Loading...
HomeMy WebLinkAboutCorrespondence _- DREWRY SIMMONS VORNEHM!tP A T TOR N E Y S v 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 46240 · (317) 580-4848 telephone · (317) 580-4855 facsimile · www.drewrysimmons.com September 8, 2004 11 ~ RECF/IIJ:D S'IlD if 4- . CJ 9 DOCS Mr. Jon c. Dobosiewicz Department of Community Services City of Carmel 1 Civic Square Carmel, Indiana 46032 RE: Developmental Plan Amendment Kite Medical Office Project, Docket No. 04080014 DP Amendment Our File Number: 3195.012 Dear Jon: I have enclosed the public notice documentation required for our September 21, 2004 public hearing before the Plan Commission for the Kite Companies' Medical Office Project. Included are the Petitioner's Affidavit of Public Hearing, the certified list of adjacent property owners from the Hamilton County Auditor's Office, the Public Notice, Proof of Publication from The Indianapolis Star, and the white receipts and green cards from the certified mail delivery. To the extent that you have any questions or if I can be of any further assistance to you, please do not hesitate to contact me. Thank you very much for your cooperation and assistance in this matter. Very truly yours, DREWRY SIMMONS V ORNEHM, LLP ~eiS Enclosures e e Construction/Stormwater Pollution Prevention Plan Technical Review and Comment (Form 1) Project Name: 126th Street Medical Office Park Phase II Plan Submittal Date: 08/04/04 Hydrologic Unit Code: Project Location Description: 13000 N Pennsylvania Street Latitude and Longitude: Lat 39 58' 39" long 86 09' 32"W = Civil T~".~ Clay Q'u~u "~I NW Section: e ~ Project Owner Name: Kite Development E Contact: Q ~ Address: 30 S Meridan S1. Suite, 1100 ~ "t City: Indianapolis o~ Phone: 317 -577 -5600 Q - ~ County: Hamilton 5120201090040 35 w " ~ 18 North 1ge 3 East FAX: State: IN 317 -577 -5605 Zip: 46204 E-Mail: Plan Preparer Name: Greg Snelling Affiliation: W oolpert LLP Address: 7140 Waldemar Drive City: Indianapolis Phone: 317-299-7500 FAX: State: IN 317-291-5805 Zip: 46268 E-Mail: R~view Date: 08/23/04 :: Principal Plan Reviewer: John B. South P.E. CPESC .~ Age'ncy: Hamilton County Soil and Water Conservation District OJ ~ Address: 1108 South 9th Street ; City: Noblesville ~ Phone: 317-773-2181 AS'sisted By:. FAX: State: IN 317-776-1101 Zip: 46060 E-Mail: john-south@iaswcd.org PLAN IS ADEQITA1"E: A comprehensive plan review has been completed and it has been determined that the plan satisfies the minimum requirements and intent of 327 lAC 15-5. o Please refer to additional information included on the following page(s). o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NO/. A NOI must also be sent to the o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and revisions to the plan may be required at that time to address deficiencies. o Please refer to additional information included on the following page(s). o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NO/. A copy of the NOI must also be sent to the Rev~~~i'!~uAuthority (e.g.. ~JYCD, DNR). o PI..A.N IS D.EFICIENT: Significant deficiencies were identified during the plan review. o Please refer to additional information included on the following page(s). o DO NOT file a Notice of Intent for this project. o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re- submitted, and notification has been received that the minimum requirements have been satisfied. Plan Revisions Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified in the Plan Review Section above. DNR, Division of Soil Conservation Page 1 of 1 Revised 12/09/03, Form 1 -.-...--.-.-------....-.-.------.---- .- eu -tt-- ]A\1ES BRAINARD, MAYOR & ~~~! ~ ~ <?~ ("~ CI EL August 11) 2004 !vIr. Paul G. Reis Dre'vVTY Simmons Vomehm, LLP 8888 Keystone Crossing, Suite 1200 Indianapolis, IN 46240 RE: 126th Street l\'edical Office Complex, Phase 2 - Project Revie\v #1 Dear Mr. Reis: \Ve have received the plans for this project \vhich is scheduled for the August 18, 2004 Technical Advisory Committee meeting. We offer "the fonowing comments: GENERAL INFOR1\'IA TION 1. The project site is located within current City of Carmel Corporate Limits. 2. Jurisdictions: . Street and Right of\Vay- City of Carmel (1 26th Street and Pennsylvania Street). . Water - Indianapolis Water Company Service Area . Sanitary Sewer - City of Carmel . Storm Sewer - City of Carmel 3. Board of Public Works and Safety Approval Requireme~ts: . Sanitary Sewer A v~ilability. . Commercial Curb Cut. The request for Board approval should include 8 ~"x 11" exhibits that will indicate the proposed curb cut(s) and all appropriate data and dimensions including width, radii, etc. The drawing should also show left turn to left turn alignment \vith existing opposing' curb c,uts. . Right of \Vay Dedication. . Con~ent to Encroach approvals for any permanent improvement to be installed within dedicated easements and/or dedicated right of way including irrigation systems. I am enclosing a schedule for Board of Public \V orks and Safety meeting qates and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. Any subntission to the Board requires prior final approval by the Carmel Clay Plan Commission and/or tlte Board of Zoning Appeals and cO/llpletion of review by the Technical Advisory Committee. All written requests to be place on tlte Board's agenda nlllst include tlte appropriate Docket NUlnbers and the date (or dates) of approval by tlte Plan Comlnission and/or BZA. 4. Sanitary Sewer Availability (acreage) and Connection Fees: A vailabiHtv (acreage) Fees - Stated 6.764 Acres at $1,365.00/ Acre Current Availability Fee = $9,233.00 Please provide this office with a separate legal description for the 6.764 acres of this phase of construction. Connection Fees..., 95,000 sq. ft. @ 0.5 E.D.U.s/IOOO sq. ft. = 47.5 E.D.U.s for Phase 2. 47.5 E.D.U.s @ 795.00/E.D.U. Current Connection Fee = $37,763.00 5. T AC ReviewlDra\vings submitted for approval: We request that all comments and comment letters generated by this office be ans\vered in writing and be accompanied by a dra\vingreflecting requested revisions. Final drawings will not be approved for construction until all issues 'have been resolved. All Carmel Utility issues must also reresolved. Thedesign engineer must certify all dra\vings submitted for final approval. This office will require a minimum of four-sets (nlaximum of six-sets) of approved dra\vings after all issues have been resolved. The dra\yings will be stamped approved and signed by both the City Engineer and Director Carmel Utilities. The Developer/Owner \vill receive one~set \vhich is to be maintained on the construction site at all times. Carmel Utilities will receive one-set. Our Construction Manager (Inspector) \vi1l receive one-set and one-set will be maintained in the Department 0 DEPARTr.'lENT OF ENGINEERING ONE CMC SQUARE, CARivlEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAlL engineering@ci.carmel.in. us e e Engineering. If more than the minimum of four-sets are requested to be approved, the additional sets (maximum total of two additional) must be submitted with the four required sets. 6. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated easements and/or right of way will require Consent to Encroach approval. 7. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all sanitary sewer main locations. 8. Carmel Utilities will provide a separate review of this project for sanitary sewer issues. Please assure that Carmel Utilities receives copies of the construction plans including all revised plans. 9. I am including copies of the following with this correspondence: . Commercial Project Approval Procedures. . Permit Data, Contacts, etc. . Commercial Permitting Procedures. BONDING REQUIREl\'IENTS 10. Upon initial review, it appears the following bonding requirements may apply to this project: Performance/Maintenance Guarantees A Performance Guarantee will be required for the sidewalks in the Pennsylvania Street right of way. We require a Certified Engineer's Estimate for 100% of labor and materials required for the construction. The Performance Guarantee amount is based upon the Engineer's Estimate. When the construction has been completed and the Performance Guarantee has been released, a 3-year, 10% Maintenance Guarantee will be required. Street CutlRight of Way Permit and Bonding Requirements Any work in the dedicated right of way of Pennsylvania Street and/or Carmel Drive will require a Right of Way Permit and a License and Permit Bond. The bond amount will be determined by the number of instances of work in the right of way @ $2,000.00 per instance. Open pavement cuts in dedicated streets require approval by our Board of Public Works and Safety. Please contact our Right of Way Manager/Inspector, Fred Glaser, to arrange permitting and bonding. PROJECT COMMENTS-GENERAL 11. We have not had a written response to our original review letter or revised plans for Phase 1 of this project. What is the planned construction schedule for Phases 1 and 2? 12. We have engaged the services of Crossroad Engineers, PC to provide storm drainage review. The drainage calculations have been forwarded to Crossroad. We will provide their review as soon as it is available. 13. Please advise the Owner and Contractors involved in this project that the City of Carmel has a strict ordinance regarding mud and other substances deposited on City,streets by vehicles and equipment used in excavation, construction, demolition or otherwise within the City Limits. Be prepared to clean Pennsylvania Street during the duration of this project. PROJECT COMMENTS-CONSTRUCTION PLANS 14. Sheet CIaO-Existing Conditions Map . Label and dimension the Pennsylvania Street right of way line (existing and proposed if different) on this and all sheets. We would expect dedication of additional right of way if the existing does not meet the requirements of the Thoroughfare Plan, which is 90' (45' half). 15. Sheet C200-Site Plan . Why are the drive aisles only 22' wide? . Alternative Transportation Plan calls for a 10' wide multi-use path on Pennsylvania Street. We reserve the right to provide additional comments as this project progresses through the approval process and receipt of the storm drainage plan review by Crossroad Engineers. The above comments are based upon the Engineering Department's initial review. Please provide our office with a" follow up letter regarding this review and revised plans, indicating all revisions. A second review will focus only on detailed construction plans. It is critical that our office be made aware of all modifications made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our initial review. If you have questions, please contact Mike McBride or me at 571-2441. ------,-- 4~~------:;-----.,;,----- ".-"~.- --~----~-~--~~~----_.__._---~--_.,-----~- --- ----~-_. --_.----- ..---..- ..- - -----------.'--.-.----.-----+--- --- e tit Enclosures cc: Jon Dobosiewicz, Department of Community Services (w.o. encI.) John Duffy, Carmel Utilities (w.o. encl.) Jim Haag, Carmel Utilities (w.o. encl.) Greg Hoyes, Hamilton County Surveyor's Office (via fax/w.o. encl.) John South, Hamilton County Soil & Water Conservation District (via fax/w.o. encI.) File Copy Engineering Department Review s: \P ROJREV04 \ 126MED ICALO FF I CEP H2 I'~ e e HAMILTON COUNTY HIGHWAY DEPARTMENT ~ August 18, 2004 The Schneider Corporation 8901 Otis Avenue Indianapolis, Indiana 46216-1037 RE: 96th Street Office Building Site Plans N of 96th Street / W of Haverstick Road Clay Township To Whom It May Concern: This letter serves to acknowledge receipt of a transmittal received 8/4/04 containing the plans for the above-mentioned project. After reviewing the plans the Highway Department has the following comments: 1. In accordance with the Hamilton County Thoroughfare Plan and the 96th Street 'Corridor Study, additional right of way is required 'at the intersection of 96th Street and Haverstick Road. On Haverstick Road, the right of way from the intersection toa point 500' to the north is a 60' half. From that point to the northern property line the right of way is 40'. On 96th Street, the rightof way is a 75' half. A 50' triangular cut is also needed at the intersection, connecting the right of way for , the perimeter streets. The'corner cut is also needed at the intersection with Wild Cherry Lane. 2. The right of way should be labeled and dimensioned on the Site Plans. 3. A Major Commercial Driveway permit will be required for the construction of the entrance. Please contact Mr. Robb Chadwell, Highway Department Permit Inspector, for the necessary forms and information. 4. Permits will be required for all utility work done within the right of way. 5. Please dimension the accelldecellanes. The dimensions for the lanes should be 100' taper and 150' lane. Additional right of way may need to be acquired north of the site to accommodate the lengths of the lanes. 6. The right turn lane on Haverstick Road should be constructed from the north property line to the intersection with 96th Street. A 50' radius should also be constructed atthe intersection of 96th and Haverstick Road. 7. A left turn lane will need to be developed on 96th Street at Haverstick Road. The necessary right of way may exist on the south side of 96th Street, but will need to be researched in the Marion County records. If the necessary right of way is not present, it will need to be acquired prior to approval of the permits. 8. Will the property be platted? 9. A roadside drainage swale will be needed around the entire perimeter of the site. 10. Where will the site drainage be discharged? The drainage will not be permitted to enter the right of way. 1700 South 10th Street N oblesville, In. 46060 ~vww .co.hamilto n.in. us Office .(317) 773-7770 Fax (317) 776-9814 ;,k /.' e e 11. Please note that decorative signs, sprinkler systems, trees, landscaping mounds, fences, light poles or other such amenities are not permitted in the right of way. 12. It appears that some of the landscaping shown will be within the 75' right of way. Please remove the trees from the right of way. 13. Please be aware that further comments may be necessary ata later time. If you have any questions or comments concerning this letter, please feel free to contact me at anytime. ~i~ Steven J. Broermann Staff Engineer cc: Jon Dobosiewicz Greg Hoyes G:\USERS\SB\04tac\08-17 -04haverstick&96.doc e e Cit o armel Fire Department Headquarters 2 CIVIC SQUARE CARMEL, INDIANA 46032 Voice (317) 571-2600 Fax (317) 571-2615 Fire Prevention Bureau Paul Reis Drewry, Simmons, Pitts and Vornehm, LLP. 8888 Keystone Crossing, Suite 1200 Indianapolis, IN 46240 RE: Kite Medical Office Complex - Phase II LETTER OF APPROVAL The undersigned has reviewed the proposed plans for Kite Medical Office Complex - Phase II and has approved the plans subject to the following: 1. Our office is requesting a meeting to discuss the location of the fire department connection and the request of an additional fire hydrant for this project. We are also requesting an exterior entrance to the fire sprinkler riser room. 2. We are requesting that a Knox box for fire department emergency access and Knox fire department connection caps be provided. Knox products and accessories can be purchased on line at www.knoxbox.com. 3. What is the height of the building and will the building have a basement? 4. Will the building have a fire alarm system? If so we are requesting a remote enunciator be located at the main entrance of the building. 5. 6. Please respond to the above noted condition(s) in writing and submit to our office prior to the scheduled Technical Advisory Meeting for this project. Date: Auaust 17. 2004 By: Gary Hoyt, Fire Marshal Carmel Fire Department e e City of Carmel VIA FAX: 580-4855 Original by mail August11,2004 Paul Reis Drewry, Simmons, Pitts & V omehm 8888 Keystone Crossing, Suite 1200 Indianapolis, IN 46240 RE: Kite Medical Office Complex, Phase 2 (#04080014 DP Amend & 04080017 ADLS Amend) Dear Mr. Reis: This letter is in response to your Development Plan and ADLS Amendment Applications for Kite Medical Office Complex, Phase 2. This is a preliminary letter to let you begin on revisions. Members at the TAC Meeting will make additional comments on August 18. Please complete the following items after you have received additional comments at the T AC Meeting. 1. Please label the dimensions of the building, on the site plan. 2. Please show/label the 90-ft build-to line from the US 31 Right-of-way. 3. Please show/label the 20-ft build-to line from the Pennsylvania St. Right-of-way. 4. Please show/label the proposed and existing half rights-of-way and label the widths for US Highway 31. 5. Please provide a list of adj acent property owners, certified by Hamilton County Auditor's Office. 6. Please present material and color samples to the Plan Commission Meeting. 7. Provide a signage location plan (site plan). 8. Provide signage details, materials, square footage, dimensions, lighting of, etc. 9. Please forward a copy of Urban Forester's Approvalletter/e-mail. 10. Show/label the landscape buffer yards, per Chapter 26.04. 11. Please provide light fixture cut sheets/details. 12. Please provide trash enclosure details. 13. Provide black-line building elevations, which show screening of rooftop-mounted equipment. 14. The building elevations appear satisfactory, but please show that they meet the Golden Section. If you have any questions or if I may be of assistance, please feel free to call. h~ &t~ Angelina Butler Planning Administrator KiteMedical0fcComplex,Ph2-DP Amend,ADLSAmend Page 1 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 AUG 10 '04 06:38PM P . 1/2 .;.......;". - . .-:e e lIf. Xento1l C. tU)ard, Surveyor fplione (j .T.7) 77G.g4,S (l-'a.\" (.3 I 7) 77tS.90:1S Jrtitt! I K S One j{llmiltolJ CtJunty S'luarr. :7Voblesvilk~ Indi~lnt1 4606o-~2..'O August 10J 2004 Drewry Simmons Pitts & V ornehm, LLP ATTN: Paul Reis 8888 Keystone Crossing, Suite 1200 Indianapolis, IN 46240 VIA FACSIMILE: 580-4855 ORe: 126th Street Medj~al Offite Park Dear Mr. Reis: We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office on August 4~ 2004 for this project and have the following comments: 1. This project falls within the jurisdiction of the City of Carmel. 2. This proposed site DOES NOT fall in a Cannel Well Head Protection Area. 3. Please coordinate the storm sewer design with both the City of Carmel Engineering Department and this office. 4. This proposed project falls in the W.R. Fertig Drainage Sheet 5. The W.R. Fertig Watershed has an allowable release rate of 0.25 cfs per acre. It appears from the drainage report that the Hamilton Crossing drainage report set the restriction for this site slightly lower, The drainage calculations provided do comply with the allowable release rate. 6. Please submit an outlet permit, for the indirect discharge into the W.Rp Fertig Regulated Drain, to this office. The application is available on our website at http~I/\VWW.co.hamilton.in.us, go to Departments, Swveyor, and Forms. 7. The HCSO would recommend you show the emergency spillway in the grading contours on sheet C300 and also show a cross section detail. AUG 10 '04 06:38PM e e 8. Please note the additional conunents may be warranted at a later date. Should you ha-ve any questions, I cal1 be reached at 317-776-8495. Sincerely, ~~ Greg Hoyes Plan Reviewer Co: Jon Dobosiewicz - Carmel DOCD 10hn South - HCSWCD Dick Hill- Cannel Engineering Greg Snelling - W oolpert P.2/2 e ,::::/!:::,;:i?::;:::!ij:::::'J:;:\,,(:!~:;i::'!;)::::~~):::::!<:::::,' .. .. ",' ...... ............... e Carmel (~~f~~I~partment :);':.:'@jn~'t.c"'::~:gu&Jre Carm~I:::(~i!I~:i4 6032 August 6, 2004 Mr. .Paul G. Reis Drewry Simmons Pitts & Vornehm, LLP 8888 Keystone Crossing, Suite 1200 Indianapolis, IN 46240 RE: Kite Medical Office Complex - Phase II Northeast Corner of U.S. 31 and 126th Street File Number: 3195.012 Dear Mr. Reis: I have received and reviewed the information for the above-referenced project. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Ti othy J. Green Acting Chief of Police T JG:vb cc: Dept. of Community Services ~~~ :::;:::::::::::::::::::. \:..... (317) 571-,2500 A Nationally Accredit_~rcement Agency Fax (317) 571-2512 IREWRY SIMMONS VORNER'LiP A T TOR N E Y S \g,t ~r 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 46240 · (317) 580-4848 telephone · (317) 580-4855 facsimile · ,,~~\'.drewrysimmons.com August 3, 2004 Mr. Dick Hill Mr. Mike McBride Dept. of Engineering One Civic Square Carmel, IN 46032 \;~~t\) ~~ ~ \ 1>.,p "\)\)\;S RE: Kite Medical Office Building Complex - Phase II Northeast Comer of U.S. 31 and 126th Street Our File Number: 3195.012 Dear Mr. Hill and Mr. McBride: I have filed with the City of Carmel Department of Community Services, on behalf of the Kite Companies, Development Plan and ADLS applications and corresponding plans for a second medical office building to be located north of the northeast comer of U.S. 31 and 126th Street, in Carmel, Indiana. Enclosed herewith are the site construction drawings and drainage report for the medical office building for your review. We anticipate having t11is project placed 011 tl1e August 18, 2004 ,agenda of the Carmel Technical Advisory Committee, the September 7, 2004 agenda of the Cannel Plan Commission Special Studies Committee, and the September 21, 2004 agenda of the Carmel Plan Commission. Please forward any comments you have after your review of the enclosed plans to me or Mark Monroe at our office address listed above. If you have any questions regarding this matter in the mean time, please feel free to contact me or Mark at 580-4848. Thank you very much for your cooperation and assistance. Best regards, DREWRY SIMMONS VORNEHM, LLP ~~:i; Attorney e Kite Companies Enclosure cc: Jon Dobosiewicz, City of Carmel (w/enclosures) LWRY SIMMONS VORNEH.LLP A T TOR N E Y S '," f ;; 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 46240 · (317) 580-4848 telephone · (317) 580-4855 facsimile · www.drewrysimmons.com August 3, 2004 Mr. Greg Hayes Hamilton County Surveyor's Office One Hamilton Squ-are, Suite 146 Hamilton. County Judicial Center Noblesville, IN 46060 RE: Kite Medical Office Building Complex - Phase II Northeast Comer of U.S. 31 and 126th Street OUT File Number: 3195.012 Dear Mr. Hoyes: I have. filed with the City of Cannel Department of Community S,ervices, on behalf of the Kite Companies, Dev-elopment Plan and ADLS applications and corresponding plans for a second medical office building to be located north of the northeast comer of U.S. 31 and 126th Street, in Cannel, Indiana. Enclosed herewith are the site construction drawings and drainage report for the medical office building for your review. We anticipate having this project placed on the August 18, 2004 agenda of the Carmel Technical Advisory Committee, the September 7, 2004 agenda of the Carmel Plan Commission Special Studies Committee, and the September 21, 2004 agenda of the Carmel Plan Commission. Please forward any comments you have after your review of the enclosed plans to me or Mark Monroe, at our office address listed above. If you have any questions regarding this matter in the mean time, please feel free to contact me or Mark at 580-4848. Thank you very much for your cooperation and assistance. Best regards, DREWRY SIMMONS VORNEHM, LLP Xu/ &. Pa~~i / Attorney for Enclosure cc: Jon Dobosiewicz, City of Carmel (w/enclosures) tREWRY SIMMONS VaRNER! LLP A T TOR N E Y-5 '.,_.J..;' ~t i 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 46240 · (317) 580-4848 telephone · (317) 580-4855 facsimile · www.drewrysimmons.com August 3, 2004 Mr. John South Hamilton Cou-nty Soil & Water Conservation District 1108 South 9th Street Noblesville, IN 46060 RE: Kite Medical Office Complex - Phase II Northeast Comer of U.S. 31 and 126th Street Our File Number: 3195.012 Dear Mr. South: I 11ave filed with the City of Carmel Department-of Community Services, on behalf of the Kite Companies, Development Plan and ADLS applications and corresponding plans for a second medical office building to be located north of the northea'st comer of u.S. 31 and 126th Street, in Cannel, Indiana. Enclosed herewith are the site construction drawings for the medical office building for your review. We anticipate having this project placed on the August 18, 2004 agenda of the Carmel Technical Advisory Committee, the September 7, 2-004 agenda of the Carmel Plan Commission Special Studies Committee, and the September 21, 2004 agenda of the Carmel Plan Commission. Please forward any comments you have after your review of the enclosed plans to lne or Mark Monroe at our office address listed above. If you have any questions regarding this matter in the mean time, please feel free to contact me or Mark at 580-4848. Thank you very much for your cooperation and assistance. Best regards, DREWRY SIMMONS VORNEHM, LLP ~s · Attorney Enclosure cc: Jon Dobosiewicz, City of Carmel (w/o enclosures) ~REWRY SIMMONS VORNEHI LLP A T TOR N E Y 5 \,1,"0 ' 'if , 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 46240 · (317) 580-4848 telephone · (317) 580-4855 facsimile · www.drewrysimmons.com August 3, 2004 Mr. Gary Hoyt Office of Fire Chief: Fire Station #1 Two Civic Square Cannel, IN 46032 RE: Kite Medical Office Complex - Phase II Northeast Comer of U.S. 31 and 126th Street Our File Number: 3195.012 Dear Mr~ Hoyt: I have filed with the City of Cannel Department of Community Services, on behalf of tl1e Kite Companies, Development Plan and ADLS applications and corresponding. plans for a second medical office building to be located north of the northeast comer of U.S. 31 and 126th Street, in Cannel, Indiana. Enclosed herewith are the site construction drawings for the medical office building for your review. We anticipate having this project placed on the August 18, 2004 agenda of the Carmel Technical Advisory Committee, the September 7, 2004 agenda of the Carmel Plan COffilnission Special Studies Committee, and the September 21, 2004 agenda of the Carmel Plan Commission. Please forward any comments you have after your review of the enclosed plans to me or Mark Monroe at our office address listed above. If you have any questions regarding this matter in the mean time, please feel free to contact me or Mark at 580-4848. Thank you very much for your cooperation and assistance. Best regards, DREWRY SIMMONS VORNEHM, LLP ~a- Pa~. Rei Attorney for Enclosure cc: Jon Dobosiewicz, City of ' Cannel (w/o enclosures) 'REWRY SIMMONS VORNEHt LLP A T TOR N E Y 5 y 8888 Keystone Cros~ing, Suite 1200 · Indianapolis, Indiana 46240 · (317) 580-4848 telephone · (317) 580-4855 facsimile · www.drewrysimmons.com August 3, 2004 Mr. Bill Akers Cannel Communications 31 First Avenue NW Cannel, IN 46032 RE: Kite Medical Office Complex - Phase II Northeast Corner of U.S. 31 and 126th Street Our File Number: 3195.012 Dear Mr. Akers: _ I have filed with the City of Carmel Department of Community Services, on behalf of the Kite Companies, Development Plan and ADLS applications and corresponding plans for a second medical office building to be located north of the northeast comer of u.S. 31 and 126th Street, in Cannel, Indiana. Enclosed herewith are the site construction drawings for the medical office building for your review. We anticipate having this project placed on the August 18, 2004 agenda of the Cannel TeclmicalAdvisory Committee, the September 7, 2004 agenda of the Cannel Plan Commission Special Studies Committee, and the September 21, 2004 agenda of the Cannel Plan Commission. Please forward any comments you have after your review of the enclosed plans to me or Mark Monroe at our office address listed above. If you have any questions regarding this matter in the mean time, please feel free ~o contact me or Mark at 580-4848. Thank you very much for your cooperation and assistance. Best regards, DREWRY SIMMONS VORNEHM, LLP p~~. Attorney for Enclosure cc: Jon Dobosiewicz, City of Carmel (w/o enclosures) 'REWRY SIMMONSVORNEHt LLP ATTORN E Y 5 " f.?l f 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 46240 · (317) 580-4848 telephone · (317) 580-4855 facsimile · www.drewrysimmons.com August 3, 2004 Mr. Jeff Rice Ameritech 5858 North College Avenue Indianapolis, IN 4(5220 RE: Kite Medical Office Complex - Phase II NortheastComer of U.S. 31 and 126th Street Our File Number: 3195.012 Dear Mr. Rice: I have filed with the City of Cannel Department of Community Services, on behalf of the Kite Companies, Development Plan and ADLS applications and corresponding plans for a second medical office building to be located north of the northeast comer of u.s. 31 and 126th Street, in Carmel, Indiana. Enclosed herewith are the site construction drawings for the medical office building for your review. We anticipate having this project placed on the August 18, 2004 agenda of the Cannel Teclmical Advisory COlnmittee, the September 7, 2004 agenda of the Cannel Plal1 Commission Special Studies Committee, and the September 21, 2004 agenda of the Cannel Plan Commission. Please forward any comments you have after your review of the enclosed plans to me or Mark Monroe at our office address listed above. If you 11ave any questions regarding this matter in the mean time, please feel free to contact me or Mark at 580-4848. Thank you very much for your cooperation and assistance. Best regards, Enclosure cc: Jon Dobosiewicz, City of Cannel (w/o enclosures) ~REWRY SIMMONS VORNEH' LLP A T TOR N E Y 5 \.','.,;' ' r 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 46240. (317) 580-4848 telephone · (317) 580-4855 facsimile · www.drewrysimmons.com August 3, 2004 Ms_ Pam Waggoner Indianapolis Water- Company P.O. Box 1220 Indianapolis, IN 46206 RE: Kite Medical Office Complex - Phase II Northeast Comer of U.S. 31 and 126th Street Our File Number: 3195.012 Dear Ms. Waggoner: I have filed with the City of Carmel Department of Community Services, on behalf of the Kite Companies, Development Plan and ADLS, applications and corresponding plans for a second medical office building to be located north of the northeast comer of U.S. 31 and 126th Street, in Carmel, Indiana. Enclosed herewith are the site construction drawings for the medical office building for your review. We anticipate having this project placed on the August 18, 2004 agenda of the Carmel Technical Advisory Committee, the September 7, 2004 agenda of the Carmel Plan Commission Special Studies Committee, and the September 21, 2004 agenda of the Carmel Plan Commission. Please forward any comments you have after your review of the enclosed plans to me or Mark Monroe at our office address listed above. If you have any questions regarding this matter in the mean time, please feel free to contact me or Mark at 580-4848. Thank you very much for your cooperation and assistance. Best regards, DREWRY SIMMONS VORNEHM, LLP p~~ Attorney for t Enclosure cc: Jon Dobosiewicz, City of Carmel (w/o enclosures) 'REWRY SIMMONS VORNEH! LLP A T TOR N E Y 5 y 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 46240 · (317) 580-4848 telephone · (317) 580-4855 facsimile · w\vw.dre\\Tysimmons.com A~oust 3, 2004 Mr. Chuck Shupperd Vectren P.O. Box 1700 Noblesville,'IN 46060 'RE: Kite Medical Office Complex - Phase II Northeast Comer ofV.S. 31 and 126th Street Our File Number: 3195.012 Dear Mr. Shupperd: __ I l1avefiled with the City of Cannel Department of Community Services, on behalf of t11e Kite Companies, Development Plan and ADLS applications and corresponding plans for a second medical office building to be located north of the northeast comer of u.S. 31 and 126th Street, in Cannel, Indiana. Enc~osed herewith are the site construction drawings for the medical office building for your review. We anticipate having this project placed on the August 18, 2004 agenda of the Carm-el Technical Advisory Committee, the September 7, 2004 agenda of the Carmel Plan Commission Special Studies Committee, and the September 21, 2004 agenda of the Carmel Plan Commission. Please forward any comments you have after your review of the enclosed plans to me or Mark Monroe at our office address listed above. If you have any questions regarding this matter in the mean time, please feel free to contact me or Mark at 580-4848. Thank you very much for your cooperation and assistance. Best regards, DRE\\TRY SIMMONS VORNEHM, LLP Enclosure cc: Jon Dobosiewicz, City of Carmel (w/o enclosures) ~REWRY SIMMoNS VORNEH! LLP A T TOR N E Y S ,'."" " r 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 46240 · (317) 580-4848 telephone · (317) 580-4855 facsimile · w'\v\\'.dre\\T)'simmons.com August 3, 2004 Chief Michael Fogarty Office of Police Chief Three Civic Square Carmel, IN 46032 RE: Kite Medical Office Complex - Phase II Northeast Comer of U.S. 31 and 126th Street Our File Number: 3195.012 Dear Chief Fogarty: I have filed with the City of Carmel Department of Community Services, on behalf of the Kite Companies, Development Plan and ADLS applications and corresponding plans for a second medical office building to be located north of the northeast comer of U.S. 31 and 126th Street, i11 Carmel,. Indiana. Enclosed herewith are the site construction drawings for the medical office building for your review. We anticipate having this project placed on the August 18, 2004 agenda of the Cannel Technical Advisory Committee, the September 7, 2004 agenda of the Carmel Plan COlnmission Special Studies Committee, and the September 21, 2004 agenda of the Carmel Plan Commission. Please forward any comments you have after your review of the enclosed plans to me or Mark Monroe at our office address listed above. If you have any questions regarding this matter in the mean time, please feel free to contact me or Mark at 580-4848. Thank you v~ry much for your cooperation and assistance. Best regards, DREWRY SIMMONS VORNEHM, LLP ,..~6,.v ~Rei Attorney for Enclosure cc: Jon Dobosiewicz, City of Cannel (w/o enclosures) 'REWRY SIMMONS VORNEHt LLP A T TOR N, E Y S y 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 46240 · (317) 580-4848 telephone · (317) 580-4855 facsimile- www.drewrysimmons.com August 3, 2004 Mr. John Duffy Cannel-City Utilities 130 First Avenue SW Cannel, IN 46032 RE: Kite Medical Office Complex - Phase II Northeast Comer of U.S. 31 and 126th Street Our File Number: 3195.012 Dear Mr. Duffy: I have filed with tl1e City of Carmel Department of Community Services, on behalf of the Kite Companies, Development Plan and ADLS applications and cQrresponding plans for a second medical office building to be located north of the northeast comer of U.S. 31 and 126th Street, in Carmel, Indiana. Enclosed herewith are the site construction drawings for the medical office building for your review. We anticipate having this project placed on the August 18, 2004 agenda of the Cannel Technical Advisory Committee, the September 7, 2004 agenda of the Carmel Plan Commission Special Studies Committee, and the September 21, 2004 agenda of the Carmel Plan Commission. Please forward any comments you have after your review of the enclosed plans to me or Mark Monroe at our office address listed above. If you have any questions regarding this matter in the mean time, please feel free to contact me or Mark at 580-4848. Thank you very much for your cooperation arid assistance. Best regards, DRE~~~MONS~ORNEHM,LLP p~;~. Attorney :D Enclosure cc: Jon Dobosiewicz, City of Cannel (w/o enclosures) tREWRY SIMMONS VaRNER! LLP A T TOR N E Y 5 \( 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 46240 · (317) 580-4848 telephone · (317) 580-4855 facsimile. www.drewrysimmons.com August 3, 2004 Mr. Scott Brewer Department of Community Services City of Cannel One Civic Square Cannel, IN 46032 RE: Kite Medical Office Complex - Phase II Northeast Comer of U.S. 31 and 126th street Our File Number: 3195.012 Dear Mr. Brewer: I have filed with the City of Cannel Departme~t of Community Services, on behalf of the Kite Companies, Development Plan and ADLS applications and corresponding plans for a second medical office building to be located north of the northeast comer of U.S. 31 and 126111 Street, in Carmel, Indiana. Enclosed herewith are the site construction drawings for the medical office building for your review. We anticipate having this project placed on the August 18, 2004 agenda of the Cannel Technical Advisory Committee, the September 7, 2004 agenda of the Cannel Plan Commission Special Studies Committee, and the September 21, 2004 agenda of the Cannel Plan Commission. Please forward any comments you have after your review of the enclosed plans to me or Mark Monroe at our office address listed above. If you have any questions regarding this matter in the mean time, please feel free to contact me or Mark at 580-4848. Thank you very much for your cooperation and assistance. Best regards, DREWRY SIMMONS YORNEHM, LLP Enclosure cc: Jon Dobosiewicz, City of Cannel (w/o enclosures) . e ''Y)REWRY SIMMONS VORNEHM, LLP A T T 0, R N E Y 5 \~.I.,';' r 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 46240 · (317) 580-4848 telephone · (317) 580-4855 facsimile .www.drewrysimmons.com .i\Ugust 3, 2004 Mr. Jim Blanchard ...Assistant Building Commissioner City of Cannel One Civic Square Cannel, IN 46032 RE: Kite Medical Office Co.mplex - Phase II Northeast Corner of U.S. 31 and 126th Street Our File Number: 3195.012 Dear Mr. Blanchard: I have filed with the City of Carmel Department of Community Services, on behalf of the Kite Companies, Development Plan andADLS applications and'corresponding plans for a second medical office building to be located north of the northeast comer of u.S. 31 and 126tl1 Street, in Carmel, Indiana. Enclosed herewith are the site construction drawings for the medical office building for your review. We al1ticipate 11aving this project placed 011 tIle August 18, 2004 agenda of the Cannel Technical Advisory Committee, the September 7, 2004 agenda of the Carmel Plan '- Commission Special Studies Committee, and the September 21, 2004 agenda of the Cannel Plan Commission. Please forward. any comments you have after your review of the enclosed plans to me or Mark Monroe at our office address listed above. If you have any questions regarding this matter in the mean time, please feel free to contact me or Mark at 580-4848. Thank you very much for your cooperation and assistance. Best regards, ite Companies Enclosure cc: J011 Dobosiewicz, City of Carmel (w/o enclosures) . e ~REWRYSIMMONS VORNEHM, LLP A T r 0 R N E Y 5 \,11./ ,l' 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 4624Q · (317) 580-4848 telephone · (317) 580-4855 facsimile · ww\v.drewrysimmons.com ~~ugust 3, 2004 Postmaster Cannel Postmaster 275 Medical Drive Cannel, Indiana 46032-9998 RE: Kite Medical Office Complex - Phase II Northeast Comer ofU..S. 31 and 126th Street Our File Number: 3195._012 Dear Postmaster: I have filed with the City of Cannel Department of Community Services, on behalf of the Kite' Companies, Development Plan and ADLS applications and corresponding plans . for a second medical office building to be located north of the northeast corner of U.S. 31 and 126th Street, in Cannel, Indiana. Enclosed herewith are the site construction drawings for the medical office building for your review. We anticipate having this project placed on the August 18, 2004 agenda of the Cannel Technical Advisory Committee, the September 7, 2004 agenda of the Cannel Plan Commission Special Studies Committee, and the September 21, 2004 agenda of the Cannel Plan Commission. Please forward any comments you have after your review of the enclosed plans to me or Mark Monroe at our office address listed above. ' If you have any questions regarding this matter in the mean time, please feel free to contact me or Mark at 580-4848. Thank you very much for your cooperation and assistance. Best regards, DREWRY SIMMONS VO~NEHM, LLP ~. / ~, P ul . Reis / Attorney for Enclosure, cc: Jon Dobosiewicz, City of Cannel (w/o enclosures) tREWRY SIMMONS VORNEH!, LLP A T TOR N E Y S \, r 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 46240 · (317) 580-4848 telephone · (317) 580-4855 facsimile · ~T.drewrysimmons.com August 3,2004 Mr. Jeff Fanner Brighthouse Nenvorks 516 East Cannel Drive Cannel, IN 46032 RE: Kite Medical Office Co'mplex - Phase II Northeast Comer of U.S. 31 and 126th Street Our File Number: 3195.012 Dear Mr. Farmer: I have filed with the City of Carmel Department of Community Services~ on behalf of the Kite Co-mpanies, Development Plan and ADLS applications and corresponding plans for a second medical office building to be located north of the northeast comer of U.S.3l and 126th Street, in Cannel, Indiana. Enclosed herewith are the site construction drawings for the medical office building for your review. We anticipate having this project placed on the August 18, 2004 agenda of the Cannel Technical Advisory Committee, the September 7, 2004 agenda of the Carmel Plan Commission Special Studies Committee, and the September 21, 2004 agenda of the Cannel Plan Commission. Please forward any comments you have after your review of the enclosed plans to me or Mark Monroe at our office address listed above. If you have any questions regarding this matter in the mean time, please feel free to contact me or Mark at 580-4848. Thank you very much for your cooperation and assistance. Best regards, DREWRY SIMMONS VOR1\TEHM, LLP ite Companies Enclosure cc: Jon Dobosiewicz, City of Carmel (w/o enclosures) - tit tREWRY SIMMONS VORNEHM,LLP A T TOR N E Y 5 \~,I l 8888 Keystone Crossing, Suite 1200 · Indianapolis, Indiana 46240 · (317) 580~4848 telephone · (317) 580-4855 facsimile . www.drewrysimmons.com August 3, 2004 Mr.. D~dTIGroves Cinergy 1441 South Guilford Carmel, IN "46032 RE: Kite Medical Office Complex -Phase II Northeast Comer ofD.S. 31 and 126th Street Our File Number: 3195.012 Dear Mr. Groves: I have filed with the City of Cannel Department of Community Services, on behalf of the Kite Companies, Development Plan and ADLS applications and corresponding plans for a second medical office building to be located north of the northeast comer of U.S. 31 and 126th Street, in Carmel, Indiana. Enclosed herewith are the site construction drawings for the medical office building for your review. We anticipate having this project placed on the August 18, 2004 agenda of the Cannel Technical Advisory Committee, the September 7, 2004 agenda of the Cannel Plan Commission Special Studies Committee, and the September 21, 2004 agenda of the Carmel Plan Commission. Please forward any comments you have after your review of the enclosed plans to me or Mark Monroe at our office address listed above. If you have any questions regarding this matter in the mean time, please feel free to contact me or Mark at 580-4848. Thank you very much for your cooperation and assistance. Best regards, DREWRY SIMMONS VORNEHM, LLP ~ ,.... ;: <<-J 6./. Piul . Reis// Att ey for d::mpanies Enclosure cc: Jon Dobosiewicz, City of Cannel (w/o enclosures)