RE: \Veiss & Company Building Addition - Project Revie\v #3
Dear Mr.Barnes:
pPl,'7A-
(J i)?[
o tfO~ 0
The City has received your comment letter dated November 5, 2004 and revised dra\vings dated October
18, 2004 based upon the City reyie\v of September 22, 2004.
The comments from the City revie\v have been' satisfactorily addressed.
Please submit five sets of plans for approval. If you have questions, please contact me at 571-2441.
cc: Jon Dobosie\vicz, Department of Communi~ Services
John Duffy, Carmel Utilities
Paul Pace, Cannel Utilities
Paul Arnone, Carmel Utilities
Greg IIko, Crossroad Engineers
Project File
Engineering Department Review
S:\PROJREV04\\VEISSBLDGADD - REVIE\V # 3
DEPARTwIENT OF ENGINEERING
ONE CIVIC SQUARE; CARNIEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439
ENtAIL engineering@ci.carm,el.in. us
EL
~
RECf\\lEO
f\I\O^
SEP L\J ~
DOCS
C1
J~~'vlES BRAINARD, MAYOR
September 22, 2004
- Mr. Dave Barnes
Weihe Engineers, Inc.
10505 North College Avenue
Indianapolis, IN 46280
RE: \Veiss & Company Building Addition - Project Revie\v #1
Dear Mr. Barnes:
We have reviewed your submission for the September 22 Technical Advisory Committee meeting. We
offer the following comments:
GENERAL INFORMATION
1. The project site is located within current City of Carmel Corporate Limits.
2. Jurisdictions:
. Street and Right of Way - City of Carmel (Range line Road).
. Water - City of Carmel
. Sanitary Sewer - City of Carmel
. Storm Sewer - City of Carmel
3. Board of Public Works and Safety Approval Requirements:
. Additional Water and Sanitary Se\ver Availability (if applicable).
. Commercial Curb Cut. The request for Board approval should include 8 ~" x 11" exhibits that
will indicate the existing and proposed curb cuts and all appropriate data and dimensions including
width, radii, etc. Please indicate all existing and opposing driveways and their relationship to the
proposed curb cuts for this development.
. Temporary Construction Entrance. -Separate BPWS approval willbe required if this entrance is to
be located anywhere other the site of the permanent curb cuts.
. Consent to Encroach approvals for any permanent improvement to be installed within dedicated
easements and/or dedicated right of way. If an irrigation system is planned for this project,
additional W ater Availability approval will be required from the Board and additional Water
Connection Fees will be due.
. Dedication of Right of Way (if applicable). Preferred dedication forms are available electronically
from this office.
I am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines
for your use. Please use the Engineering Department deadlines for submissions to the Board.
Any subnlission to the Board requires prior final approval by tlte Carmel Clay Plan Commission
and/or the Board of Zoning Appeals and completion of review by the Technical Advisory
Committee. All written requests to be place on the Board's agenda must include the appropriate
Docket Numbers and the date (or dates) of approval by the Plan Commission and/or BZA.
4. Water and Sanitary_ Sewer Availability and Connection Fees: .
Water and Sanitary Se\ver Availability (acreag~) Fees - This site and previous development \vas
served by and connected to Carmel Utilities. That being the case, Availability or Acreage Fees would
not be applicable for this development.
DEPARTMENT OF ENGINEERING
ONE CMC SQUARE, CAR\IEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439
E.vtAIL engineering@ci.carme1.in. us
Mr.Dave Barnes
September 22, 2004
Page 2
Additional. Water and Sanitary Sewer Connection Fees - Determination of additional water and
sanitary sewer connection fees will be made by Cannel Utilities.
5. TAC Review/Drawings submitted for approval:
We request that.all comments and comment letters generated by this office be answered in writing and
be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for
construction until all issues have been resolved. All Carmel Utility issues must also re re$olved. The
design engineer must certify all drawings submitted for final approval. This_ office will require a
minimum of five-sets (maximum of seven-sets) of approved drawings after all issues have been
resolved. The drawings will be stamped approved and signed by both the City Engineer and Director
Carmel Utilities. The Developer/Owner will receive one-set which is to be maintained on the
construction site at all times. Carmel Utilities will receive two-sets.. Our Construction Manager will
receive one-set and one-set will be maintained in the Department of Engineering. If more than the
minimum of five-sets are requested to be approved, the additional sets (maximum total of two
additional) must be submitted with the five ,required sets.
6. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated
easements and/or right of way will require Consent to Encroach approval.
7. Carmel Utilities' does not subscribe to "Holey Moley" and'should be contacted directly for all water
and sanitary sewer main locations.
8. Carmel Utilities will provide a separate review of this project for water and sanitary sewer issues.
9. I am including copies of the following with this correspondence:
. Commercial Project Approval Procedures.
. Permit Data, Contacts, etc.
. Commercial Permitting Procedures.
. Utility Fees
BONDING REQUIREMENTS
10. Upon initial review, it appears the following bonding requirements may apply to this project:
Performance Guarantees/Engineer's Estimates
It does not appear that this project will be required to post Performance Guarantees.
Street Cut/Right of Way Permit and Bonding Requirements
Any work in the dedicated right of way of Range line Road will require a Right of Way Permit and a
License and Permit Bond. The bond amount will be determined by the number of instances of work in
the right of way @ $2,000.00 per instance. Open pavement cuts in dedicated streets require approval
by our Board of Public Works and Safety. Please contact our Right of Way Manager, Fred Glaser, to
arrange permitting and bonding.
11 0 We have engaged Crossroad Engineers to review drainage plans and drainage calculations for all
projects submitted to this office for review. Please provide drainage calculations for this project so
that we may submit the plans and calculations to Crossroad for review. We will share Crossroad's
comments as they are received.
PROJECT COMMENTS-CONSTRUCTION PLANS
12. The City assumes that there will be no modifications to the existing entrance or within the right of way
of Rangeline Road.
13. Confrrm with our Department of Community Services the need to meet the Alternative Transportation
Plan by upgrading sidewalk to multi-use path.
14. How does the existing site drain? Has the installation of a pipe been considered?' Is in not possible?
15. Provide a swale between the property line and the proposed parking area where the paving is offset 5 '
or more from the, property line.
16. The City's sub-consultant is reviewing the provided drainage report and calculations. The City has not
yet determined the need for detention with the addition of the asphalt parking.
Mr. Dave Barnes
September 22, 2004
Page 3
The abov~.comments are based upon the Engineering Department's initial review. Please provide our
office with a follow up letter regarding this review and revised plans, indicating all revisions. A second
review will focus only on detailed construction plans. It is critical that our office be made aware of all
modifications made on the plans beingre-submitted, particularly if any such changes are considered "new"
or fall outside of our initial review. If you have questions, please contact Mike McBride or me at 571-
2441.
Enclosures
cc: Jon Dobosiewicz, Department of Community Services (w.o. encl.)
John Duffy, Carmel Utilities (w.o. encl.)
Paul Pace, Cannel Utilities (w.o. encl.)
Jim Haag, Carmel Utilities (w.o. encl.)
Project File
Engineering Department Review
S :\PROJREY04 \ WEISSB LDGAD 0
. '..'."."':.".'."".'."C:..
C&rmel ,!i''-llp&rtment
.... ....:.::... ........................:....: ';.- ........:-....
3:~:.::~::i~!i~:.::;~:b.ii~:~~
C \:-"1"-" \'~;~;::.:~:;:~rJ;;:~(~{:;.:::::::~:.:..:..:.,.:X1f 6 0'7 2
aJrn1l~;-::.;.,:.)j~:~~~~,:~.::/~ iJ)
. -
:: ::.::: ;:.:: ,"
September 14, 2004
Dave Barnes
Weihe Engineers, INC.
10505 N. college Avenue
Indianapolis, IN 46280
RE: Weiss & Company Building Addition
Dear Mr. Barnes:
I have, received and reviewed the information for the above-mentioned
project.
At the present time, I seen'othingin the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you ,please contact us.
Respectfully,
1Iu~.h.~
, Michael D. Fogarty
Chief of Police
MDF:vb
cc: Dept. of Community Services
:~j~)~m~~~!~~;::~r~:::~:;:::;:;::;::~~~!!il~~!~1~~);;;;~~~.
", :~: .~;: ::< .ift::;: :~~~~; :::~~ :~:;~~i: ~:'....:::,;;
:;::::::;::;::::::::. :....:
(317) 571-2500
A Nationally Accredit."orcement Agency
Fax (317) 571-2512
SEP 13 '04
P . 1/2
.
..~KttI1ICJI1 (-:, ~ loe}arc!, ~~"u rLJeyor
t 1'(1017" '..3 t 7 J 77 L;.1,~4~\.:;
Il-'a.\' (~l7) 77e;;-~'L:;:!S
.suitt! 108 S
Ollt' :J['amiltoll COllll~' cSquttn'
.::"'ob/(~,~lJillfr Jnclitl1l0 4b('l)(.,...1JJO
.September 13. 2004
Weihe Engineering, Inc.
A TIN: Dave: Barnes
10505 North College Avenue
Indianapolis, IN 46280
VIA FACSIMILE: 843..0546
Re:Weiss & Company
Dear -Mr. Barnes:
We have reviewed the construction plans submitted to the Hamilton Co~ty Surveyor's
Office on September 9, 2004 for this project and have the following comments:
1. The proposed project falls in thejuri~diction of the City of Carmel
2. The proposed project DOES fall in a Carmel Wellhead Protection Zone.
3. The proposed project falls in the Follett & MotTow Regulated Drain Watershed.
- 4. Please submit an indirect outlet permit for the discharge into the Follett and
Morrow Regulated Drain. The applioation is available on our website a.t
http://wwW.co.hamilton-in..us. go to Departments" Surveyor, and Forms.
5. Pl~ase add the developer fax number to the cover sheet of the construction plans.
6. Please show in the construction plans how and where this site drains~
7. Please provide the square footage -of the existing and proposed impervious surface
to determine if detention will be required on this site.
8. Please,direttall other storm sewer questions to the City of Carmel Engineering
Department.
c
SEP 13 '04 05:48PM
.
e
9. Please note that further comments may be necessary ~t a Jater date.
Should you:have any questions; I can be reached at 317-776-849.5.
Sincerely,
. ~. 0J.~.n/1
v Wtyl l
Greg oyes
Plan Reviewer
Cc: Jon Dobosiewicz - Carmel DOCD
John South ~ HCSWCD
Dick Hill - Carmel Engineering
P.2/2
SEP-09-200409:43 FROM:HAM~ON CO HWY DEP 3177769814
411f:317 571 2426
P.001/001
HAMILTON COUNTY
HIGHWA Y DEPARTMENT
September 9. 2004
Mr. Dave Barnes .
Weihe Engineers, Inc.
10505 N.orthCoUegeAvenue
Indianapolis, Indiana 46260
RE: Wets & Company BuildJng Addition
Development Plan
S of 3rYJ Street SW I W of Rangeline Road
Clay Township
Dear Mr. Barnes;
Th;s letter serves to acknowledge receipt of a transmittal containing the plans for the above-
mentioned subdiv1sion. After reviewing the plans, the HrghwayDepartment has the following
comments:
1. It appears that this project lies entirely within the limits of the City of Carmel. Therefore!
all future comments should be dfrected toward the City. If you have any information
contrary to this statement, please contact me. immediately.
If you have any comments or questions regarding this letter or project, please feel free to contact
me at any time. Thank you for your attention and cooperation.
Sincerely,
~/8~~
Steven J. Broermann
Staff Engineer
cc: Jon Dobosiewicz
Greg Hoyes'
G=\USERS\Sa\04tac\09..D~4weis9 bldg, doc
1700 South loth Street
N obles\1j lie., In. 46060
wW\Y,co".hn01iJto~
OMce (317) 173..7770
Fax (317) 77.9814