HomeMy WebLinkAbout0383.97cc
161 -611
161 -611
FIXED
c
a
I I I I
3 -2x6 BR6 I I I I
I I I I
T- - ==
I 11L
o I ,11
III
d- III O
n,
nl
M
III
°
M — I
0
- - - - - - - - - -- �SEEBASEPLAN
8 -2x6 R6 I BEAM B
I
3-2x6 BR6
211 -411
I
' 3- 1 3/4" x 18" ML BEAMS L - - - - - - -
o
_3 °
ZE Of
CC
I - X 2 1-* NOTE 5"
3-2x6 BR6 OFF5E T
N
REF ELEV.5 REF ELEV.5
3-CAR 510E ENTRY
1/411 = 1141
E FRONT ELEVATION
SHEETS FOR WINDOW
21'-2 1/2" LOCATIONS AN0 MATERIAL
FIN 15HES
0
2/8
SC
24 WALL
IV
v +10
co
NOTES
I
I.
N
ALL DIMEN51ON5 PRESENTED HERE ARE FRAME
DIMEN51ON5 ONLY - SEE 5HT. 1.1 FOR FOUNDATION
2597
HOLD HEADER T16HT TO PLATE
FOOTPRINT,
2.
I
ALL FIRST FLOOR WINDOW HOR. HT5 TO BE 7' -10" AFF +/ .
595
lf1
VERIFY W/ ELEVATIONS AND CORNICE DETAIL5
°
ALL E1-PA55 DOOR5 R.O.'S = SAME AS DOOR
000
0000
fl
000
m
2x BLOGKIN6 UNDER ALL EXTERIOR 5WIN6 DOOR5
NOTE:
5.
Ix BLOCK IN6 UNDER ALL EXTERIOR 5L ID IN6 DOORS
I
`a
}b
DOCUMENTS SHALL BE 13ROU614T TO THE ATTENTION OF THE
6.
TOWEL BARS (TB) OVER CABINET5 AND TOILETS
ARCHITECT: IN WRITING, AND WRITTEN INSTRUCTION SHALL
BLOCK IN6 TO BE 55" AFF TO CL
BE OBTAINED PRIOR TO PROCEEDIN6 WITH CONSTRUCTION.
7.
TOWEL BARS (TB) NOT OVER 6ABINET5 AND TOILETS
THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY
ERRORS, 015CREPAN6IE5 OR OMISSIONS FOR WHICH THE
s
BLOCK IN6 TO BE 39" AFF TO GL
CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR
8.
O
TO CONSTRUCTION AWIOR FABRICATION OF THE WORK.
x
I 13' -5"
2-2x10 HOR
ALL EXTERIOR HEADER5 TO BE 2-2x 12 DF U.N.O.
HEARTH PER
C
1019 7 6 5 4 3 2
�
1
4-2x10 FL. NOR
- - _
2/0
VAULTED
LOCAL CODE
I I 81 511
M
b
Jp
o I �
o I
Vti+ b
2-CAR 510 E
1/411 = 114"
J o
Y
®� o
ClJ �
16'-611
sz
fY
v
16' -611
Q
N
11,10"
� J
,
NOTE : ALL DIMENSIONS ARE FROM FACE OF 5TUD TO
NOTES
FACE OF STUD. ALL 5TU05 ARE 3 1/2" UNLE55 NOTED.
I.
ALL CA5ED OPENINGS GREATER THAN 48" WIDE
ALL DIMEN51ON5 PRESENTED HERE ARE FRAME
DIMEN51ON5 ONLY - SEE 5HT. 1.1 FOR FOUNDATION
2597
HOLD HEADER T16HT TO PLATE
FOOTPRINT,
2.
ALL BI -FOLD DOOR5 R.O.'5 = 1 1/2" WIDER THAN DOOR5
ALL FIRST FLOOR WINDOW HOR. HT5 TO BE 7' -10" AFF +/ .
595
HEADER HT. = 82" AFF
VERIFY W/ ELEVATIONS AND CORNICE DETAIL5
3.
ALL E1-PA55 DOOR5 R.O.'S = SAME AS DOOR
000
0000
HEADER HT = 83" AFF
000
4.
2x BLOGKIN6 UNDER ALL EXTERIOR 5WIN6 DOOR5
NOTE:
5.
Ix BLOCK IN6 UNDER ALL EXTERIOR 5L ID IN6 DOORS
ERRORS AND OMISSIONS WHICH MAY OCCUR IN THE CONTRACT
5 IA 141-2 1/2"
}b
DOCUMENTS SHALL BE 13ROU614T TO THE ATTENTION OF THE
6.
TOWEL BARS (TB) OVER CABINET5 AND TOILETS
ARCHITECT: IN WRITING, AND WRITTEN INSTRUCTION SHALL
BLOCK IN6 TO BE 55" AFF TO CL
BE OBTAINED PRIOR TO PROCEEDIN6 WITH CONSTRUCTION.
7.
TOWEL BARS (TB) NOT OVER 6ABINET5 AND TOILETS
THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY
ERRORS, 015CREPAN6IE5 OR OMISSIONS FOR WHICH THE
BLOCK IN6 TO BE 39" AFF TO GL
CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR
8.
BLOCK IN6 FOR T155UE HOLDER5 (TH) TO BE 24" AFF
TO CONSTRUCTION AWIOR FABRICATION OF THE WORK.
N
I 13' -5"
2-2x10 HOR
ALL EXTERIOR HEADER5 TO BE 2-2x 12 DF U.N.O.
561 -011
311,6" 81 -011
10•6 1/2" 14'-I 11/2"
21-9 1/2"
2
3, I
3-2x10 HOR 3-2834
2-2x10 HDR 2834 2 -2834 W/ HALF RN0 2834 2-2x10 WR 2-2x10 HDR
N
2X6WALL
m!
AREA
FIRST FLOOR
1398
SECOND FLOOR
1199
TOTAL
2597
GARAGE
532
BASEMENT
1468
CRAWL
595
000
0000
000
000
000
0000
000
000
000
0000
05
0 o I X I I°
5 1/211 KITCHEN
i 13/4 FRAMING
BETWEEN
ti���
2xi0 FLOOF
JOISTS
1
4911 QQ
910" 6L6 HT.
o" 'J VINYL
21' 0 1/2n
'
WINDOWS
I
2/8
I tt
16 O.C.
I "
OVER
1
C 1
IV
I SOFFIT
Q ?+
a
1
i /2°
f6t -111
I
5 IA 141-2 1/2"
}b
- OPT. OPEN RAIL
6
o
ts,
6" PRE -FAB FP `,
°
uj NOOK
11 9 0 6L6 HT.
4 0
51_
1/
/
W/ 5URROUND AND
d X
I I �? VINYL �-
3i -2"
N
I 13' -5"
2-2x10 HOR
HEARTH PER
\, �, u- -
K Q
1019 7 6 5 4 3 2
�
1
4-2x10 FL. NOR
- - _
2/0
VAULTED
LOCAL CODE
I I 81 511
2x6 LANDING I
112 III
k
- - - -
FRAMIN6 -
HANG FROM
! 1
=
I
UP
FOYERk
ti
FAMILY
o
2/8
�"
r,
�a I 515 1/2" 9u
4 1/211
1-4
s 2 STORY
" H
FLOOR ABOVE
13
-,o I 20
- - - - - --------------- ---- - - - _
- - — -
KNEEWALL--------------
4= _
05
0 o I X I I°
5 1/211 KITCHEN
0
CIP
1.o
v
x
N
I n
I n
1
4911 QQ
910" 6L6 HT.
o" 'J VINYL
21' 0 1/2n
'
3 21 -9"
2180' 2' 10" 31.2"
2/8
I tt
1
8
37" RAKE WALL
I SOFFIT
Q ?+
a
1
3.1
WPR
}b
- OPT. OPEN RAIL
6
o
ts,
2834
F C
4 0
51_
1/
/
"
I
3i -2"
N
I 13' -5"
2-2x10 HOR
LITE
1019 7 6 5 4 3 2
�
1
4-2x10 FL. NOR
- - _
2/0
VAULTED
2x6 LANDING I
112 III
k
- - - -
FRAMIN6 -
HANG FROM
! 1
=
I
UP
FOYERk
-
o
2/8
�"
r,
�a I 515 1/2" 9u
4 1/211
1-4
o
FLOOR ABOVE
13
-,o I 20
4= _
o M I
9'0" CL6 HT.
H0 WO
w
3_I 3/4" x 18'1 ML BEAMS
_
F 7
-
h0
�
r ,
—•�
N',
2 STORY
- \? FROM BASEMENT
�,
DN I
- - -
�_�
®
8111 II -111 $11 8''8"
x �
N
I DINING
o" O
VLAN.-
`�'
—
N
S- 5HN
I 1211 H16H X 8" WI
N
I
0
CIP
1.o
v
x
N
GARAGE
21' 0 1/2n
'
2R
2180' 2' 10" 31.2"
2/8
I tt
1
8
a
I SOFFIT
a
1
WPR
i
o
ts,
LIVING
F C
4 0
51_
1/
/
"
3i -2"
N
I 13' -5"
H E 24 AFF
LITE
i
v HVAC CHA5E
2/0
VAULTED
_
STACK WALL
_
`-
FOYERk
2/8
1
o
a APPROX 1811 x 24"
3_I 3/4" x 18'1 ML BEAMS
I
h0
�
r ,
N',
2 STORY
- \? FROM BASEMENT
�,
DN I
- - -
m
8111 II -111 $11 8''8"
811 I' I" Isis
TO GARAGE GL6.
—
_
— —
00 IN5UL. AS R150'
IR/i5
-
2 2x10 FL. HDf�
�) �n III
"
104 1/2"
B @55" AFF
10' -4"
— —
°
N
N
°O
° °
> 111
FL Ur
-
2/4
BOTH SIDES I
3 2x10 HDR
a II 2- 1 3/4 x 14 ML BEAMS
O
0
W cv
_
_d
I
o
CC%
"2-2x4
SEE SECTION
0
CIP
1.o
v
C-4
2 REF. ELEV.
3.1 3.1
101-8" 10' 8" REF ELEV.5 REF ELEV.5 REF ELEV.5 REF ELEV.5 REF ELEV.5
211 -411 121 011 81,811 141 -0"
FIRST FLOOR PLAN
1 /411 = 11 -011
n
w
= v
� O
O N
0
3
3.1
REF ELEV.5
3
cp
FIELD VERIFY
VAULTED CL6
DETAIL -
THI5 WALL MAY
BE 2x6 IF
HT 15 12'0" OR
MORE
M
0
M
Q
°
co
0
N
GJ
N
x
N
GARAGE
F
c
a
a
WPR
i
o
ts,
LIVING
N
H E 24 AFF
LITE
i
o
VAULTED
STACK WALL
_
`-
FOYERk
o
3_I 3/4" x 18'1 ML BEAMS
h0
�
r ,
N',
2 STORY
- - -
"
104 1/2"
10' -4"
a II 2- 1 3/4 x 14 ML BEAMS
o
"2-2x4
SEE SECTION
r
r
O
o
O
0
3.
—
o
N!
I
u
°
u-
°
LIBRARY
3/0 S.C.
W/ 2-12" 51PELIGH
5
46
o
_°
ROOF TRUSSES
I
N
N
9'0" GL6 HT.
r,
241106.
^; I I
16'X 1 O.H. DOOR
L- - - -
- --
—
CARPEL
2 2x10 HDF
__
2. 1 3/4° x ib" ML BEAMS
— —
— — ��
ti��k
2 2x12 HDR
���
o
REF. ELEV.
C-4
2 REF. ELEV.
3.1 3.1
101-8" 10' 8" REF ELEV.5 REF ELEV.5 REF ELEV.5 REF ELEV.5 REF ELEV.5
211 -411 121 011 81,811 141 -0"
FIRST FLOOR PLAN
1 /411 = 11 -011
n
w
= v
� O
O N
0
3
3.1
REF ELEV.5
3
cp
FIELD VERIFY
VAULTED CL6
DETAIL -
THI5 WALL MAY
BE 2x6 IF
HT 15 12'0" OR
MORE
M
0
M
Q
°
co
0
N
GJ
N