HomeMy WebLinkAbout0481.97m5R -4 BATH OPTION
i /411 = !1.011
I
LL!
a
SEGONO FLOOR PLAN
NOTES :
NOTE : ALL DIMEN51ON5 ARE FROM FACE OF 5TUD TO
I. ALL CASED OPF-NIN65 GREATER THAN 48" WIPE
FACE OF 5TUP. ALL 5TUD5 ARE 3 1/2° UNLE55 NOTED.
HOLD HEADER T16HT TO PLATE
ALL PIMEN51ONS PRE5ENTED HERE ARE FRAME
DIMEN51ON5 ONLY - SEE 514T. 1.1 FOR FOUNDATION
2. ALL BI-FOLP DOORS R.O.'5 = 1 1/2" WIPER THAN POOR5
FOOTPRINT.
HEADER HT. = 82" AFF
REVIEW ALL WINDOW HDR HE16HT5 PER PLATE HT. AND
3. ALL B1-PA55 POOR5 R.O.'S = SAME AS POOR
VERIFY W/ ELEVATIONS AND CORNICE DETAIL5
HEADER HT = 83" AFF
4. 2x BLOCKIN6 UNDER ALL EXTERIOR 5WIN6 POOR5
i
NOTE:
ERRORS AND OM155IONS WHICH MAY OCCUR IN THE CONTRACT
6. TOWEL BARS (TB) OVER 6ABINET5 ANP TOILETS
r;
BLOCKING TO BE 55" AFF TO CL
ARCHITECT, IN WRITING, ANP WRITTEN INSTRUCTION SHALL
7, TOWEL 13AR5 (TB) NOT OVER CABINET5 ANP TOILETS
6E OBTAINED PRIOR TO PROCEEDIN6 WITH CON5TRUCTION-
THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY
BLOCKING TO BE 39" AFF TO CL
ERRORS, DISCREPANCIES OR OMISSIONS FOR WHICH THE
SEGONO FLOOR PLAN
NOTES :
NOTE : ALL DIMEN51ON5 ARE FROM FACE OF 5TUD TO
I. ALL CASED OPF-NIN65 GREATER THAN 48" WIPE
FACE OF 5TUP. ALL 5TUD5 ARE 3 1/2° UNLE55 NOTED.
HOLD HEADER T16HT TO PLATE
ALL PIMEN51ONS PRE5ENTED HERE ARE FRAME
DIMEN51ON5 ONLY - SEE 514T. 1.1 FOR FOUNDATION
2. ALL BI-FOLP DOORS R.O.'5 = 1 1/2" WIPER THAN POOR5
FOOTPRINT.
HEADER HT. = 82" AFF
REVIEW ALL WINDOW HDR HE16HT5 PER PLATE HT. AND
3. ALL B1-PA55 POOR5 R.O.'S = SAME AS POOR
VERIFY W/ ELEVATIONS AND CORNICE DETAIL5
HEADER HT = 83" AFF
4. 2x BLOCKIN6 UNDER ALL EXTERIOR 5WIN6 POOR5
5. Ix 151-06K INC, UNDER ALL EXTERIOR 5L IPING DOORS
NOTE:
ERRORS AND OM155IONS WHICH MAY OCCUR IN THE CONTRACT
6. TOWEL BARS (TB) OVER 6ABINET5 ANP TOILETS
POCUMENT5 SHALL BE BROU614T TO THE ATTENTION OF THE
BLOCKING TO BE 55" AFF TO CL
ARCHITECT, IN WRITING, ANP WRITTEN INSTRUCTION SHALL
7, TOWEL 13AR5 (TB) NOT OVER CABINET5 ANP TOILETS
6E OBTAINED PRIOR TO PROCEEDIN6 WITH CON5TRUCTION-
THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY
BLOCKING TO BE 39" AFF TO CL
ERRORS, DISCREPANCIES OR OMISSIONS FOR WHICH THE
8. BLOCKING FOR T155UE HOLPER5 (TH) TO BE 24" AFF
CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR
TO CON5TRUCTION AND /OR FABRICATION OF THE WORK.
-- ALL EXTERIOR HEAPER5 ARE 22x12
NOTE:
FIELD CHECK ALL
APPROPR LATE AND
CURRENT DETAIL5
FOR THI5 PROJECT
PRIOR TO 5TART m
OF CON5TRUCT ION
Field verify all dimensions
DO NOT SCALE DRAWINGS!
I �C Copyright 1994 Pulte Home Corporation