Loading...
HomeMy WebLinkAbout0383.97cc 161 -611 161 -611 FIXED c a I I I I 3 -2x6 BR6 I I I I I I I I T- - == I 11L o I ,11 III d- III O n, nl M III ° M — I 0 - - - - - - - - - -- �SEEBASEPLAN 8 -2x6 R6 I BEAM B I 3-2x6 BR6 211 -411 I ' 3- 1 3/4" x 18" ML BEAMS L - - - - - - - o _3 ° ZE Of CC I - X 2 1-* NOTE 5" 3-2x6 BR6 OFF5E T N REF ELEV.5 REF ELEV.5 3-CAR 510E ENTRY 1/411 = 1141 E FRONT ELEVATION SHEETS FOR WINDOW 21'-2 1/2" LOCATIONS AN0 MATERIAL FIN 15HES 0 2/8 SC 24 WALL IV v +10 co NOTES I I. N ALL DIMEN51ON5 PRESENTED HERE ARE FRAME DIMEN51ON5 ONLY - SEE 5HT. 1.1 FOR FOUNDATION 2597 HOLD HEADER T16HT TO PLATE FOOTPRINT, 2. I ALL FIRST FLOOR WINDOW HOR. HT5 TO BE 7' -10" AFF +/ . 595 lf1 VERIFY W/ ELEVATIONS AND CORNICE DETAIL5 ° ALL E1-PA55 DOOR5 R.O.'S = SAME AS DOOR 000 0000 fl 000 m 2x BLOGKIN6 UNDER ALL EXTERIOR 5WIN6 DOOR5 NOTE: 5. Ix BLOCK IN6 UNDER ALL EXTERIOR 5L ID IN6 DOORS I `a }b DOCUMENTS SHALL BE 13ROU614T TO THE ATTENTION OF THE 6. TOWEL BARS (TB) OVER CABINET5 AND TOILETS ARCHITECT: IN WRITING, AND WRITTEN INSTRUCTION SHALL BLOCK IN6 TO BE 55" AFF TO CL BE OBTAINED PRIOR TO PROCEEDIN6 WITH CONSTRUCTION. 7. TOWEL BARS (TB) NOT OVER 6ABINET5 AND TOILETS THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY ERRORS, 015CREPAN6IE5 OR OMISSIONS FOR WHICH THE s BLOCK IN6 TO BE 39" AFF TO GL CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR 8. O TO CONSTRUCTION AWIOR FABRICATION OF THE WORK. x I 13' -5" 2-2x10 HOR ALL EXTERIOR HEADER5 TO BE 2-2x 12 DF U.N.O. HEARTH PER C 1019 7 6 5 4 3 2 � 1 4-2x10 FL. NOR - - _ 2/0 VAULTED LOCAL CODE I I 81 511 M b Jp o I � o I Vti+ b 2-CAR 510 E 1/411 = 114" J o Y ®� o ClJ � 16'-611 sz fY v 16' -611 Q N 11,10" � J , NOTE : ALL DIMENSIONS ARE FROM FACE OF 5TUD TO NOTES FACE OF STUD. ALL 5TU05 ARE 3 1/2" UNLE55 NOTED. I. ALL CA5ED OPENINGS GREATER THAN 48" WIDE ALL DIMEN51ON5 PRESENTED HERE ARE FRAME DIMEN51ON5 ONLY - SEE 5HT. 1.1 FOR FOUNDATION 2597 HOLD HEADER T16HT TO PLATE FOOTPRINT, 2. ALL BI -FOLD DOOR5 R.O.'5 = 1 1/2" WIDER THAN DOOR5 ALL FIRST FLOOR WINDOW HOR. HT5 TO BE 7' -10" AFF +/ . 595 HEADER HT. = 82" AFF VERIFY W/ ELEVATIONS AND CORNICE DETAIL5 3. ALL E1-PA55 DOOR5 R.O.'S = SAME AS DOOR 000 0000 HEADER HT = 83" AFF 000 4. 2x BLOGKIN6 UNDER ALL EXTERIOR 5WIN6 DOOR5 NOTE: 5. Ix BLOCK IN6 UNDER ALL EXTERIOR 5L ID IN6 DOORS ERRORS AND OMISSIONS WHICH MAY OCCUR IN THE CONTRACT 5 IA 141-2 1/2" }b DOCUMENTS SHALL BE 13ROU614T TO THE ATTENTION OF THE 6. TOWEL BARS (TB) OVER CABINET5 AND TOILETS ARCHITECT: IN WRITING, AND WRITTEN INSTRUCTION SHALL BLOCK IN6 TO BE 55" AFF TO CL BE OBTAINED PRIOR TO PROCEEDIN6 WITH CONSTRUCTION. 7. TOWEL BARS (TB) NOT OVER 6ABINET5 AND TOILETS THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY ERRORS, 015CREPAN6IE5 OR OMISSIONS FOR WHICH THE BLOCK IN6 TO BE 39" AFF TO GL CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR 8. BLOCK IN6 FOR T155UE HOLDER5 (TH) TO BE 24" AFF TO CONSTRUCTION AWIOR FABRICATION OF THE WORK. N I 13' -5" 2-2x10 HOR ALL EXTERIOR HEADER5 TO BE 2-2x 12 DF U.N.O. 561 -011 311,6" 81 -011 10•6 1/2" 14'-I 11/2" 21-9 1/2" 2 3, I 3-2x10 HOR 3-2834 2-2x10 HDR 2834 2 -2834 W/ HALF RN0 2834 2-2x10 WR 2-2x10 HDR N 2X6WALL m! AREA FIRST FLOOR 1398 SECOND FLOOR 1199 TOTAL 2597 GARAGE 532 BASEMENT 1468 CRAWL 595 000 0000 000 000 000 0000 000 000 000 0000 05 0 o I X I I° 5 1/211 KITCHEN i 13/4 FRAMING BETWEEN ti��� 2xi0 FLOOF JOISTS 1 4911 QQ 910" 6L6 HT. o" 'J VINYL 21' 0 1/2n ' WINDOWS I 2/8 I tt 16 O.C. I " OVER 1 C 1 IV I SOFFIT Q ?+ a 1 i /2° f6t -111 I 5 IA 141-2 1/2" }b - OPT. OPEN RAIL 6 o ts, 6" PRE -FAB FP `, ° uj NOOK 11 9 0 6L6 HT. 4 0 51_ 1/ / W/ 5URROUND AND d X I I �? VINYL �- 3i -2" N I 13' -5" 2-2x10 HOR HEARTH PER \, �, u- - K Q 1019 7 6 5 4 3 2 � 1 4-2x10 FL. NOR - - _ 2/0 VAULTED LOCAL CODE I I 81 511 2x6 LANDING I 112 III k - - - - FRAMIN6 - HANG FROM ! 1 = I UP FOYERk ti FAMILY o 2/8 �" r, �a I 515 1/2" 9u 4 1/211 1-4 s 2 STORY " H FLOOR ABOVE 13 -,o I 20 - - - - - --------------- ---- - - - _ - - — - KNEEWALL-------------- 4= _ 05 0 o I X I I° 5 1/211 KITCHEN 0 CIP 1.o v x N I n I n 1 4911 QQ 910" 6L6 HT. o" 'J VINYL 21' 0 1/2n ' 3 21 -9" 2180' 2' 10" 31.2" 2/8 I tt 1 8 37" RAKE WALL I SOFFIT Q ?+ a 1 3.1 WPR }b - OPT. OPEN RAIL 6 o ts, 2834 F C 4 0 51_ 1/ / " I 3i -2" N I 13' -5" 2-2x10 HOR LITE 1019 7 6 5 4 3 2 � 1 4-2x10 FL. NOR - - _ 2/0 VAULTED 2x6 LANDING I 112 III k - - - - FRAMIN6 - HANG FROM ! 1 = I UP FOYERk - o 2/8 �" r, �a I 515 1/2" 9u 4 1/211 1-4 o FLOOR ABOVE 13 -,o I 20 4= _ o M I 9'0" CL6 HT. H0 WO w 3_I 3/4" x 18'1 ML BEAMS _ F 7 - h0 � r , —•� N', 2 STORY - \? FROM BASEMENT �, DN I - - - �_� ® 8111 II -111 $11 8''8" x � N I DINING o" O VLAN.- `�' — N S- 5HN I 1211 H16H X 8" WI N I 0 CIP 1.o v x N GARAGE 21' 0 1/2n ' 2R 2180' 2' 10" 31.2" 2/8 I tt 1 8 a I SOFFIT a 1 WPR i o ts, LIVING F C 4 0 51_ 1/ / " 3i -2" N I 13' -5" H E 24 AFF LITE i v HVAC CHA5E 2/0 VAULTED _ STACK WALL _ `- FOYERk 2/8 1 o a APPROX 1811 x 24" 3_I 3/4" x 18'1 ML BEAMS I h0 � r , N', 2 STORY - \? FROM BASEMENT �, DN I - - - m 8111 II -111 $11 8''8" 811 I' I" Isis TO GARAGE GL6. — _ — — 00 IN5UL. AS R150' IR/i5 - 2 2x10 FL. HDf� �) �n III " 104 1/2" B @55" AFF 10' -4" — — ° N N °O ° ° > 111 FL Ur - 2/4 BOTH SIDES I 3 2x10 HDR a II 2- 1 3/4 x 14 ML BEAMS O 0 W cv _ _d I o CC% "2-2x4 SEE SECTION 0 CIP 1.o v C-4 2 REF. ELEV. 3.1 3.1 101-8" 10' 8" REF ELEV.5 REF ELEV.5 REF ELEV.5 REF ELEV.5 REF ELEV.5 211 -411 121 011 81,811 141 -0" FIRST FLOOR PLAN 1 /411 = 11 -011 n w = v � O O N 0 3 3.1 REF ELEV.5 3 cp FIELD VERIFY VAULTED CL6 DETAIL - THI5 WALL MAY BE 2x6 IF HT 15 12'0" OR MORE M 0 M Q ° co 0 N GJ N x N GARAGE F c a a WPR i o ts, LIVING N H E 24 AFF LITE i o VAULTED STACK WALL _ `- FOYERk o 3_I 3/4" x 18'1 ML BEAMS h0 � r , N', 2 STORY - - - " 104 1/2" 10' -4" a II 2- 1 3/4 x 14 ML BEAMS o "2-2x4 SEE SECTION r r O o O 0 3. — o N! I u ° u- ° LIBRARY 3/0 S.C. W/ 2-12" 51PELIGH 5 46 o _° ROOF TRUSSES I N N 9'0" GL6 HT. r, 241106. ^; I I 16'X 1 O.H. DOOR L- - - - - -- — CARPEL 2 2x10 HDF __ 2. 1 3/4° x ib" ML BEAMS — — — — �� ti��k 2 2x12 HDR ��� o REF. ELEV. C-4 2 REF. ELEV. 3.1 3.1 101-8" 10' 8" REF ELEV.5 REF ELEV.5 REF ELEV.5 REF ELEV.5 REF ELEV.5 211 -411 121 011 81,811 141 -0" FIRST FLOOR PLAN 1 /411 = 11 -011 n w = v � O O N 0 3 3.1 REF ELEV.5 3 cp FIELD VERIFY VAULTED CL6 DETAIL - THI5 WALL MAY BE 2x6 IF HT 15 12'0" OR MORE M 0 M Q ° co 0 N GJ N