Loading...
216096 01/09/2013 CITY OF CARMEL, INDIANA VENDOR: 171000 Page 1 of 1 ` ONE CIVIC SQUARE JONES&HENRY ENGINEER INC CARMEL, INDIANA 46032 CHECK AMOUNT: $28,230.85 3103 EXECUTIVE PARKWAY SUITE 300 ,�. TOLEDO OH 43606 CHECK NUMBER: 216096 CHECK DATE: 1/9/2013 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 609 5023990 62299 28 , 230 . 85 OTHER EXPENSES Jones&Henry Engineers,Ltd. 3103 Executive Parkway,Suite 300 Toledo,OH 43606 (419)473-9611 CITY OF CARMEL Invoice number 62299 MR. JOHN DUFFY Date 5/10/2012 UTILITY DIRECTOR 760 3rd AVE. S.W. SUITE 110 CARMEL, IN 46032 Contract: 00451-6528 Customer ID: 451 CONST-WTP 1 Scope of Work: Professional engineering services during construction of the City's new Water Treatment Plant No. 1 in accordance with Amendment No. 5-10 dated September 1, 2010. The projected fee is$960,000. FOR SERVICES PERFORMED THRU 04/30/12 9-001 CONST/WTP 1 CONSTRUCTION SRVS Labor Employee Hours Cost Amount MICHAEL P. MAGSAM 14.50 174.00 BRYAN J. CLEVENGER 74.50 1,341.00 THOMAS J. SCHREIBER 110.00 2,937.50 BRIAN W HOUGHTON 37.00 1,667.10 THOMAS L. FILBRUN 2.00 64.77 ROBERT FREY 3.50 112.00 GARY L WILLIAMS 49.00 2,178.55 LOUIS G. MACHLAN 6.00 156.82 JEAN PIERRE NASSAUX 1.00 37.93 Total cost 297.50 8,669.67 Rate Basis Markup Amount DPE 35% 8,669.67 3,034.38 11,704.05 Overhead 130% 11,704.05 15,215.27 26,919.32 26,919.32 Labor Subtotal 26,919.32 Reimbursable ActivitV Cost Mult. Amount MAILING COST/UPS COSTS 18.08 PRINTING.COPYING & BLUPRNTIN 140.79 1.10 154.87 OTHER CONTRACT COST 1,035.07 1.10 1,138.58 Page 1 of 2 CITY OF CARMEL Invoice number 62299 MR. JOHN DUFFY Date 5/10/2012 UTILITY DIRECTOR 760 3rd AVE. S.W. period of Performance SUITE 110 CARMEL, IN 46032 Contract: 00451-6528 Customer: 451 CONST-WTP 1 9-001 CONSTIWTP 1 CONSTRUCTION SRVS Reimbursable Subtotal 1,311.53 CONST/WTP 1 CONSTRUCTION 28,230.85 SRVS Subtotal 9-002 CONST/FIBER OPTIC DUCT Labor Employee Hours Cost Amount ANDREW J. BLAISING 76.00 1,602.04 JOHN P. MAGSAM 113.00 3,434.94 BRIAN W HOUGHTON 30.00 1,351.70 LOUIS G. MACHLAN 161.00 4,207.96 Total cost 380.00 10,596.64 Rate Basis Markup Amount DPE 35% 10,596.64 3,708.82 14,305.46 Overhead 130% 14,305.46 18,597.10 32,902.56 32,902.56 Labor Subtotal 32,902.56 CONST/FIBER OPTIC DUCT 32,902.56 Subtotal Invoice total 61,133.41 Contract Summary Prior Current Total Labor 527,620.20 59,821.88 587,442.08 Reimbursable 4,400.15 1,311.53 5,711.68 Consultant 36,204.21 0.00 36,204.21 Total 568,224.56 61,133.41 629,357.97 Page 2 of 2 VOUCHER # 123200 WARRANT # ALLOWED 171000 IN SUM OF $ JONES & HENRY ENGINEER INC 2000 WEST CENTRAL AVE TOLEDO, OH 43606 Carmel Water Utility ON ACCOUNT OF APPROPRIATION FOR Board members PO# INV# ACCT# AMOUNT Audit Trail Code 62299 07-1050-06 $28,230.85 90 Voucher Total $28,230.85 Cost distribution ledger classification if claim paid under vehicle highway fund Prescribed by State Board of Accounts City Form No.201 (Rev 1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show, kind of service, where performed, dates of service rendered, by whom, rates per day, number of units, price per unit, etc. Payee 171000 JONES & HENRY ENGINEER INC Purchase Order No. 2000 WEST CENTRAL AVE Terms TOLEDO, OH 43606 Due Date 12/28/2012 Invoice Invoice Description Date Number (or note attached invoice(s) or bill(s)) Amount 12/28/201; 62299 $28,230.85 1 hereby certify that the attached invoice(s), or bill(s) is (are) true and correct and I have audited same in accordance with IC 5-11-10-1.6 Date Officer