HomeMy WebLinkAbout0728.97ec�
a
O
m
K
PLASTIC, LAMINATE
COUNTERTOP BACK /END_ i
SPLAHES, d APRON
NOTE: BACK d END SPLASH
TO BE APPLIED
IN FIELD.
RECONFIGURE
WA5TE PIPING
OUT OF REQUIRED
KNEE CLEARANCE
Z
8" MIN,
PLASTIC, LAMINATE
COUNTERTOP
NO SGALE
I REMOVEABLE
PLASTIC
LAMINATE
- PANEL
z_ CLEAT TO SIDE 5
� _ N
_ In
I CV
I
I
I
� I
KNEE CLEARANCE DIAGRAM
SGALE: I" = 1' -0"
636
BREAK #510
SGALE: 112" = 1' -0"
B36
5636
5A
N2.
PLASTIC LAMINATE PL -I
UPPER 8 BASE GAOINET5
COUNTER TOP AND
OAGK /END SPLASH
UNDER COUNTER LIOHTIN6
DOUBLE BOWL - ADA
STAINLESS STEEL SINK
6005ENEGK FAUCET
W/ LEVER CONTROLS
r~
ELEVATlc�DN
FULL HE16HT GLASS
BLOCK WALL
PITT5E3UR&H GORN16
DEGORA 8 "X8"
3/4" PLYWD SHELF, PAINTED
DOOR SGHEDUL E
16"
FLOOR
GENERAL NOTES
1/4" x 3/4' WOOD EDGING
I x 2 NAILER
REMARKS
12'
DETAILS
HDV4R.
I x 2 SKIRT
3O1
N
I x 2 SUPPORT
FRAME TO MATCH
PT -I
PT -I
�
NO.
DIMENSIONS
YPE
MATERIAL
FINISH
HEADI-JAME31
PT- I
51LL
SET
REMARKS
ROD BRACKET
TRAININ&/REP
DELTA TAU DELTA I.
ALL PLAN DIMEN510145 ARE TAKEN FROM CENTER OF NEW WALL TO CENTER OF NEW WALL AND
PT -I
I x 2 BRACKET SUPPORT
PT -2
PT -1
ANGLED WALL
304
GOATS
CPT -I
~W
PT -I
PT -I
FRAMES ON 15T FLOOR
CENTER OF NEW WALL TO FACE OF EXISTING WALL.
OI
(PR) 3'- O "x7' -O "xl 3/4"
B
GLASS
GLASS
—
4
PT -I
PT -2
PT -1
AN6LED WALL
306
INTERVIEW
GPT -1
PT-2
PT -I
PT -I
PT -1
30-1
CORRIDOR
GPT -I
S.G. WOOD 2.
ALL DOOR ROUGH OPENINGS SHALL BE FRAMED 4" FROM ADJACENT WALL CORNER UNLESS OTHERWISE
02
3'- O "x7' -O "xl 3/4"
A
S.G. WOOD
STAINED
2" H.M. FRAME
I
VGT -I
PT -I
STAINED
NOTED.
PT -I
30q
OPEN AREA
CPT-I
v,
PT -2
PT -I
PT -I
PT -2
3.
PROVIDE BLOCKING IN WALL5 FOR ALL MILLWORK, WALL STOPS, HARDWARE AND CABINETRY WHERE
OFFICE
GPT - I /
GPT -2
V
F WC, -I
FWG -I
FWG -I
FWG -I
311
OFFICE
03
EXISTING
"x- "xl
A
PT -I
PT -I
PT -2
PT -1
312
OFFICE
GPT -I
3
PT -2
PT -I
PT -I
PT -I
SPECIFIED. ALL WOOD BLOGKIN6 SHALL BE FIRE TREATED.
313
3'- O 1' -O 3/4"
CPT-I
PT -I
PT -I
PT -I
PT -2
tu
Q
314
OPEN AREA
GPT`1
PT -1
PT -I
PT -1
PT -I
V
04
3'- O "x- 1' -O "xi 3/4"
A
W
PT -I
PT -I
PT -I
PT -2
O
316
CORRIDOR
GPT_I
2
PT -I
PT -I
�
4.
GEILIN6: EXISTING 24" X 24" SUSPENDED 6RID d TILE. REPLACE DAMAGED TILES AS NEGE55ARY.
317
OFFIGE
GPT -I
PT -I
PT -1
PT -1
PT -2
Q
318
BREAK
VGT -2
u t
T
VWG -I
VWG -I
VWG -1
LEVER STYLE
31q
OPEN AREA
GPT -I
0ifi,'�i=
No. �.
PT -I
PT -I
PT -2
PT -1
ANGLED WALL
320
GOATS
GPT -1
PT -I
05
3'- O "x7'-O "xl 3/4"
A
& /I& /q7
321
EQUIPMENT
VGT -3
PT -I
PT -1
PT -1
PT -1
2
HARDWARE 5.
LIGHTS: 24" X 48" FLUORESCENT FIXTURES WITH PRISMATIG LEN5E.
6.
TENANT IS RESPONSIBLE FOR PROVIDING AND IN5TALLIN6 ALL TELEPHONE d GOMPUTER WIRING.
06
3'- O "x- 1' -O "xl 3/4"
A
2
ALL GABLE MUST BE TELFON COATED OR IN CONDUIT.
07
3'- O "x7' -O "xl 3/4"
A
2
7.
WHERE STRUCTURAL BEAMS, DUGTWORK ETC. PENETRATE RATED PARTITIONS, 6YP5UM WALL BOARD
3'- O "x7'-O "xi 3/4"
A
I
DOOR TYPE
A
SHALL BE SCRIBED TO FIT TIGHT AND CAULKED.
O8
6.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD GHECKINO ALL DIMEN510N5 AND
Oq
3'- O "x7' -O "xl 3/4"
A
MEASUREMENTS. IF JOB CONDITIONS PREVENT OBTAINING DIMENSIONS OR RESULTS AS SHOWN OR
SPECIFIED, CONTRACTOR SHALL BE RESPONSIBLE FOR INFORMING LAM50N d LONDON, INC. BEFORE
10
3'- O "x7'-O "xl 3/4"
A
I
ANY CONSTRUCTION 15 COMPLETED.
q.
EACH CONTRAGTOR SHALL VERIFY EXISTING CONDITIONS AS INDICATED ON THE DRAWINGS AND
11
3'- O "x7'-O "xl 3/4"
A
I
REPORT ANY DISCREPANCY THAT MAY OCCUR TO THE GENERAL GONTRAGTOR. ANY IRREGULARITIES
SHALL BE REPORTED TO LAMSON E GONDON, INC., FROM THE 6ENERAL CONTRACTOR.
12
3'- O "x7'-O "xl 3/4"
A
2
10.
ALL DETAILS, MATERIALS, AND INSTALLATIONS OF SAME ARE SUBJECT TO FINAL APPROVAL BY
13
3'- O "xl'-O "xl 3/4"
A
I
LAM50N d CONDON, INC.
I HR 60 MIN.
11.
SHOP PRAWIN&5 OR GATALO& GUTS MUST BE SUBMITTED TO LAM50N d LONDON, INC. AND MGCOY,
14
3'- O "x7'-O "xl 3/4"
A
3
DOOR d FRAME
ON ALL MATERIALS OR ITEMS IF THE GONTRACTOR GHOO5E5 TO DEVIATE FROM THAT SHOWN ON THE
PRANIN65 OR IF THE DRAWING DOES NOT INDICATE A 5PEGIFIG MANUFACTURER OR MODEL NUMBER.
IS
3'- O "x7'-O "xl 314°
A
2
12.
GENERAL CONTRACTOR SHALL EXPEDITE PREPARATION AND SUBMITTAL OF ALL SHOP DRAWINGS TO
ALLOW SUFFICIENT TIME FOR CHEGKIN& FABRICATION AND /OR ORDERIN6 AND DELIVERY OF MATERIALS
I6
3'- O "x7'-O "xl 3/4"
A
2
AND EQUIPMENT.
STRUCTURAL &LASS
17
3'- O "x7'-0 "xl 3/4"
A
I
DOORS WITH OUT FRAME 13.
THE GENERAL GONTRAGTOR SHALL BE RE5PON51BLE FOR OVERSEEING THAT ALL MATERIAL AND LABOR,
SHALL BE IN ACCORDANCE WITH THE BEST QUALITY STANDARDS OF THE RESPECTED TRADE. THE
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OVERSEEING THAT ALL WORK SHALL BE IN
18
3'- O "x7' -O "xi 3/4"
A
3
ACCORDANCE WITH THE STATE UNIFORM BUILDING CODES AND STANDARDS FOR ALL GENERAL
CONSTRUCTION, MECHANICAL, AND ELECTRICAL WORK AND LOCAL AND FEDERAL GODE5 AND
STANDARDS.
HARDWARE SETS:
14.
ALL TRADE GONTRACTOR5 SHALL WARRANTY ALL MATERIALS AND WORKMANSHIP FOR ONE YEAR FROM
DATE OF CONSTRUCTION COMPLETION.
l J 3'VENT
Y
15.
THE 6ENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, DAILY WORKING HOURS,
HARDWARE SET #I
WEEKEND HOURS AND HOURS THAT MAY BE WORKED PRIOR TO AND DURING HOLIDAYS.
1 1/2 PAIR HIN&E5
;
DOOR TYPE
�� B ��
Q
I LOGKSET
16.
THE GENERAL GONTRACTOR SHALL ESTABLISH WITH THE LANDLORD GLEAN -UP PROGEDURE5 AND
I DOOR STOP
1
GUIDELINES TO BE FOLLOWED ON A DAILY BASIS IN ORDER TO GONDUGT BUSINESS IN A SAFE AND
1 1/2'
GLEAN ENVIRONMENT. THE 6ENERAL CONTRACTOR SHALL COORDINATE ELEVATOR USE AND PROTECT
THE ELEVATOR GABS AS THE LANDLORD REQUIRES.
HARDWARE SET #2
I
17.
THE 6ENERAL CONTRACTOR SHALL MAINTAIN A CLEAR AND UNOBSTRUGTED PATHWAY TO ALL EXITS
1 112 PAIR HIN&E5
i
DURING DEMOLITION AND NEW CONSTRUCTION.
ILATGH5ET
I DOOR STOP
I
18.
THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, AN AREA FOR STAGING OF
CONSTRUCTION MATERIALS, EQUIPMENT, DUMPSTER AND PARKIN& CONSTRUCTION AND DELIVERY
HARDWARE SET #3
VEHICLES. THE USE OF EXISTING RE5TROOM FAGILITIE5 SHALL BE APPROVED BY THE LANDLORD.
51NK
ONLY THOSE DESIGNATED AREAS SHALL BE USED BY CONSTRUCTION CREWS.
1 1/2 PAIR HINGES
1112'
1 LOGK5ET
Iq.
IN CONSTRUCTION OF A MULTI- TENANT FLOOR, OR A REMODEL OF EXISTING TENANT, THE GENERAL
I DOOR STOP
CONTRACTOR SHALL USE DUST PARTITIONS TO MINIMIZE DISTURBANCES OF DAILY TENANT
I CLOSER
OPERATIONS DURING DEMOLITION AND CONSTRUCTION WORK. DUST PARTITIONS SHALL BE
CONSTRUCTED OF 2 X 4 WOOD STUDS AT 24" ON CENTER, INSULATION AND 6 MIL VAPOR BARRIER ON
EACH SIDE. DUST PARTITIONS SHALL EXTEND FROM FLOOR TO GEILIN6. THE USE AND LOCATION OF
HARDWARE SET #4
DUST PARTITIONS SHALL BE GOORDINATED WITH THE LANDLORD.
MANUFACTURE5 STANDARD
HARDWARE PACKAGE W/
20.
CONTRACTOR TO ALLOW FOR UNLEVEL FLOOR CONDITIONS. ALL EXI5TIN6 FLOOR AND WALL SUBSTRATES
CLOSERS AND CYLINDER
SHALL BE LEVELED AND PATCHED AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES.
LOOKS
ADJUST DOORS AND FRAMES AS REQUIRED.
STAIN 13RA55 FINISH
TUBULAR PULLS AND
P
L
U
M
E3
I
I N
C�
D
I A G�
j�
f� A
j�j
M
TOP AND BOTTOM TRIM
K
PLASTIC, LAMINATE
COUNTERTOP BACK /END_ i
SPLAHES, d APRON
NOTE: BACK d END SPLASH
TO BE APPLIED
IN FIELD.
RECONFIGURE
WA5TE PIPING
OUT OF REQUIRED
KNEE CLEARANCE
Z
8" MIN,
PLASTIC, LAMINATE
COUNTERTOP
NO SGALE
I REMOVEABLE
PLASTIC
LAMINATE
- PANEL
z_ CLEAT TO SIDE 5
� _ N
_ In
I CV
I
I
I
� I
KNEE CLEARANCE DIAGRAM
SGALE: I" = 1' -0"
636
BREAK #510
SGALE: 112" = 1' -0"
B36
5636
5A
N2.
PLASTIC LAMINATE PL -I
UPPER 8 BASE GAOINET5
COUNTER TOP AND
OAGK /END SPLASH
UNDER COUNTER LIOHTIN6
DOUBLE BOWL - ADA
STAINLESS STEEL SINK
6005ENEGK FAUCET
W/ LEVER CONTROLS
r~
ELEVATlc�DN
FULL HE16HT GLASS
BLOCK WALL
PITT5E3UR&H GORN16
DEGORA 8 "X8"
3/4" PLYWD SHELF, PAINTED
DRYWALL
I 6' 1
r� �
(3LASS BLOCK ELEVATION
SGALE: 112" = 1' -0"
0
LATERAL FILE
UNDER —
COUNTER
LIGHT _
N
�t
5 ROD SHELF DETAIL 4 RE(�,EPTI ON DESK
X2.1 A2.1
SGALE: 112" = 1' -O" SGALE: 112" = 1' -0"
Ue
Lw
4" PAINTED WOOD GAP
SEMI -GLOSS FIN15H
14 GAUGE &ALVINIZED
STEEL PAN W/ EXTERIOR
SEAL AND LIP
3/4" PLYWOOD LINER
5/8" 6YB. OD. ON 2 112"
METAL STUDS o 24" O.G.
II� 16 11 VINYL BASE
PLANTER SECTION
SGALE: 112" = I' -O"
12" WOOD - STAINED
TRAN51 T I ON TOP
m� PLASTIC LAMINATE - T.B.D.
GROMMETS COUNTER TOP
24" GENTER — —
DRAWER —
GROMMET5
BBF BBF
15" 15"
ROOM FINISH 4 GOLOR SCHEDULE
NO.
16"
FLOOR
BASE
1/4" x 3/4' WOOD EDGING
I x 2 NAILER
REMARKS
12'
EAST
SOUTH
I x 2 SKIRT
3O1
N
I x 2 SUPPORT
VB -I
PT -I
PT -I
�
u
REG EHI N DESK
METAL GL05ET ROD
5TORA6E
Q
PT- I
PT- I
ADJ. PAINTED CLOSET
PT- I
ROD BRACKET
TRAININ&/REP
GPT -I
PT -I
I x 2 BRACKET SUPPORT
DRYWALL
I 6' 1
r� �
(3LASS BLOCK ELEVATION
SGALE: 112" = 1' -0"
0
LATERAL FILE
UNDER —
COUNTER
LIGHT _
N
�t
5 ROD SHELF DETAIL 4 RE(�,EPTI ON DESK
X2.1 A2.1
SGALE: 112" = 1' -O" SGALE: 112" = 1' -0"
Ue
Lw
4" PAINTED WOOD GAP
SEMI -GLOSS FIN15H
14 GAUGE &ALVINIZED
STEEL PAN W/ EXTERIOR
SEAL AND LIP
3/4" PLYWOOD LINER
5/8" 6YB. OD. ON 2 112"
METAL STUDS o 24" O.G.
II� 16 11 VINYL BASE
PLANTER SECTION
SGALE: 112" = I' -O"
12" WOOD - STAINED
TRAN51 T I ON TOP
m� PLASTIC LAMINATE - T.B.D.
GROMMETS COUNTER TOP
24" GENTER — —
DRAWER —
GROMMET5
BBF BBF
15" 15"
ROOM FINISH 4 GOLOR SCHEDULE
NO.
ROOM NAME
FLOOR
BASE
WALLS
C
co
REMARKS
NORTH
EAST
SOUTH
WEST
3O1
RECEPTION
CPT-[ �
VB -I
PT -I
PT -I
PT -2
PT -1
REG EHI N DESK
302
5TORA6E
VGT - I
PT- I
PT- I
PT -1
PT- I
303
TRAININ&/REP
GPT -I
PT -I
PT -I
PT -2
PT -1
ANGLED WALL
304
GOATS
CPT -I
~W
PT -I
PT -I
PT -I
PT -1
305
GONFERENGE
CPT -1 /
GPT -2
ry
PT -I
PT -I
PT -2
PT -1
AN6LED WALL
306
INTERVIEW
GPT -1
PT-2
PT -I
PT -I
PT -1
30-1
CORRIDOR
GPT -I
PT -I
PT -I
PT -I
PT -1
nO
!L
308
STORAGE
VGT -I
PT -I
PT -I
PT -I
PT -I
30q
OPEN AREA
CPT-I
v,
PT -2
PT -I
PT -I
PT -2
Z
310
OFFICE
GPT - I /
GPT -2
V
F WC, -I
FWG -I
FWG -I
FWG -I
311
OFFICE
GPT -I
PT -I
PT -I
PT -2
PT -1
312
OFFICE
GPT -I
�
PT -2
PT -I
PT -I
PT -I
313
OPEN AREA
CPT-I
PT -I
PT -I
PT -I
PT -2
tu
Q
314
OPEN AREA
GPT`1
PT -1
PT -I
PT -1
PT -I
V
315
GOPY/MAIL
VGT -I
W
PT -I
PT -I
PT -I
PT -2
O
316
CORRIDOR
GPT_I
7—
PT -I
PT -I
PT -I
PT -1
317
OFFIGE
GPT -I
PT -I
PT -1
PT -1
PT -2
Q
318
BREAK
VGT -2
u t
T
VWG -I
VWG -I
VWG -1
VWG -1
31q
OPEN AREA
GPT -I
0ifi,'�i=
No. �.
PT -I
PT -I
PT -2
PT -1
ANGLED WALL
320
GOATS
GPT -1
PT -I
PT -I
PT -I
PT -I
& /I& /q7
321
EQUIPMENT
VGT -3
PT -I
PT -1
PT -1
PT -1
FIN15HE5: FINISHES: TO MEET CHAPTER 40
UBC STANDARDS
CARPET:
GPT -I PRINCE STREET, ATLANTIS
#4815 THE FISH THAT 60T AWAY
GPT -2 MONTEREY, SPECTRUM II
#2g8q GRAPHITE
CARPET BORDER
VINYL BASE:
VB -I BURKE VINYL BASE
IRONWOOD 523P
2 112" STRAIGHT AT CARPET, COVED AT TILE
VINYL FLOOR TILE:
VGT -1 ARMSTRONG, STONETEX
52132 DU5TY KHAKI
VGT -2 CON&OLEUM ALTERNATES
AL -35 HEATHERED BLUE/RO5E
VGT -3 VPI - CONDUGTIVE FLOORING
GON -3 BEI&E
d
4"
PAINTED WOOD GAP
SEMI -GLOSS FINISH
I/2"
14 6AU6E 6ALVINIZED
STEEL PAN W/ EXTERIOR
C
co
SEAL AND LIP
3/4" PLYWOOD LINER
— 5/8" 6YB. BD. ON 2 112"
METAL STUDS & 24" O.G.
— VINYL BASE
16"
8
fi LANTER SD�,TION
X2.1
SCALE: 112" = 1' -0"
�l
T
NOTE: WOOD F I N I5H TG
OF DELTA TA D
WOOD - STAINED
TRANSITION TOP
PAINT:
PT -1 BENJAMIN MOORE - MAIN PAINT
#q 75
PT -2 BENJAMIN MOORE - ACCENT PAINT
#q77
WALLGOVERING:
FWG -1 DE516NTEX -FABRIC
LEXIN6TON 6011 -401
VWG -1 SYMPHONY - VINYL
MEDLEY INTERLUDE AZ50083
PLASTIC LAMINATE:
PL -I FORMICA
7208 -58 MINERAL METALGRAFT
(5) PLYWOOD SHELVES, 0
STAINED, ON ADJUSTABLE
HEAVY DUTY K.V. BRACKETS.
STANDARDS TO BE -1' -0" LONG,
16" ON GTR.
ADJUSTABLE SHELVES 6
SGALE: 112" = 1' -0"
REGEPT I ON DESK 2 RE(f,,EPT I ON DESK
A2.1 A2.
SGALE: 112" = 1' -0" `GALE: 112" = 1' -0"
I:\cf6200 \A2 -I 06/17/17 12:11:10 pm
N
N
WOOD
C
co
N
STAINED FRONT
Cl
V C]
PAINT:
PT -1 BENJAMIN MOORE - MAIN PAINT
#q 75
PT -2 BENJAMIN MOORE - ACCENT PAINT
#q77
WALLGOVERING:
FWG -1 DE516NTEX -FABRIC
LEXIN6TON 6011 -401
VWG -1 SYMPHONY - VINYL
MEDLEY INTERLUDE AZ50083
PLASTIC LAMINATE:
PL -I FORMICA
7208 -58 MINERAL METALGRAFT
(5) PLYWOOD SHELVES, 0
STAINED, ON ADJUSTABLE
HEAVY DUTY K.V. BRACKETS.
STANDARDS TO BE -1' -0" LONG,
16" ON GTR.
ADJUSTABLE SHELVES 6
SGALE: 112" = 1' -0"
REGEPT I ON DESK 2 RE(f,,EPT I ON DESK
A2.1 A2.
SGALE: 112" = 1' -0" `GALE: 112" = 1' -0"
I:\cf6200 \A2 -I 06/17/17 12:11:10 pm
N
C
co
�
U
Cl
V C]
0
y
a�
1L
z
Q 'Q
Az
Q
WQ
�z
~W
Q
z�
ry
W
t!1
nO
!L
Z
o
a
v,
Z
..
V
�
W
tu
Q
o�
V
V
c:d
W
ul
O
7—
ox
�
A
Q
o
N a
1�
u t
T
4e!4 r4
0ifi,'�i=
No. �.
_
4041*
s STATE OF
,9
�cH I
sue
A
MITTAL
Date
& /I& /q7
Sheet
A:2.1