 MINERAL METALGRAFT (5) PLYWOOD SHELVES, 0 STAINED, ON ADJUSTABLE HEAVY DUTY K.V. BRACKETS. STANDARDS TO BE -1' -0" LONG, 16" ON GTR. ADJUSTABLE SHELVES 6 SGALE: 112" = 1' -0" REGEPT I ON DESK 2 RE(f,,EPT I ON DESK A2.1 A2. SGALE: 112" = 1' -0" `GALE: 112" = 1' -0" I:\cf6200 \A2 -I 06/17/17 12:11:10 pm N N WOOD C co N STAINED FRONT Cl V C] PAINT: PT -1 BENJAMIN MOORE - MAIN PAINT #q 75 PT -2 BENJAMIN MOORE - ACCENT PAINT #q77 WALLGOVERING: FWG -1 DE516NTEX -FABRIC LEXIN6TON 6011 -401 VWG -1 SYMPHONY - VINYL MEDLEY INTERLUDE AZ50083 PLASTIC LAMINATE: PL -I FORMICA 7208 -58 MINERAL METALGRAFT (5) PLYWOOD SHELVES, 0 STAINED, ON ADJUSTABLE HEAVY DUTY K.V. BRACKETS. STANDARDS TO BE -1' -0" LONG, 16" ON GTR. ADJUSTABLE SHELVES 6 SGALE: 112" = 1' -0" REGEPT I ON DESK 2 RE(f,,EPT I ON DESK A2.1 A2. SGALE: 112" = 1' -0" `GALE: 112" = 1' -0" I:\cf6200 \A2 -I 06/17/17 12:11:10 pm N C co � U Cl V C] 0 y a� 1L z Q 'Q Az Q WQ �z ~W Q z� ry W t!1 nO !L Z o a v, Z .. V � W tu Q o� V V c:d W ul O 7— ox � A Q o N a 1� u t T 4e!4 r4 0ifi,'�i= No. �. _ 4041* s STATE OF ,9 �cH I sue A MITTAL Date & /I& /q7 Sheet A:2.1