Loading...
HomeMy WebLinkAboutPacket DP Amend Approval 09-21-04 I I I I I I I I I I I I I I I I I I I North of the NE Corner of 126th Street and U.S. Highway 31 Docket No. 04080014 DP Amend. Kite Medical Office Complex Development Plan Amendment Approval Carmel Plan Commission September 21, 2004 Paul G. Reis, Esq. I I I I I I I I I I I 'I I I I I I I I Kite Medical ,Office Complex Development Plan Amendment Approval Carmel Plan Commission September 21, 2004 Table of Contents 1. Introduction and Overview 2. Aerial Photograph 3. Site Plan 4. Landscape Plan 5. Building Elevation Drawings I I I I I I I I I I I I I I I I I I I KITE MEDICAL OFFICE COMPLEX 126TH STREET AND U.S. 31 Development Plan Amendment Approval INTRODUCTION AND OVERVIEW In the fall of 2000, an ADLSapplication and Development Plan were approved for the development of this site located at the northeast comer of 126th Street and U.S. 31. Construction of that approved project did not commence. Because more than two years have passed since the approval of the original project, and the State of Indiana has begun the process of designing the upgrade of U.S. 31, a revised development plan for the site is being submitted to the Plan Commission for approval. The overall project is planned to consist of three office buildings, to be developed in three phases. At this time, we are presenting the revised development plan for the second phase to be constructed on the middle portion of the site, composed of approximately 6 acres. The second phase consists of a three story office building containing 95,000 rentable square feet and the associated parking area. The amended architectural design, landscaping. lighting and signage (ADLS) for the second phase of this project, which is essentially the same as the prior project,. did not require a public hearing and was reviewed by the Special Studies Committee on September 9, 2004.