Loading...
HomeMy WebLinkAbout0481.97e0 i M OWE �- N O W O n w w o 0 a� o N LEAD WALL PAST °> N OVER DIG t— 3 -6AR 51PE ENTRY GARAGE 1/411 : 11.0" C7 Ic 2-GAR SIDE ENTRY GARAGE 1/4" _ li3On LEAD WALL PAST OVER D16-- va N - iI I• 8 FA 551, �II 244" 161,gu 131.811 LEGEND 8" 8" WALL 8/4 8" WALL 4" LED6E C, I L o 8' I g o 1110 + W8x18 TL BM Ll I — — W d O y wO w OWE �- O W O n w w o 0 a� o vw LEAD WALL PAST °> vsw w OVER DIG t— uYi W/ 4x12 BRICK LE06E FOUNDATION LAYOUT U3 w cv to vob o 1(12 1101 8" POURED CONC WALL III ° 8'-0" POURED HT ON X III ° 8" x 20" CONT. 5PREAD o n1 M °o FOOTING o — cn - - - POINT LOAD PG = POINT LOAD N PC T P T I FROM A80VE FROM A60VE KNEEWALL 32" ABOVE TAIR TREAD NOSE 51-611 6° 41-011 51-9 3,4" 3' 011 13/4 TYP - - - - - - - - - - 3E POCKET 6" 6" WIDE, , --3-270- - - - - - - 511 DEEP — _— 8" HIG BLEEDER 1111111 1111 0 UP 13 R - 068 WALL O�NG - L m 2'2x10 HOP 1 NO 5TL 13EAM PIA. 5TL P05T ON - - - - -- - --- - - - - - - 30" x 30" x12" CONIC PADFT6 FAU 2x6 WALL ON 16" x 8' CONT. - - p -2x12 5YP W/ CONIC THICKENED SLAB 2- 1/2" PLYWO FLITCHES 1 1 1 201'01/2111 1 1 1 1 201-11° 5 " 131-711 OUCH IN PIPE 5A5EMENT II FOR RADON N EXHAUST � W/ "T" BELOW SLAB 4" CONC, 5LA15 ON MIN -0- P _ 4" COMP. SAND FILL M 8/4 0 Y RDU6H IN I I/2' PIPE ° �o PC t TO FLOOR DRAIN FOR o o v w - - - - - - FAU CONDEN5ATE o ° ° > III i4 REBAR * 24" O. C., 7' LONG TO SPAN OVER -016 UNEXCAVATED 4" CONC. 5LA13 W/ MIN. 4' GLEAN COMP. 5AND FILL 24" x 4" CONC . RETURN — — 2'-4 1 /2u FOUNDATION PLAN 1/411 s 11_011 161.311 211.011 O V BLEEDER i 11 7 111 N� II N 341-111/2° X 1102 1120 — —8/4 — — 21.4 1/2" 34'-011 NOTE: 50ME COLUMN DIMENSION5 ARE FROM CENTER OF COLUMN TO EXTERIOR FACE OF BASEMENT WALL. NOTE ERRORS AND OM1551ON5 WHICH MAY OCCUR IN THE CONTRACT DOCUMENT5 SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT, IN WRITIN6, AND WRITTEN INSTRUCTION SHALL BE OBTAINED PRIOR TO PROCEEDIN6 WITH CONSTRUCTION. THE CONTRACTOR SHALL BE HELD RESPON515LE FOR ANY ERRORS, DI5CREPANCIE5 OR OMISSIONS FOR WHICH THE CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR TO CONSTRUCTION AND /OR FABRICATION OF THE WORK. � I O 3 j 3 v uj _ g ED BLEEDER �1 1 1111 - - SEWER SLEEVE N co cn � 8') �o ip Icz BLEEDER 1.1 1 11111 01 I I SUMP 411 x 4" CONC . — 1 RETURN I WAT�jR AND 51 WER ENTRANCE LCATION NOTE PROVIDE (2) '4 REBAR, TEN FT. LON6 TO SPAN UTILITY TRENCH O a VERIFY 5UMP LOCATION W/ 5UPERINTEN12ANT 0 NOTE: FIELD VERIFY UTILITY LOCATIONS FOR SIDE OF HOUSE W/ 5UPERINTENDANT Field verify all dimensions DO NOT SCALE DRA WINO QC Copyright 1995 Pulte Home Corpor LEAD WALL PAST OVER DIG 8" POURED GONG WAL SEE ELEVATIONS FOR uYi W/ 4x12 BRICK LE06E FOUNDATION LAYOUT U3 81-0' POURED HT ON IN TH15 AREA. 8" x 20" CONT. SPREAD FOOTIN6 �/4 34'-011 NOTE: 50ME COLUMN DIMENSION5 ARE FROM CENTER OF COLUMN TO EXTERIOR FACE OF BASEMENT WALL. NOTE ERRORS AND OM1551ON5 WHICH MAY OCCUR IN THE CONTRACT DOCUMENT5 SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT, IN WRITIN6, AND WRITTEN INSTRUCTION SHALL BE OBTAINED PRIOR TO PROCEEDIN6 WITH CONSTRUCTION. THE CONTRACTOR SHALL BE HELD RESPON515LE FOR ANY ERRORS, DI5CREPANCIE5 OR OMISSIONS FOR WHICH THE CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR TO CONSTRUCTION AND /OR FABRICATION OF THE WORK. � I O 3 j 3 v uj _ g ED BLEEDER �1 1 1111 - - SEWER SLEEVE N co cn � 8') �o ip Icz BLEEDER 1.1 1 11111 01 I I SUMP 411 x 4" CONC . — 1 RETURN I WAT�jR AND 51 WER ENTRANCE LCATION NOTE PROVIDE (2) '4 REBAR, TEN FT. LON6 TO SPAN UTILITY TRENCH O a VERIFY 5UMP LOCATION W/ 5UPERINTEN12ANT 0 NOTE: FIELD VERIFY UTILITY LOCATIONS FOR SIDE OF HOUSE W/ 5UPERINTENDANT Field verify all dimensions DO NOT SCALE DRA WINO QC Copyright 1995 Pulte Home Corpor